Board of Public Utilities
Regular MeetingSanta Rosa, CA · March 3, 2022
Minutes
Hybrid - See Agenda for
City of Santa Rosa Participation Information
City Council Chamber
100 Santa Rosa Avenue
Board of Public Utilities
Meeting Minutes - Final
Thursday, March 3, 2022 1:30 PM
1:30 PM - HYBRID VIA IN-PERSON AND ZOOM
1. CALL TO ORDER AND ROLL CALL
Chair Galvin called the meeting to order at 1:33 p.m.
Present 7 - Chair Daniel Galvin III, Vice Chair William Arnone Jr., Board Member
Lisa Badenfort, Board Member Christopher Grabill, Board Member
Mark Walsh, Board Member Mary Watts, and Board Member Glen
Wright
2. STATEMENTS OF ABSTENTION BY BOARD MEMBERS
There were no Statements of Abstention from Board Members.
3. STUDY SESSION - NONE.
4. MINUTES APPROVAL
4.1 February 17, 2022 - Regular Meeting Minutes.
Attachments: February 17, 2022 - Regular Meeting Minutes
The minutes for February 17, 2022 were received and accepted as
submitted.
5. STAFF BRIEFINGS
5.1 2021 ANNUAL COMPLIANCE UPDATE
In 2021, the Regional Water Reuse System’s Laguna Treatment Plant beneficially
reused 5.43 billion gallons of recycled water, 5,071 dry metric tons of biosolids, and
197 million cubic feet of biogas. This is all done through an intensive treatment
process, resulting in a high-quality tertiary-treated recycled water. Through the
treatment process, the solids are separated out and are treated to create class B
biosolids in addition to biogas that is used to generate electricity which offsets the
demand of the Laguna Treatment Plant. In order to minimize the impacts of our
operations on the natural environment the Laguna Treatment Plant implements a
broad range of compliance programs which supports the Department operations
and promotes environmental stewardship. Staff will provide an overview of
applicable regulations, highlight permit requirements, and summarize compliance
during 2021. The Board may discuss this item and give direction to staff.
City of Santa Rosa
Meeting Minutes
Page 2 of 6
Board of Public Utilities Meeting Minutes - Final March 3, 2022
Attachments: Presentation (added 3/2/22)
Presenter: Heather Johnson, Environmental Services Officer
5.2 WATER AND RECYCLED WATER SUPPLY UPDATE
Staff will update the Board on water and recycled water supply issues. The Board
may discuss this item and give direction to staff.
Attachments: Presentation (added 3/2/22)
Presenters: Peter Martin, Deputy Director - Water Resources and
Emma Walton, Deputy Director - Water Reuse
6. CONSENT ITEMS
NONE.
7. REPORT ITEMS
7.1 REPORT - MINOR REVISIONS TO THE GUIDE TO POTABLE WATER,
RECYCLED WATER AND WASTEWATER POLICY
BACKGROUND: The Guide to Potable Water, Recycled Water and Wastewater
Policy was last updated in August of 2014. This update includes corrections of
typographical errors, adds clarifying language, removes language in the Best
Available Technology section and updates the Residential Payment Plan section.
RECOMMENDATION: It is recommended by the Water Department that the Board
of Public Utilities, by resolution, approve the revisions and proposed update to the
Guide to Potable Water, Recycled Water and Wastewater Policy.
