Sewer and Water Utilities
Regular MeetingSister Bay, WI · September 9, 2025
Minutes
Minutes of the September 9, 2025 meeting of the Utilities- SWUC Committee – Approved Version
Sewer and Water Utilities Committee Meeting Minutes
Tuesday, September 9, 2025 at 1:00 P.M.
VIA Video Conference
(Approved Version)
1. Call Meeting to Order
The Sewer and Water Utilities Committee meeting was called to order on Tuesday, September 9,
2025, at 1:00 PM by Denise Bhirdo, Chair.
2. Roll Call
A roll call was conducted, with the following members present: Chairperson Denise Bhirdo and
members Nate Bell, and Kurt Harff.
Staff present: Village Administrator Julie Schmelzer, Utilities Director Megan Barnes, Utilities Clerk
Kara Kroll
Others: Chad Olsen from McMahon Associates and Laurel Harff
3. Approval of Agenda
A motion was made to approve the agenda as presented.
Motion by Harff, seconded by Bell. All in favor. Motion carried.
4. Approval of Minutes of the August 12, 2025 Meeting, as Published
Nate Bell requested a correction on page 3, line 47, noting that "his friend, Tim Wright" should be
changed to "former coworker, Tim Wright."
Chairperson Bhirdo requested adding a statement after line 60 that "staff was not concerned with
the issue because the vendor would be replaced in a couple of months." Mr. Bell disagreed with this
characterization, stating that it wasn't fair to say they weren't going to try and fix an existing vendor
issue because they knew a new vendor was coming. He emphasized that staff should try to work
with existing vendors when problems arise. Chairperson Bhirdo clarified that the chain of command
wasn't broken but rather had chosen not to reach out.
Utilities Clerk Kara Kroll asked for clarification on what to write, and it was agreed to add that staff
was not concerned with the issue because the vendor would be replaced in a couple of months.
A motion was made to approve the minutes as amended per Bhirdo and Bell’s request.
Motion by Harff, seconded by Bell. All in favor. Motion carried.
5. Comments, Correspondence and Concerns from the Public
No correspondence was received.
Minutes of the September 9, 2025 meeting of the Utilities- SWUC Committee – Approved Version
6. Discussion/Action Items
a. Wastewater Treatment Plant Operations Report
Utilities Director Megan Barnes presented a brief operations report to allow time for the main
presentation. She mentioned that people were working on well testing and permitting updates as
noted in the meeting materials.
Nate Bell inquired about the Programmable Logic Controllers (PLCs) that had failed during a recent
storm. Barnes explained that these controllers are integral to automated operations of the
wastewater treatment plant, with three PLCs at the plant and one at each well. They control set
points and equipment operation, such as pumps activating when floats are triggered.
Barnes reported that the cause of the recent PLC failure was likely related to electrical issues from
power surges during downtown line breaks. She commended the operators who had to manually
operate the plant every hour until repairs could be made the following Monday. Mr. Bell
acknowledged that Barnes had handled the situation well by providing remote guidance to staff
despite being away at a wedding.
Bell also inquired about power conditioning systems for the PLCs, and Barnes noted she would check
with their integrated process technician about protective measures. Bell observed that with
electrical issues, it's rarely possible to identify a definitive cause, especially with integrated circuits.
Barnes clarified that the PLC failure affected the Variable Frequency Drives (VFDs) because the
control system was out, requiring manual operation of equipment.
b. Facility Study Presentation
Chad Olson from McMahon Associates presented the Wastewater Treatment Facility Assessment
and Feasibility Study. His presentation included current loadings, projected loadings, facility capacity,
and analysis of specific infrastructure components.
Mr. Olson noted that for funding considerations, he was assuming Clean Water Fund loans, which
currently offer attractive interest rates (1.485% for 20-year loans) and potential principal forgiveness
of up to 60% with a cap of $2,100,000. He explained that for 2027 funding, a notice of intent would
need to be filed this year, and a facility plan with specifications submitted by September 30, 2026.
Current Facility Overview: Olson described the existing wastewater treatment plant, which receives
flow from two force mains, has fine screen removal, an oxidation ditch, two final clarifiers, UV
treatment, and an outfall. The solids handling system includes waste activated sludge, an aerobic
digester, a thickener, and two holding tanks, with sludge currently hauled to Sturgeon Bay.
