Design Review Board
Regular MeetingSaratoga Springs, NY · February 28, 2024
Minutes
DESIGN REVIEW BOARD
MINUTES DRAFT (FINAL)
WEDNESDAY, FEBRUARY 28, 2024
6:00 P.M.
CITY COUNCIL ROOM
CALL TO ORDER: Tamie Ehinger, Chair, called the meeting of the Design Review Board to order at 6:05 P.M.
PRESENT: Tamie Ehinger, Chair; Rob DuBoff, Vice Chair; Chris Bennett, Jeff Gritsavage, Tad Roemer,
Ellen Sheehan
ABSENT: Leslie DiCarlo, Karen Cavotta (Alternate), Kennedy Flack (Alternate)
STAFF: Amanda Tucker, Senior Planner, City of Saratoga Springs,
A. APPROVAL OF MEETING MINUTES:
A motion was made by Rob DuBoff and seconded by Ellen Sheehan to approve the
February 7, 2024, meeting minutes. All in favor, motion carried.
B. POSSIBLE CONSENT AGENDA ITEMS:
NOTE: The intent of a consent agenda is to identify any "approvable" applications
without the need for further evaluation or discussion. If anyone wishes to further
discuss any proposed consent agenda item, that item would then be pulled from the
Consent Agenda and considered individually.
1. #20240049 282 Ballston Ave. Egress Windows. #9 Architectural Review of rear
egress windows.
2. #20240079 NBT Insurance Wall Sign 295 Broadway. Historic Review of a new wall
sign within the Urban Core / T-6 District.
3. #20231035 431-433 Broadway Infrared Heaters. Historic Review of new wall
mounted infrared heaters within the Urban Core / T-6 District.
4. #20240073 Studio A Freestanding Sign 74 Warren. Architectural Review of a new
freestanding sign within the Neighborhood Center / T-5 District.
Tamie Ehinger, Chair made a motion to approve the consent agenda items #20240049
282 Ballston Ave., #20240079 NBT Insurance, & #20240073 Studio A. The motion was
seconded by Ellen Sheehan. Vote: T. Ehinger-Y, R. DuBoff-Y, C. Bennett-Y, J.
Gritsavage-Y, T. Roemer-Y, E. Sheehan-Y. 6-0, motion carried.
Tamie Ehinger, Chair made a motion to approve the consent agenda item #20231035,
431-433 Broadway. The motion was seconded by Chris Bennett. Vote: T. Ehinger-Y,
C. Bennett-Y, J. Gritsavage-Y, T. Roemer-N, E. Sheehan-Y. 4-1, motion carried. Rob
DuBoff abstained after recusing himself.
C. DRB APPLICATIONS UNDER CONSIDERATION. Note: agenda item discussion
will not begin past 10:00 p.m.
1. #20240028 176 Lake Railing and Heat Pump System. Architectural Review of
exterior modifications including rear deck railing replacement and a new heat pump
system within the Urban Residential-3 District.
Randall Williams, owner. Randall said he is seeking approval to replace the treated
lumber railing and install a condenser unit on the back of the building, the second-floor
deck area. Randall said the deck is old and structurally unsound. He said they are also
having problems with the rubber roof above the deck, and it needs to be replaced. He
said they are looking to put a new air conditioning unit with heat on the second floor,
and showed a sketch of where the condenser unit will be located. Randall said all the
work will be done at the back of the building. He said the railing will be white, which
compliments the house and provides the most structural support posts that they could
get.
Tamie asked where the conduit and venting would be located. Randall said it will come
down to the right of the unit as shown in the photo and the conduit will be covered with a
white service unit. The condenser will be located on the house about 18” above the roof
(deck floor) to the right of the chimney. Tamie said vinyl is not a product that she would
typically approve of, especially in the architectural or historic districts. She said she
doesn’t have any concerns about the location of the condenser or conduit because it’s
in the rear of the building and there is zero visibility from the street. The same with the
vinyl railing, Tamie feels it’s not inappropriate enough to deny the application.
Ellen said she agrees with Tamie. Vinyl can get mold and mildew and be tricky to
repair because it needs to be done in sections. She said a different material might
serve him better. Ellen said if they choose to move forward with the vinyl, it’s fine
because it’s located in the back of the house. Randall said he chose the white vinyl
railing because it comes with a very solid structural post. He said rubber roofing
membranes don’t stick to wood products. Randall explained how the deck railing will be
reassembled giving additional strength to the deck.
Tad said he doesn’t object because it’s not an historic building and it’s at the rear of the
structure.
Jeff said the condenser and railing will not be a visual impediment to Lake Ave. and
suggested they minimize the run for the conduit by the placement of the unit to make it
look better. Jeff said he would never use vinyl, but white is most appropriate because it
won’t fade.
Chris clarified that the applicant will be putting on a new rubber roof which will be the
deck. He asked if the applicant had considered Premier Rail, a fiberglass system.
