Infrastructure Committee
Regular MeetingRoswell, NM · August 24, 2020
Minutes
Regular Meeting of the Infrastructure Committee Held
in the Convention Center
August 24, 2020
Notice of this meeting was given to the public in compliance with Sections 10-15-1
through 10-15-4, NMSA 1978 and Resolution 20-26.
ROLL CALL:
The meeting convened at 4:00 p.m. with Chairman Roebuck presiding, Councilors
Kennard and Sanchez being present, and Councilor Peterson being absent.
Staff Present:
Lorenzo Sanchez, Mike Mathews, Juan Fuentes, Juan Salas, Louis Najar, and
Bernadette Lopez.
Guest(s) Present:
Grace Sanchez
APPROVAL OF AGENDA:
Councilor Kennard moved to approve the agenda. Councilor Sanchez was the
second. A voice vote of 3-0 was unanimous, and the motion passed with
Councilor Peterson being absent.
APPROVAL OF MINUTES:
1. July 27, 2020:
Councilor Kennard moved to approve the minutes. Councilor Sanchez was
the second. A voice vote of 3-0 was unanimous, and the motion passed with
Councilor Peterson being absent.
NON-ACTION ITEMS
2. Projects Updates Discussion:
Mr. Najar gave the updates on the water towers and 5th & Garden Sewer. He discussed
the handout given to the committee on slurry seal and nova chip; costs for N. Main from
College to Country Club. This project is underfunded.
REGULAR ITEMS (ACTION):
3. Water Trust Application Resolution 21-xx:
Councilor Kennard moved to send Resolution 21-xx to support the Water Trust Board
project application to the September 10, 2020 City Council on the consent agenda.
Page 1 of 2
Mr. Najar discussed this item. Councilor Sanchez was the second. A voice vote of 3-0
was unanimous, and the motion passed with Councilor Peterson being absent.
4. Roadway Project Prioritization:
Mr. Najar discussed this item initiated by Councilor Roebuck. Councilor Kennard would like
a copy of the study. No Action taken; informative only.
5. Roswell Water Valve System Replacement Project – Change Order 1:
Councilor Kennard moved to consider ITB-20-008 Roswell Water System Valve
Replacement to be sent to the September 10th City Council’s consent agenda. Louis
Najar and Lorenzo Sanchez discussed this item. Mr. Fuentes briefly discussed the
approval process of the budget adjustment to take place in October 2020. Councilor
Sanchez was the second. A voice vote of 3-0 was unanimous, and the motion
passed with Councilor Peterson being absent.
OTHER BUSINESS (Non-Action):
6. Department Reports:
Chairman Roebuck inquired about the status on the porta potties at Cielo Grande
originally inquired by Councilor Peterson at last month’s meeting. Mr. Mathews
responded they were removed due to COVID-19; however, he will follow up.
7. Public Comments:
Chairman Roebuck stated the roads will be strongly emphasized in the ICIP list. Mr. Najar
voiced his priority projects for the ICIP List which are the West McGaffey and North
Garden Bridge projects.
Mr. Fuentes discussed plans of a rate study for utilities for the Water & Sanitation
department in which they will be piggy backing on a purchase agreement.
ADJOURN:
The meeting adjourned at 4:53 p.m. The next scheduled meeting is September 28,
2020.
Page 2 of 2
Agenda
ROSWELL INFRASTRUCTURE COMMITTEE AGENDA
Monday, August 24, 2020, at 4:00 p.m.
Meeting Room A – Roswell Convention Center
912 N. Main, Roswell, NM 88201
Committee Chair: Jacob Roebuck
Committee Vice Chair: Margaret Kennard
Committee Members: George Peterson, Savino Sanchez
Staff Coordinator: Louis Najar
A. Call to Order
B. Roll Call
C. Approval of the Agenda
D. Approval of Minutes
1. July 27, 2020 1-2
E. Non-Action Items
2. Project Updates Discussion 3-7
F. Regular Items (Action Items)
3. Water Trust Application Resolution 21-xx 8 – 13
4. Roadway Project Prioritization 14
5. Roswell Water Valve System Replacement Project – Change Order 1 15 - 48
G. Other Business (Non-Action)
6. Department Reports 49 - 63
7. Public Comments
H. Adjourn (Next Meeting: September 28, 2020)
Notice of this meeting has been given to the public in compliance with Sections 10-15-1 through 10-15-4 NMSA 1978
and Resolution 20-26.
NOTICE OF POTENTIAL QUORUM – A quorum of the City Council may or may not attend, but there will not be
debate by the City Council, and no action will be taken.
If you are an individual with a disability who is in need of a reader, amplifier, qualified sign language interpreter, or
any other form of auxiliary aid or service to attend or participate in the hearing or meeting, please contact Human
Resources at 575-624-6700 at least one week prior to the meeting or as soon as possible. Public documents,
including the agenda and minutes, can be provided in various accessible formats. Please contact the City Clerk at
575-624-6700 if a summary or other type of accessible format is needed.
Printed and posted: 8/20/2020
THE PUBLIC IS ENCOURAGED TO PARTICIPATE ELECTRONICALLY THROUGH THE GOTO MEETING
APPLICATION AND NOT PHYSICALLY ATTEND DURING THE PANDEMIC.
TO ATTEND THE INFRASTRUCTURE COMMITTEE BY GO-TO-MEETING
Infrastructure Committee
Mon, August 24, 2020 4:00 PM - 6:00 PM (MDT)
Please join my meeting from your computer, tablet or smartphone.
https://global.gotomeeting.com/join/929161493
You can also dial in using your phone.
United States: +1 (571) 317-3122
Access Code: 929-161-493
New to GoToMeeting? Get the app now and be ready when your first meeting starts:
https://global.gotomeeting.com/install/929161493
Help Desk – 500-0587
Regular Meeting of the Infrastructure Committee Held
in the Convention Center
July 27, 2020
Notice of this meeting was given to the public in compliance with Sections 10-15-1
through 10-15-4, NMSA 1978 and Resolution 20-26.
