Planning Commission
Regular MeetingTroy, NY · July 11, 2013
Agenda
-
Barbara Nelson
William Dunne
Chair
Commissioner
Phone (518) 279-7168 Planning Commission Phone (518) 279-7166
Fax (518) 270-4642 NOTICE of PUBLIC HEARING
Fax (518) 270-4642
Notice is hereby given that the Planning Commission of the City of Troy, New York will conduct a public
hearing on Thursday July 11, 2013 at 6:00 P.M. in the 5th Floor Planning Department Hearing Room of The
Hedley Building, in order to hear and decide on proposals for development as follows:
PC2013-031 Review of a proposal to renovate and make changes to the façade of an existing plaza. Project
location is Troy Plaza, 120 Hoosick Street, an HCD Zone, ID101.31-10-3/1. Applicant is Troy Plaza SC 34
Fairview Road Penn Valley PA, 19072.
PC2013-033 Subdivision review of a proposal to construct 4 homes. Project location is 709 Burden Ave, an
IND Zone, ID111.68-3-3. Applicant is Habitat for Humanity, 35 State St Troy, NY 12180.
PC2013-036 Subdivision review of a proposal to construct 3 homes. Project location is 720 6th Ave, an R-2
Zone, ID80.41-7-2. Applicant is Justin Haas, 18 Peachtree Lane, Colonie NY 12205.
PC2013-037 Site Plan Review of a proposal to occupy an existing structure into a multi use building. Project
location is 9 1st Street, a B-4 Zone, ID 100.60-2-2/ Applicant is Jeff Buell, 9 1st Street, Troy, NY 12180.
Should any unforeseen events occur, any of the proposals noted herein may not be reviewed at said hearing.
Any proposals previously tabled by the Commission may be reviewed at this hearing without benefit of public
notice. Any other proposals reviewed by the Commission at this hearing will receive publication in this
newspaper at least five days prior to the hearing date.
Auxiliary aids and services are available for individuals or groups with disabilities. Please provide one-week
advance notice for such service. For information contact the Troy Planning Department at 279-7168. Any
person having interest in the above matters will be heard at said time and place.
Planning Commission of the City of Troy, New York
Andrew Petersen
Planning Commission July 2013 1
Staff Report # PC2013-031
Applicant: Troy Plaza SC
Project Summary:
PC2013-031 Review of a proposal to renovate and make changes to the façade of an existing
plaza. Project location is Troy Plaza, 120 Hoosick Street, an HCD Zone, ID101.31-10-3/1.
Applicant is Troy Plaza SC 34 Fairview Road Penn Valley PA, 19072.
SEQRA : Pursuant to 6 N.Y.C.R.R. Part 617, the described proposal is subject to the State
Environmental Quality Review Act and is classified as an Unlisted action. The applicant has
completed an Environmental Assessment Form (E.A.F.), and based upon the submission of an
EAF adequate information is available to determine that no significant impacts are likely to occur
as a result of this proposal. No Federal agencies are involved; no other agencies are known to be
involved.
Prior Planning Board Action
Prior Zoning Board
Site Design Review:
Under new ownership, the applicant proposes to undergo a redevelopment of the plaza in stages.
The initial stage under this review is a façade renovation and signage package. Façade promenade
structures will be removed, the creation of new facades, storefronts, entrances and signage
location areas and monument entrance sign will be undertaken.
Stipulations
Additional Phases to be presented to the Planning Commission.
All projects approved are to be reviewed in accordance with the 2010 NYS Building Code, NYS
Fire Code and all other applicable codes.
Planning Commission July 2013 2
Planning Commission July 2013 3
Planning Commission July 2013 4
Planning Commission July 2013 5
Planning Commission July 2013 6
Planning Commission July 2013 7
Planning Commission July 2013 8
Planning Commission July 2013 9
Staff Report # PC2013-033
Applicant: Habitat for Humanity
Project Summary:
PC2013-033 Subdivision review of a proposal to construct 4 homes. Project location is 709
Burden Ave, an IND Zone, ID111.68-3-3. Applicant is Habitat for Humanity, 35 State St Troy,
NY 12180.