Randall said he only considered it in the structural means of the post fastening. He said
City of Saratoga Springs – Design Review Board Minutes – February 28, 2024 - Page 2 of 13
the other reason he didn’t consider it for the railing is that there are vinyl corners and
vinyl post sleeves match the same material on the front of the building. Chris agreed
with the other board members about the vinyl and it being on the back of the house.
Tamie asked if anyone from the audience wished to comment on the application. There
were no comments.
Jeff Gritsavage made a motion to approve the application with the following conditions:
Locate the unit to minimize the length of conduit; the vinyl must be white in color. The
motion was seconded by Tad Roemer. Vote: T. Ehinger-Y, R. DuBoff-Y, C. Bennett-N,
J. Gritsavage-Y, T. Roemer-Y, E. Sheehan-Y. 5-1, motion carried.
2. #20240029 130 Regent St. Window Replacement. Historic Review of select window
replacement within the Institutional Education District.
Gillian Staniforth, Owner. Gillian said her and her husband purchased the unit in
2021. She said she’s retiring from her job in Vermont, and they will be moving here in
the near future. Gillian said there is a large arched opening on the back of the building
where bats have come in and there have been leakages, and they are not able to open
and close the windows. There are two smaller windows in the bedroom section that
have rot and decay and the sash cords within them are broken. They do not open and
close easily. Gillian said the large arched window was a carriage house door that
opened outward at one time. The house was built in 1903. She said the archway has
been painted and sealed shut. Gillian said because the windows are single pane and
on the second floor, they’re unsafe. Plexiglass has been placed over the arched
window as a full-length barrier to keep people from going through the opening. Gillian
said they are proposing to have the smaller windows fixed. She said she contacted
people who do historic restoration, and none were willing to take on the job. Gillian said
she contacted Renewal by Andersen to see what they could do. She said the two
smaller windows have vinyl storm windows that are warped and don’t function well.
Gillian said the large arched window is peeling and rotted. Some of the wooden pieces
around the panes have fallen off. Gillian said in working with Andersen they have come
up with a solution. The arch would look the same and the material they would use is
wood reinforced with polymer. There would be a large arched window at the top that
would meet a sliding window on the bottom that would be operable. Gillian said it would
function differently because it wouldn’t be doors or open outward but look the same as it
does now. Gillian said they are looking to preserve the architecture of the building. She
showed a photo of a railing that has been placed in front of the archway on the interior
for safety reasons. Gillian said she’s hoping for a solution that allows them to preserve
the aesthetic, increase the efficiency, and for the windows to be operable; that would be
an ideal outcome for her as the owner and person who will be living there.
Tamie Ehinger, Chair clarified that the smaller windows are wood not vinyl but have
vinyl storms on them. Tamie noted the historic standards regarding window
replacement.
Preserve rather than remove:
City of Saratoga Springs – Design Review Board Minutes – February 28, 2024 - Page 3 of 13
• Distinguishing the original features of a structure or site is essential to the historic
quality and character of that site.
• Distinguishing original qualities or character of a structure, site and/or its
environment must be preserved and protected to the maximum extent possible.
• Destruction or alteration of any historic material or distinctive architectural
features should be avoided.
Repair rather than replace:
• Distinctive architectural features that characterize a structure or site must be
repaired whenever possible.
• If replacement is necessary the replacement should match the original in
composition, design, color, texture, and all other visual qualities.
Tamie said historic windows are a character defining feature of a historic home. She
said it will need to be determined whether the windows are damaged beyond repair. If
they are, then appropriate replacement materials could be discussed at that time.
Tamie said there’s not enough documentation at this time to determine if the windows
are damaged beyond repair. Tamie added that it would be rare for a window to not be
repairable. If the windows are allowed to be replaced, they must be replaced in kind.
Gillian said she has been unsuccessful in finding someone with historic preservation
knowledge to repair the windows because of the condition. Tamie said that most
historic windows that need repair have broken ropes, and most are sealed but they can
be repaired. Tamie recognized that it is hard to find someone to do that work.
Chris Bennett said he knows the property and it’s beautiful. He said there are two
separate issues going on; the 2 double hung windows with the ropes can be repaired;
the arch doors have metal plates holding them together, so the issue is more complex.
Chris said if she replaces the smaller windows with the proposed Fibrex window it will
change the look of the outside of the building. Chris said if they were making a new
arched doorway the board would need a layout of where the grill patterns are and how
it's all going to work. Chris said what Gillian proposed with the separate arch and
bottom slider will not look the same.
Rob DuBoff agreed with Chris about the double hung windows. Rob said the board is
just looking at the photos of the windows for the first time tonight. He said you can see
that the arch window has some structural issues and it likely was not a good design to
begin with. Rob said the board will need to see exactly what they are proposing for the
arched window. The arched window is a defining architectural feature of the property.
