City Council Worksession
Regular MeetingSouth St. Paul, MN · September 30, 2019
Agenda
South St. Paul
SPECIAL
MAYOR/COUNCIL WORKSESSION
Planning Commission/
Economic Development Authority Board (EDAB)
SSP City Hall
125 3rd Avenue North
Council Chambers
Monday, September 30, 2019
7:00 p.m.
AGENDA:
1. Hardman Triangle Project
a. Presentation of the market study by Cunningham Group (No attachments)
2. Concord Street Project
a. Kimley-Horn Group – Discussing Concord Street Project
A COUNCIL WORKSESSION REPORT
DATE: SEPTEMBER 30, 2019 2
DEPARTMENT: Engineering
ADMINISTRATOR: JRH
AGENDA ITEM: Concord Street Improvement Discussion/Update
ACTION TO BE CONSIDERED:
Information only: for input and discussion
OVERVIEW:
Design of the Concord Street project has proceeded to a point where confirmation of the direction
of the design in the key corridor areas is needed. This report provides a summary of the items that
will be presented in more detail in a presentation at the joint City Council/EDAB/Planning
Commission work session on Monday, September 30th.
The project boundaries run from I-494 to the City limits at Annapolis Street. The presentation will
focus on two major project segments and the key design components in each. These two segments
are Concord Street from I-494 to Grand Avenue and Grand Avenue to Annapolis to the north.
As outlined in the scoping study and the Memorandum of Understanding for the project, MnDot
is proposing to turn back the roadway from I-494 to Grand Avenue to Dakota County. This will
require that Dakota County provide design approval through this segment as the ultimate owner.
Utilizing the scoping study as a guide, we have worked collaboratively with Dakota County staff
to develop and refine a corridor layout that will serve the needs of the area based on current and
proposed traffic level projections as well as providing improved pedestrian connectivity and traffic
safety.
The major items that will be discussed for the I-494 to Grand Avenue segment are:
• Conversion from 4-lane to 2-lane section from Armour to Grand.
• Traffic signals and access management
o Traffic signals at Villaume Ave., Armour Ave., Grand Ave. will remain.
o Intersections at Bridgepoint Ave., 6th Street, and Concord Exchange will be
modified to promote use of signalized intersections.
o Proposed driveway modifications at EnVision, Walser, and Bremer Bank.
City Council Report – Concord Street Improvement Discussion
September 30, 2019
Page 2 of 2
The second major segment to be presented for input is the area from Grand Avenue through the
business district to the north. The roadway through this segment is proposed to be turned back to
the City of South St. Paul and therefore the City will drive this design layout. The main items that
will be discussed are:
• Traffic signals
o Wentworth Signal proposed to be removed
o Bryant Signal to remain
• On-Street parking
• Shared turn lane modifications
• Sidewalk connectivity
SOURCE OF FUNDS:
No fiscal impact at this time.
Get email alerts for South St. Paul
A daily email when new agendas and minutes are posted.