Parks and Public Works Committee
Regular MeetingPrescott, WI · January 17, 2022
Agenda
CITY OF PRESCOTT
PARKS & PUBLIC PROPERTY COMMITTEE
MONDAY, JANUARY 17
5:00 PM
MUNICIPAL BUILDING
800 BORNER ST
PRESCOTT, WI 54021
1. Call to Order
2. Roll Call
3. Approve minutes for November 15, 2021
4. Riverfront Project Phase 1 – Bid Timeline
5. Riverfront Phase 2 Discussion – Boat Launch & Fishing Pier
6. Updated Signs for Prescott Parks – Graphic House Inc. Presentation
7. Magee Park Boundary Discussion
8. Other Business
9. Adjourn
NOTICE
ACCESS TO THE MUNICIPAL BUILDING FOR THE DISABLED IS
AVAILABLE AT THE MAIN ENTRANCE.
ALL THOSE WITH SPECIAL NEEDS SHOULD CALL CITY HALL OFFICES
(715-262-5544) IF ASSISTANCE IS REQUIRED
CITY OF PRESCOTT, WISCONSIN
November 15, 2021, PARKS AND PUBLIC PROPERTY COMMITTEE MEETING MINUTES
Pursuant to due call and notice thereof, a meeting of the Parks and Public Property Committee was held,
November 15, 2021, Municipal Building, 800 Borner Street, Prescott, WI 54021.
Call to Order: Chair Ruona called the meeting to order at 5:03 pm. Members present were Rob Daugherty,
Bailey Ruona, and Pat Knox. City Administrator Matt Wolf and Police Chief Eric Michaels represented staff.
Also present were Seth Hudson representing Cedar Corporation, Israel Haas representing Friends of Freedom
Park and Coulee River Trails, and Alison Ennenga and Bethany Christenson with the Fairy Wonderland group.
1. Approve Minutes for October 18, 2021
Daugherty/Ruona motioned to approve the minutes for October 18, 2021, passed without a negative voice
vote.
2. Fairy Wonderland Discussion
Alison Ennenga and Bethany Christenson presented on the current state of the Fairy Wonderland Park to be
located within the Saint Croix Bluffs Park stating the total project was around $500,000 with just under half that
raised. They requested that a Coming Soon sign be placed at the park, which was approved by the Committee
Chair. Moving forward Alison and Bethany are going to work with Cedar Corporation to help develop a grade
layout and will be in contact with City Administrator Matt Wolf on potentially installing phase 1 of the park
spring/summer of 2021.
3. Downtown Riverfront Phase 2 Discussion
Cedar Corporation Seth Hudson had a map of the downtown area and spoke with Committee Members about
items they would like to see in Phase 2 of the Downtown Riverfront Project. Cedar Corporation will be using
the information to go after grant opportunities for the work. The committee spoke about the desire to see a
fishing dock, new boat launch, lights and bollards carried on from Phase 1, a area for kayak/canoe rental, and
look into a redesign to make traffic flow better in the area.
4. Amendment to Comprehensive Outdoor Recreational Plan
Cedar Corporation Seth Hudson presented on the amendment to the Comprehensive Outdoor Recreational Plan
as it relates to the inclusion of the Coulee River Trails.
Ruona/Daugherty motioned to approve the amendment to the Comprehensive Outdoor Recreational
Plan
5. Discussion on Resolution 22-21 and the Prescott Non-Motorized Boat Launch
Police Chief Michaels discussed the changes that were made as part of Resolution 22-21 and how they are
affected by the Public Trust Doctrine. The Committee would like further discussion on this item at the
December 6, 2021 Workshop.
6. Pierce County Tourism – JEM Grant
Chair Ruona presented on the JEM Grant and the work that is being done with Sherry Quamme with the
Wisconsin Mississippi River Parkway Commission on tourism. Chair Ruona stated that Ms. Quamme would
be reaching out to the City once she needs specific items to be included in the tourism marketing materials.
7. Coulee River Trails Workshop – Tuesday, December 7 at 5:00 pm
Chair Ruona stated their will be a workshop with City Council on Tuesday, December 7 regarding the Coulee
River Trails Workshop.
