NOTICE OF PUBLIC HEARING
Notice is hereby given that the Zoning Board of Appeals of the City of Troy, New York will conduct a regular
public hearing at 6:00 P.M. on Tuesday, August 27, 2019 the 5th Floor of 433 River Street, to act upon the
following requests for approvals and appeals from decisions made by the Bureau of Code Enforcement of the
City of Troy.
PLZB 2019-58 Ghamdan Alseidi seeks a Use Variance for 3283 Sixth Ave (90.54-3-2) to convert the existing
structure into a gas station and convenience store (within 500 ft. of an existing convenience store). R4 Zone
PLZB 2019-59 The City of Troy, on behalf of Valente Gravel, seeks a Use Variance for 0-6 Madison St (the
“Scolite site”, 111.28-4-1) to operate an aggregate trans-shipping facility. WCD Zone
PLZB 2019-60 Bonnie Patterson seeks a Use Variance for 520 Fifth Ave (80.64-6-19) to use the existing lot
and structure for storage. B2 Zone
Additional information regarding the above listed actions is available in the Department of Planning and
Community Development located on the 5th floor of Troy City Hall, 433 River Street, Troy, New York 12180.
Telephone: 279-7169. E-mail: james.rath@troyny.gov. Office hours are weekdays 8:30 A.M. to 4:30 P.M.
As required by Americans with Disabilities Act, auxiliary aids and services are available upon request. Please
give one-week advance notice for services needed.
City Hall, 433 River Street, Troy, New York 12180
STAFF REPORT ZB 2019-58
Address: 3283 Sixth Ave (90.54-3-2) Zone: R-4
Applicant: Ghamdan Alseidi
Project description: Ghamdan Alseidi seeks a Use Variance for 3283 Sixth Ave (90.54-3-2) to convert the
existing structure into a gas station and convenience store (within 500 ft. of two existing convenience stores).
Staff Notes:
Existing structure previously used as a Stewart’s convenience store which closed earlier this year
Within 500 ft of an existing conveinvence store (at River & Glen)
Within a mile of five existing gas stations
There is significant data showing a gas station would not necessarily serve the neighboring community
No information on gradient, run-off from gas station
Significant number of allowed uses that could yield a reasonable return that have not been explored
Applicant is under-contract to purchase the property, which requires a use variance for intended use.
Unclear how need for variance is not self-created.
Approvals needed:
1) Per Zoning Code Section § 285-55B a Use Variance is required for a gas station in an R-4
2) Per Zoning Code Section § 285-67J a Use Variance is required for a convenience store within 500
feet of an existing convenience strore
USE VARIANCE
I move to approve/deny the Use Variance based on the following findings of fact:
1. The land, property, structure, or building in question can/cannot yield a reasonable economic return if used only
for a purpose allowed in the zone, because
_________________________________________________________________
2. The need for the variance was / was not caused by the applicant, because
____________________________________________________________________________
3. The use shall / shall not alter the essential character of the neighborhood, nor depreciate aesthetic or property
values of the locality, because
____________________________________________________________________________
4. The plight of the owner is / is not due to unique circumstances instead of the general conditions in the
neighborhood, which may reflect the unreasonable uses of the zoning ordinance itself, because
______________________________________________________________________
SEQRA:
Staff recommends that the Board find this proposal to be a Unlisted action with sufficient information available
upon which to make a determination that the project is not expected to cause significant environmental impact
STAFF REPORT ZB 2019-59
Address: 0-6 Madison St (the “Scolite site”, 111.28-4-1) Zone: WCD
Applicant: The City of Troy, on behalf of Valente Gravel
Project description: The City of Troy, on behalf of Valente Gravel, seeks a Use Variance for 0-6 Madison St
(the “Scolite site”, 111.28-4-1) to operate an aggregate trans-shipping facility. WCD Zone
Staff Notes:
This zone, HCD, was adopted in 2004, and implemented to encourage “mixed uses, including
recreation, public green space, professional offices, multifamily residential, research and development
space, and limited retail…”
Site is on the Hudson waterfront, and abuts the Poestenkill Canal to the north
Site is currently used by members of the public to fish
Site is less than 300 ft of residences
Multiple community members have voiced concerns over high truck traffic, exhaust, dust and debris
from gravel and aggregate, and other health and environmental impacts
Approvals needed:
1) Per Zoning Code Section § 285-66.1C(5) a Use Variance is required for Transshipping facilities,