Attachments: Staff Report
Attachment 1_Revised Guide
Attachment 2_Guide (Redline)
BPU Resolution No. 1285
Exhibit A_Guide (Redline)
Presentation (added 3/2/22)
Presenter: Caryn Lozada, Development Review Coordinator
A motion was made by Vice Chair Arnone, Jr., seconded by Board Member
Wright, to approve Item 7.1 - RESOLUTION NO. 1285 ENTITLED
"RESOLUTION OF THE BOARD OF PUBLIC UTILITIES OF THE CITY OF
SANTA ROSA APPROVING REVISIONS TO THE GUIDE TO POTABLE
WATER, RECYCLED WATER AND WASTEWATER POLICY." The motion
carried by the following vote:
City of Santa Rosa
Meeting Minutes
Page 3 of 6
Board of Public Utilities Meeting Minutes - Final March 3, 2022
Yes: 7 - Chair Galvin III, Vice Chair Arnone Jr., Board Member Badenfort,
Board Member Grabill, Board Member Walsh, Board Member Watts
and Board Member Wright
7.2 REPORT - SOLE SOURCE CONTRACT SPECIFICATION FOR THE
FUELMASTER 2500 PLUS FUEL MANAGEMENT SYSTEM AND INTEGRATED
PROKEE KEY AND APPROVAL OF PROJECT FOR THE LAGUNA
TREATMENT PLANT EMERGENCY GENERATOR FUEL TANK AND FLEET
FUELING STATION REPLACEMENT PROJECT, CONTRACT NO. C02192
BACKGROUND: The emergency generator system for the Laguna Treatment Plant
(Plant) was installed in 1990. The system provides emergency power to enable
plant operation to maintain National Pollutant Discharge Elimination System
compliance, in the event that the Plant’s primary power source is unavailable from
Pacific Gas and Electric Company (PG&E). In recent years, Plant staff have noted
the frequency of power outages has increased with PG&E’s implementation of
Public Safety Power Shutoffs (PSPS). The unpredictable frequency of PSPS has
escalated the City’s need to address the aged condition of the emergency
generator system, which includes a 15,000-gallon diesel fuel underground storage
tank (UST).
Construction contract C02192, Laguna Treatment Plant Emergency Generator Fuel
Tank and Fleet Fueling Station Replacement, will replace the existing diesel tank
and the fueling station supplied by the tank. The project will include a sole source
specification to include the FuelMaster 2500 Plus and integrated PROKEE key to
provide operational uniformity and compatibility with the City’s existing fuel
management system.
RECOMMENDATION: It is recommended by the Transportation and Public Works
Department and the Water Department that the Board of Public Utilities, by
resolution: 1) approve the sole source contract specifications for the FuelMaster
2500 Plus fuel management system and integrated PROKEE key; and 2) approve
the Laguna Treatment Plant Emergency Generator Fuel Tank and Fleet Fueling
Station Replacement Project.
Attachments: Staff Report
BPU Resolution No. 1286
Presentation (added 3/2/22)
Presenter: Richela Maeda, Associate Civil Engineer
A motion was made by Board Member Wright, seconded by Board Member
Watts, to approve Item 7.2 - RESOLUTION NO. 1286 ENTITLED
"RESOLUTION OF THE BOARD OF PUBLIC UTILITIES APPROVING THE
SOLE SOURCE SPECIFICATION FOR THE FUELMASTER 2500 PLUS FUEL
MANAGEMENT SYSTEM AND INTEGRATED PROKEE KEY AND
APPROVING THE PROJECT FOR THE LAGUNA TREATMENT PLANT
City of Santa Rosa
Meeting Minutes
Page 4 of 6
Board of Public Utilities Meeting Minutes - Final March 3, 2022
EMERGENCY GENERATOR FUEL TANK AND FLEET FUELING STATION
REPLACEMENT PROJECT, CONTRACT NO. C02192." The motion carried
by the following vote:
Yes: 7 - Chair Galvin III, Vice Chair Arnone Jr., Board Member Badenfort,
Board Member Grabill, Board Member Walsh, Board Member Watts
and Board Member Wright
7.3 REPORT - SOLE SOURCE CONTRACT SPECIFICATION FOR THE WASTE
GAS BURNER SYSTEM AND APPROVAL OF PROJECT FOR LAGUNA
TREATMENT PLANT WASTE GAS BURNER REPLACEMENT PROJECT,
CONTRACT C01978
BACKGROUND: The City’s Laguna Wastewater Treatment Plant (Plant) operates
a cogeneration system consisting of four internal combustion engines. Two of the
engines are primarily fueled by digester gas from four anaerobic digesters and
regularly consume all digester gas produced from the Plant. To facilitate biogas
handling, the Plant operates an open, “candlestick” type waste gas burner (WGB)
when excess or low-quality digester gas cannot be consumed by the cogeneration
system, or as a backup to the cogeneration system, such as when engines are
off-line for maintenance. Originally constructed in 1976, the Varec Biogas WGB
system is nearing the end of its useful life and requires replacement.