8. Other Business
Committee Member Knox stated that he spoke with the River Falls swim team on the lifeguard opportunities
that the City has at their public beach. Committee Member Knox said that the River Falls coach was excited to
share the opportunity with the team.
Daugherty/Ruona motion to adjourn passed without a negative voice vote at 6:14 pm.
Respectfully Submitted,
Matthew J. Wolf
City Administrator
To: Parks and Public Property Committee
From: Matt Wolf, City Administrator
Date: January 14, 2022
Subject: Riverfront Project Phase 1 – Bid Timeline
Discussion
Cedar Corporation will be present to discuss the bid timeline process for Phase 1 of the
Riverfront Project.
Attachments
1. Project Scope
2. Proposed Tentative Timeline
To: Parks and Public Property Committee
From: Matt Wolf, City Administrator
Date: January 11, 2022
Subject: Riverfront Phase 2 Discussion – Boat Launch & Fishing Pier
Background
The City is currently pursuing grant opportunities for the proposed trail that connects Freedom
Park with downtown Prescott and phase 2 of the Riverfront Project. The City worked with
Cedar Corporation to submit a Tourism Capital Grant application through the Wisconsin
Department of Administration for the trail from downtown to Freedom Park. Additionally, the
Federal Economic Development Administration (EDA) has a Travel, Tourism and Outdoor
Recreation Grant that the City of Prescott is working on for submittal.
Discussion
The City currently has in their capital expenses budget for 2022, $125,000 for the construction
of a new boat launch and fishing pier. This money is budgeted to come out of Tax Increment
District #4.
One of the criteria the EDA considers when evaluating grant applications is cost share
participation. Funding of the dock and pier would go towards that cost participation and result
in a stronger application. The City plans to work with Mississippi River Regional Planning
Commission to submit the EDA grant. However, to get the dock and pier properly permitted
and go out for bids the city is proposing to work with Cedar Corporation. As part of the bidding
process, the City would determine the final cost for construction of the pier and dock to come
out of TID #4. Cedar Corporation as prepared a proposal for the work that covers the
following:
1. Preliminary Layout, WDNR Permit Application $850
2. Final Plans and Bidding Documents $1,800
3. Advertising and Bidding $800
4. Construction Staking and Layout $1,000
5. Construction Observation and Administration $1,000
Total Engineering Lump Sum “Not to Exceed” Fee $5,450
Recommendation
Authorize the professional services of Cedar Corporation to provide engineering services for
the City of Prescott Boat Launch & Fishing Pier Improvement Project for a total cost of $5,450
to come out of TID #4.
Attachments
1. Cedar Corporation Request for Services Proposal
2. EDA Travel, Tourism and Outdoor Recreation One Page Flyer
Project No.
Date: January 12, 2022
Confirmation of Client Request for Services
between Cedar Corporation (ENGINEER)
and City of Prescott (CLIENT)
Authorization to Perform Professional Engineering Services
ENGINEER is hereby authorized to proceed with the project listed below. The services are to be completed
in a timely manner mutually agreeable with the CLIENT and ENGINEER.
Project: City of Prescott - Boat Launch & Fishing Pier Improvement Project
Scope of Work: ENGINEER will provide engineering services for the City of Prescott Boat Launch & Fishing
Pier Improvement Project engineering services including WDNR permitting, design, cost estimating,
staff/committee/council meetings, plans and specifications, bidding, contract awarding, pre-construction meeting,
construction staking, limited construction observation, construction administration of pay requests, and closeout
permitting documents to WDNR.
Method of Compensation: Work will be completed on a Lump Sum “Not to Exceed” basis for $5,450.00.
Boat Launch & Fishing Pier Design Permitting, Bidding, & Construction Services
Preliminary Layout, WDNR Permit Application $850
Final Plans and Bidding Documents $1,800
Advertising and Bidding $800
Construction Staking and Layout $1,000
Construction Observation and Administration $1,000
Total Engineering Lump Sum “Not to Exceed” Fee $5,450
Payments are due and payable thirty (30) days from the date of the ENGINEER’s invoice. Amounts unpaid
thirty (30) days after the invoice date shall bear interest at the rate of one percent (1%) per month from invoice
date.
Prescott 2022 Boat Launch & Fishing Pier Design Permiting Bidding and Construction Services proposal 01-12-22.docx Agreement – Page 1 of 7
Project No.