ROLL CALL:
The meeting convened at 4:00 p.m. with Chairman Roebuck presiding, Councilors
Kennard, Sanchez, and Peterson being present.
Staff Present:
Louis Romero, Daniel Mendiola, Rebecca Hicks, Juan Fuentes, Juan Salas, Lorenzo
Sanchez, Bill Morris, Todd Verciglio, Mayor Dennis Kintigh, and Bernadette Lopez.
Guest(s) Present:
Grace Sanchez
APPROVAL OF AGENDA:
Councilor Kennard moved to approve the agenda. Councilor Peterson was the
second. A voice vote of 4-0 was unanimous, and the motion passed.
APPROVAL OF MINUTES:
1. June 22, 2020:
Councilor Kennard moved to approve the minutes. Councilor Peterson was
the second. A voice vote of 4-0 was unanimous, and the motion passed.
NON-ACTION ITEMS:
2. Projects Updates Discussion:
Mr. Salas gave the updates for the water towers, and the Garden Bridge.
3. Housing Development Program:
Mr. Morris discussed this program along with Todd Verciglio and his role in the program.
Group discussion was held.
REGULAR ITEMS (ACTION):
4. NONE
Page 1 of 2 1
OTHER BUSINESS (Non-Action):
5. Department Reports:
No discussion on department reports.
8. Public Comments:
Chairman Roebuck inquired about the timeline for the Carpenter Park Splash Pad. Mr.
Morris responded he will get with Mr. Najar to provide this information to the Committee.
Councilor Peterson inquired about the porta potties at Cielo Grande. He stated they were
all removed. Mr. Morris responded he will get back with the Committee on that
information.
ADJOURN:
The meeting adjourned at 4:41 p.m. The next scheduled meeting is August 24, 2020.
Page 2 of 2 2
CITY OF ROSWELL
Infrastructure Committee
Meeting Room A – Roswell Convention Center
912 N. Main, Roswell, NM 88201
Monday, August 24, 2020 at 4:00 p.m.
ACTION REQUESTED: Project Updates – Infrastructure Committee open discussion
BACKGROUND: Initiated by: Louis Najar
Committee will be given opportunity for Q&A on any project.
Project Dashboard report is part of the committee packet.
Please note there is one project updates report, Engineering
Department.
FINANCIAL
CONSIDERATION: None at this time.
LEGAL REVIEW: Not applicable for this agenda item.
BOARD AND
COMMITTEE ACTION: Open discussion for this Committee.
STAFF
RECOMMENDATION: None, this is opportunity for Committee to ask questions.
3
City of Roswell Projects Status
8/20/2020
Street Projects & Other
Garden Bridge:
SCOPE: Replace bridge on Garden Ave.
BUDGET: $ 911,237 Paid to date $475,183
FUNDING SOURCE: Capital Improvements - PO 22001918
EST. COMPLETION: September 30, 2020
PROJECT STATUS: 61%
Project awarded to Abraham's Construction. Project began January 27, 2020. Concrete box culvert is in place and backfilled. Contractor is working on
curb and gutter and roadway. Completion is progress for end of September, 2020. Contractor did take one month off due to COVID19.
Country Club/Main Traffic Signal:
SCOPE: Upgrade traffic signals at Country Club and Main.
BUDGET: $ 750,000 Legis. Grant $712.5K, City $37.5
FUNDING SOURCE: FY 2019 Special Electronics Budget, PO 22002450, $464,926.84
EST. COMPLETION: September 30, 2020
PROJECT STATUS: 33%
Due to Covid19, there were delays on parts. Construction commenced August 3, 2020. Contractor has removed the existing traffic signal, utility
relocations are complete, and bore for conduit complete 8.20.20. Still on schedule for end of September 2020 completion.
S. Atkinson Project - McGaffey to 2nd Street
SCOPE: ADA / Sidewalk & Mill & Fill of pavement
BUDGET: $1,451,732 ($990,000 NMDOT Share) Close out pending - due to Contractor dispute.
FUNDING SOURCE: FY 2019 Budget
EST. COMPLETION: Work in Dec. 2019 was completd
PROJECT STATUS: 99%
NMDOT & FHWA need to perform project audit of City. City audit complete. Final change order has been submitted to NMDOT for approval. Once
approved by NMDOT, then project can be closed and final payment to contractor, $116,731.60. Project will experience $70k savings.
Lea/Deming Bridge
SCOPE: Remove and replace bridge
BUDGET: $ 1,000,000
FUNDING SOURCE: 2019 Legislative Grant $800,000 & City Funds $200,000
EST. COMPLETION: 7/1/2021
PROJECT STATUS: 5%
Grant agreements being executed. RFP for design awarded to Souder Miller & Associates in the amount of $103,018.95
Bridge design is at 100%.
Awaiting instructions to proceed to bid project. Remaining Grant funding $696,981.05. Current Engr. Estimate = $1,110,879
Shortfall of budget is $413,898.
S. Atkinson Project - Phase II - 2nd to Cherry St.
SCOPE: ADA / Sidewalk & reconstruction of pavement
BUDGET: $1,544,553 ($1,ooo,000 NMDOT Share) Construction costs based on 2018 Estimate
Design PO #22002226 $62,241.38
Design Survey Performed by Engineering Department
FUNDING SOURCE: FY 20 Budget Capital Improvements
EST. COMPLETION: 12/1/2020
PROJECT STATUS: Design 98%
Plans 98% complete. Final approval by NMDOT in August 2020. Bid in Fall 2020. NMDOT PSE Review is August 25, 2020.
Spring River Trail - Atkinson to Virginia
SCOPE: Trail maintenance improvements
BUDGET: $149,000 ($127,326 NMDOT Share) Construction costs based on 2018 Estimate
Design PO #22002447 $27,039.20
Design Survey Performed by Engineering Department
FUNDING SOURCE: FY 20 Budget Capital Improvements
EST. COMPLETION: 12/1/2020
PROJECT STATUS: Design 100%
Plans 100% complete. Final approval by NMDOT in August 2020. Bid in Fall 2020. NMDOT PSE review was August 20, 2020.
