SUFFOLK WETLANDS BOARD
AGENDA FOR
March 16, 2017
PREPARED BY THE CITY OF SUFFOLK
DEPARTMENT OF PLANNING
A MEETING WILL BE HELD AT 6:00 P.M.
IN THE SUFFOLK CITY COUNCIL CHAMBERS IN
SUFFOLK CITY HALL
PLEASE CALL TO CONFIRM YOUR ATTENDANCE
THE PLANNING DEPARTMENT
AT 514-4060
PRIOR TO
12:00 NOON ON WEDNESDAY, MARCH 15, 2017
GEOFFREY HINSHELWOOD
CHAIRMAN
AGENDA
SUFFOLK WETLANDS BOARD
March 16, 2017
6:00 P.M.
I. Call to Order
II. Roll Call
III. Approval of Minutes
October 20, 2016
IV. Public Hearings – None
V. Restoration Hearings – None
VI. Permit Extensions –
VMRC #13-1859, submitted by Bob Simon with Waterfront Consulting, Inc.,
applicant, on behalf of Loretta Willis, property owner, for the installation of 1,627
linear feet of rip rap, construction of a 14-foot by 32-foot concrete boat ramp, and
construction of timber stairs for beach access. The project is located at 2527 Bridge
Road on the Nansemond River. The subject property is further identified as Zoning
Parcel 5*32C, zoned RR, Residential Rural District.
VII. Old Business – None
VIII. New Business – None
IX. Compliance and Inspections – None
X. Adjournment
MINUTES
SUFFOLK WETLANDS BOARD
October 20, 2016
6:00 P.M.
The meeting of the Suffolk Wetlands Board was held on Thursday, October 20, 2016,
at 6:00 p.m., in the City Council Conference Room of the City Hall Building, 442 West
Washington Street, Suffolk, Virginia.
MEMBERS: STAFF:
Geoffrey Hinshelwood Karla Williams, Associate City Attorney
Darius Davenport Robert Goumas, Interim Director of
Richard Vroman Planning & Community Development
C. Robbie Johnson David Parks, Principal Planner
Jeffrey Colley Amanda Beck, Planner II
Sidney Hazelwood
ROLL CALL:
The meeting was called to order by Chairman Hinshelwood. The roll was then called
by Mr. Parks and the Chairman was informed that a quorum was present.
APPROVAL OF THE MINUTES:
The minutes of the previous meeting were approved as written.
PUBLIC HEARINGS:
VMRC16-1265, submitted by Richard Bartlett of Professional Construction
Consultants, LLC, applicant, on behalf of Raymond Faircloth, property owner and
applicant, for the removal of an existing pier and the construction of riprap, new pier
with two finger piers, a floating pier, boathouse, and boatlift. This property is located
at 6615 Crittenden Road along Chuckatuck Creek; further identified as Zoning Parcel
1
3*10A, zoned A, Agricultural Zoning District.
The first item of business was introduced by the Chairman followed by a staff report
presented by Amanda Beck, Planner II. Mrs. Beck advised that the applicant proposed
to remove an existing pier and boathouse structure and to install riprap, a new open-
pile pier with 2 finger piers, a L-head, boathouse, and boatlift. The shoreline along the
Faircloth property is defined mostly by upland vegetation, with much of their property
along Chuckatuck Creek being non-vegetated wetlands. The northeastern most corner
of the property does have some vegetated wetlands, which VIMS estimates is more
than 50% Phragmites. The applicant requested to remove the existing pier and
boathouse structure and to install 130 linear feet of riprap and a 6-foot by 58-foot
open-pile pier with (2) 5-foot by 35-foot finger piers, a 6-foot by 23-foot L-head, a 10-
foot by 25-foot floating pier with gangway, and a 14.5-foot by 48-foot boathouse with
a 15,000 pound boatlift. The pier and associated structures are outside of the Wetlands
Board jurisdiction, and exempted activity, and therefore will be permitted by the
VMRC. Of the proposed work, the Wetlands Board will need to consider the approval
or denial to permit for the riprap which falls in the Board’s jurisdiction, which will
have a permanent impact to 520 square feet of non-vegetated wetlands. It was staff’s
opinion that due to the existing conditions on site that the proposed construction of
riprap, new pier with two finger piers and L-head, a floating pier, boathouse, and a
2
boatlift is appropriate. Therefore, staff recommended approval of this application with
the conditions noted in the staff report.
The public hearing was opened and speaking in favor of this application was Richard
Bartlett, Professional Construction.
There being no speakers in opposition, the public hearing was closed.
After discussion by the Board, Mr. Davenport made a motion to approve this
application with the conditions, seconded by Mr. Vroman and passed by a
recorded vote of 6 to 0.
VMRC#16-0300, submitted by Brian D. Smith for the repair of 239’ of existing rip
rap, the addition of 150’ of new rip rap, 400 square feet of shoreline repair, and the
repair of a 30’x48’ pier along the Nansemond River. This property is located at 1337
River Road along the Nansemond River; further identified as Zoning Parcel 26B*41,
zoned RLM, Residential Low Medium Zoning District.
