Architectural Review Board
Regular MeetingPetersburg, VA · December 12, 2018
Minutes
Architectural Review Board
City of Petersburg, Virginia
Minutes of the Regular Meeting
December 12, 2018 6:00 p.m.
Council Chambers, City Hall
135 N. Union Street, Petersburg VA 23803
Members Present:
Chair, Joe Battiston
Celeste Wynn
Larry Murphy
Substitute Members:
Planning Director, Michelle Peters
Members Absent:
Mitchell Pradia
Vice-Chair, Isaac Ward
Dino Lunsford
Staff:
Secretary to the ARB, Kate Sangregorio
1. CALL TO ORDER
Chair Joe Battiston called to order a regular meeting of the City of Petersburg
Architectural Review Board on Wednesday, December 12, 2018 at 6:00 p.m. at
Council Chambers, City Hall, 135 N. Union Street, Petersburg, Virginia 23803.
2. THE PLEDGE OF ALLEGIANCE
3. REVIEW OF MINUTES
October 10, 2018 Minutes and November 14, 2018 minutes were presented. Mr
Murphy motioned to approve the minutes, seconded by Ms Wynn. Motion passed
unanimously.
4. APPROVAL OF AGENDA
Ms Wynn moved to approve the agenda as presented, with a second from Mr
Murphy. Motion passed unanimously.
5. PUBLIC INFORMATION PERIOD
Chair Battiston opened the Public Information Period to anyone who wished to speak
on any subject not on the agenda. With there being no comments, Chair Battiston
closed the Public Information Period.
6. REQUEST(S) FOR CERTIFICATES OF APPROPRIATENESS
1
Regular Agenda:
a. 702-708 Harrison Street:
Applicant present, Al Smith. Staff recommended denial of the application as
originally presented.
Mr Battsiton asked if the applicant understood that his design was too ornate;
fancy sounds like a good idea, however changes have to be in tune with existing
conditions, which are currently plain. Mr Battiston asked if some of the details
could be removed from the drawing to make it less ornate. Mr Smith said he
would remove the two outward curved paths, but said he wants to encourage
residents to be active, walk around, have healthy living and not just sit; but he was
open to take some off his plans. Mr Battiston said the paths should be in line with
the structure.
Mr Smith said he would like to keep the perimeter and center paths, Mr Battiston
requested the applicant re-sketch the design to have on record. Mrs Peters
questioned the flowers, Mr Battiston said the flowers would be fine, but the paved
walkways were more concerning because the house is plain. Staff suggested, as
per the staff recommendation, that a flowerbed may go around the perimeter of
the yard. Mr Battiston said that was more common than diamond flowerbeds, and
said that it would be ok to have a bed liner for trees, but not so much for flowers.
Mr Smith asked if the re-sketch should include proposed flowers, the board
agreed.
No public comment.
Mr Murphy moved to approve the application with the changes discussed to be re-
sketched for administrative approval. Motion seconded by Ms Wynn and passed
unanimously.
c. 712 Harrison Street:
Applicant present, Al Smith. Staff recommended denial of the proposed
application due to lack of information.
Mr Murphy stated that this project would need a Building Permit, which would
require a lot more detail to be approved. Mr Battiston said the board needed more
detail and suggested that next time the board should go out to look at the site
separate from the ARB meeting. Mr Battiston asked the type of siding, it is
asbestos. Mr Battiston asked the age of the building, it was built circa 1873.
Staff stated that the applicant already had partial approval for the siding of the
house.
2
Mr Battiston said that the applicant should provide as much detail as possible,
because it is needed for a Building Permit anyway; need specifications from how
the porch connects to the house, roof details, ect. Mrs Peters said the applicant
should put the drawings together in advance of the January meeting and get with
staff to ensure that they have enough detail. Mr Battiston suggested the
application be deferred. The portion of the application requesting paint was
questioned; Mr Smith said he would not be doing that right away. Ms Wynn
stated the applicant received prior approval for site clean-up.
No public comment.
A motion was made to defer the application to the January meeting so all specifics
could be in order. The motion was seconded by Mrs Peters and passed
unanimously.
c. 306 Hinton Street:
Applicant present, Daniel Salley. Staff recommended approval if the proposed
enclosure includes some element to differentiate it as new.