4
N. Main - Pavement Maintenance - COOP Agreement with NMDOT approved at July 9, 2020 City Council
SCOPE: Micro Surface or Nova Chip on Main - Alameda to McGaffey & College to Country Club (Original limits with application)
BUDGET: Estimated Applied for $378,020 (NMDOT Share 50% - $189,010) - Approved agreement is less. Current project funding is $215,443.
FUNDING SOURCE: Current Project Amount $213,443 (75%-25% split)
NMDOT Funding $161,582
City Portions $53,861
EST. COMPLETION:
PROJECT STATUS: Re-analyzing limits of work
This project is being reviewed to perform best pavement maintenance with the reduced budget of $215,443. It is anticipated that project will be
shortened to only be N. Main from College to Country Club (driving lanes open). Current cost full width would be $621,789.
Hondo River Trail - 2nd to Virginia
SCOPE: Trail maintenance improvements
BUDGET: $129,000 ($110,218 NMDOT Share) NMDOT FY 21, Construction Costs based on 2018 Estimate
FUNDING SOURCE: FY 20 Budget Capital Improvements
EST. COMPLETION: 12/1/2021
PROJECT STATUS: 5%
Engineering has performed survey and began plans. City awaiting final agreement forms from NMDOT to continue with development.
RFP-20-004 On Call Engineering Services
SCOPE: Qualify pool of engineering firms
BUDGET: Budget for projects as needed
FUNDING SOURCE: From Project Budgets
EST. COMPLETION: 2 year pool
PROJECT STATUS: RFP Complete and vendors approved.
Vendors approved are Bohannan Huston Inc; Enprotec Hibbs & Todd; HDR Inc.; JSH Engineering; Smith Engineering; Souder Miller & Associates
CDBG Grant 18-C-NR-I-03-G-14 Boys & Girls Club
SCOPE: Repairs and Upgrades to Boys & Girls Club
ESTIMATED COST: Cost$80K HVAC,
$1,048,123.50 Bid Cost, White Sands Construction Inc. - Apparent low bidder
FUNDING SOURCE: Federal Grant & FY19 City Budget
BUDGET Bid Cost $ 1,048,123.50
HVACs $ 59,360.00 City Supplied
Professional Services $ 42,595.00 JSH Engineering
SENMCOG $ 15,000.00
Total Change Orders: $ -
Total Cost $ 1,165,078.50
PROJECT SCHEDULE: August 2020 - February 2021
PROJECT COMPLETION:
PROJECT STATUS: Project to be awarded at Special Council of July 23, 2020. Contracts are at City Hall awaiting signature by Mayor & Legal.
Preconstruction conference to be Week of August 28, 2020.
McGaffey - Atkinson to Garden ON HOLD DUE TO BUDGET
SCOPE: ADA/Sidewalk - Mill & Fill 2800 LF 13500 SY
BUDGET: Estimated $1.3 million 3" Mill & Fill only = $459K
FUNDING SOURCE: Submitted on 2020 Legislative ICIP
EST. COMPLETION:
PROJECT STATUS:
Project is on the year 1 Pavement Condition List. No activity
Project on hold due to lack of funding.
McGaffey - Main to Garden ON HOLD DUE TO BUDGET
SCOPE: ADA/Sidewalk - Mill & Fill 2500 LF 12000 SY
BUDGET: Estimated $1.3 million 3" Mill & Fill only = $408K
FUNDING SOURCE: Submitted on 2020 Legislative ICIP
EST. COMPLETION:
PROJECT STATUS:
Project is on the year 1 Pavement Condition List. No activity
McGaffey - Wyoming to Union ON HOLD DUE TO BUDGET
SCOPE: ADA/Sidewalk - Mill & Fill 3000 LF 14,500 SY
BUDGET: Estimated $1.3 million 3" mill & fill only = $493K
FUNDING SOURCE: Submit for 2020 NMDOT Call For Projects
EST. COMPLETION:
PROJECT STATUS:
Project is on the year 1 Pavement Condition List. No activity
Project on hold due to lack of funding.
5
FY 21 - Hot Recycling & Micro-surfacing Pavement Maintenance ON HOLD DUE TO BUDGET
SCOPE: Hot Recycle & Micro-surfacing of various streets
BUDGET: Estimated Budget to be determined by City Council
FUNDING SOURCE: City Road Fund
EST. COMPLETION:
PROJECT STATUS:
Streets have been selected by using Pavement Condition Survey and field review by Streets & City Engineer.
FY 21 - Nova Chip Pavement Maintenance ON HOLD DUE TO BUDGET
SCOPE: Place Nova-Chip pavement maintenance lift (plant mix wearing course)
BUDGET: Estimated Budget to be determined by City Council
FUNDING SOURCE: City Road Fund
EST. COMPLETION:
PROJECT STATUS:
Streets have been selected by using Pavement Condition Survey and field review by Streets & City Engineer.
FY 21 - Mill & Fill Pavement Rehab ON HOLD DUE TO BUDGET
SCOPE: Mill and fill 3" depth of existing streets.
BUDGET: Estimated Budget to be determined by City Council
FUNDING SOURCE: Engineering Capital Improvement Fund
EST. COMPLETION:
PROJECT STATUS:
Streets have been selected by using Pavement Condition Survey and field review by Streets & City Engineer.
This project is to address pavement condition only. These locations will not have any sidewalk/ADA improvements.
Bland/Atkinson Turning Lane ON HOLD DUE TO BUDGET
SCOPE: Build turn lane EBL traffic from S. Atkinson
BUDGET: Estimated cost $100K
FUNDING SOURCE: Special Electronics
EST. COMPLETION:
PROJECT STATUS: Design Complete
A turning lane has never been able to be constructed due to electrical power poles. XCEL now has to replace damaged powerpoles and
will now be able to removed obstructions for turning lane. This project to requested in FY 21 budget.