SEQRA : Pursuant to 6 N.Y.C.R.R. Part 617, the described proposal is subject to the State
Environmental Quality Review Act and is classified as an Unlisted action. The applicant has
completed an Environmental Assessment Form (E.A.F.), and based upon the submission of an
EAF adequate information is available to determine that no significant impacts are likely to occur
as a result of this proposal. No Federal agencies are involved; no other agencies are known to be
involved.
Prior Planning Board Action
Prior Zoning Board
Site Design Review:
The applicant proposes to expand an existing Habitat for Humanity project by adding 2 detached
single family homes on Cross Street and 3 attached single family homes on Burden Ave. Habitat
has purchased an adjacent lot to expand the project for a total of 14 single family attached and
detached homes as part of Fox Hollow. Elevations to match previously approved project site.
The board will also be required to approve the subdivision of 3 lots to create 5 separate lots. All
lots not to exceed Zoning Approvals granted February 2012.
Stipulations
All projects approved are to be reviewed in accordance with the 2010 NYS Building Code, NYS
Fire Code and all other applicable codes.
Planning Commission July 2013 10
Planning Commission July 2013 11
Staff Report # PC2013-036
Applicant: Justin Haas
Project Summary:
PC2013-036 Subdivision review of a proposal to construct 3 homes. Project location is 720 6th
Ave, an R-2 Zone, ID80.41-7-2. Applicant is Justin Haas, 18 Peachtree Lane, Colonie NY 12205.
SEQRA : Pursuant to 6 N.Y.C.R.R. Part 617, the described proposal is subject to the State
Environmental Quality Review Act and is classified as an Unlisted action. The applicant has
completed an Environmental Assessment Form (E.A.F.), and based upon the submission of an
EAF adequate information is available to determine that no significant impacts are likely to occur
as a result of this proposal. No Federal agencies are involved; no other agencies are known to be
involved.
Prior Planning Board Action Approved storage units on Site May 2013
Prior Zoning Board
Site Design Review:
Applicant proposes to purchase an adjacent CROW and subdivide 3 building lots to meet Zoning
requirements of the R-4 Zone.
Lots 1
Located on 120th Street. (Northeastern Most Lot) This lot is served with utilities gas / electric,
water, sanitary and storm sewer. 80’x100’ Lot meets all ZBA requirements for lot characteristics.
Lot 2
Located on 120th Street. (Northwestern Most Lot) This lot is served with utilities gas / electric,
water, sanitary and storm sewer. 80’x100’ Lot meets all ZBA requirements for lot characteristics.
The applicant will construct a single story ranch style home on this lot.
Lot 3
Located on 119th Street (Southeastern Most Lot) This lot is served with utilities gas / electric,
water, sanitary and storm sewer. 70’x300’ Lot meets all ZBA requirements for lot characteristics.
Stipulations
All projects approved are to be reviewed in accordance with the 2010 NYS Building Code, NYS
Fire Code and all other applicable codes.
Planning Commission July 2013 12
Planning Commission July 2013 13
Planning Commission July 2013 14
Planning Commission July 2013 15
Staff Report # PC2013-037
Applicant: Jeff Buell
Project Summary:
PC2013-037 Site Plan Review of a proposal to occupy an existing structure into a multi use
building. Project location is 9 1st Street, a B-4 Zone, ID 100.60-2-2/ Applicant is Jeff Buell, 9 1st
Street, Troy, NY 12180.
SEQRA : Pursuant to 6 N.Y.C.R.R. Part 617, the described proposal is subject to the State
Environmental Quality Review Act and is classified as an Unlisted action. The applicant has
completed an Environmental Assessment Form (E.A.F.), and based upon the submission of an
EAF adequate information is available to determine that no significant impacts are likely to occur
as a result of this proposal. No Federal agencies are involved; no other agencies are known to be
involved.
Prior Planning Board Action
Prior Zoning Board
Site Design Review:
The applicant proposes to redevelop a vacant building as a multiuse building. The first floor will
be utilized as a restaurant, the second floor office space and the upper 2 floors will be occupied
by 2 apartments. Each floor is approximately 1570 SF.
The project is under a 2 year LDA agreement with the Troy LDC.
Stipulations
Applicant shall submit a site plan with the following elements
Dumpster / Trash Pickup Location
Exterior Lighting
Exterior modifications to go before the Historic Review Commission
All projects approved are to be reviewed in accordance with the 2010 NYS Building Code, NYS
Fire Code and all other applicable codes.