Mr Battiston asked for clarification on staff’s recommendation to show the old
porch. Staff explained her original idea was to show a false railing on the exterior
of the second floor, but that may be too much, so some amount of trim to indicate
the original two story porch could be sufficient. Mr Battiston suggested bull-nose
trim where the floors are divided, 2 ½ or 3 inches wide, and not very protruding,
otherwise the siding running unobstructed across would imply that the two story
addition has always been there. Mr Salley agreed with this option. Mr Battiston
confirmed the siding and trim would be wood, Mr Salley agreed.
No public comment.
Ms Wynn motioned to approve the application as submitted with the adjustment
to include an exterior element to show the closed in floor separation. Motion was
seconded by Mrs Peters and passed unanimously.
d. 29 W. Tabb Street:
Applicant not present. Staff recommended approval of the proposed application.
The board asked staff to explain the fencing question, staff said a portion of the
original wrought iron fence had been stolen years ago, so the applicant would like
to know if those pieces have to be replaced in wrought iron even though he did
not remove those panels, or if another metal to match the look of the original is
acceptable.
Mr Murphy estimated the missing portion of fence to be about 30 feet long. Mr
Battiston said it would be hard to replicate the posts, and commented that the
location is very visible so the fence should be replicated or a close match. Mr
3
Battsiton suggested the applicant check local people, he said the fence was
removed for repairs and was stolen, so it’s possible to find the original; a fence
was stolen on Liberty Street and was found elsewhere in the city. Mr Battiston
suggested Colonial Iron Works in Petersburg or Andrew’s Iron Work in
Dinwiddie for the posts to be replicated; the posts would be hard to replace, but
the board may have to live with something not exact.
Mrs Peters stated the windows were fine because they’re in-kind.
Mr Battiston said in terms of the fence he would recommend reconstruction.
No public comment.
A motion was made by Mrs Peters to approve the in-kind window replacement,
but deny desire to use alternate metal for fencing. Motion seconded by Ms Wynn
and passed unanimously.
e. 1013 W. High Street:
Applicant not present.
Ms Wynn motioned to move the application to the end of the agenda, motion
seconded and passed unanimously.
f. 127 W. Bank Street:
Applicant present, Margaret Byrne. Staff recommended approval of the proposed
application.
Ms Byrne gave background on the status of the building; work was supposed to
start in March but a lot of things happened. The first structural engineer had a
stroke so the contractors had to wait, another engineer came the Sunday before the
meeting (in the snow). A crack on the rear had gotten about 2 inches wider; it’s
separating because the interior stair in that north east corner was braced wrong.
The building needs walers on the east side but the applicant doesn’t own that
alley. Mr Battiston asked if she could get access to that alley. Ms Byrne said the
suggestion is to tie together the east side to the walers already on the west side on
129 W. Bank. Mr Battiston asked how far into the alley supports would go, Ms
Byrne said about 3 feet, which would be in the middle of the alley. Mrs Peters
commented that the alley needs to be accessible.
Mr Battiston asked what the applicant was requesting, Ms Byrne said she was
informing the board so it wouldn’t be a shock; originally the application was for
foundation work but now the building might be lost, because in her opinion the
city thinks the alley is more important than the building. Mrs Peters asked how
long she might need in the alley, and said she’s not sure if the issue with the alley
is politics but rather education; there’s got to be a medium somewhere, but who is
impacted needs to know how long the alley will be gone. Ms Byrne said the
contractor would need to converse with the structural engineer, but once they start
4
it could take a couple of months. The walers might not be out so long, need to tie
east side to west and stitch together the floors and joists. Once that’s ok the north
side can be done, may need new roof because the current roof is new but it wasn’t
installed right.
Mr Battiston said he was familiar with the building, and that the supports that
used to be on the front were there for years, that’s why neighbors are concerned
and the city would get flack if the alley is blocked for any length of time. Ms
Byrne said they had been working since March, but it was hard to get good
people, plus the rain delayed work. Ms Wynn asked if she was given a timeframe,
Ms Byrne said they were supposed to start in November but with the rain they
couldn’t. Ms Wynn asked even without the weather, what was the timeframe. Ms
Byrne said she was not given a timeframe, only vague estimates.
Mrs Peters apologized for any invasiveness, but asked that if all things work
together on this project, financially could she take the financial responsibility to
get the work done in two months. Ms Byrne reminded everyone that the reason
the front work took so long because Dominion Power would not let them work so
close to the power lines; she said they talked to them every day and tried to work
with former City Manager David Canada; that’s what took so long, 80% was the
fight with Dominion. Mrs Peters, as the Planning Director, said the Planning
office was called so a meeting needs to be held to try and make everyone mostly
happy and move along quickly.