unloading and aggregate in an WCD zone
USE VARIANCE
I move to approve/deny the Use Variance based on the following findings of fact:
1. The land, property, structure, or building in question can/cannot yield a reasonable economic return if used only
for a purpose allowed in the zone, because
_________________________________________________________________
2. The need for the variance was / was not caused by the applicant, because
____________________________________________________________________________
3. The use shall / shall not alter the essential character of the neighborhood, nor depreciate aesthetic or property
values of the locality, because
____________________________________________________________________________
4. The plight of the owner is / is not due to unique circumstances instead of the general conditions in the
neighborhood, which may reflect the unreasonable uses of the zoning ordinance itself, because
______________________________________________________________________
SEQRA:
Staff recommends that the Board find this proposal to be a Unlisted action with sufficient information available
upon which to make a determination that the project is not expected to cause significant environmental impact
Agency Use Only [If applicable]
Full Environmental Assessment Form Project :
Part 2 - Identification of Potential Project Impacts Date :
Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could
be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental
professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that
can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the
most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the
lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity.
If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding
with this assessment.
Tips for completing Part 2:
• Review all of the information provided in Part 1.
• Review any application, maps, supporting materials and the Full EAF Workbook.
• Answer each of the 18 questions in Part 2.
• If you answer “Yes” to a numbered question, please complete all the questions that follow in that section.
• If you answer “No” to a numbered question, move on to the next numbered question.
• Check appropriate column to indicate the anticipated size of the impact.
• Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency
checking the box “Moderate to large impact may occur.”
• The reviewer is not expected to be an expert in environmental analysis.
• If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general
question and consult the workbook.
• When answering a question consider all components of the proposed activity, that is, the Awhole action@.
• Consider the possibility for long-term and cumulative impacts as well as direct impacts.
• Answer the question in a reasonable manner considering the scale and context of the project.
1. Impact on Land
Proposed action may involve construction on, or physical alteration of, NO YES
✔
the land surface of the proposed site. (See Part 1. D.1)
If “Yes”, answer questions a - j. If “No”, move on to Section 2.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may involve construction on land where depth to water table is E2d 9
✔ 9
less than 3 feet.
b. The proposed action may involve construction on slopes of 15% or greater. E2f 9
✔ 9
c. The proposed action may involve construction on land where bedrock is exposed, or E2a 9
✔ 9
generally within 5 feet of existing ground surface.
d. The proposed action may involve the excavation and removal of more than 1,000 tons D2a 9
✔ 9
of natural material.
e. The proposed action may involve construction that continues for more than one year D1e 9
✔ 9
or in multiple phases.
f. The proposed action may result in increased erosion, whether from physical D2e, D2q 9
✔ 9
disturbance or vegetation removal (including from treatment by herbicides).
g. The proposed action is, or may be, located within a Coastal Erosion hazard area. B1i 9
✔ 9
h. Other impacts: _______________________________________________________ 9 9
___________________________________________________________________
Page 1 of 10
FEAF 2019
2. Impact on Geological Features
The proposed action may result in the modification or destruction of, or inhibit
access to, any unique or unusual land forms on the site (e.g., cliffs, dunes, NO
✔ YES
minerals, fossils, caves). (See Part 1. E.2.g)
If “Yes”, answer questions a - c. If “No”, move on to Section 3.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. Identify the specific land form(s) attached: ________________________________ E2g 9 9
___________________________________________________________________
b. The proposed action may affect or is adjacent to a geological feature listed as a E3c 9 9
registered National Natural Landmark.