Planning Commission July 2013 16
Sequence
DEVELOPMENT
[The Rebirth of
9 First Street]
Submitted by:
Jeffrey Buell PHONE 518.944.8674 EMAIL jeffbuell@yahoo.com
Planning Commission July 2013 17
EXECUTIVE SUMMARY
Two neighbors sit perched along this quiet block of First Street‐ one, the finest reclamation
project you can find, the other a long forgotten brownstone in historic Downtown Troy. The
first is the iconic Rice Building‐ a rehabilitated landmark constructed in 1871 that stands as
a beacon of pride for boosters of this upstate city.
Its neighbor to the south is 9 First Street‐ a former book
bindery screaming to be redeveloped. It has been vacant
since 1996 when Code Enforcement ordered the building
shuttered due to its uninhabitable state.
Currently the interior of the building is in the process of
being gutted and stabilized. The floors at the rear of the
building have been completely destroyed and need to be
rebuilt. The upper floor staircase has detached from the
structure and needs to be rebuilt.
Sequence Development proposes to tackle those very
problems. We see the development as an excellent
opportunity to establish street front retail and second floor
office space, and residential apartments on the upper floors. This is a true mixed use
redevelopment.
Sequence Development has entered into a 2‐year LDA agreement for the sale of 9 First
Street from the City of Troy Local Development Corporation.
Planning Commission July 2013 18
PROJECT DESCRIPTION
The proposed project located at 9 First Street in Downtown Troy between Broadway and
State Street. The building is currently owned by the Troy Local Development Corporation.
The first floor will be utilized perfectly as a boutique restaurant that will add another
dynamic dining option to Downtown Troy.
The second floor space will be used a office space.
The upper floor residential rehabilitation will be undertaken by Sequence Development, a
company owned by Jeffrey Buell. Construction on the residential units and office space will
take approximately six months. The restaurant will open shortly thereafter.
MARKET ANALYSIS
The apartment market in Downtown Troy continues to
grow leaps and bounds each year. The units developed
at 9 First Street will be dynamic and sought after by high
quality tenants for years to come.
Created with a true loft experience in mind, there will be
one unit per floor accessed from the north side of the
building. The units will feature unique finishes like
concrete countertops,
exposed duct work, and
interior brick work.
Each apartment will be approximately 1,400 square feet with
wide open floor plans and plenty of sunshine on each side of
the apartment. Every unit has windows at the front and rear
looking out onto River Street and First Street.
Our idea for the boutique restaurant is aimed at
becoming a “destination” environment that urban
communities crave in the vein of the Charles Lucas
Confectionary, Market Block Books and other ventures
in Troy that have
gained success during
the past couple of
years.
Planning Commission July 2013 19
DEVELOPMENT ORGANIZATION
Owner: 9 First Street LLC, owned 51 percent by Christopher Colwell and 49 percent by
Jeffrey Buell.
Lead Developer: Sequence Development.
Management: MHC Management
Contractor: GSD Contracting
Architect: TAP, Inc.
Engineer: Preston Engineering
Site/Civil: RDM
DEVELOPMENT/OWNERSHIP TEAM
Jeffrey A. Buell, Project Developer and Owner
Jeff is formerly a Real Estate Development Executive with the United Group of Companies, in
Troy, NY, a position he left to form MHC Development. MHC Mission Statement is simple‐ “Do
It Right, Or Don’t Do It At All.” Focusing on the small details at the front of a potential
development will eliminate surprises on the back end, and help ensure that financial
projections hit the target.
Prior to forming MHC, Jeff worked under Walter Uccellini at the United Group of Companies
and was in charge of all new student housing development. Since 2010, Jeff spearheaded the
creation of four new assets in the Captial District totaling more than $59 million. One of those
assets is currently under construction, and the other three are cash flowing assets.
City Station West is a $16 million, mixed use facility in Downtown Troy
featuring 184 beds of graduate student housing for Rensselaer Polytechnic
Institute and 17,000 square feet of retail space. As of the spring 2013, the
building is 100 percent occupied/leased and accomplished a permanent
financing in December of 2012.