Gillian asked if a sliding window is a bad thing. Rob said it’s not appropriate for this
building. Rob said to fix the arch window, the glass would need to be taken out, pulled
apart where there are seams and glued back together. He said he’s not even sure that
they could get it back to functioning properly. Chris added that it could be replicated.
Tamie said this is one unit in a building and none of the other windows have been
replaced and they shouldn’t be based on historic standards.
Jeff said what is being proposed is a half round window with a slider underneath. Jeff
said one window will be in front of the other for it to slide, so it won’t look the same. He
said what has been presented is not adequate for him to go ahead with this application.
City of Saratoga Springs – Design Review Board Minutes – February 28, 2024 - Page 4 of 13
Jeff said the property is gorgeous and the window is a character defining feature that
needs to be repaired.
Tad Roemer said he’s on board with everyone else that the window should be repaired
or replaced in kind.
Ellen Sheehan noted that Chris and Rob are experts in windows and their opinion that
the window would need to be repaired is likely correct. She said if it needs to be
replaced, then a slider wouldn’t work. Ellen said Gillian could get casement windows
that open at the top where the window is arched and fixed on the bottom.
Samantha Bosshart, Saratoga Springs Preservation Foundation. Samantha said
the photos are helpful in understanding the condition of the windows. She agreed with
the board that the double hung windows do not look beyond repair. Samantha
researched the property and had a photo that showed that historically there were barn
doors that opened inward with a solid bottom panel on the carriage door.
Tamie suggested that the applicant work with the Preservation Foundation to come up
with some designs for replacement of the arched doors/window and come back in two
weeks. She said the DRB is very willing to work with Gillian to come up with a solution.
Amanda said that the applicant can submit to her whatever she would like to revise
based on tonight’s discussion and she will place Gillian on a future agenda when she’s
ready. Tamie added that the applicant should come back with all of the details she can
possibly provide so they can make an informed decision.
3. #20240051 Clancy's Rear Addition 43 Caroline St. Architectural Review of a 1-story
rear addition within the Urban Core / T-6 District.
Bob Flansberg, Dreamscapes Unlimited. Bob showed slides of property location, site
plan and
Bob said the existing building is 72’ long by 20’ wide and there’s an existing alley
between Trotters and Clancy’s Tavern that is 6’ +- wide and that is the only access to
the rear of the property. Bob said the front of Clancy’s is brick veneer and the
remainder of the building is cinder block (CMU). Bob noted the new 30 ft. building in the
photo at the rear of Clancy’s. Bob said they can build right up to the lot line which is 10
ft. for the proposed addition. The applicant is proposing to put a kitchen at the back of
the building. Bob said he will be moving an exit door (on the right of the building)
forward about 2 ft. so that people will not have to go through the kitchen to egress. Bob
said initially they were going to continue with cinder blocks on the exterior, with footings
but decided they wouldn’t be able to get concrete and equipment back there. They’ve
designed the addition on piers with Sonotubes and a wood frame structure with a one-
hour fire rating. They are proposing fiber cement material that will be flush with the
existing cinder block. The building is 14 ft. high and steps down about 2 ft. The roof
drainage comes forward. The 10 ft. addition will drain onto the existing roof. He said
the bulk of the building is 12’ 9” high. Bob said the fiber cement panels are 4’ x 10’ that
he will run horizontally as opposed to vertically. He said there’s an aluminum flashing
system about an inch and a half wide. Bob said the vertical strips are 2.5” battens. Bob
showed photos of the existing condition at the rear of Clancy’s. They will be removing
the steps and railing at the back of the building. Bob said the existing floor elevation to
City of Saratoga Springs – Design Review Board Minutes – February 28, 2024 - Page 5 of 13
the ground measures approximately 21”. He said once the addition is completed
skirting won’t be necessary because there will be less than a foot exposed. Rob asked
what the distance was between Bonacio’s building and the new addition. Bob said
Bonacio’s is not built to the property line and Clancy’s will be built to theirs, so about a
foot. The panels will be color matched to the cinder blocks.
Tamie Ehinger, Chair said this addition will not be visible and won’t negatively affect
the character of the neighborhood. Tamie said in this instance she has no concern
about the cement board panels but installation is key to longevity. She suggested they
use a skirt board in the back to keep small animals from living under there but will leave
that up to the applicant. Tamie asked about any mechanicals that may be located
there. Bob said there will be an Ansul hood that will come up about 1.5’ out of the roof.
They will place it about 10’ away so they won’t need a safety rail. Bob said it’s not a
serviceable item. Tamie said she would like to see details on that venting.
Jeff Gritsavage asked about the existing windows on the back and if that will be the
service window. Bob said the wall will be pushed two feet forward into the bar and a
new service window will be put in. Jeff said that expanding food offerings in pubs is the
direction the city wants to go. Jeff said he is ready to advance the application with the
details of the Ansul hood being administratively approved.
