Marina Committee Meeting
Regular MeetingSister Bay, WI · November 12, 2025
Minutes
Minutes of the November 12th, 2025 Meeting of the Marina Committee – Approved
1 MARINA COMMITTEE MEETING MINUTES
2 Wednesday November 12th, 2025
3 (Approved)
4
5 Agenda Item No. 1. The November 12th, 2025 meeting of the Marina Committee was called to
6 order by White at 10:00A.M.
7
8 Present: Brigid White, Chad Kodanko, Kevin Grant & Pat Duffy
9
10 Absent: Patrice Champeau
11
12 Staff: Marina Manager - Dave Lienau, Assistant Manager - Sam Jordan
13
14 Others: John Blossom, Nikolas Dokolas, Marley Inksetter, Merih Bayirli, Laurie Zelnio
15
16 Agenda Item No. 2. Approval of the Agenda
17
18 A motion was made by Grant, seconded by Duffy that the Agenda for the November 12th, 2025 meeting of
19 the Marina Committee be approved as presented. Motion carried – All ayes.
20
21 Agenda item No. 3. Approval of the Minutes
22
23 A motion was made by Kodanko, seconded by Grant that the minutes of the October 15th, 2025 meeting of
24 the Marina Committee be amended and approved by the committee. Motion carried – All ayes.
25
26 Agenda Item No. 4. Comments, correspondence, and concerns from the public
27
28 No correspondence was received for this meeting. White asked if anyone would like to make a
29 public comment, and no one responded.
30
31 Agenda Item No. 5. Discussion/Action Items
32
33 a.) Boathouse Project Update
34
35 Lienau and Blossom updated the committee on the status of the boathouse project, noting that
36 the village’s contracts with the Historical Society have been signed by the president of the
37 Historical Society.
38
39 b.) New Marina Building Update
40
41 Lienau gave an overview of where the marina is in the new building development process,
42 noting that the recent surveys of the marina property show an outflow sewage line running just
43 under the southwest corner of the new building’s design. Lienau added that the building design
44 process cannot proceed until engineers do further surveying to address potential issues like the
45 sewer line.
46
47 c.) New Marina Building – Engineering Proposals
48
Minutes of the November 12th, 2025 Special Meeting of the Marina Committee - Approved
1 Lienau explained the function and cost of the engineering proposals, requesting committee’s
2 approval to allocate the necessary funds to conduct the surveys highlighted in the proposals.
3
4 A motion was made by Grant, seconded by Kodanko to approve both engineering contracts as presented
5 in the packet and forward them to the Board of Trustees for approval. Motion carried – All ayes.
6
7 d.) Boardwalk Materials Purchase
8
9 Lienau noted that since exploring Ipe wood as an optional material to use in reconstructing the
10 boardwalk, he has received three different estimates on the cost for the necessary amount of
11 material and its shipping, adding that the prices vary only slightly. Lienau furthered that the
12 marina would operate as the general contractor in the boardwalk project but first needs to
13 purchase the material before subcontracting a business to install the wood. Lienau recommends
14 the committee do this now given that this is the only time of year suppliers can ship the wood.
15 Lienau recommends that the marina purchases the wood and stores it until a subcontractor can
16 come and install it in the Spring of 2026. Lienau recommends a cap on the purchase of the wood
17 and mounting materials at $110,000 because the quotes received on the wood max out at about
18 $105,000. Lienau clarified that the quotes included the wood, mounting and installation
19 materials, and temporary storage. Lienau and marina engineering consultant, Mike Kahr,
20 estimate the installation cost to be around $50,000, which is comparable to the overall
21 boardwalk project cost estimates given by contractors last year. White and Lienau clarified that
22 using clips with bored channels in the wood does not increase material cost, just installation
23 cost.
24
25 A motion was made by Kodanko, seconded by Grant to allocate $110,000 to purchase Ipe wood and
26 materials for reconstruction of the marina boardwalk.
27
28 e.) Marina Winterization Update
29
30 Lienau noted that the marine construction company Pier and Waterfront Solutions (PWS) has
31 fully winterized the docks throughout the marina and has begun the emergency dredging
32 project to move various rocks and rip rap throughout the marina and increase the depth in ten
33 or eleven locations. Lienau added that this project coincides conveniently with the Parks
34 Department’s project of reinforcing the north side of the swim dock, since PWS was able to use
35 the rocks removed from the marina as reinforcing rip rap along the swim dock. Lienau noted
36 that the marina’s current maintenance dredging permit expires in May of 2026, but the marina
37 will immediately reapply for a new permit so that spot dredging can be conducted as needed
38 with continually lowering water levels. Lienau noted that marina staff have begun installing ice
39 eaters throughout the marina. Lienau added that the last finger pier on C-Dock is being
40 reinforced, which is the last of the piers on C-Dock to be completed in the two-year project.