E Hobson Road Design ON HOLD DUE TO BUDGET
SCOPE: Perform design to improve Hobson Road from E. Earl Cummings Loop east to YO Crossing Road
BUDGET: $65,000
FUNDING SOURCE: Capital Improvements
Road Cores PO 22001555 $431.33 - Completed
Design Services PO 22001652 $64,380.88
Topo Survey Performed by Engineering Department
Geotech Testing Performed by Engineering Department
EST. COMPLETION: May-20
PROJECT STATUS: Design 100%
Design will be shelved, for future considerations or State call for projects.
Habitat For Humanity Subdivision Development ON HOLD DUE TO BUDGET
SCOPE: Construct cul-de-sac for Habitat Way Court
BUDGET: Estimated cost $180K
FUNDING SOURCE: Capital Improvement
EST. COMPLETION:
PROJECT STATUS: Design Complete
The City created a subdivision in 2018 for low income housing. As owner/developer the City needs to construct the cul-de-sac.
This project to requested in FY 21 budget.
6
Projects coordinated with Utility Departments
RIAC Reservoirs
SCOPE: (2) New Water Towers at RIAC
BUDGET: Design Complete $ 178,500 PO 180704
Historic Documents $ 10,458 PO 190125 _
Const. Prof. Services $ 612,597 PO 22000643 Steel fabrication inspection, field rebar, coating certified inspection
Const. Contractor $ 6,148,750 PO 22002556 Drinking Water Loan - $5,381,142 Principal - Forgiveness $389,463
Total Cost $ 6,950,304
FUNDING SOURCE: EPA Loan & Water Capital Fund
EST. COMPLETION: Tower 1 Gillis St. January 2021, Tower 2 W. Martin St. August 2021.
PROJECT STATUS: Time used 46%.
Construction commenced 11.18.19. Tower 1 (next to old one on Gillis) is 75% complete, paint crew is on the project. Tower 2 on W. Martin St. is
approximately 55%, steel tank being welded for erection to final location.
Large Diameter Valve Project
SCOPE: Large Diameter Valve construction
BUDGET: $ 1,438,496 PO 22002823
FUNDING SOURCE: 2019 Legislative Grant $750,000 and Water Enterprise all over $750K
EST. COMPLETION: 3/5/2021
PROJECT STATUS: 6%
Engineering Department in house design and construction inspection and management.
Work commenced May 4, 2020. Preliminary excavation and pipe measurements performed. Excavations revealed significantly different site
conditions than the old construction plans showed. Project will require a change order to address. Contractor waiting on parts, which are delayed due
to Covid19. During preliminary excavation and verification of pipe review, three of the four sites have significant differing site conditions. Pipe is not
constructed or in postion as per plans. Change order 1 is $210,543.73 including GRT as recommended by City Engineer.
5th St. Sewer - Phase II -
SCOPE: Replace existing 8" sewer in easement between E 5th St & Morningside
BUDGET: $161,744.56 Awarded Amount.
FUNDING SOURCE: Sewer Fund FY 20
EST. COMPLETION: 9/30/2020
PROJECT STATUS: Project is 50% complete constructed.
Engineering Dept. - in house design and construction inspection & management.
Preliminary service verification performed July 22, 2020. Contractor began sewer line construction on July 28, 2020. NM Gas Company will also
construct new gas line in the easement. Project should be completed by end of September 2020.
Manhole Rehab Project 2020
SCOPE: Rehabilitate 53 sewer manholes.
BUDGET: $204,343.03 award amount
FUNDING SOURCE: FY 20 Budget
EST. COMPLETION: 12.31.2020
PROJECT STATUS: 5%
Engineering Department in house design and construction inspection and management.
Contract awarded to Corrosion Resistant Coatings. Contractor began work August 17, 2020. Scheduled to be completed December 2020.
WWTP Screw Press Improvements
SCOPE: Install screw presses at WWTP
BUDGET: Estimated $ 5,500,000 Loan is for design and construction
FUNDING SOURCE: WWTP - Clean Water Loan
EST. COMPLETION: Design March 2021
Construction July 2022
PROJECT STATUS:
RFP process complete and project awarded to HDR for design and future construction professional services. HDR is working on putting together cost
proposal for review by City.
WWTP Dissolved Oxygen Study
SCOPE: Perform study of effluent at WWTP for oxygen values.
BUDGET: $11,325
FUNDING SOURCE: WWTP FY 20
EST. COMPLETION: Nov-20
PROJECT STATUS: 80%
HDR has been consulted to do study. Study is a result of EPA rule changes and will require WWTP modifications in the future.
HDR reviewing possible solution alternatives.
7
CITY OF ROSWELL
Infrastructure Committee
Meeting Room A – Roswell Convention Center
912 N. Main, Roswell, NM 88201
Monday, August 24, 2020 at 4:00 p.m.
ACTION REQUESTED: Consider proposed Resolution 21-xx to support Water Trust Board
project application to construct new water lines in the Edgewood
Area.
BACKGROUND: Initiated by: Louis Najar
This Water Trust Board Application will be to continue replacement
of old lines in the Edgewood area of Roswell. In 2019 Phase 1 was
performed to construct new water line on N. Garden and also to
stub out a 12” water line east on Cherry St.
This application is to continue construction of new 12” water main
on Cherry St. from Garden St. east to Atkinson Ave. Cost is
estimated at $1,000,000. The application is for $750,000,
application requires a Resolution supporting the project.
Future phases for Edgewood area would continue construction of
new water lines north and south of Cherry St.
FINANCIAL
CONSIDERATION: The application is being submitted and at this time it is not known
if it would be a grant or a loan. This requires review by Water Trust
Board for acceptance and offer to be presented to City of Roswell
LEGAL REVIEW: Resolution 21-xx has been submitted to City Attorney for review.