Current Loadings:
● Average flow: 200,000 gallons per day (28% of design capacity)
● BOD: 660 pounds per day (37% of design capacity)
● TSS: 720 pounds per day (50% of design capacity)
Mr. Bell expressed concern about TSS (Total Suspended Solids) reaching 145% of capacity on peak
days. Olson explained that this primarily impacts sludge generation rather than permit compliance,
and occasional peak days are manageable, though multiple consecutive peak days would be
problematic.
Minutes of the September 9, 2025 meeting of the Utilities- SWUC Committee – Approved Version
Director Barnes confirmed that July 4th is typically their peak day and explained that their permit
limits are based on monthly averages, so occasional peaks don't cause compliance issues as long as
the monthly average remains in check.
Population Projections: Olson noted that the Wisconsin Department of Administration had updated
population projections, showing higher numbers than previously anticipated. The 2020 census
revealed a service population of 3,244 compared to the previously projected 2,680. Projections for
2050 are now 3,638 people, which is still within the plant's design capacity of 4,456 for summer
conditions.
Projected 2050 Loadings:
● Flow: 227,000 gallons per day (32% of design capacity)
● BOD: 764 pounds per day (43% of design capacity)
● TSS: 820 pounds per day (57% of design capacity)
The design capacity varies between summer and winter conditions, with the plant configured to
handle more capacity in summer by bringing another clarifier online.
Hauled-in Waste Receiving: Olson presented options for improving the hauled waste receiving tank,
which currently has mixing and aeration issues when liquid levels drop:
● Add a second set of coarse bubble diffusers with a new blower: $218,000
● Install a compressed gas mixing system that would work at all levels: $300,000
Oxidation Ditch Aeration: The facility's oxidation ditch is currently aerated by disc aerators installed
in 1990. Olson presented two options for replacement:
● Surface aerators: $1,200,000 with annual operating costs of $41,400
● Fine bubble diffusers with submersible mixers: $2,100,000 with annual operating costs of
$18,500
Director Barnes indicated a preference for fine bubble diffusers as they would provide more efficient
mixing and oxygen transfer.
Secondary Clarifiers: The facility has two 40-foot diameter secondary clarifiers, one covered and one
uncovered. The uncovered clarifier cannot be used in winter due to freezing risks. Additionally,
having only one waste activated sludge (WAS) pump limits the ability to operate both clarifiers
simultaneously.
Olson recommended adding a second WAS pump ($171,000) and potentially covering the uncovered
clarifier ($300,000).
Effluent Reuse System: The existing effluent reuse pump was installed in 1990 with a VFD added in
2020. Two pneumatic tanks from 1991 are also in place, with one leaking. Sizing of replacements
would depend on decisions about sludge handling.
Sludge Handling: Olson presented three options for sludge handling:
● Continue hauling to Sturgeon Bay (current cost: $107,400 annually)
● Install reed beds ($3,100,000 capital cost; $99,300 annual operating cost by 2050)
● Install a sludge dryer to create Class A biosolids ($17,800,000 capital cost; $200,000 annual
operating cost)
Olson also explored the possibility of a regional sludge handling facility that could serve Sister Bay
along with Bailey's Harbor, Ephraim, and Fish Creek.
Minutes of the September 9, 2025 meeting of the Utilities- SWUC Committee – Approved Version
PFAS Considerations: Per- and polyfluoroalkyl substances (PFAS) emerged as a significant concern.
Sister Bay's sludge testing showed levels of 38-48 micrograms/kilogram, which puts them in a
category where the DNR would recommend developing a source reduction plan and tracking
application rates. Sturgeon Bay's results were below 20 micrograms/kilogram, considered "not
impacted."
The committee discussed PFAS concerns related to land application, noting that even if sludge were
dried to Class A standards, PFAS would still be present, potentially limiting disposal options
regardless of the technology chosen.
Reed Bed Location: There was extensive discussion about potential locations for reed beds if that
option were selected. Schmelzer noted that the location shown in the presentation would impact
community gardens and areas designated as parkland in previous facility studies. Alternative
locations were discussed, including the west side of the plant near the parks building.