Rob DuBoff has concerns with the addition being built so close to the property line and
Bonacio’s property, especially with drainage. Rob suggested the applicant have a
conversation with Bonacio about that. Rob asked that the applicant submit a site plan
showing exact dimensions of where Bonacio’s building sits versus Clancy’s property
line. Tamie asked if it would be possible to pull the addition back another foot to take
care of maintenance issues, etc. Bob said they will look at pulling it back one foot.
Tamie Ehinger, Chair asked that the applicant submit details regarding the Ansul
system and moving the addition back from the lot line one foot, the board will review it
and place them on the consent agenda for the next meeting.
4. #20240054 128, 132 Washington Garage Demolition. Determination of
Historic/Architectural Significance for an existing residential accessory structure and
discussion regarding proposed new additions within the Urban Residential-3 District.
Tamie Ehinger, Chair said the DRB looks at the demolition of a structure that could
possibly be historic. They need to determine if it has any historical or architectural
significance, and that will be all the board will determine today. She said based on that
determination it will allow the city to put up the required posting which will include the
determination. After it’s posted for two weeks the applicant can return and the board
can have further discussion about the demolition if it has been determined not
historically significant. If it is historically significant, that would be included on the
posting and the applicant would return for more discussion.
Sue Davis, SD Atelier Architecture represented the applicant. Sue said they are
proposing to demolish a CMU block, two-car garage, that was constructed in the 1950’s
and is non-compliant as it is slightly off the property line. The house is on the corner of
City of Saratoga Springs – Design Review Board Minutes – February 28, 2024 - Page 6 of 13
Beekman and Washington and faces Washington. The garage is to the rear left of the
property, partially on the neighbor’s property. Sue said she has contacted Samantha at
the Foundation and gotten some Sanborn maps to reference. Sue displayed photos of
the interior of the garage that showed mold or mildew, sagging over the garage doors
and that the structure is very close to the property fence and in the back as well. Sue
showed the Sanborn map circa 1950’s and 1895. The 1895 map shows a larger
attached structure that goes out toward Beekman. There is nothing going back to 1852
that indicates that the garage structure was there as it stands today. Sue said it would
make it easier for the applicant to move forward by showing that they don’t believe it’s
historical and being allowed to remove it. Sue said structurally it is compromised with
water damage and rodents that have gotten in.
Tamie reiterated that they are determining historical and/or architectural significance at
this point and not the condition of the building. Tamie said she does not see any
architectural significance to the structure. Tamie said in looking at the historic
significance, the DRB looks at the age of the building, if a significant historic event took
place there, or if an historical figure lived there. Tamie said even though the building
has been there a long time, she does not find it to be historically significant.
Ellen agreed with Tamie that there was no historical or architectural significance. Tad,
Jeff, Rob and Chris agreed with Tamie and Ellen.
Tamie said the posting can be made that the structure is not historically or
architecturally significant and the applicant can return to discuss the demolition. Tamie
asked if there were any comments from the audience. There were none.
Tamie Ehinger made a motion determining that the structure at 128, 132 Washington
St. does not have historical and/or architectural significance. The motion was seconded
by Chris Bennett. Vote: T. Ehinger-Y, R. DuBoff-Y, C. Bennett-Y, J. Gritsavage-Y, T.
Roemer-Y, E. Sheehan-Y. 6-0, motion carried.
Lori Sames, applicant for 128, 132 Wahington asked what the DRB will need to know
with regard to the demolition of the garage. Tamie said because it was found
insignificant, they won’t need anything from the applicant in that regard.
5. #20230992 140 Grand Ave. Partial Demolition and New Addition. Historic Review of
proposed partial demolition of a significant structure within the Urban Residential-3
District.
Tamie Ehinger, Chair reminded the board that the middle portion of this structure was
found to be historically significant. She said the applicant was asked to provide the
DRB with good faith documentation involving 5 criteria. The applicant must:
1. Document good faith efforts in seeking an alternative that will result in the
preservation of the structure, including consulting with the DRB and Preservation
Foundation. Joe said when he purchased the property it had been on the market
for 2 years and was a mess. He said a structural engineer assessed the building
City of Saratoga Springs – Design Review Board Minutes – February 28, 2024 - Page 7 of 13
and said it was significantly compromised and recommended tearing down the
middle section of the structure and building it up from the foundation which was
deemed good.
2. Document efforts to find a purchaser interested in acquiring and preserving the
structure.
3. Demonstrate that the structure cannot be adapted for any other permitted use
(middle addition).
4. Submit evidence that the property is not capable of earning a reasonable return.
5. Must include post demolition plans for the site.
Tamie said there needs to be a public hearing.