Specific feature: _____________________________________________________
c. Other impacts: ______________________________________________________ 9 9
___________________________________________________________________
3. Impacts on Surface Water
The proposed action may affect one or more wetlands or other surface water ✔
NO YES
bodies (e.g., streams, rivers, ponds or lakes). (See Part 1. D.2, E.2.h)
If “Yes”, answer questions a - l. If “No”, move on to Section 4.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may create a new water body. D2b, D1h 9 9
b. The proposed action may result in an increase or decrease of over 10% or more than a D2b 9 9
10 acre increase or decrease in the surface area of any body of water.
c. The proposed action may involve dredging more than 100 cubic yards of material D2a 9 9
from a wetland or water body.
d. The proposed action may involve construction within or adjoining a freshwater or E2h 9 9
tidal wetland, or in the bed or banks of any other water body.
e. The proposed action may create turbidity in a waterbody, either from upland erosion, D2a, D2h 9 9
runoff or by disturbing bottom sediments.
f. The proposed action may include construction of one or more intake(s) for withdrawal D2c 9 9
of water from surface water.
g. The proposed action may include construction of one or more outfall(s) for discharge D2d 9 9
of wastewater to surface water(s).
h. The proposed action may cause soil erosion, or otherwise create a source of D2e 9 9
stormwater discharge that may lead to siltation or other degradation of receiving
water bodies.
i. The proposed action may affect the water quality of any water bodies within or E2h 9 9
downstream of the site of the proposed action.
j. The proposed action may involve the application of pesticides or herbicides in or D2q, E2h 9 9
around any water body.
k. The proposed action may require the construction of new, or expansion of existing, D1a, D2d 9 9
wastewater treatment facilities.
Page 2 of 10
l. Other impacts: _______________________________________________________ 9 9
___________________________________________________________________
4. Impact on groundwater
The proposed action may result in new or additional use of ground water, or ✔ NO
YES
may have the potential to introduce contaminants to ground water or an aquifer.
(See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t)
If “Yes”, answer questions a - h. If “No”, move on to Section 5.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may require new water supply wells, or create additional demand D2c 9 9
on supplies from existing water supply wells.
b. Water supply demand from the proposed action may exceed safe and sustainable D2c 9 9
withdrawal capacity rate of the local supply or aquifer.
Cite Source: ________________________________________________________
c. The proposed action may allow or result in residential uses in areas without water and D1a, D2c 9 9
sewer services.
d. The proposed action may include or require wastewater discharged to groundwater. D2d, E2l 9 9
e. The proposed action may result in the construction of water supply wells in locations D2c, E1f, 9 9
where groundwater is, or is suspected to be, contaminated. E1g, E1h
f. The proposed action may require the bulk storage of petroleum or chemical products D2p, E2l 9 9
over ground water or an aquifer.
g. The proposed action may involve the commercial application of pesticides within 100 E2h, D2q, 9 9
feet of potable drinking water or irrigation sources. E2l, D2c
h. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
5. Impact on Flooding
The proposed action may result in development on lands subject to flooding. NO YES
✔
(See Part 1. E.2)
If “Yes”, answer questions a - g. If “No”, move on to Section 6.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may result in development in a designated floodway. E2i 9
✔ 9
b. The proposed action may result in development within a 100 year floodplain. E2j 9
✔ 9
c. The proposed action may result in development within a 500 year floodplain. E2k 9
✔ 9
d. The proposed action may result in, or require, modification of existing drainage D2b, D2e 9
✔ 9
patterns.
e. The proposed action may change flood water flows that contribute to flooding. D2b, E2i, 9
✔ 9
E2j, E2k
f. If there is a dam located on the site of the proposed action, is the dam in need of repair, E1e 9
✔ 9
or upgrade?
Page 3 of 10
g. Other impacts: ______________________________________________________
9 9
___________________________________________________________________
6. Impacts on Air
The proposed action may include a state regulated air emission source.