The Laguna Treatment Plant Waste Gas Burner Replacement project, Contract
C01978, will replace the existing waste gas burner system with a new waste gas
burner Varec Biogas, Model 244E. The project will include a sole source
specification to provide compliance with key design criteria as well as maintain
reliability and uniform compatibility with the existing equipment and minimize
operational impacts to the Plant.
RECOMMENDATION: It is recommended by the Transportation and Public Works
Department and the Water Department that the Board of Public Utilities, by
resolution: 1) approve the sole source contract specifications for the Varec Biogas,
Model 244E Enclosed Waste Gas Burner system and integrated Siemens
programmable logic controllers; and 2) approve Laguna Treatment Plant Waste
Gas Burner Replacement Project, C01978.
Attachments: Staff Report
Attachment 1_Technical Memorandum
BPU Resolution No. 1287
Presentation (added 3/2/22)
Presenter: Tracy Duenas, Supervising Engineer
A motion was made by Board Member Walsh, seconded by Board Member
Grabill, to approve Item 7.3 - RESOLUTION NO. 1287 ENTITLED
"RESOLUTION OF THE BOARD OF PUBLIC UTILITIES APPROVING THE
SOLE SOURCE SPECIFICATION FOR VAREC BIOGAS ENCLOSED WASTE
City of Santa Rosa
Meeting Minutes
Page 5 of 6
Board of Public Utilities Meeting Minutes - Final March 3, 2022
GAS BURNER AND SIEMENS PROGRAMMABLE LOGIC CONTROLLER
AND APPROVING THE LAGUNA TREATMENT PLANT WASTE GAS
BURNER REPLACEMENT PROJECT, CONTRACT C01978." The motion
carried by the following vote:
Yes: 7 - Chair Galvin III, Vice Chair Arnone Jr., Board Member Badenfort,
Board Member Grabill, Board Member Walsh, Board Member Watts
and Board Member Wright
8. PUBLIC COMMENTS ON NON-AGENDA MATTERS
NONE.
9. REFERRALS - NONE.
10. WRITTEN COMMUNICATION (AND POSSIBLE BOARD DISCUSSION)
10.1 CONGRESSMAN THOMPSON LETTER AND WRDA REQUEST - Provided for
information.
Attachments: Letter and WRDA Request
11. SUBCOMMITTEE REPORTS
Board Member Watts reported the Budget Review Subcommittee
met on February 23, 2022. Staff provided preliminary information
about the FY 2022/23 budget including an overview, assumptions
and projected revenues and reserves for the Water, Wastewater
and Subregional funds. Staff also provided an update on FEMA and
grant-funded project.
12. BOARD MEMBER REPORTS
NONE.
13. DIRECTORS REPORTS
Jennifer Burke, Director, reported during the October 2021 storms,
the Laguna Treatment Plant had an inflow of 65,000 gallons per
minute. Water that was not fully treated was captured and isolated in
recycled water storage ponds and staff implemented a system to
return the water to the Plant for re-treatment. The process was
completed on February 22, 2022 with a total of 300 million gallons
being re-treated.
Director Burke provided an update on the water and wastewater
City of Santa Rosa
Meeting Minutes
Page 6 of 6
Board of Public Utilities Meeting Minutes - Final March 3, 2022
arrearages. Santa Rosa Water staff pursued State funding and
recently received $385,000 that will be applied to overdue water
charges on customer accounts. Staff is working on an application for
funding related to overdue wastewater charges that is due in April.
Director Burke reported the Laguna Environmental Laboratory (LEL)
received its new Environmental Laboratory Accreditation Program
(ELAP) certification following an external audit by an outside
contractor.