City Station South is a $7.7 million, 55‐unit multi family housing complex
that is the home to married students at RPI. Jeff negotiated a ten year
revenue agreement with the school and parlayed it into 100 percent
constuction financing from a regional lender.
College Suites @ Washington Square is a 264‐bed student housing
facility with total development costs above $16 million. This
development is the first student housing ever for Schenectady County
Community College, and it achieved 80 percent occupancy in its first
year, far exceeding expectations. An aggressive tax agreement, grants for
Planning Commission July 2013 20
curing land concerns, tremendous public/private relationship with SCCC, and an infill urban
development, Washington Square is a great example of the profile project MHC intends to
pursue, simply on a larger scale.
Prior to joining UGOC, Jeff enjoyed his time as the Economic Development Coordinator for the
City of Troy where he learned the uphill battles that urban areas to stuggle with, and the
advantages that can be had by those who can visualize the solid markets within them. Jeff
began his career has a reporter for the Troy Record, twice earning Associated Press awards for
coverage of ongoing events.
Jeff received his education from the College of Saint Rose in Albany NY, studying
Communications and History. He lives on Burden Lake in Averil Park and is a lifelong resident of
the Capital District. He currently serves as the Chairman of the Board at True North Troy
Prepatory School, and is a board member at the YMCA.
Christopher Colwell, Project Owner and Analyst
Chris is a lifelong resident of the Capital District that is preparing to graduate from Rensselaer
Polytechnic Institute with an MBA in Supply Chain Management and Bachelor of Science Degree
in Management and Mathematics.
Chris has been an active member of US Army since 2003, serving a total of 15 months in Iraq
with the 82nd Airborne Division as a team leader during contact movements and reconnaissance
operations. Chris was promoted to Drill Sergeant of the 95th Infantry Division where he
developed, directed and supervised training programs for the Army. He was eventually
promoted as an Information Systems Operator/Analyst for the 42nd National Guard Infantry
Division.
Prior to being Honorably Discharged, Chris was awarded the 2007 Battalion Non Commissioned
Officer of the Year and the 2008 Brigade Officer of the Year. He is also a proud member of the
Combat Infantryman’s Association and the Disabled American Veterans.
While at Rensselaer, Chris worked closely with fellow students to study how an increased
relationship between RPI and Troy could help grow the economy in the upstate City. He plans
on further exploring this idea by creating business opportunities in Downtown Troy.
Chris is currently employed by Target as Engineering and Facility Group Leader specializing in
organizational efficiency, risk assessment, problem solving and applying advanced mathematics
to derivative market models.
David R Hubbard, Director of Construction Services
Dave will lead all construction activities at MHC after spending nearly 15 years in a variety of
construction related fields‐ including work done for McDonald’s, National Grid, CVS, Wal‐Mart,
Shaw’s Grocery Stores, Crossgates Mall, Grand Union, Topps, Starbucks, Colonie Center,
Adirondack Outlets, UW Marx, and Charlew Builders. Most recently, Dave was the crew leader
and foreman building single family homes throughout the Capital District.
Planning Commission July 2013 21
With a keen understanding of building codes and tremendous hands on skills, Dave prides
himself on bringing a job in on time and within budget. He recently earned a bachelor’s degree
in Business Administration from Sage College of Albany, graduating with honors. In his down
time, Dave is a wood worker and craftsman that owns A Walk In The Woods crafts with his wife
of 15 years, Delia and their four children.
SITE PLAN ELEMENTS LISTING
1. Show the following information as notations on the site plan:
a. Identify the property by its street address
b. Provide today’s date
c. Identify the scale of the drawing (ex. 1”=20’)
d. Note the zoning district: B‐4, Historic District
e. Note the tax map number of the property: 100.60‐2‐2
2. Indicate the applicant’s full name and address and the property owner’s name and
Address: Sequence Development, 25 Blue Heron Drive, Averill Park, NY 12018
3. Show the boundaries of the property and provide the dimension at each change of
direction of the boundary line.