Joe Snyder, Owner. Joe said he is looking to demolish and rebuild the middle section
of 140 Grand Ave. to reflect the Greek Revival style. Joe said the middle section was
likely built in 1866, but they discerned after visiting the site that it doesn’t reflect the
Greek revival style and that the integrity has been compromised over the years with
vinyl siding and replacement windows that are not located in the original places. Joe
said he attempted to get the building inspector out to the property, but two appointments
were canceled, and the building inspector had Covid for the third attempt and scheduled
visit. Joe said he has a report from a structural engineer which he has submitted. He
made the following points regarding the demolition of the middle section:
• When he purchased the property, it had been on the market for 2 years and was
a mess. He said a structural engineer assessed the building and said it was
significantly compromised and recommended tearing down the middle section of
the structure and building it up from the foundation, which was deemed good.
• Water intrusion – extensive water damage. Leaking was observed at the roofs,
windowsills, waterlogged spray foam ceiling, moisture being retained at high
levels within the framing, walls, roof sheeting and rafters. Wood decay
throughout which is further compromising the structural integrity of the building.
Molds were tested and there are at least two types present and possibly up to
four.
• Chimney failures – compromised flashing, deteriorated brick, broken mortar
bonds, damaged stucco covering and missing a support leg on the first floor.
• Window failures – all the windows are vinyl replacement windows which were put
in without permission and not vertically aligned.
• Insulation flaws – the window framing lacks the essential components like
headers, jacks, kings, and cripples. Improper bearing and point loads on the
window frames.
• Structural framing and bearing wall concerns – critical failures in the bearing
walls: cracked joists, notched beams at every joist connection, a beam
improperly bearing on a notched stud. The bearing walls are made up of mis-
aligned pieces and non-continuous point loads.
• Infeasibility of retention or relocation – wouldn’t be practical due to the
deterioration of the building.
Joe said he spoke with and presented a document from someone from NYS Parks,
Recreation and Historic Preservation and they said it looked like many things were done
City of Saratoga Springs – Design Review Board Minutes – February 28, 2024 - Page 8 of 13
without permission, including the porch. He said the load bearing wall is between the
porch and main structure. Joe said he intends to remove the asbestos siding which is
underneath the vinyl. The document shows that the porch and windows were replaced
after 1973. Joe said the issues that were cited in the structural engineering report are
as follows:
• Extensive wood decay in the wall and roof framing.
• Undersized framing members. Highly unconventional and unsound framing
practices. Joe said it was noted that even for its time it was not built properly.
• Many joists are undersized, bowed, split, cracked, and have smaller wood pieces
attached to them.
• Several beams supporting the second floor are undersized, bowed, and
damaged.
• Recommended demolition of the middle section and rebuilding on the foundation.
Joe showed the water damage readings, mold sample tests with positive results and
photos of the windows.
Tamie said she was incredibly impressed with the amount of good faith documentation
the applicant provided, especially considering it’s a middle addition to a building and not
an entire structure.
Tamie Ehinger, Chair opened the floor for public comment.
Samantha Bosshart, Saratoga Springs Preservation Foundation. Samantha said with
all of the good faith documentation that has been provided by the applicant, the
Foundation does not object to the demolition of the middle portion of the structure.
Samantha said that Joy King, who spoke at the last meeting, asked her to relay that she
has reviewed and supports their project.
Paul Trimble, 139 Grand said he is in full support of the project.
Tamie said she strongly feels the applicant has demonstrated good cause as to why the
middle portion of the structure cannot be preserved and should be demolished. Tamie
asked the other board members to state their opinions on the demolition.
Chris agreed with Tamie and said “it’s a mess. Rob feels the applicant has more than
demonstrated that this part of the structure cannot be maintained. Jeff noted that the
middle section of the house was added later and didn’t follow the Greek revival style.
Jeff said there’s mold in the middle section and there’s likely mold in the main structure
that will have to be mitigated. Jeff said the front and middle section are over the
property line so if the applicant wants to rebuild the middle section there are committees
who will decide where he can build. The applicant said he’ll be keeping the original
foundation. Jeff agrees that the middle section needs structural repair but, in his
opinion, everything can be repaired. Tad and Ellen agreed with the demolition of the
middle section.
City of Saratoga Springs – Design Review Board Minutes – February 28, 2024 - Page 9 of 13
Tamie Ehinger, Chair said that the Design Review Board issued a negative declaration
of environmental impact regarding partial demolition at 140 Grand Ave. Saratoga
Springs, NY on February 7, 2024. The Design Review Board has reviewed all new
materials submitted and found that there are no new or different impacts that were not
previously considered and made a motion to reaffirm the negative declaration of
environmental impact. The motion was seconded by Rob DuBoff. Vote: T. Ehinger-Y,
R. DuBoff-Y, C. Bennett-Y, J. Gritsavage-Y, T. Roemer-Y, E. Sheehan-Y. 6-0, Motion
carried.
Tamie Ehinger made a motion to approve the demolition of middle section #2 as
submitted in the previously attached plans. The motion was seconded by Tad Roemer.
Vote: T. Ehinger-Y, R. DuBoff-Y, C. Bennett-Y, J. Gritsavage-N, T. Roemer-Y, E.