Director Burke announced that Celia Parkinson, Civil Engineering
Technician, retired on March 1 after 27 years of service with the City
- most recently as a member of the Water Engineering Services
team.
14. ADJOURNMENT OF MEETING
Chair Galvin adjourned the meeting at 2:41 p.m. in honor of Celia
Parkinson and wished her the best in her retirement. The next
regular meeting of the Board of Public Utilities is scheduled for
March 17, 2022.
Approved on: March 17, 2022
_______/S/_______________
Roberta Atha, Recording Secretary
Agenda
Hybrid - See Agenda for
City of Santa Rosa Participation Information
City Council Chamber
100 Santa Rosa Avenue
BOARD OF PUBLIC UTILITIES
REGULAR MEETING AGENDA AND
SUMMARY REPORT
MARCH 3, 2022
PURSUANT TO GOVERNMENT CODE SECTION 54953(e) AND THE
RECOMMENDATION OF THE HEALTH OFFICER OF THE COUNTY OF
SONOMA, THE BOARD MEMBERS WILL BE PARTICIPATING IN THIS
MEETING EITHER VIA ZOOM WEBINAR OR IN-PERSON, SOCIALLY
DISTANCED, IN THE COUNCIL CHAMBER AT 100 SANTA ROSA AVENUE.
MEMBERS OF THE PUBLIC CAN PARTICIPATE IN THE MEETING BY
ATTENDING IN-PERSON FROM COUNCIL CHAMBER AT 100 SANTA
ROSA AVENUE (SOCIAL DISTANCING AND MASK REQUIREMENTS WILL
BE OBSERVED), OR VISITING
HTTPS://SRCITY-ORG.ZOOM.US/J/82254845640, OR BY
DIALING 877-853-5257 AND ENTER WEBINAR ID: 822 5484 5640
THE MEETING WILL ALSO BE LIVE STREAMED AT
HTTPS://SANTA-ROSA.LEGISTAR.COM/CALENDAR.
CLICK ON THE "IN PROGRESS" LINK TO VIEW.
THE MEETING CAN ALSO BE VIEWED ON COMCAST CHANNEL 28,
AT&T U-VERSE CHANNEL 99, AND AT
HTTPS://WWW.YOUTUBE.COM/CITYOFSANTAROSA
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 2 of 7
Board of Public Utilities MARCH 3, 2022
The public attending in person or accessing the meeting through the
Zoom link will be able to provide public comment on agenda items at the
time an agenda item is discussed during the Board of Public Utilities
Meeting.
Public Comment may also be submitted via e-mail at
bpu-comment@srcity.org
or recorded voice message at 707-543-4224.
Deadlines and additional instruction for public comment are set forth
below. The City of Santa Rosa has postponed many non-essential
meetings until further notice. We appreciate your patience and
willingness to protect the health and wellness of our community. If you
have any questions regarding this meeting, please contact Roberta Atha
at ratha@srcity.org.
1:30 PM - HYBRID VIA IN-PERSON AND ZOOM
1. CALL TO ORDER AND ROLL CALL
2. STATEMENTS OF ABSTENTION BY BOARD MEMBERS
3. STUDY SESSION - NONE.
4. MINUTES APPROVAL
4.1 February 17, 2022 - Regular Meeting Minutes.
Attachments: February 17, 2022 - Regular Meeting Minutes
5. STAFF BRIEFINGS
5.1 2021 ANNUAL COMPLIANCE UPDATE
In 2021, the Regional Water Reuse System’s Laguna Treatment Plant
beneficially reused 5.43 billion gallons of recycled water, 5,071 dry
metric tons of biosolids, and 197 million cubic feet of biogas. This is all
done through an intensive treatment process, resulting in a high-quality
tertiary-treated recycled water. Through the treatment process, the
solids are separated out and are treated to create class B biosolids in
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 3 of 7
Board of Public Utilities MARCH 3, 2022
addition to biogas that is used to generate electricity which offsets the
demand of the Laguna Treatment Plant. In order to minimize the
impacts of our operations on the natural environment the Laguna
Treatment Plant implements a broad range of compliance programs
which supports the Department operations and promotes environmental
stewardship. Staff will provide an overview of applicable regulations,
highlight permit requirements, and summarize compliance during 2021.