The next item of business was introduced by the Chairman followed by a staff report
presented by David Parks, Principal Planner. Mr. Parks advised that this proposal is to
repair 239 feet of exiting rip rap, as well as installation of an additional 150 feet of rip
rap and proposed repair of an existing 30-foot by 48-foot pier. Impacts associated with
this request will effect 750 square feet of vegetated wetlands and 2,914 square feet of
non-vegetated wetlands. The applicant has not provided any plan for mitigation at this
point. VIMS define the existing shoreline as a low exposure shoreline with minimal
impact. Recommended action for the shoreline protection would be the enhancement
3
of the buffer and the widening of the marsh along the undefended portion of the
shoreline given the low energy of this area of the Nansemond River. VIMS did
conduct a site visit and prepared a report advising that best erosion defense for the
shoreline would be to provide additional vegetation to establish marsh fringe. SEAS
also conducted a site visit and determined the following: 1) the erosion rate for this
property is less than 1 foot per year, 2) trees and shrubs growing on the bank and
within 10 feet of the bank edge should be selectively cut or trimmed - this would allow
additional sunlight exposure and stimulate growth of upland ground cover and marsh
fringe, 3) additional vegetative cover should be established - mixture and native
grasses or low-growing vegetation, 4) enhancement of marsh grasses will help
dissipate wave energy, 5) may consider the construction of a rip rap marsh sill and 6)
the consideration for the construction of the rip rap should be considered as an
alternative to enhancement of the marsh and the marsh sill. The applicant proposed to
repair 239’ of existing rip rap. The existing stone would be removed and filter fabric
placed. Stone would be re-installed along with additional stone for erosion protection.
Also, proposed to install 150’ of new rip rap in the form of concrete and rock. The
new rip rap will be installed along an undefended portion of shoreline with existing
vegetated wetlands. The Wetland Laws of Virginia require that any wetland impacts be
mitigated either on-site or off-site through a local mitigation bank. Also, in 2008, the
4
Board established an in-lieu fee for impact set at 1% over the cost of mitigation. Given
the impacts to vegetated wetlands, this in-lieu fee would be approximately $9,900. The
applicant has not provided a mitigation plan with this application. The applicant
provided two separate cross sections for the shoreline work. The applicant proposed
accessing the property from the driveway. All work is proposed to be completed from
the bank with use of heavy equipment. The applicant also requested to repair an
existing pier on the property. The applicant previously received a permit from VMRC
to construct a pier and covered boathouse. This request will be reviewed by staff as it
has no wetlands board impacts. Staff’s opinion that the portion of the shoreline that
currently contains rip rap and which has direct access to the Nansemond River is
appropriate for the applicant’s proposal of the installation of new stone. The placement
of stone shall be directly in the same line or landward of the existing stone so as not to
disturb and existing vegetated wetlands. Staff does not recommend approval of the
request by the applicant to install rip rap along the undefended portion of the shoreline
due to the amount of vegetated wetland impacts, the absence of apparent active
erosion, and no mitigation plan in place for the impact to wetlands.
The public hearing was opened and speaking in favor of this application was
Brian Smith, 1337 River Road, Suffolk, VA.
After discussion by the Board, Mr. Johnson advised that the application is not
5
complete; therefore, he made a motion to table this application until #13, 17, 18
and 19 of the Wetlands Board Checklist is complete and receive a good set of
drawings, seconded by Mr. Davenport and passed by a recorded vote of 6 to 0.
NEW BUSINESS:
VMRC05-2245 – Mr. Parks advised that staff was notified by the applicant that they
will be continuing maintenance on the pipeline.
OTHER BUSINESS:
Mr. Hinshelwood requested that he would like to see the buffer restoration plans prior
to approving the wetland permit.
ADJOURNMENT:
There being no further business, the meeting was adjourned.
6
CITY OF SUFFOLK
442 W. WASHINGTON STREET, P.O. BOX 1858, SUFFOLK, VIRGINIA 23439-1858
PHONE: (757) 514-4060 FAX: (757) 514-4099
DEPARTMENT OF
PLANNING & COMMUNITY DEVELOPMENT
Division of Planning
Memorandum
To: Suffolk Wetlands Board
From: David Parks, Principal Planner
RE: Permit Extension Request – VMRC #13-1859, submitted by Bob Simon with
Waterfront Consulting, Inc., applicant, on behalf of Loretta Willis, property
owner, for the installation of 1,627 linear feet of rip rap, construction of a 14-
foot by 32-foot concrete boat ramp, and construction of timber stairs for
beach access. The project is located at 2527 Bridge Road on the Nansemond
River. The subject property is further identified as Zoning Parcel 5*32C,
zoned RR, Residential Rural District.
Date: March 16, 2017
The applicant, Bob Simon, on behalf of Loretta Willis, property owner, is requesting an
additional permit extension request for VMRC13-1859. This project involves the installation of
rip rap, the construction of a concrete boat ramp, and the construction of timber stairs for beach
access.
This application was originally approved in January 2013 and since then the Board has approved
a permit extension request for this project in January 2014. This previous permit extension
request validated the permit until 2017. The applicant is now requesting an additional extension
to be able to complete the project.
I have attached the original Joint Permit Application for your reference.