Sheehan-Y. 5-1, Motion carried.
6. #20240050 Tree House Brewing New Development 3376 S. Broadway. Architectural
Review of a new commercial development of a vacant property within the Gateway
Rural Commercial District.
John Cannie, Attorney represented the applicant, Tree House Brewing Company.
John was joined by Stan Kubinski & Joe Vecchione, Bergmeyer and Steve Wilson, civil
& landscape architect, Bohler. Also present, Sarah Maggi Morin, Chief Growth Officer
for Tree House Brewing.
John presented a project narrative:
• Seeking to construct a facility for micro-production of alcohol and eating and
drinking.
• 3376 Broadway has been unused since 2013. It was previously Murphy’s driving
range and is now a vacant lot with trees on the northern, southern, and eastern
borders. They are proposing to construct a primary structure housing a brewery,
kitchen, indoor dining, retail & off premises distribution. They are proposing
accessory structures for on-premises patrons in a campus-like outdoor setting.
• UDO compliant, sufficient off-street parking, no variances, on-site traffic
circulation with 2 curb cuts.
John said Tree House is the largest direct to consumer on-site brewery in the country.
It will bring more craft beer tourism to Saratoga and build up the local craft beer
economy. John said their proposal works within the comprehensive plan – specialty
mixed-use parkland designation, focusing on the outdoor elements. They anticipate
60+ jobs at Tree House and 35 ancillary jobs. The project is compatible with the
neighbors’ commercial use to the north and south. Four Winds, east of the project, has
issued a letter of support for the project which has been presented to the planning
board.
John said the planning board has issued a negative declaration under SEQRA and
issued a special use permit for the outdoor dining with minimal conditions. John said
DOT has given them a preliminary curb cut approval for the right-of-way improvements
and been in discussion with DPW regarding sewer and water and they have been
approved.
City of Saratoga Springs – Design Review Board Minutes – February 28, 2024 - Page 10 of 13
John said they are seeking architectural review from the DRB, site plan approval from
the planning board, building permit from the building department, and licensing from the
City for the restaurant and the state liquor authority.
Stan Kubinski & Joe Vecchione, Bergmeyer presented a video of a “walk around” the
proposed project. The porte co·chère has been removed and they added glazing on the
front to mimic what they have at the rear of the structure so that both entrances are
primary. There were 3 outdoor structures, they removed one the one closer to Four
Winds. They’ve added rich woods everywhere that the public engages the building.
The campus setting is in the rear. Stan showed still slides of the project including the
proposed monument sign.
Tamie Ehinger, Chair explained that the DRB’s job is to look at the project and make
sure that it meets the city’s standards and guidelines for the architectural review district
to include: height, proportion, mass & scale, contextual appropriateness (how the
structure relates to neighboring structures and to the neighborhood in general), street
orientation, directional expression, fenestration (rhythm of doors & windows),
articulation, pedestrian engagement, etc. Tamie said the board specifically looks at
street orientation, main entrances, and pedestrian friendliness. Tamie said the
materials that they are proposing are incredibly good and appropriate – the wood and
agricultural feel really fits in with the comprehensive plan for the city is very successful.
Tamie said she still has concerns about the front entrance because it still doesn’t look
like a main entrance because it’s so far back from the street. It lacks pedestrian
engagement, and she wonders if that’s appropriate. She asked the applicant to
consider how many parking spots they need at the front of the building based on the
function of what that’s meant to be. Stan said based on planning board comments they
reworked the front – reduced the parking and pulled it back. Stan said the curb cut is
based on comments from DOT. Tamie asked if the stormwater area would be fenced
in. Steve Wilson, Bohler said it would have a split rail fence with a chain link on the
inside so that it has aesthetics but keeps people out. Tamie said the board will need to
see details on that moving forward.
Rob DuBoff noted that the hotel and Honda dealer both have parking at the front of the
structures so it’s difficult to ask that the parking be limited in front. Rob said ideally the
parking is not in front, it’s more wooded and the building is closer to the street. Rob
asked about the monument sign. Stan said it will be halo lit, like a silhouette. Rob
asked about the “can cooler” and will it be seen. Stan said there’s a partition/finished
wall in front of it that will hide it. Rob asked about the proposed vinyl fencing #22 on the
landscape site plan. Stan said it’s over by the Honda dealer and more of a screening
with Four Winds. It will match what is already there between Four Winds and the
Honda dealership.
Chris Bennett agrees with Tamie about the parking out front. He said the applicant is
tasked with softening the front to make it look more like a front entrance. Chris feels by
removing the porte co·chère they’ve lost some of the woody elements at the front
entrance making it look more industrial. Chris suggested bringing more wood into the
front of the building, making it more inviting to pedestrians. Tamie suggested that they
bring some of the porch architecture to the front of the building.