The Board may discuss this item and give direction to staff.
Attachments: Presentation (added 3/2/22)
5.2 WATER AND RECYCLED WATER SUPPLY UPDATE
Staff will update the Board on water and recycled water supply issues.
The Board may discuss this item and give direction to staff.
Attachments: Presentation (added 3/2/22)
6. CONSENT ITEMS
7. REPORT ITEMS
7.1 REPORT - MINOR REVISIONS TO THE GUIDE TO POTABLE
WATER, RECYCLED WATER AND WASTEWATER POLICY
BACKGROUND: The Guide to Potable Water, Recycled Water and
Wastewater Policy was last updated in August of 2014. This update
includes corrections of typographical errors, adds clarifying language,
removes language in the Best Available Technology section and
updates the Residential Payment Plan section.
RECOMMENDATION: It is recommended by the Water Department that
the Board of Public Utilities, by resolution, approve the revisions and
proposed update to the Guide to Potable Water, Recycled Water and
Wastewater Policy.
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 4 of 7
Board of Public Utilities MARCH 3, 2022
Attachments: Staff Report
Attachment 1_Revised Guide
Attachment 2_Guide (Redline)
BPU Resolution No. 1285
Exhibit A_Guide (Redline)
Presentation (added 3/2/22)
7.2 REPORT - SOLE SOURCE CONTRACT SPECIFICATION FOR THE
FUELMASTER 2500 PLUS FUEL MANAGEMENT SYSTEM AND
INTEGRATED PROKEE KEY AND APPROVAL OF PROJECT FOR
THE LAGUNA TREATMENT PLANT EMERGENCY GENERATOR
FUEL TANK AND FLEET FUELING STATION REPLACEMENT
PROJECT, CONTRACT NO. C02192
BACKGROUND: The emergency generator system for the Laguna
Treatment Plant (Plant) was installed in 1990. The system provides
emergency power to enable plant operation to maintain National
Pollutant Discharge Elimination System compliance, in the event that
the Plant’s primary power source is unavailable from Pacific Gas and
Electric Company (PG&E). In recent years, Plant staff have noted the
frequency of power outages has increased with PG&E’s implementation
of Public Safety Power Shutoffs (PSPS). The unpredictable frequency
of PSPS has escalated the City’s need to address the aged condition of
the emergency generator system, which includes a 15,000-gallon diesel
fuel underground storage tank (UST).
Construction contract C02192, Laguna Treatment Plant Emergency
Generator Fuel Tank and Fleet Fueling Station Replacement, will
replace the existing diesel tank and the fueling station supplied by the
tank. The project will include a sole source specification to include the
FuelMaster 2500 Plus and integrated PROKEE key to provide
operational uniformity and compatibility with the City’s existing fuel
management system.
RECOMMENDATION: It is recommended by the Transportation and
Public Works Department and the Water Department that the Board of
Public Utilities, by resolution: 1) approve the sole source contract
specifications for the FuelMaster 2500 Plus fuel management system
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 5 of 7
Board of Public Utilities MARCH 3, 2022
and integrated PROKEE key; and 2) approve the Laguna Treatment
Plant Emergency Generator Fuel Tank and Fleet Fueling Station
Replacement Project.