Date: January 12, 2022
Timetable: The Engineer’s services shall be performed as expeditiously as is consistent with the orderly progress of the
Project. The Engineer shall make every effort to complete the work within the time frame set by the Client. Note: It is
most likely that the WDNR permit approval will not be received before the bid opening date. The Cedar
Corporation team has the capacity and availability to commence work immediately. The following is the Engineer’s
proposed timeline for the construction year 2022 Project:
TASK COMPLETION DATE
Preliminary Layout, WDNR Permit Application February 11, 2022
Final Plans and Bidding Documents February 18, 2022
Bid Opening March 10, 2022
City Council Award Bid March 14, 2022
Notice of Award & Contract Documents March 16, 2022
Notice to Proceed & Pre-Construction Conference March 31, 2022
Commence Fabrication/Construction April 1, 2022
Substantial Complete Construction May 15, 2022
Final Complete Construction May 30, 2022
THIS AGREEMENT is hereby approved and executed this ____ day of _____________, 2022.
CITY OF PRESCOTT CEDAR CORPORATION
By: By:
Name: Name: Seth Hudson, E.D.F.P.
Title: Title: Director Economic & Strategic Development
By: By:
Name: Name: Greg Adams, PE
Title: Title: Municipal Engineering Team Lead
Standard Short Form Agreement for Professional Services 2019 Agreement – Page 2 of 7
Attached: Standard Conditions
Project No.
Date: January 12, 2022
Attachment A
Scope of Work
Scope of Services:
ENGINEER will complete the following Scope of Services for the Project, as follows:
Design, Permitting, Plans & Specifications:
• Meet with City staff to review the approved boat launch and fishing pier configuration.
• Prepare a preliminary layout of the new boat launch and fishing pier and submit the required WDNR permit
application. Correspond with WDNR regarding permit process.
• Prepare final plans and specifications for bidding documents. Include project construction cost estimate.
Bidding:
• Prepare Advertisement for Bid to be published in the Client’s official newspaper, and the Engineer will post the
Project to its Website via the Quest Electronic Construction Document Network for bid documents download by
prospective bidders.
• Provide answers and clarification of questions from contractors, suppliers, sub-contractors, and Client during
bidding, including preparation of any necessary bid addendums.
• Host electronic public bid opening at Cedar Corporation via Quest Electronic Construction Document Network.
• Review the bid results, prepare bid tabulation results for all bidders, confirm that low bidder has obtained all
bonds and insurance, and is capable of completing the work, and recommend bid award after review of all bids.
• The Engineer will coordinate the issuance of Notice of Award, execution of Contract Documents, required
Bonds and Insurance, and Notice to Proceed with the Client.
• Attend required city staff, committee, council and other governing agency meetings.
Construction Engineering:
• Conduct a pre-construction meeting with Client and contractor.
• Provide one-time horizontal and vertical control staking and layout for construction, as needed. Engineer is not
responsible for preservation of construction staking for the contractor, and any required re-staking due to
contractor negligence will be performed at the expense of the contractor. Any required re-staking due to
vandalism or severe weather will be discussed and negotiated with the Client.
• Provide limited, as-need on site construction observation services during construction related work to observe
contractor’s work in conformance with permits, plans, specifications and contract documents. The Engineer
cannot guarantee the performance of, and shall have no responsibility for, the actions or omissions of any
contractor, sub-contractor, supplier, vendor, or any other entity furnishing materials or performing any
construction work on the Project. Provide Client copies of construction observation report documents.
Prescott 2022 Boat Launch & Fishing Pier Design Permiting Bidding and Construction Services proposal 01-12-22.docx Agreement – Page 3 of 7
Project No.
Date: January 12, 2022
• Provide construction coordination and administration services for the Project during construction. Oversee and
coordinate construction activities, including processing change orders and payment requests. Attend on-site
progress meeting with contractor and Client.
• The Client shall review and approve all Work Directives or Change Orders for the Project as presented by the
Engineer prior to the work being commenced by the contractor.
• Prepare and provide as-built construction record drawings to the Client in AutoCAD electronic and hard copy
format upon completion.