✔ NO YES
(See Part 1. D.2.f., D.2.h, D.2.g)
If “Yes”, answer questions a - f. If “No”, move on to Section 7.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. If the proposed action requires federal or state air emission permits, the action may
also emit one or more greenhouse gases at or above the following levels:
i. More than 1000 tons/year of carbon dioxide (CO2) D2g 9 9
ii. More than 3.5 tons/year of nitrous oxide (N2O) D2g 9 9
iii. More than 1000 tons/year of carbon equivalent of perfluorocarbons (PFCs) D2g 9 9
iv. More than .045 tons/year of sulfur hexafluoride (SF6) D2g 9 9
D2g 9 9
v. More than 1000 tons/year of carbon dioxide equivalent of
hydrochloroflourocarbons (HFCs) emissions
vi. 43 tons/year or more of methane D2h 9 9
b. The proposed action may generate 10 tons/year or more of any one designated D2g 9 9
hazardous air pollutant, or 25 tons/year or more of any combination of such hazardous
air pollutants.
c. The proposed action may require a state air registration, or may produce an emissions D2f, D2g 9 9
rate of total contaminants that may exceed 5 lbs. per hour, or may include a heat
source capable of producing more than 10 million BTU=s per hour.
d. The proposed action may reach 50% of any of the thresholds in “a” through “c”, D2g 9 9
above.
e. The proposed action may result in the combustion or thermal treatment of more than 1 D2s 9 9
ton of refuse per hour.
f. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
7. Impact on Plants and Animals
The proposed action may result in a loss of flora or fauna. (See Part 1. E.2. m.-q.) NO
✔ YES
If “Yes”, answer questions a - j. If “No”, move on to Section 8.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may cause reduction in population or loss of individuals of any E2o 9 9
threatened or endangered species, as listed by New York State or the Federal
government, that use the site, or are found on, over, or near the site.
b. The proposed action may result in a reduction or degradation of any habitat used by E2o 9 9
any rare, threatened or endangered species, as listed by New York State or the federal
government.
c. The proposed action may cause reduction in population, or loss of individuals, of any E2p 9 9
species of special concern or conservation need, as listed by New York State or the
Federal government, that use the site, or are found on, over, or near the site.
d. The proposed action may result in a reduction or degradation of any habitat used by E2p 9 9
any species of special concern and conservation need, as listed by New York State or
the Federal government.
Page 4 of 10
e. The proposed action may diminish the capacity of a registered National Natural E3c 9 9
Landmark to support the biological community it was established to protect.
f. The proposed action may result in the removal of, or ground disturbance in, any E2n 9 9
portion of a designated significant natural community.
Source: ____________________________________________________________
g. The proposed action may substantially interfere with nesting/breeding, foraging, or
E2m 9 9
over-wintering habitat for the predominant species that occupy or use the project site.
h. The proposed action requires the conversion of more than 10 acres of forest, 9 9
E1b
grassland or any other regionally or locally important habitat.
Habitat type & information source: ______________________________________
__________________________________________________________________
i. Proposed action (commercial, industrial or recreational projects, only) involves use of D2q 9 9
herbicides or pesticides.
j. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
8. Impact on Agricultural Resources
The proposed action may impact agricultural resources. (See Part 1. E.3.a. and b.) ✔
NO YES
If “Yes”, answer questions a - h. If “No”, move on to Section 9.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may impact soil classified within soil group 1 through 4 of the E2c, E3b 9 9
NYS Land Classification System.
b. The proposed action may sever, cross or otherwise limit access to agricultural land E1a, Elb 9 9
(includes cropland, hayfields, pasture, vineyard, orchard, etc).
c. The proposed action may result in the excavation or compaction of the soil profile of E3b 9 9
active agricultural land.
d. The proposed action may irreversibly convert agricultural land to non-agricultural E1b, E3a 9 9
uses, either more than 2.5 acres if located in an Agricultural District, or more than 10
acres if not within an Agricultural District.
e. The proposed action may disrupt or prevent installation of an agricultural land El a, E1b 9 9
management system.
f. The proposed action may result, directly or indirectly, in increased development C2c, C3, 9 9
potential or pressure on farmland. D2c, D2d
g. The proposed project is not consistent with the adopted municipal Farmland C2c 9 9
Protection Plan.
h. Other impacts: ________________________________________________________ 9 9
Page 5 of 10
9. Impact on Aesthetic Resources
The land use of the proposed action are obviously different from, or are in ✔
NO YES
sharp contrast to, current land use patterns between the proposed project and
a scenic or aesthetic resource. (Part 1. E.1.a, E.1.b, E.3.h.)