41
42 f.) Commercial Vendor’s Annual Reports
43
44 White inquired about the operational status of the marina pump-out system. Lienau responded
45 that the system operates successfully on vessels located on A, B, C and part of D Dock. Lienau
46 noted that marina staff were able to conduct pump-outs for the commercial vendors upon their
47 request, with Sister Bay Boat Tours able to complete pump-outs at their slip almost daily for the
Minutes of the November 12th, 2025 Special Meeting of the Marina Committee - Approved
1 two busiest months of the season.
2
3 g.) Review of Monthly Financials
4
5 Duffy inquired as to why the pump-out revenue was only $400 to which Lienau clarified that
6 most of the money made from pump-outs comes from commercial vendors who have paid their
7 bill, but these payments have not yet been reflected in the marina financials.
8
9 Agenda Item No.6. Matters to be placed on a future agenda or referred to a committee,
10 official, or employee
11
12 It was the consensus of the committee that that following items be included on a future committee
13 meeting agenda:
14 - New Building Engineering Contracts to the Board of Trustees
15
16 Next marina committee meeting is tentatively scheduled for December 17th at 4:00PM via ZOOM only.
17
18 Adjournment: A motion was made by Grant, seconded by Kodanko to adjourn the November 12th, 2025
19 meeting of the Marina Committee at 10:45A.M. Motion carried – All ayes.
20
21 Respectfully submitted,
22
23 Samuel Jordan
24 Assistant Marina Manager
Agenda
MARINA COMMITTEE MEETING AGENDA
Wednesday November 12th, 2025 at 10:00 A.M.
Meeting held via Zoom ONLY, click below:
https://zoom.us/j/3597569647?pwd=671UiiJPSuJM9QHfABHmzGC12vlhJa.1&omn=99413666077
Meeting ID: 359 756 9647
Password: 8544457
To connect by telephone, please dial
1-305-224-1968 - Meeting ID 359 756 9647#
Deviations from the agenda order shown may occur.
1 Brigid White – Trustee & Chairperson 2 Chad Kodanko – Trustee
3 Patrice Champeau – Trustee 4 Pat Duffy - Resident
5 Kevin Grant – Citizen Marina Manager – David Lienau
Julie Schmelzer – Village Administrator Asst. Marina Manager- Sam Jordan
1. Call to Order
2. Approval of Agenda
3. Approval of Minutes – October 15th, 2025
4. Comments and Correspondence
5. Discussion/Action Items:
a. Boathouse Project Update
b. New Maring Building Update
c. New Marina Building – Engineering Proposals
d. Boardwalk Materials Purchase
e. Marina Winterization Update
f. Commercial Vendors’ Annual Reports
g. Review of Monthly Financials
6. Matters to be Placed on a Future Agenda or Referred to a Committee, Official, or Employee
7. Adjournment
Public Notice
Questions regarding the nature of the agenda items or more detail on the agenda items listed above can be directed to Village Administrator, Julie
Schmelzer. Email julie.schmelzer@sisterbaywi.gov. It is possible that members of, and possibly a quorum of members, of other governmental bodies of
the municipality may attend the meeting to gather information; no action will be taken by any governmental body other than the governmental body
specifically referred to in this notice. Upon reasonable notice, a good faith effort will be made to accommodate the needs of disabled individuals through
sign language interpreters or other auxiliary aids at no cost to the individual to participate in public meetings. Due to the difficulty in finding interpreters,
requests should be made as far in advance as possible preferably a minimum of 48 hours. For additional information or to request this service, contact the
Sister Bay Village Administration Office at 854-4118, (FAX) 854-9637, or by writing to the Village Administration Building, 2383 Maple Drive, PO Box 769,
Sister Bay, WI 54234. Copies of reports and other supporting documentation are available for review at the Administration Building, 2383 Maple Drive
during operating hours. (8 a.m. – 4 p.m. Monday – Thursday, 8 a.m. to 12:00 p.m. on Friday).