4. Draw the locations of the curb lines of all streets and alleys adjoining the property and show
the following: N/A
a. Provide the street (curb‐to‐curb) widths
b. Provide the alley widths
c. Show the street and alley Right‐of‐way widths
d. Identify whether the streets are privately or publicly owned
5. Place a labeled north arrow on the plan.
6. Draw the locations of the buildings on adjacent properties and provide the following
information:
a. Complete building dimensions (attached)
b. Descriptions of existing uses of the building and the quantity of space so used (See above)
Planning Commission July 2013 22
c. Show the distances from the building to the nearest property line: The building is covered by
two buildings to the north and south. 214 River Street, currently used as a driveway is to the
west, First Street to the west.
7. Draw the locations of the buildings on adjacent properties and provide the following
information:
a. Approximate dimensions of the buildings
b. Approximate distances to property lines‐ 0’
c. Describe uses of the buildings: Office Buildings
d. Identify the construction of the buildings (brick, frame, brownstone, etc.)‐ Brick and
Brownstone
8. Describe your proposal fully and identify the following as part of the overall description:
a. Indicate the proposed future use of the property (see above)
b. Identify the area affected by the proposal: an exterior and interior rehabilitation of 9 First
Street to provide 5,700 square feet of mixed use building, including office, restaurant, and
apartments.
c. Describe hours of operation and the expected number of customers: The restaurant will
operate seven days a week with a focus on dinner.
9. Locate and describe any existing and all proposed driveways, curb cuts and walkways. If none
existing or proposed, so state. If new curb cuts are being proposed, provide detail to describe
its construction and layout. New sidewalk at front of building.
10. Provide the following information to describe landscaping on the property:
a. Show all existing landscaping, trees and fences and identify its size and type: one current tree
to remain.
b. Show all proposed new landscaping, trees and fences and identify it by species, size, number
and spacing‐ n/a
11. Prepare a scaled drawing of any proposed sign(s) and provide the following information:
(signage to be determined and return to Planning Commission)
a. Overall sign dimensions
b. Sign colors
c. Method of illumination (if non, state)
d. Approximate messages (ex: Sam’s Deli, open 24 hours)
Planning Commission July 2013 23
e. Identify the installation height of the sign above grade
f. Show the sign(s) installation location(s)
g. Identify the type of sign proposed (ex. flush mounted, projecting, freestanding, etc.)
12. Draw existing and/or proposed off street parking areas and provide the following
information: n/a
a. Describe how the parking area will be illuminated (if it will not, so state) and include design of
lamp heads and wattage‐ N/A
b. Identify the size of all parking spaces
c. Indicate the total number of parking spaces, both existing and proposed
d. Show locations of guard rails, tire stops, bollards etc.
e. Show the locations of all landscaping, screening and traffic islands
f. Indicate the slope of all driveways and the parking surface
g. Describe how storm water will be drained and removed
h. Describe how snow will be removed and where it will be piled
13. Using arrows, show traffic circulation patterns to and from the site, and the direction of
traffic of all adjoining streets and alleys: All traffic flows south on First Street.
14. Provide topography lines or spot elevations if there is more than a five foot difference in
elevation between any two points on the site. n/a
15. Show the locations and describe all exterior lighting not associated with parking: n/a
16. If additional pavement or roof area will be placed on the site, describe how storm drainage
will be addressed and include the following information as it applies: n/a
17. Identify the locations of existing water supply and of existing sanitary sewerage lines will
connect into.
18. Describe future trash collection provisions and include the following information:
a. Show where the trash will be accumulated on the property (dumpster locations, trash can
locations, etc.)
b. Show where the trash will be collected (at the curb, in the alley, etc.)
c. Identify who will collect the trash (city collection, private commercial collection, transfer to
landfill by tenants or property owner, etc.)
Planning Commission July 2013 24
d. Identify what landfill the trash is expected to be transferred to.
19. Show the location of the nearest fire hydrant on the plan and describe any additional fire
protective measures that exist or will be added to the property: Fire hydrant on street. Building
will be fully sprinklered.
20. Submit a photograph of all buildings that are a part of your proposal and that shows the
public notice signs have been posted. If no buildings are involved, submit a photo of the site.
The photo is not required to be submitted with your application, but should be presented at the
hearing of the proposal.
21. If modifications to the exterior of the building or new construction is proposed (such as an
addition, entry alteration, new windows or doors, etc.), submit a sketch to indicate the shape of
the proposed change, the color, the size and the materials to be used.
Planning Commission July 2013 25
Planning Commission July 2013 26