Mr Battiston said she needed a timeframe from the contractors, she may have a
hard time with the history of the building, and it’s a contentious position for the
city so they need solid estimates of time, weather issues aside. Mr Battiston said
they don’t want to see the same trouble happening again where the old front
supports had to be paved around. Ms Byrne said they wanted a pedestrian tunnel
but the city wouldn’t allow it. Mr Battiston said she needs to give a realistic time
so the city doesn’t get hung out to dry if deadlines aren’t met. Ms Byrne said she
was nervous with deadlines. Mr Battiston asked that she look into timelines and
get with Mrs Peters, but she needs information to be able to help. Ms Wynn asked
if she told the contractors it was a die-hard situation and she needed it now; Ms
Byrne said she had but that doesn’t work.
Mr Murphy asked the applicant her opinion on what would happen; Ms Byrne
said it will fail. It was fine for a long time, but has a perimeter of rubble and not a
foundation, and before WWI the floors were lowered and it wasn’t done right,
then the glass façade was installed and not supported which weakened the front,
the tornado damaged it, and it’s no longer square the corners are all out of whack,
when the middle building came down it lost all that support and had interior walls
on the exterior.
Mr Murphy asked if it would behoove the applicant to have an orderly demolition
plan, Ms Byrne said yes, she would like to salvage and rebuild two buildings. Mr
Murphy stated that he loves preservation, but sometimes its better to deconstruct
and rebuild. Mr Battiston asked if the applicant had drawings, she said yes and
detailed pictures. Ms Byrne said she can’t find anyone yet to rebuild with steel
5
and proper support. Mr Murphy said it will have to be to code. Ms Byrne said yes
it would be with historic elements. Mr Battiston questioned if she had the funds
for this, Ms Byrne said she had enough to stabilize but not enough to take it down
and bring it back. Mr Murphy expressed his concern for safety, echoed by Mrs
Peters. Ms Byrne agreed with the concern because the crack is getting bigger. Mr
Battiston asked if this crack was caused by the mortar shell, but it was not, this
was caused by the staircase and the lowering of the floors. Mr Battiston said years
back there was a 6 inch gap. Ms Byrne stated the preliminary evaluation doesn’t
think its eminent danger of collapse, but next week the engineer could say
something else. Mr Battiston asked her to get a time commitment and talk with
Mrs Peters. He said the ARB would have to approve the demolition if that’s the
decision, but deconstruction is preferable. Ms Byrne said someone would be
coming to price that.
Mr Battiston suggested the applicant talk to Bobby Lynch, the former owner, or
Melvin Davies who worked on it. Mrs Peters stated she was impressed with Ms
Byrne’s knowledge of the building, and agreed with the suggestion to talk to Mr
Davies or Mr Lynch; because if something is not done there will be an issue. Ms
Byrne said people are coming through the barricades. Mr Battiston thought Bobby
Lynch may have other ideas. Mrs Peters suggested meeting Friday. Ms Byrne
expressed concern that a business owner on Bank Street may sue her for having
the parking lot blocked. Mrs Peters said she would be talking with that person the
next day.
Mr Murphy questioned the gap in the roof, Ms Byrne said they were going to do
that but the crack took precedence. Mr Murphy thought it would need a tarp. Ms
Byrne said there’s no lime mortar on the top 6 courses of brick. Mr Battiston said
to check with Melvin Davies then speak with Mrs Peters.
e. 1013 W. High Street:
Applicant still not present. Staff recommended approval of the application.
Mr Murphy confirmed that the proposed windows were wood.
No public comment.
Mrs Peters motioned to approve the application, with a second from Ms Wynn.
The motion passed unanimously.
g. 30 Corling Street:
Applicant not present. Staff recommended approval of the proposed application.
Mr Battiston said built in gutters are a chronic problem, and asked what stance the
board should take on them. Mr Battiston’s opinion was to keep them on
commercial buildings but not for residential, because it can be an extreme cost.