Prescott 2022 Boat Launch & Fishing Pier Design Permiting Bidding and Construction Services proposal 01-12-22.docx Agreement – Page 4 of 7
Project No.
Date: January 12, 2022
Attachment C - Standard Conditions
PART I - DESCRIPTION OF issued by Client are specifically unless the other party is given not
SERVICES Corporation with a written objected to by Cedar less than ten calendar day’s
objection to the bill within 15 Corporation. written notice of intent to
1.1 CEDAR CORPORATION days of receipt, Client shall be terminate and an opportunity for
agrees to provide professional deemed to accept the bill as 4.2 CHANGE OF SCOPE. The correcting the default and for
services for the PROJECT as submitted. Scope of Services set forth in this consultation with the terminating
more completely described in Agreement and in any addenda to party before termination. If Cedar
this Agreement. 3.2 Where Client disputes some the Agreement is based on facts Corporation terminates as a result
portion of the charges contained known at the time of execution of of Client default or the Client
1.2 CEDAR CORPORATION in Cedar Corporation’s bill for this Agreement, including, if terminates for cause, Cedar
agrees to provide all professional services, he shall make payment applicable, information supplied Corporation shall be paid for
services within a reasonable of that portion of the bill which is by Client. For some projects services performed to the
period of time following the date undisputed. In no case may involving conceptual or process termination date including
of authorization to proceed by Client elect to withhold payment development services, scope may reimbursable expenses due. Upon
OWNER. If a special time to Cedar Corporation of the not be fully definable during receipt of the terminating action,
schedule must be met for a entire amount due. initial phases. As the project Cedar Corporation shall
PROJECT, it shall be specifically progresses, facts discovered may promptly discontinue all services
set forth in this Agreement. 3.3 If Client fails to make any indicate that scope must be unless the notice directs
payment due Cedar Corporation redefined. otherwise, and upon receipt of
PART II - CLIENT’S for services and expenses after final compensation make
RESPONSIBILITIES receipt of Cedar Corporation’s 4.3 SAFETY. Cedar Corporation has available to Client all appropriate
bill therefore, the amounts due established and maintains documents prepared under the
Client, at its expense, shall do the Cedar Corporation shall bear corporate programs and Agreement whether completed or
following in a timely manner so as not interest from invoice date at the procedures for the safety of its in process.
to delay the services, rate set forth in this agreement, employees. Unless specifically
or in the absence thereof at the included as a service to be 4.6 OPINIONS OF PROBABLE
2.1 INFORMATION/REPORTS legal rate prevailing from time to provided under this Agreement, CONSTRUCTION COST. Any
time at the principal place of Cedar Corporation specifically opinion of probable construction
Furnish Cedar Corporation with business of Cedar Corporation. In disclaims any authority or costs prepared by Cedar
all reports, studies, site addition Cedar Corporation may, responsibility for general job site Corporation is supplied for the
characterizations, regulatory after giving ten (10) days written safety and safety of persons other general guidance of the Client
orders, and similar information in notice to Client, suspend services than Cedar Corporation only. Since Cedar Corporation
its possession relating to the under this agreement until paid in employees. has no control over competitive
Project. Unless otherwise full all amounts due under this bidding or market conditions,
specified in Part I, Cedar agreement. In the event Client 4.4 DELAYS. If events beyond the Cedar Corporation cannot
Corporation may rely upon does not pay, or does not pay control of Client or Cedar guarantee the accuracy of such
Client-furnished information timely, Cedar Corporation shall Corporation, including, but not opinions as compared to contract
without independent verification be entitled to collect from Client limited to, fire, flood, explosion, bids or actual costs to Client.
in performing the Service. all amounts due plus expenses, riot, strike, war, process
including but not limited to shutdown, act of god or the 4.7 RELATIONSHIP WITH
2.2 REPRESENTATIVE attorney fees, incurred by Cedar public enemy, and act or CONTRACTORS. Cedar
Corporation in connection with regulation of any government Corporation shall serve as
Designate a representative for the collection efforts, in addition, the agency, result in delay to any Client’s professional
project who shall have the reasonable value of Cedar schedule established in this representative for the services,
authority to transmit instructions, Corporation’s time spent in Agreement or in any Addenda to and may make recommendations
receive information, interpret and connection with collection this Agreement, then such to Client concerning action
define Client’s policies, and efforts, computed at Cedar schedule shall be amended to the relating to Client’s contractors.
make decisions with respect to Corporation’s prevailing fee extent necessary to compensate However, Cedar Corporation
the services. schedule. for such delay. In the event such specifically disclaims any
delay exceeds 60 days, Cedar authority to direct or supervise
2.3 GIVE NOTICE PART IV - STANDARD TERMS Corporation shall be entitled to
AND CONDITIONS an equitable adjustment in the means, methods, techniques,
Give prompt written notice to compensation. sequences or procedures of
4.1
STANDARD OF CARE.
