Members Present: Mayor David Kline, Law Director Megan Raber, Finance Director Mollie
Gilbride, Director of Public Service Mike Rorar, President of Council Dennis Loughry
Meeting Chaired By: Mayor David G. Kline Minutes: Tish Rowland
Item 1: Call to Order and Approval of B.O.C. Minutes for the September 7th meeting: Mayor Kline
called the meeting to order at 8:10 p.m.
Item 2: Adoption of Minutes: Megan Raber moved to adopt the Minutes of the September 7th B.O.C.
meeting; seconded by Mollie Gilbride. (Mr. Loughry was in the building, but not present at
meeting) Vote to approve: 4/0
Item 3: Consideration and approval of the second, 1-year renewal for staffing temporary labor
through Safe Staffing of Ohio. The effective dates would be October 17, 2023, through
October 16, 2024. This is the last renewal of the contract. The original project was approved
by Council in Ord. 78-2021. Mollie Gilbride moved to approve; seconded by Megan Raber.
Discussion: Gilbride: Will the rate stay the same? Mayor: Yes. Vote to approve: 4/0
Item 4: Authorizing the Mayor to enter into a cooperative agreement with Brimfield Township for
the Howe Road Culvert Replacement Project. The overall portion of the project cost for
Tallmadge is $110,500.00. (This is authorized in Ord. 46-2021) Rorar: It appears that this was
not taken to the Board of Control when the ordinance was passed in 2021. I take full
responsibility for that; I apologize for missing it. The work was done, and we’ve received the
invoice. Raber: We just received the invoice? Gilbride: Correct, it has not been paid yet. Mayor
Kline moved to approve; seconded by Megan Raber. Vote to approve: 4/0
Item 5: Consideration and approval of Change Order #1 Brimfield Township for the Howe Road
Culvert Replacement Project for an increase of $7,080.82. This is an increase due to
construction administration costs that went from $17,500 to 31,890.00. (The original project
was approved in Ord. 46-2021) Rorar: The project was broken into three phases – design,
construction, and construction admin. The overage is with construction admin because the
winner prolonged it and there were some utility issues. The overage amount was $14390.00.
We split that with Brimfield, so our total was $7080.82. Mayor: For the record Councilman
Loughry is here now. We’re on Item #5. Mayor Kline moved to approved; seconded by Megan
Raber. Vote to approve: 4/0 (Councilman Loughry abstained)
Item 6: Additional Items
Item7: Adjournment: The meeting was adjourned at 8:15 p.m.
Board of Control minutes for this meeting electronically distributed October 2, 2023/tf
Agenda
Board of Control
Agenda
Thursday, September 28, 2023, 7:30 p.m. Mayor’s Conference Room
1. CALL TO ORDER
2. ADOPTION OF MINUTES –September 7, 2023
3. Consideration and approval of the second, 1-year renewal for staffing temporary labor
through Safe Staffing of Ohio. The effective dates would be October 17, 2023, through
October 16, 2024. This is the last renewal of the contract. The original project was
approved by Council in Ord. 78-2021.
4. Authorizing the Mayor to enter into a cooperative agreement with Brimfield Township
for the Howe Road Culvert Replacement Project. The overall portion of the project cost
for Tallmadge is $110,500.00. (This is authorized in Ord. 46-2021)
5. Consideration and approval of Change Order #1 Brimfield Township for the Howe Road
Culvert Replacement Project for an increase of $7,080.82. This is an increase due to
construction administration costs that went from $17,500 to 31,890.00. (The original
project was approved in Ord. 46-2021)