BOARD AND
COMMITTEE ACTION: Consider proposed Resolution 21-xx to support Water Trust Board
project application to construct new water lines in the Edgewood
Area and send to September 10, 2020 City Council as a consent
item.
STAFF
RECOMMENDATION: Approval of Resolution 21-xx and move forward with application
process. This project is on the master project list for Water
Maintenance and Transmission Department.
8
RESOLUTION 21-xx
A RESOLUTION OF THE CITY OF ROSWELL, AUTHORIZING FILING OF AN APPLICATION
FOR FINANCIAL ASSISTANCE FROM THE NEW MEXICO WATER TRUST BOARD
WHEREAS, the City of Roswell whose project will be to design and construct water
distribution lines in the Edgewood area of Roswell, NM; and
WHEREAS the City of Roswell may apply for financial assistance from the New Mexico
Water Trust Board to fund this water distribution project; and
WHEREAS, the City of Roswell is eligible to apply for funding from the New Mexico
Water Trust Board.
NOW THEREFORE, BE IT RESOLVED BY THE GOVERNING BODY OF THE CITY
OF ROSWELL:
That the filing of an application to the New Mexico Water Trust Board for funding in the
2021 Water Project Fund funding cycle is hereby authorized. The Project type falls under
“Water Storage, Conveyance and Delivery”; and proposes the design and construction of new
water distribution lines in the Edgewood area of Roswell, NM.
BE IT FURTHER RESOLVED BY THE GOVERNING BODY OF THE CITY OF
ROSWELL:
That the City Engineer, Louis Najar, is the primary contact on behalf of this application.
Additionally the Mayor, Dennis Kintigh, is herby designated as primary signature for any
agreements or other documents which may bind the City of Roswell.
PASSED, ADOPTED, SIGNED, AND APPROVED THIS 10th day of September, 2020
__________________________________
Dennis Kintigh, Mayor
Attest:
___________________________________
Sharon Coll, City Clerk
9
10
11
12
13
CITY OF ROSWELL
Infrastructure Committee
Meeting Room A – Roswell Convention Center
912 N. Main, Roswell, NM 88201
Monday, August 24, 2020 at 4:00 p.m.
ACTION REQUESTED: Consider moving forward with a Roadway Project Prioritization
process.
BACKGROUND: Initiated by: Jacob Roebuck
Committee chairman Roebuck has requested this committee begin
development of a process for planning and selecting roadway
repair projects with clarity that can build the political and public
support for more funding for roads. Goal is to have in place for full
council in six months.
Preliminary concepts suggested are:
1. A methodology/formula by which we prioritize road repair.
2. A process where Council can make exceptions to the method to
move projects up or down.
3. A determination of what level of quality roads we are striving to
maintain.
4. A plan or multiple plans on how the city can fund those levels.
FINANCIAL
CONSIDERATION: None at this time.
LEGAL REVIEW: Not applicable for this agenda item.
BOARD AND
COMMITTEE ACTION: Open discussion for this Committee and to instruct Staff to proceed
in direction as discussion may suggest.
STAFF
RECOMMENDATION: Proceed in direction of Committee and to bring back to
Infrastructure Committee as needed until a process is developed.
14
CITY OF ROSWELL
Infrastructure Committee
Meeting Room A – Roswell Convention Center
912 N. Main, Roswell, NM 88201
Monday, August 24, 2020 at 4:00 p.m.
ACTION REQUESTED: Consider ITB-20-008 Roswell Water System Valve Replacement
Project – RE: Change Order #1 in the amount of $210,543.71.
BACKGROUND: Initiated by: Lorenzo Sanchez
The Water Maintenance & Transmission Department was provided
a change order request by White Cloud Pipeline in the amount of
$210,543.71. This change order is due to significant changes
identified with the contractor’s required excavation and
verification operations. This included changes in pipe diameter,
fittings & additional repair.
City Engineer, Louis Najar, reviewed the change order for costs and
quantities and recommends proceeding with change order.
FINANCIAL
CONSIDERATION: Consider increasing the project costs in the amount of $210,543.71
out of the Water Enterprise fund.
LEGAL REVIEW: Not applicable for this agenda item.
BOARD AND
COMMITTEE ACTION: This action item is brought to Infrastructure Committee for
consideration to approve Change Order #1 in the amount of
$210,543.71, be sent to September 10, City Council consent
agenda.
STAFF
RECOMMENDATION: Proceed with change order as presented.
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
CITY OF ROSWELL
Infrastructure Committee
Meeting Room A – Roswell Convention Center
912 N. Main, Roswell, NM 88201
Monday, August 24, 2020 at 4:00 p.m.
ACTION REQUESTED: Non-Action Departmental Reports
(Informational for Meeting Packets)
BACKGROUND: Compiled by: Louis Najar
Department Reports Listing: (Alphabetical listing)
Central Control/Source of Supply - (Not submitted)
Engineering Report Annual Maintenance Support
Engineering Report Community Development Support
Fleet Maintenance (two reports)
Solid Waste Departments – (Not submitted)
Special Electronics
Streets Department
Water Maintenance & Transmission
WWTP & Sewer
FINANCIAL
CONSIDERATION: None at this time.
LEGAL REVIEW: Not applicable for this agenda item.
BOARD AND
COMMITTEE ACTION: Informational for meeting packets from departments associated
with Infrastructure Committee.
STAFF
RECOMMENDATION: Not applicable for this item.
49
Engineering Annual Maintenance Report July 2020
Sidewalk Curb & Gutter ADA Ramps Drive Pad Parking Lot Plant Mix Bitumunious Work order
Location Work Performed
(Linear feet) (Linear feet) (per job) (per job) Area (yd²) Pavement (tons) cost
NO CITY MAINTENANCE LETTERS COMPLETED IN THE MONTH OF JULY
Sidewalk SW
Curb & Gutter C&G
Valley Gutter VG
ADA Ramps ADA-R
Drive Pad DP
Parking Lot PL
Plant Mix Bitumunious Pavement PMBP
Structural Concrete SC
50
July 2020 Engineering Highlights Report
Community Development Support
Development Reviews
Kass Development Review
Big R Outdoor Lot
110 W. Hobbs (KFC back lot)
Sewer/Utility Cuts
1512 W. 2nd; 1310 E Tilden; 1007 E. Hendrick; 1414 E Tilden; 609 W. Country Club;
811 W 10th; 500 Viale Bond; 502 Viale Bond; 600 N. Main
Utility Reviews
600 E. Country Club,
Hollingshead Summary Plat – 713 N. Pennsylvania & 208 W 8th St.