Mr Murphy stated that he had looked at the house before, the repairs are
6
expensive and need soffit work; now there is interior damage from water
infiltration. Mr Murphy also said built in gutters can be eliminated, PVC can’t be
used, but houses should have exterior gutters or none at all. Mr Battiston said
gutters are needed to preserve the houses. Mr Murphy said there are cheaper
ways, but with the guidelines the board’s hands are tied. Mr Battiston said the
ARB is supposed to follow the guidelines, however houses are falling down
because some things are too expansive. Mr Battiston mentioned a new building
that was constructed but had to be taken down because of problems with built in
gutters, and stated that he would like to allow them to go.
Mr Murphy said to enclose the box and have gutters under the roof, the PVC
board would be behind and not visible. Mr Battiston said ½ round gutters aren’t
good because there’s only one way to attach them, but they’re still easier than
built in gutters. Staff explained that this is a Project:HOMES job using CDBG
money. Ms Wynn said she’s been having issues with the built in gutters, but they
look nice; the board shouldn’t plant their heels but have options for people. Mr
Murphy said they should given guidance; you have to be careful closing the box
or it will leak. Mr Battiston said the board should stick with ½ round gutters, Ms
Wynn added the use of a round downspout as well. Mr Murphy said the PVC
would not be visible so it was ok; dentals won’t be visible but could be moved
down. Staff pointed out a person would look up for the dentals, and in that case
they would be visible. Mr Murphy agreed, and said fascia boards take the place of
crown molding.
No public comment.
Mr Murphy motioned to approve the application with the note that built in gutters
are properly sealed with adequate PVC fascia if hidden by gutter, with exterior
half round gutters and round downspouts. Motion seconded by Ms Wynn and
passed unanimously.
6. OLD BUSINESS
7. NEW BUSINESS
- Heather Barrar and Wendy Austin presented Friends of the Lower
Appomattox’s plan for the Appomattox River Trail in Petersburg.
8. ADMINISTRATIVE APPROVALS
9. WORK SESSION
- The board expressed interest in DHR holding a workshop for the city’s
guidelines to be updated.
10. ADJOURNMENT
7
A motion was made by Mrs Peters to adjourn the meeting seconded by Ms Wynn.
passed unanimously and the meeting was adjourned.
8
Agenda
Agenda
Architectural Review Board
Wednesday, December 12, 2018
Council Chambers, City Hall
6:00 p.m.
1. Call to Order
2. Pledge of Allegiance
3. Review of Minutes
4. Approval of Agenda
5. Public Information Period
6. Request(s) for Certificate of Appropriateness:
Regular Agenda:
a. 702-708 Harrison Street (T.P. 031-20-0024) Poplar Lawn Historic District; Owner:
Dogwood Townhomes LLC; Applicant: Same
Install paths, landscaping
b. 712 Harrison Street (T.P. 031-20-0025) Poplar Lawn Historic District; Owner:
Dogwood Townhomes LLC; Applicant: Same
Install paths, landscaping, rear porch and deck addition
c. 306 Hinton Street (T.P. 023-12-0012) Folly Castle Historic District; Owner: Daniel M.
Salley; Applicant: Same
Approval for rear porch enclosure, install windows in existing openings, replace damaged
windows in-kind
d. 29 W. Tabb Street (T.P. 011-23-0810) Courthouse Historic District; Owner: Sean
Ingram; Applicant: Same
Replace some windows with in-kind materials to match originals, options to replace missing
portions of fence
e. 1013 West High Street (T.P. 024-07-0032) Battersea/ West High Street Historic District;
Owner: David Budych and Miroslaw Wapniarz; Applicant: David Budych
Install wood windows
f. 127 W. Bank Street (T.P. 011-13-0040) Old Towne Historic District; Owner: Bank St
Properties; Applicant: Margaret Byrne and J. Brian Caldwell
To stabilize east side of building either; remove current river rock and install temporary
concrete foundation wall, to be replaced back with same salvaged river rock; or to install
permanent concrete foundation and face it with same salvaged river rock.
g. 30 Corling Street (T.P. 031-19-0004) Poplar Lawn Historic District; Owner: Ida and
Booker Edwards; Applicant: Justin Randolph
Remove severly deteriorated boxed in gutters, enclose with 1x6 fascia boards painted white
or with PVC board, install metal gutters and downspouts.
7. Old Business
8. New Business
-Presentation by Heather Barrar and Wendy Austin on the Appomattox River Trail in
Petersburg
-Administrative Approvals:
a. 236 High Street- Paint front door
b. 253 High Street- Paint 4 colors
9. Work Session
10. Adjournment