Cedar Corporation whenever construction selected by Client’s
Services shall be performed in
Client observes or otherwise 4.5 TERMINATION. Either party contractors.
accordance with the standard of
becomes aware of any defect in may terminate this Agreement at
professional practice ordinarily
the Project or other event which the end of the term hereof, or any 4.8 CONSTRUCTION REVIEW.
exercised by the applicable
may substantially affect extension thereof, upon 30 days For projects involving
profession at the time and within
performance of services under written notice to the other party construction, Client
the locality where the services
this Agreement. as provided at PART I above. acknowledges that under
are performed. Professional
generally accepted professional
services are not subject to, and
PART III - BILLING, AND Also, this Agreement may be practice, interpretations of
Cedar Corporation cannot
PAYMENT terminated by either party if the construction documents in the
provide any warranty or
other party fails to fulfill its field are normally required, and
guarantee, either express or
3.1 Cedar Corporation will obligations under this Agreement that performance of construction-
implied. Any such warranties or
periodically bill the client with through no fault of the related services by the design
guarantees contained in any
net payment due in 30 days. terminating party. No such professional for the municipal
purchase orders, Client action,
Unless Client provides Cedar termination may be effected project permits errors or
requisitions or notices to proceed
Prescott 2022 Boat Launch & Fishing Pier Design Permiting Bidding and Construction Services proposal 01-12-22.docx Agreement – Page 5 of 7
Project No.
Date: January 12, 2022
omissions to be identified and law, Cedar Corporation’s total than that for which such permission of the other party.
corrected at comparatively low liability to Client and anyone documents or deliverables were This Agreement shall be binding
cost. Client agrees to hold Cedar claiming by, through, or under originally prepared, or alteration upon and inure to the benefit of
Corporation harmless from any Client for any cost, loss, or of such documents or any permitted assigns.
claims resulting from damages caused in part by the deliverables without written
performance of municipal negligence of Cedar Corporation verification or adaptation by 4.16 DISPUTE RESOLUTION.
services by persons other than and in part by the negligence of Cedar Corporation for the Parties shall attempt to settle
Cedar Corporation. Client or any other negligent specific purpose intended, shall disputes arising under this
entity or individual, shall not be at the Client’s risk. Further, all agreement by discussion between
4.9 INSURANCE. Cedar exceed the percentage share that title blocks and the engineer’s the parties senior representatives
Corporation will maintain Cedar Corporation’s negligence seal, if applicable, shall be of management. If any dispute
insurance coverage for bears to the total negligence of removed if and when Client cannot be resolved in this manner
Professional Liability, Client, Cedar Corporation, and provides deliverables in within a reasonable length of
Comprehensive General, all other negligent entities and electronic media to another time, parties agree to attempt
Automobile, Workers individuals. entity. Client agrees that relevant non- binding mediation or any
Compensation, and Employer’s analyses, findings and reports other method of alternative
Liability in amounts in 4.11 HAZARDOUS MATERIAL. provided in electronic media dispute resolution prior to filing
accordance with applicable legal Hazardous materials may exist at shall also be provided in “hard any legal proceedings. In the
requirements as well as Cedar a site where there is no reason to copy” and that the hard copy event any actions are brought to
Corporation’s business believe they could or should be shall govern in the case of a enforce this Agreement, the
requirements. Certificates present. Cedar Corporation and discrepancy between the two prevailing party shall be entitled
evidencing such coverage will be Client agree that the discovery of versions, and shall be held as the to collect its litigation costs,
provided to Client upon request. unanticipated hazardous official set of drawings, as signed including attorneys’ fees from
materials constitutes a changed and sealed. Client shall be the other party.