300 Block N. Balsam Ave – west side
Property Reviews
1305 S. Pennsylvania, 3202 Purdue Drive, 103 W Pine Lodge, 612 La Fonda
Driveway, Sidewalk, Fence or Curb Reviews Inspections
1712 W. Mathews
Zoning Site Reviews:
1503 S. Lea
ADA Reviews
City Hall Annex
Traffic/Speed Reviews:
E. Cherry St.
51
CITY OF ROSWELL
MONTHLY VEHICLE/EQUIPMENT MAINTENANCE COSTS BY DEPARTMENT
FOR FY2020
DEPARTMENT JUL 2019 AUG 2019 SEP 2019 OCT 2019 NOV 2019 DEC 2019 JAN 2020 FEB 2020 MAR 2020 APR 2020 MAY 2020 JUN 2020 FY2020 TOTAL
AIR CENTER 4,073.31 14,640.68 10,769.20 10,686.54 8,507.78 2,198.84 6,150.85 4,410.34 4,519.45 5,821.74 4,169.54 10,758.04 86,706.31
ANIMAL CONTROL 230.29 1,901.23 1,206.69 1,226.24 2,768.49 69.79 111.83 835.98 2,577.52 659.05 1,088.08 932.91 13,608.10
CAPITAL IMPROVEMENTS 867.05 733.34 624.28 1,493.54 33.62 372.97 1,343.07 1,709.96 (336.22) 1,675.54 490.43 127.12 9,134.70
CEMETERY 1,951.51 1,170.24 1,837.85 1,422.10 1,774.10 2,056.41 810.49 897.49 1,177.05 2,128.48 1,295.66 289.65 16,811.03
CENTRAL CONTROL 1,868.86 1,659.81 47.42 1,797.69 1,907.54 2,253.10 1,347.02 2,798.87 5,516.43 4,791.09 700.00 1,714.30 26,402.13
CODE ENFORCEMENT 1,029.62 783.31 1,591.18 4,587.75 1,199.42 258.85 448.81 888.80 1,023.24 2,093.90 628.06 28.66 14,561.60
COMMUNITY ENHANCEMENT 2,242.03 1,406.05 2,325.41 4,539.38 1,881.28 456.00 947.44 154.81 240.98 1,457.52 848.49 358.33 16,857.72
CONSOLIDATED DISPATCH - (176.40) - - - - - - 176.40 229.86 259.43 - 489.29
EMERGENCY MANAGEMENT - 3.53 1.77 1.77 170.69 3.52 1.76 1.76 1.77 1.77 120.48 1.77 310.59
FACILITIES MAINTENANCE 50.43 71.03 954.72 382.81 2,281.80 63.34 104.96 145.36 1,505.45 2,482.90 1,415.48 18.70 9,476.98
FINANCE/CITY HALL - 5.70 334.05 1,075.72 - 5.69 24.41 132.98 (195.10) 784.17 92.96 117.71 2,378.29
FIRE 596.20 6,595.63 13,204.33 26,648.68 14,983.11 23,130.38 37,326.86 13,797.22 35,665.39 2,996.95 11,899.41 27,788.38 214,632.54
FLEET MAINTENANCE - 4.23 2.12 2.12 - 4.22 616.65 2.11 2.12 2.12 2.12 2.13 639.94
GOLF 336.25 206.83 1,322.27 1,925.91 5,390.52 1,132.58 165.78 145.62 927.57 126.93 1,593.07 1,070.98 14,344.31
IT - 1,153.29 176.78 1,289.30 494.95 114.39 225.69 510.23 41.02 8.67 41.02 41.02 4,096.36
LANDFILL 14,329.42 5,698.20 22,020.18 25,376.88 30,647.49 16,394.23 10,640.76 6,601.80 4,021.98 133,781.99 28,559.14 20,956.49 319,028.56
NEIGHBORHOOD WATCH - - - 75.00 - - - - - - - - 75.00
PARKS 3,833.75 7,757.21 4,876.65 10,496.31 12,876.14 1,507.84 5,503.40 3,744.63 7,407.42 8,663.65 661.79 2,362.29 69,691.08
PLANNING & ZONING - 3.15 412.30 1.57 - 3.14 12.35 1.57 1.57 1.57 1.57 1.57 440.36
POLICE 25,487.39 22,126.86 28,186.05 36,775.57 18,614.73 19,958.56 25,219.45 13,028.22 29,361.30 37,323.31 30,933.43 17,160.18 304,175.05
RECREATION - 14.10 7.05 468.90 138.33 550.86 1,296.48 858.88 976.51 1,974.89 7.05 702.41 6,995.46
RECYCLING CENTER 851.67 - 438.20 - - - - - - - - - 1,289.87
SAFETY - 694.61 3.62 47.11 - 7.23 14.39 3.61 552.93 3.62 3.62 3.62 1,334.36
SANITATION 46,697.10 68,410.85 78,347.19 81,637.01 57,155.28 55,149.22 105,823.51 50,267.18 56,251.73 78,122.56 93,348.77 90,561.49 861,771.89
SEWER MAINTENANCE 1,387.91 9,312.08 3,046.74 9,821.27 1,017.91 25,152.09 43,505.85 793.84 16,332.10 3,215.62 3,393.00 12,564.22 129,542.63
SPECIAL ELECTRONICS 265.80 60.41 99.64 761.32 350.17 731.70 489.19 184.90 (306.02) 3,048.44 435.25 3,038.88 9,159.68
STREETS 19,761.85 25,849.65 12,155.06 48,241.40 26,889.23 6,427.32 27,684.01 5,250.92 6,846.57 24,077.53 27,126.52 19,970.21 250,280.27
TRANSIT 11,177.29 8,645.49 14,038.13 18,656.00 11,474.35 3,608.75 16,239.24 4,342.50 3,152.20 15,237.76 7,254.71 25,162.16 138,988.58
WWTP 1,594.53 3,611.38 970.64 5,667.18 6,529.92 530.53 2,459.53 1,041.23 7.36 4,021.42 1,420.63 2,291.04 30,145.39
WATER MAINT & TRANS 15,301.11 10,961.93 10,080.26 14,768.74 9,235.17 3,162.52 6,310.36 5,842.81 2,705.94 6,582.30 5,139.99 4,277.28 94,368.41