If “Yes”, answer questions a - g. If “No”, go to Section 10.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. Proposed action may be visible from any officially designated federal, state, or local E3h 9 9
scenic or aesthetic resource.
b. The proposed action may result in the obstruction, elimination or significant E3h, C2b 9 9
screening of one or more officially designated scenic views.
c. The proposed action may be visible from publicly accessible vantage points: E3h
i. Seasonally (e.g., screened by summer foliage, but visible during other seasons) 9 9
ii. Year round 9 9
d. The situation or activity in which viewers are engaged while viewing the proposed E3h
action is:
E2q,
i. Routine travel by residents, including travel to and from work 9 9
ii. Recreational or tourism based activities E1c 9 9
e. The proposed action may cause a diminishment of the public enjoyment and E3h 9 9
appreciation of the designated aesthetic resource.
f. There are similar projects visible within the following distance of the proposed D1a, E1a, 9 9
project: D1f, D1g
0-1/2 mile
½ -3 mile
3-5 mile
5+ mile
g. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
10. Impact on Historic and Archeological Resources
The proposed action may occur in or adjacent to a historic or archaeological NO
✔ YES
resource. (Part 1. E.3.e, f. and g.)
If “Yes”, answer questions a - e. If “No”, go to Section 11.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may occur wholly or partially within, or substantially contiguous
to, any buildings, archaeological site or district which is listed on the National or E3e 9 9
State Register of Historical Places, or that has been determined by the Commissioner
of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for
listing on the State Register of Historic Places.
b. The proposed action may occur wholly or partially within, or substantially contiguous E3f 9 9
to, an area designated as sensitive for archaeological sites on the NY State Historic
Preservation Office (SHPO) archaeological site inventory.
c. The proposed action may occur wholly or partially within, or substantially contiguous E3g 9 9
to, an archaeological site not included on the NY SHPO inventory.
Source: ____________________________________________________________
Page 6 of 10
d. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
If any of the above (a-d) are answered “Moderate to large impact may
e. occur”, continue with the following questions to help support conclusions in Part 3:
i. The proposed action may result in the destruction or alteration of all or part E3e, E3g, 9 9
of the site or property. E3f
ii. The proposed action may result in the alteration of the property’s setting or E3e, E3f, 9 9
integrity. E3g, E1a,
E1b
iii. The proposed action may result in the introduction of visual elements which E3e, E3f, 9 9
are out of character with the site or property, or may alter its setting. E3g, E3h,
C2, C3
11. Impact on Open Space and Recreation
The proposed action may result in a loss of recreational opportunities or a NO
✔ YES
reduction of an open space resource as designated in any adopted
municipal open space plan.
(See Part 1. C.2.c, E.1.c., E.2.q.)
If “Yes”, answer questions a - e. If “No”, go to Section 12.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may result in an impairment of natural functions, or “ecosystem D2e, E1b 9 9
services”, provided by an undeveloped area, including but not limited to stormwater E2h,
storage, nutrient cycling, wildlife habitat. E2m, E2o,
E2n, E2p
b. The proposed action may result in the loss of a current or future recreational resource. C2a, E1c, 9 9
C2c, E2q
c. The proposed action may eliminate open space or recreational resource in an area C2a, C2c 9 9
with few such resources. E1c, E2q
d. The proposed action may result in loss of an area now used informally by the C2c, E1c 9 9
community as an open space resource.
e. Other impacts: _____________________________________________________ 9 9
_________________________________________________________________
12. Impact on Critical Environmental Areas
The proposed action may be located within or adjacent to a critical NO
✔ YES
environmental area (CEA). (See Part 1. E.3.d)
If “Yes”, answer questions a - c. If “No”, go to Section 13.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may result in a reduction in the quantity of the resource or E3d 9 9
characteristic which was the basis for designation of the CEA.
b. The proposed action may result in a reduction in the quality of the resource or E3d 9 9
characteristic which was the basis for designation of the CEA.
c. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
Page 7 of 10
13. Impact on Transportation
The proposed action may result in a change to existing transportation systems. ✔
NO YES
(See Part 1. D.2.j)
If “Yes”, answer questions a - f. If “No”, go to Section 14.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. Projected traffic increase may exceed capacity of existing road network. D2j 9 9
b. The proposed action may result in the construction of paved parking area for 500 or D2j 9 9
more vehicles.