4.10 ALLOCATION OF RISKS. To condition mandating a afforded a period of thirty (30)
the fullest extent permitted by renegotiation of the Project scope days in which to check the hard 4.17 NO WAIVER. No waiver by
law, Cedar Corporation shall of work. Cedar Corporation copy against the electronic either party of any default by the
indemnify and hold harmless, agrees to notify Client as soon as media. In the event that any error other party in the performance of
Client, Client’s officers, practically possible should or inconsistency is discovered any particular section of this
directors, partners, and unanticipated hazardous within such thirty (30) day period Agreement shall invalidate any
employees from and against any materials or suspected hazardous it shall be corrected at no other section of this Agreement
and all costs, losses, and materials are encountered. Client additional cost to Client. or operate as a waiver of any
damages (including but not acknowledges and agrees that it Following the expiration of this future default, whether like or
limited to all fees and charges of retains title to all hazardous thirty (30) day period, Client different in character.
engineers, architects, attorneys, material existing on the site and shall bear all responsibility for
and other professionals, and all shall report to the appropriate the care, custody and control of 4.18 NO THIRD-PARTY
court or arbitration or other federal, state or local public the electronic media. In addition, BENEFICIARY. Nothing
dispute resolution costs) caused agencies, as required, any Client represents that it shall contained in this Agreement, nor
solely by the negligent acts or conditions at the site may present retain the necessary mechanisms the performance of the parties
omissions of Cedar Corporation a potential danger to the public to read the electronic media, hereunder, is intended to benefit,
or Cedar Corporation’s officers, health, safety or the environment. which Client acknowledges to be nor shall inure to the benefit of,
directors, partners, employees, Client shall execute any of only limited duration. Client any third party, including
and Cedar Corporation’s manifests or forms in connection agrees to defend, indemnify, and Client’s municipal project
consultants in the performance with transporting or storage and hold harmless Cedar Corporation contractors.
and furnishing of Cedar disposal of hazardous materials from all claims, damages, and
Corporation’s services under this resulting from the site or work on expenses (including reasonable
4.19 SEVERABILITY. The various
Agreement. the site or shall authorize Cedar litigation costs), arising out of
terms, provisions and covenants
Corporation to execute such such reuse or alteration by Client
contained in this Agreement or
To the fullest extent permitted by documents as Client’s agent. or others acting through Client.
any addenda shall be deemed to
law, Client shall indemnify and Client waives any claim against Cedar Corporation agrees that all
be separate and severable, and
hold harmless Cedar Cedar Corporation and agrees to plans, engineering designs,
the invalidity or unenforceability
Corporation, Cedar defend, indemnify, and save electronic and computer data and
of any of them shall not affect or
Corporation’s officers, directors, Cedar Corporation harmless from imagery relating to Client’s
impair the validity or
partners, employees, and Cedar any claim or liability for injury or projects are the property of the
enforceability of the remainder.
Corporation’s consultants from loss arising from Cedar Client and shall be presented to
and against any and all costs, Corporation’s discovery of Client at no additional cost upon
4.20 AUTHORITY. The persons
losses, and damages (including unanticipated hazardous written request.
signing this Agreement warrant
but not limited to all fees and materials or suspected hazardous
that they have the authority to
charges of engineers, architects, materials. 4.14 AMENDMENT. This
sign as, or on behalf of, the party
attorneys, and other Agreement, upon execution by
for whom they are signing.
professionals, and all court or 4.12 ACCESS. Client shall provide both parties hereto, can be
arbitration or other dispute Cedar Corporation safe access to amended only by a written
4.21 OTHER. Cedar Corporation
resolution costs) caused solely by any premises necessary for Cedar instrument signed by both parties.
reserves the right to enter into
the negligent acts or omissions of Corporation to provide the
agreements with other design
Client or Client’s officers, services. 4.15 ASSIGNMENT. Except for professionals for portions of the
directors, partners, employees, assignments (a) to entities which work included under this
and Client’s consultants with 4.13 REUSE OF PROJECT control, or are controlled by, the Agreement. Where this
respect to this Agreement or the DELIVERABLES. Reuse of parties hereto or (b) resulting subagreement would represent a
Project. any documents or other from operation of law, the rights major portion of the design work,
deliverables, including electronic and obligations of this Cedar Corporation shall receive
To the fullest extent permitted by media, pertaining to the project Agreement cannot be assigned by approval of Client for this
by Client for any purpose other either party without written
Prescott 2022 Boat Launch & Fishing Pier Design Permiting Bidding and Construction Services proposal 01-12-22.docx Agreement – Page 6 of 7
Project No.