WWTP LAB - 0.85 17.24 375.18 - 55.88 70.02 0.44 (134.05) 329.98 0.44 29.33 745.31
ZOO 639.65 449.61 839.83 1,324.01 7,170.23 1,276.86 2,471.62 237.41 698.12 22.45 606.05 22.45 15,758.29
154,573.02 193,754.88 209,936.85 311,573.00 223,492.25 166,636.81 297,365.78 118,631.47 180,718.73 341,667.78 223,536.19 242,353.32 2,664,240.08
52
CITY OF ROSWELL
MONTHLY VEHICLE/EQUIPMENT MAINTENANCE COSTS BY DEPARTMENT
FOR FY2021
DEPARTMENT JUL 2020 FY2021 TOTAL
AIR CENTER (4,373.57) (4,373.57)
ANIMAL CONTROL 484.13 484.13
CAPITAL IMPROVEMENTS 748.41 748.41
CEMETERY 198.89 198.89
CENTRAL CONTROL 508.88 508.88
CODE ENFORCEMENT 88.00 88.00
COMMUNITY ENHANCEMENT 67.74 67.74
CONSOLIDATED DISPATCH - -
EMERGENCY MANAGEMENT - -
FACILITIES MAINTENANCE 357.75 357.75
FINANCE/CITY HALL 4.80 4.80
FIRE 24,862.84 24,862.84
FLEET MAINTENANCE - -
GOLF 2,206.64 2,206.64
IT 8.28 8.28
LANDFILL 2,659.19 2,659.19
PARKS 1,925.23 1,925.23
PLANNING & ZONING - -
POLICE 20,862.46 20,862.46
RECREATION 550.71 550.71
RECYCLING CENTER 139.46 139.46
SAFETY 2.70 2.70
SANITATION 54,679.24 54,679.24
SEWER MAINTENANCE 1,721.40 1,721.40
SPECIAL ELECTRONICS 18.54 18.54
STREETS 12,119.61 12,119.61
TRANSIT 9,296.99 9,296.99
WWTP 311.66 311.66
WATER MAINT & TRANS 3,102.86 3,102.86
WWTP LAB 1.52 1.52
ZOO 1,361.82 1,361.82
133,916.18 133,916.18
53
The Special Electronics Department reported activity for July 2020.
The primary focus for this month:
• The annual testing of the conflict monitoring devices in each traffic control cabinet
located in the City of Roswell.
• Moving the service drop for the traffic control cabinet at Atkinson & Bland.
EMERGENCY CALL OUTS:
• 2nd & Richardson
• 2nd & Virginia
• 2nd & Sycamore
• 2nd & Garden
• Country Club & Garden
• Pedestrian Light on South Main &
Tilden
Continuing Projects:
Installed Traffic Cameras at 19th & N. Main
RPD Video Request at:
• Pine Lodge & N. Main
• College & N. Main
• 2nd St. & Sunset
• 2nd St. & Virginia
• 2nd St. & Garden
Utility One Call Responses
Locates conducted at 343 different locations to identify City underground wiring.
54
Streets Dept. Monthly Report for July 2020
Projects Focus
The focus of work this month was community support. The Street Department has employees and
equipment involved in the reworking project of the fishing pond at the City Zoo. The sign shop set up
and removed as needed traffic control equipment for COVID 19 testing.
Projects Continued
The moving of overburden continues at the crusher site, delayed some by the diversion of working at the
fishing pond. The day to day operations continues without interruption. The mower crew is working alleys
and right of ways. The herbicide crew continues to spray weed where the mower is unable to mow,
responds to the need for sand after an accident, or to pick up some hazard out of the roadway. The alley
maintenance crew is continuing to maintain alleys with stockpiled material. Street sweeping continues
with two sweepers in operation.
Quantities of Materials
Street crews have used 88 tons of cold-mix and 51 bags of poly patch were used filling potholes
The herbicide crew applied 1635 gallons of weed killer to City properties.
The sign shop replaced 21 signs this month. During the month 21 posts and bases were replaced.
The rock crusher is not operational, awaiting replacement conveyor belt just received from the supplier.
The sweepers have removed 24 dump truck loads of waste material that have been sent to the landfill.
COVID-19 Corona Virus Impact
Support for the testing sites in the way of traffic control devices set out and recovered as needed. The
department has continued to encourage the use of hand sanitizers and have provided face masks and
encourage use when in public.
Projects Upcoming
Rock crushing operation will resume once the replacement conveyor belt is installed. Normal day to day
operations will continue despite high temperature and COVID-19 adjustments.
Equipment Brief: No changes in equipment.