• Cost Comparison (Annual Cost for Sister Bay Only, Year 2050):
• Continue hauling to Sturgeon Bay: $166,000
• With Sturgeon Bay's potential new tank: $227,000
• Reed beds (without principal forgiveness): $280,000
• Reed beds (with 60% principal forgiveness): $171,000
• Sludge dryer (without principal forgiveness): $1,200,000
• Sludge dryer (with principal forgiveness capped at $2.1M): $1,000,000+
• Cost Comparison (Annual Cost for With Other Communities, Year 2050):
• Continue hauling to Sturgeon Bay: $326,405
• With Sturgeon Bay’s potential new tank: $448,509
• Reed Beds (without principal forgiveness): $423,000
• Reed beds (with 60% principal forgiveness): $301,000
• Sludge dryer (without principal forgiveness): $1,300,000
• Sludge dryer (with principal forgiveness): $1,200,000
Next Steps: Olson recommended visiting Egg Harbor to see their reed beds and mentioned that Rick
from VCR would be presenting on dryers at the next meeting. He also offered to arrange a
presentation with Reed Bed Systems later in the year.
For funding purposes, Olson noted that a notice of intent could be submitted by the end of October
to preserve eligibility for Clean Water Fund loans in 2027, even if a final decision hadn't been made
on which option to pursue.
7. Matters to be placed on a future agenda or referred to a committee, official, or
employee
The next meeting was scheduled for October 14, 2025, at 1:00 PM, with a presentation about sludge
drying systems.
Minutes of the September 9, 2025 meeting of the Utilities- SWUC Committee – Approved Version
8. Adjournment
A motion was made to adjourn the meeting.
Motion by Bhirdo, seconded by Harff. All in favor. to adjourn at 3:24 PM. Motion carried.
The meeting was adjourned at 3:24 PM.
Respectfully submitted,
Kara Kroll
Utilities Clerk
Agenda
VIRTUAL SEWER AND WATER UTILITIES
COMMITTEE MEETING AGENDA
Tuesday, September 9, 2025 at 1:00 P.M.
This meeting will be conducted electronically via “Zoom” video conferencing software.
To access the meeting electronically, click:
https://zoom.us/j/4439901723?pwd=yAVpi40M1OIqgNufcVUE8XWCUSkKaH.1&omn=97063638580
Meeting ID: 443 990 1723 Passcode: 304078
To connect by phone: 1-301-715-8592 - Meeting ID 443 990 1723#
For additional information check: http://www.sisterbaywi.gov
AGENDA
1. Call Meeting to Order
2. Roll Call
3. Approval of Agenda
4. Approval of Minutes of the August 12, 2025 Meeting, as Published
5. Comments, Correspondence and Concerns from the Public
6. Discussion/Action Items:
a) Wastewater Treatment Plant Operations Report
b) Facility Study Presentation
7. Matters to be placed on a future agenda or referred to a committee, official, or employee
8. Adjournment
Public Notice
Questions regarding the nature of the Agenda items or more detail on the items listed can be directed to Megan Barnes,
Utilities Director, at megan.barnes@sisterbaywi.gov. It is possible that members of and possibly a quorum of members
of other governmental bodies may attend the meeting to gather information; no action will be taken by any
governmental body other than the body specifically referred to above. Upon reasonable notice, a good faith effort will
be made to accommodate the needs of disabled individuals through sign language interpreters or other auxiliary aid or
accommodation at no cost to the individual. Due to the difficulty in finding interpreters, requests should be made as far
in advance as possible, preferably a minimum of 48 hours. For additional information or to request this service, contact
the Sister Bay Village Administration Office at 854-4118, (FAX) 854-9637, or by writing to the Village Administration
Building, 2383 Maple Drive, PO Box 769, Sister Bay, WI 54234. Copies of reports and other supporting documentation
are available for review at the Village Administration Building during operating hours (8 a.m. – 4 p.m. Monday –
Thursday and 8 a.m.-12 p.m. Friday).
The Village of Sister Bay is an Equal Opportunity Provider and Employer.
POSTED DATE/SIGNATURE___________________________
Get email alerts for Sister Bay
A daily email when new agendas and minutes are posted.