City of Saratoga Springs – Design Review Board Minutes – February 28, 2024 - Page 11 of 13
Jeff Gritsavage said he doesn’t find the stormwater management area appropriate the
way it will look. Jeff said there are technical solutions such as sub-surface detention
under the pavement which would cost more but would look better. If they are using
chain link fencing it has to be the black vinyl wrapped product, not galvanized. Jeff said
he doesn’t think the bike parking is in the right place because most people biking to the
Tree House will be coming from the north and will have to go past the pub to get to the
bicycle parking. He suggested maybe putting the bike parking in the front and replace
some of the car parking out there. Jeff said some of the stuff at the back of the building
– loading dock, transformer, dumpster corral, need to be consolidated into one service
cord. Jeff said there should be some sort of circulation for larger mass transit vehicles
like the trolly bus and limo buses.
Tad Roemer said he preferred the previous rendering with the porte co·chère on the
front of the building. He said it looks very industrial now. It looks dark. Maybe they
could incorporate more wood on the outside. Tad noted that the sign on the side of the
building seemed very large. Amanda said it’s based on linear feet and they may be fine
with the size proposed. There was a discussion about the function of the front entrance.
Sarah Maggi Morin said there are two different streams of business at Tree House –
beverages to go where you order ahead, pull into a parking space and an employee
brings your order to your car or sit and enjoy in a park-like setting, eat pizza, have a few
beers and shop in the retail store. Sarah said it’s a totally different logistical matter and
the reason why they have separate operations in different parts of the campuses.
Tad said he likes the bike path and all the trees in the front. The trees are a very
important element in the design.
Ellen Sheehan asked about the roof. In the rendering it appears to be black, but it says
in the narrative that it’s a “black metal standing seam roof with dark grey, insulated
metal panels on the recessed wings to the north and south”. Stan said it’s charcoal
grey and black – two different products and materials. The applicant brought samples.
Where there is no wood it will be black steel. Ellen said the applicant described wood in
the overhangs at the entrances but in the narrative, it says it’s a “fully glazed curtain wall
façade with aluminum wood look clad overhangs”. The applicant said they’ve had wood
at other campuses and the sun turns it black in some places and bleaches it out in
others. They’ve had to remove and replace it. The product they are proposing has the
look and feel of wood year-round. Ellen asked if the glass was clear or tinted. The
applicant showed the board a sample. Ellen asked that they explain the “Adirondack”
influence in their design. Stan said the “agrarian” structure and every place where
they’ve added wood. Stan said the two pavilions are very “camp” like and the style of
furniture adds to the Adirondack feel. Sarah spoke about the connection with the arts
and history with Saratoga Springs and how it relates to Tree House. Ellen asked about
the distance the building is set back from the street and how it compares to the hotel
and Saratoga Honda. They are closer than the Honda dealership and further back than
the hotel. Ellen said the parking in the front reads like the Honda dealership. It would
be nice if the parking were not in the front. She feels the design is successful, but they
could soften it a bit, maybe bring in more wood.
Tamie said looking at the rendering of the front of the building without the trees the wall
to the left is a solid wall. Could they do something to break that up? Chris agreed it
City of Saratoga Springs – Design Review Board Minutes – February 28, 2024 - Page 12 of 13
would be helpful to soften the wings and take away the industrial look. The applicant
said they will come up with some solutions for that.
Tamie Ehinger, Chair said it appears that everyone is very excited about this project.
She said it’s a great project and a wonderful asset to the community. The changes
suggested will help to make the project more in keeping with the city’s standards and
guidelines – adding more wood, softening up the front, breaking up the mass, and
making the front entrance functional as such. John said there won’t be any patrons
coming through the entrance at the front of the building. Tamie asked how they will
direct people to where they want to be. Sarah said it’s communicated online when
people order to go and there are directional signs when they arrive. John asked if the
board was comfortable with mass and scale tonight. Tamie said she would not be
comfortable moving forward until they see some of the final details of the changes that
the DRB has proposed. John said the mass and scale approval would help them to
order the steel needed because they would know the exact dimensions of the building.
John said if the board could vote on just that it would help the project move along.
Tamie added that mass and scale includes the footprint so if there’s hesitation about the
location of the building then that needs to be considered. Amanda said the approval
could be conditioned that the front setback is up for discussion. Tamie listed
comments from the planning board: improve how the project presents from the street
and area between the street and the front of the building; consider relocating the
retail/beer to go operation from the front of the building to the side of the building;
reduce the number of parking spaces in front of the building; consider importance of
design in the gateway.
Rob DuBoff made a motion to approve the mass and scale of the Tree House Brewing
application at 3376 So. Broadway with the following conditions: mass and scale
approval only without front setback. Applicant to return for final details including exact
front setback. The motion was seconded by Chris Bennett. Vote: T. Ehinger-Y, R.
DuBoff-Y, C. Bennett-Y, J. Gritsavage-Y, T. Roemer-Y, E. Sheehan-Y. 6-0, Motion
carried.