55
Water Maintenance and Transmission
Monthly Report for July, 2020
Work Orders by Category This Month Year to Date
Main Break 12 86
Main Break - Unfounded 2 14
Replace Mainline Valve 3 15
Service Line City Side Leak 81 372
Service Line Customer Side Leak 32 253
Service Line Break Unfounded 19 124
Meter Box repair 12 104
Customer no water-unfounded 2 11
Hydrant Repair 6 61
Meter call returned to Central Control 2 39
New Service 8 49
Abandon Service 1 4
811 Utility Located 707 5151
Other-misc. 12 73
PROJECTS
Completed
Current
Garden Street Bridge
Airport water towers
Valve Insertions
Future
Small In-house water main replacements (currently on hold)
Inventory Control Program (Taylor module) for warehouse
56
WWTP Monthly Report for July 2020
Sewer Crew
PSU calls 19
Actual stop ups 2
Shot line to satisfy customer2
Shot line due to clean out 1
Sewer odor calls 0
Applied HTH to 3 manholes
Locate Sewer Line 0
Loose manhole lids calls 1
Sink hole 0
Facility Maintenance 0
Lift station 0
WWTP Total calls 19
Central called in 7 of the 19 calls
Footage for Stripping South side 0’ Vactor 355 down for the month of July.
North side 3,275’ Vactor was down for emergency use only due to mechanical
problems.
Manhole adjustments 1
Point Repairs 2
West 19th Street
Televised Lines 3
Weekly Maintenance Northside was done on July 10th & July 24th.
Southside maintenance was done on June 3rd and June 17th.
57
WWTP Plant Operators
Plant operator making daily rounds and collecting data of pumps and motors.
Making adjustments as needed to keep plant operational.
Servicing the UV station weekly which consists of replacing burnt out lamps
adding cleaner and greasing.
Cleaning irrigation filters weekly which consists of removing dirty screens and
replacing with clean screens and then proceed to clean dirty screens.
Operators doing daily cleaning and maintenance as needed.
Operator mixing drying beds with loader.
Fixed lines in plant irrigation line.
Mowing season has started operators mowing in between maintenance of
equipment and issues as they occur.
Plant Operator called out twice for low header pressure (blower overload). Called
out for high level alarm had to reset bar screen.
Dropping basin 3 (three) for maintenance, maintenance consists of empting basin
washing basin, removing diffusers, broken rings and replacing both broken rings
and diffusers. Putting basin 1 (one) on line.
Replaced shear pins on primary piston pumps.
58
Lab
Doing weekly Bactis’ for city drinking water. Collecting and sampling 15 samples
every Tuesday to meet the NMED requirements of 60 samples monthly.
Running daily process control for the WWTP
Running the three weekly tests required by NMED permit to discharge reclaimed
water to the farmers.
Collected samples from the 20 MW located around the fields using the treated
effluent water. This is a 2(two) day process.
Lab personnel collected the quarterly Haloacetic Acids (HAA5) along with the
Total Trihalomethanes (TTHM) as required by NMED permit.
59
Pretreatment
Industrial surcharge sampling inspection for the month of July
Maintenance the equipment to be used in August for sampling.
Billed septic haulers/deposited checks as they came in.
Month JULY
No. Customer Name PT SC Comments
Inspections. Billing Surcharge on 4th of June
Surcharge Programs End of Fiscal Year Purchase Order Invoicing
Wing Stop X Receive payments For Surcharge Progams
totaling$2910.00
Churchs South X
Golden Corral X Sample bottles for 3rd Quarter WWTP and all
equipment ready for July events
KFC/Taco Bell X
Long JOHNS X
Ameripride linen X
Dunkin Donuts X
X
Dions pizza
60
Wing Stop X
Inspect Dean Baldwin X Closed due to Covid
Super Fund Main and Mcgaffey X
Super fund Lea and Second X
Christmas By Krebs X Every month of the year sample results are due.
RV Village X
Leprino
Red Lobster
Golden Corral x
61
Glossary
Bacti Samples Samples of drinking water collected throughout the city from
customers’ faucets located outside of home and tested for fecal coliform and
E. coli.
Bar Screen Equipment used to remove large debris from continuing further into
plant.
Basin Rectangular tank that holds 850,000 gallons of water that is aerated with
fine air diffusers.
Central Known as Central Control. This is a 24 hour a day, 7 days a week
manned control station located west of the Roswell Industrial Air Center (RIAC).
Clarifiers Wastewater is introduced into a sedimentation tank or clarifier and the solids are
allowed to settle to the bottom once settled it is pumped to the digester for further treatment.
The floatables rise to the top and are skimmed off to a scum box.
Clean Out Reduced access line in the main sewer line with a reduced 6” 90⁰
sweep for inspection.
DWAS Tank Tank used to store WAS for dewatering.
Dead End Buried main sewer line with no access.
Digester Three large tanks used to hold solids for anaerobic digestion. Two
tanks used to heat and mix sludge one tank for extra storage. Combined gallons of
tanks are 1,400,000 gallons.
GBT Gravity Belt Thickener is used to dewater the WAS coming from the final
clarifiers
HAA5 Haloacetic Acids samples are state required for drinking water.
Manhole Adjustments Realignment of manhole with the surface of the ground.
Monitoring Well Sample points to test for ground water where reclaimed water
is used to irrigate crops.
Reclaimed Water Sewer water that has gone through the process of the WWTP.
PSU Possible Stop Up
62
Point Repair Realignment of main sewer lines or repair of broken main line.
RAS (Return Activated Sludge) treated water being returned to the head of the
aeration basin for more treatment.
RAS Pump Return Activated Sludge, this is the pump to pull water from the final
clarifiers and reintroduce it to the front of the aeration basin for more treatment.
Stripping Cleaning the main sewer lines using the Vactor truck.
TTHM Total Trihalomethanes samples are state required for drinking water.
UV Station Ultra violet lamps that disinfects processed water prior to being
released to river or for irrigation of crops.
Vactor Large truck used to unplug main sewer stop ups and clean the main
sewer lines.
WAS (Waste Activated Sludge) also known as wasting, taking treated water from
the final clarifiers and taking it out of the system to keep from overloading the
system.
WAS Pump Waste Activated Sludge, this pump is to pull water from the final
clarifiers and send to the DWAS tank so it can be taken out of the system and
dewatered and the solids sent to the digester.
WWTP Wastewater Treatment Plant
Weekly Maintenance Stripping and cleaning main sewer lines in problem areas
and lift stations.
63