Date: January 12, 2022
subagreement.
Prescott 2022 Boat Launch & Fishing Pier Design Permiting Bidding and Construction Services proposal 01-12-22.docx Agreement – Page 7 of 7
EDA: AMERICAN RESCUE PLAN
TRAVEL, TOURISM & OUTDOOR RECREATION
Promoting America’s
Tourist Communities
Through the Travel, Tourism & Outdoor Recreation program, EDA is focused
on accelerating the recovery of communities that rely on the travel, tourism and
outdoor recreation sectors. $750 million of EDA’s American Rescue Plan funds are
allocated to support the following efforts:
• State Tourism Grants: $510 million in non-competitive awards to help
states quickly invest in marketing, infrastructure, workforce and other projects
to rejuvenate safe leisure, business and international travel.
• Competitive Grants: $240 million to help communities that have been
hardest hit by challenges facing the travel, tourism and outdoor recreation
sectors to invest in infrastructure, workforce or other projects to support
the recovery of the industry and economic resilience of the community in
the future.
WHO SHOULD APPLY APPLICATION DEADLINE
State Tourism Grants State Tourism Grants
Eligible applicants for EDA’s Statewide Planning Grants include Governors, Application due 60 days
the Mayor of DC, and other applicable Territory leaders or their designees. after receiving invitation
EDA will send these applicants a formal invitation to apply.
Competitive Tourism Grants
Competitive Tourism Grants
Eligible applicants for EDA’s Competitive Tourism Grants program include a(n):
Suggested Application
Submission Date:
• District Organization of an EDA-designated Economic Development District March 15, 2022
• Indian Tribe or a consortium of Indian Tribes Applications reviewed
• State, county, city, or other political subdivision of a State, including a on a rolling basis
special purpose unit of a State or local government engaged in economic or
infrastructure development activities, or a consortium of political subdivisions
• Institution of higher education or a consortium of institutions of
higher education CONTACTS
• Public or private non-profit organization or association acting in cooperation • Email your questions about the
with officials of a political subdivision of a State
American Rescue Plan Travel, Tourism
Individuals or for-profit entities are not eligible. & Outdoor Recreation program to
TravelandTourism@eda.gov
• Visit www.eda.gov/contact to
find contact information for
your Economic Development
Representative
To learn more about EDA’s American Rescue Plan Travel, Tourism and Outdoor
Recreation program, visit eda.gov/arpa/travel-tourism/.
To: Parks and Public Property Committee
From: Matt Wolf, City Administrator
Date: January 13, 2022
Subject: Updated Signs for Prescott Parks – Graphic House Inc. Presentation
Discussion
Recently the Parks and Public Property Committee discussed developing a comprehensive
sign plan for updating public parks and public land. This would be done to more clearly
articulate parks regulations, give the parks a unified look, and refresh old or dated signs. As a
result, Dave Nadolny the Regional Sales Manager with Graphic House Inc.
(https://www.graphichouseinc.com/) has been invited to the meeting and will be presenting on
the work his company has done with other communities regarding signs.
To: Parks and Public Property Committee
From: Matt Wolf, City Administrator
Date: January 13, 2022
Subject: Magee Park Boundary Discussion
Discussion
On Tuesday, December 7 the City of Prescott City Council held a workshop on the proposed
Coulee River Trails. As part of that discussion a clear definition was requested for what makes
up Magee Park. A map is attached that shows the current Magee Park as shown in Pierce
County records and the City of Prescott’s CORP (Comprehensive Outdoor Recreation Plan)
versus the additional land that is City owned but not formally in Magee Park.
As part of the meeting staff is requesting to have a discussion with the Parks and Public
Property Committee on the boundaries of Magee Park.
Attachments
Magee Park Map with Surrounding City Owned Land
Magee Park Map with Surrounding City Owned Land
Current Magee Park
Additional City
Owned Land