Matt Jones spoke of everyone’s appreciation for Amanda and how she will be missed.
Upcoming Meetings: March 20, 2024 at 6 pm. Caravan March 13, 2024
MOTION TO ADJOURN:
A motion to Adjourn was made by Rob DuBoff and seconded by Jeff Gritsavage.
ALL IN FAVOR
There being no further business to discuss the meeting was adjourned at 10:00 P.M.
Respectfully submitted,
Donna Gizzi, Recording Secretary
City of Saratoga Springs – Design Review Board Minutes – February 28, 2024 - Page 13 of 13
Agenda
DRC Members
City of Saratoga Springs Tamie Ehinger (Chair)
Rob DuBoff (Vice Chair)
DESIGN REVIEW BOARD Chris Bennett
Leslie DiCarlo
City Hall • 474 Broadway Jeffrey Gritsavage
Saratoga Springs, New York 12866 Tad Roemer
Ellen Sheehan
518.587.3550
Karen Cavotta (Alternate)
www.saratoga-springs.org Kennedy Flack (Alternate)
NOTE: This meeting is being held in person in the Council Room at City Hall and via Zoom
• To view the webcast live or once recorded, go to www.saratoga-springs.org.
• To participate or provide input during the meeting, enter the ramp door at City Hall. The door is unlocked
1/2 hour prior to meeting start time and locks again 1 hour after meeting start time. After 7:00pm, please
use the buzzer at the Lake Avenue entrance.
• Comments may be submitted up to 12PM on the day of the meeting using the Public Comment form on
the Planning Department page.
DESIGN REVIEW BOARD MEETING AGENDA
Wednesday, February 28, 2024, at 6:00 p.m.
Salute the Flag
Roll Call
1. Approval of Minutes: 2/7/2024
2. Possible Consent Agenda Items
NOTE: The intent of a consent agenda is to identify any "approvable" applications without the need for further evaluation or discussion. If anyone wishes to further
discuss any proposed consent agenda item, that item would then be pulled from the Consent Agenda and considered individually.
Agenda Ordinance
Project # Project Project Location Project Description Project Index
Order Type
1 20240049 282 Ballston Egress 282 Ballston Ave Architectural Review of rear egress windows and UDO
Windows #9
2 20240079 NBT Insurance Wall Sign 295 Broadway Historic Review of a new wall sign within the Urban Core / T-6 District. UDO
3 20231035 431-433 Broadway 431-433 Broadway Historic Review of new wall mounted infrared heaters within the Urban UDO
Infrared Heaters Core / T-6 District.
4 20240073 Studio A Freestanding 74 Warren Architectural Review of a new freestanding sign within the UDO
Sign Neighborhood Center / T-5 District.
3. DRB Applications Under Consideration Note: agenda item discussion will not begin past 10:00pm
Agenda Ordinance
Project # Project Project Location Project Description Project Index
Order Type
1 20240028 176 Lake Railing and Heat 176 Lake Ave. Architectural Review of exterior modifications including rear deck UDO
Pump System railing replacement and a new heat pump system within the Urban
Residential-3 District.
2 20240029 130 Regent Window 130 Regent St. Historic Review of select window replacement within the Institutional UDO
Replacement Education District.
3 20240051 Clancy's Rear Addition 43 Caroline St. Architectural Review of a 1-story rear addition within the Urban Core / UDO
T-6 District.
4 20240054 128, 132 Washington 128, 132 Determination of Historic/Architectural Significance for an existing UDO
Garage Demolition Washington residential accessory structure and discussion regarding proposed new
additions within the Urban Residential-3 District.
5 20230992 140 Grand Partial 140 Grand Ave Historic Review of proposed partial demolition of a significant structure UDO
Demolition and New within the Urban Residential-3 District.
Addition
6 20240050 Tree House Brewing New 3376 S. Broadway Architectural Review of a new commercial development of a vacant UDO
Development property within the Gateway Rural Commercial District.
4. Upcoming Meetings: March 20, 2024 at 6PM
5. Announcement: If you are interested in supporting our community by sitting on a Land Use Board, please fill out the form on the City's website.
6. The 2024 Land Use Board calendar can be found on the City Website.
VIRTUAL PARTICIPATION
• Due to unexpected circumstances, one or more of our members may need to participate remotely; if the meeting is remote or hybrid, please find relevant meeting
details here.
• A video recording of the meeting will be available here.
GENERAL MEETING GUIDELINES
• Public comments from the audience during public hearings will be limited to 3 minutes.
• All speakers will be timed to ensure compliance.
• Individuals may not donate their allotted time to other speakers.
• Please be respectful to the speakers while they are addressing the Board.
• Comments to the Board should relate specifically to the application under consideration and the review criteria.
• All written comments will be distributed to the Board and made part of the public record.
Note: This agenda is subject to change. Please check the website for latest version.