Attachments: Staff Report
BPU Resolution No. 1286
Presentation (added 3/2/22)
7.3 REPORT - SOLE SOURCE CONTRACT SPECIFICATION FOR THE
WASTE GAS BURNER SYSTEM AND APPROVAL OF PROJECT FOR
LAGUNA TREATMENT PLANT WASTE GAS BURNER
REPLACEMENT PROJECT, CONTRACT C01978
BACKGROUND: The City’s Laguna Wastewater Treatment Plant
(Plant) operates a cogeneration system consisting of four internal
combustion engines. Two of the engines are primarily fueled by
digester gas from four anaerobic digesters and regularly consume all
digester gas produced from the Plant. To facilitate biogas handling, the
Plant operates an open, “candlestick” type waste gas burner (WGB)
when excess or low-quality digester gas cannot be consumed by the
cogeneration system, or as a backup to the cogeneration system, such
as when engines are off-line for maintenance. Originally constructed in
1976, the Varec Biogas WGB system is nearing the end of its useful life
and requires replacement.
The Laguna Treatment Plant Waste Gas Burner Replacement project,
Contract C01978, will replace the existing waste gas burner system with
a new waste gas burner Varec Biogas, Model 244E. The project will
include a sole source specification to provide compliance with key
design criteria as well as maintain reliability and uniform compatibility
with the existing equipment and minimize operational impacts to the
Plant.
RECOMMENDATION: It is recommended by the Transportation and
Public Works Department and the Water Department that the Board of
Public Utilities, by resolution: 1) approve the sole source contract
specifications for the Varec Biogas, Model 244E Enclosed Waste Gas
Burner system and integrated Siemens programmable logic controllers;
and 2) approve Laguna Treatment Plant Waste Gas Burner
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 6 of 7
Board of Public Utilities MARCH 3, 2022
Replacement Project, C01978.
Attachments: Staff Report
Attachment 1_Technical Memorandum
BPU Resolution No. 1287
Presentation (added 3/2/22)
8. PUBLIC COMMENTS ON NON-AGENDA MATTERS
Public Comment may be submitted via e-mail or recorded voice message.
Live Public Comment: Members of the public can provide comment on an
agenda item in-person from the Council Chamber, by accessing the meeting
through the Zoom link, or by dial-in at the time an agenda item is discussed
during the Board of Public Utilities Meeting. Go to
https://srcity.org/virtualparticipation for more information.
Advance Public Comment:
E-mail Public Comment: To submit an e-mailed public comment to the Board
of Public Utilities, please send to: bpu-comment@srcity.org by 5:00 p.m.,
Wednesday, March 2. Identify in the subject line of your e-mail the agenda
item number(s) on which you wish to comment, provide your name in the body
of the e-mail and your comment. These comments will be e-mailed to all
Board Members, will be posted to the agenda documents on-line, and be
made part of the archive packet.
Recorded Voice Message Public Comment: To submit a voice message
public comment, please call 707-543-4224 by 5:00 p.m., Wednesday, March
2. State your name, the agenda item number(s) on which you wish to
comment, and your comment. Recordings will be limited to 3 minutes.
Recorded comments may be played at the time that the agenda item is
discussed during the Board Meeting.
Recorded public comments on public hearing items may be played at the time
when the hearing is opened.
9. REFERRALS - NONE.
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 7 of 7
Board of Public Utilities MARCH 3, 2022
10. WRITTEN COMMUNICATION (AND POSSIBLE BOARD DISCUSSION)
10.1 CONGRESSMAN THOMPSON LETTER AND WRDA REQUEST -
Provided for information.
Attachments: Letter and WRDA Request
11. SUBCOMMITTEE REPORTS
12. BOARD MEMBER REPORTS
13. DIRECTORS REPORTS
14. ADJOURNMENT OF MEETING
The Board of Public Utilities encourages public comments regarding the above items. If you are unable to attend this meeting,
please feel free to call the Water Department at 543-4200 or forward written comments to the City of Santa Rosa, Water
Department, 35 Stony Point Road, Santa Rosa, CA 95401. All comments will be forwarded to the Board at the meeting.
The City of Santa Rosa does not discriminate against individuals with disabilities in its employment, services, benefits,
facilities, programs or activities. Requests for accommodations, auxiliary aids, or services necessary to participate in a City
program, service, or activity, including printed information in alternate formats, are available by contacting the Secretary at
(707) 543-4266 (TTY Relay at 711) or ratha@srcity.org. Requests should be submitted as far in advance as possible, but no