c. The proposed action will degrade existing transit access. D2j 9 9
d. The proposed action will degrade existing pedestrian or bicycle accommodations. D2j 9 9
e. The proposed action may alter the present pattern of movement of people or goods. D2j 9 9
f. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
14. Impact on Energy
The proposed action may cause an increase in the use of any form of energy. NO
✔ YES
(See Part 1. D.2.k)
If “Yes”, answer questions a - e. If “No”, go to Section 15.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action will require a new, or an upgrade to an existing, substation. D2k 9 9
b. The proposed action will require the creation or extension of an energy transmission D1f, 9 9
or supply system to serve more than 50 single or two-family residences or to serve a D1q, D2k
commercial or industrial use.
c. The proposed action may utilize more than 2,500 MWhrs per year of electricity. D2k 9 9
d. The proposed action may involve heating and/or cooling of more than 100,000 square D1g 9 9
feet of building area when completed.
e. Other Impacts: ________________________________________________________
____________________________________________________________________
15. Impact on Noise, Odor, and Light
The proposed action may result in an increase in noise, odors, or outdoor lighting. NO ✔
YES
(See Part 1. D.2.m., n., and o.)
If “Yes”, answer questions a - f. If “No”, go to Section 16.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may produce sound above noise levels established by local D2m ✔9 9
regulation.
b. The proposed action may result in blasting within 1,500 feet of any residence, D2m, E1d 9
✔ 9
hospital, school, licensed day care center, or nursing home.
c. The proposed action may result in routine odors for more than one hour per day. D2o 9
✔ 9
Page 8 of 10
d. The proposed action may result in light shining onto adjoining properties. D2n 9
✔ 9
e. The proposed action may result in lighting creating sky-glow brighter than existing D2n, E1a 9
✔ 9
area conditions.
f. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
16. Impact on Human Health
The proposed action may have an impact on human health from exposure NO ✔
YES
to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.)
If “Yes”, answer questions a - m. If “No”, go to Section 17.
Relevant No,or Moderate
Part I small to large
Question(s) impact impact may
may cccur occur
a. The proposed action is located within 1500 feet of a school, hospital, licensed day E1d 9
✔ 9
care center, group home, nursing home or retirement community.
b. The site of the proposed action is currently undergoing remediation. E1g, E1h 9
✔ 9
c. There is a completed emergency spill remediation, or a completed environmental site E1g, E1h 9
✔ 9
remediation on, or adjacent to, the site of the proposed action.
d. The site of the action is subject to an institutional control limiting the use of the E1g, E1h 9
✔ 9
property (e.g., easement or deed restriction).
e. The proposed action may affect institutional control measures that were put in place E1g, E1h 9
✔ 9
to ensure that the site remains protective of the environment and human health.
f. The proposed action has adequate control measures in place to ensure that future D2t 9
✔ 9
generation, treatment and/or disposal of hazardous wastes will be protective of the
environment and human health.
g. The proposed action involves construction or modification of a solid waste D2q, E1f 9
✔ 9
management facility.
h. The proposed action may result in the unearthing of solid or hazardous waste. D2q, E1f ✔
9 9
i. The proposed action may result in an increase in the rate of disposal, or processing, of D2r, D2s 9
✔ 9
solid waste.
j. The proposed action may result in excavation or other disturbance within 2000 feet of E1f, E1g ✔
9 9
a site used for the disposal of solid or hazardous waste. E1h
k. The proposed action may result in the migration of explosive gases from a landfill E1f, E1g 9
✔ 9
site to adjacent off site structures.
l. The proposed action may result in the release of contaminated leachate from the D2s, E1f, 9
✔ 9
project site. D2r
m. Other impacts: ______________________________________________________
__________________________________________________________________
Page 9 of 10
17. Consistency with Community Plans
The proposed action is not consistent with adopted land use plans. NO YES
✔
(See Part 1. C.1, C.2. and C.3.)
If “Yes”, answer questions a - h. If “No”, go to Section 18.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action’s land use components may be different from, or in sharp C2, C3, D1a 9
✔ 9
contrast to, current surrounding land use pattern(s). E1a, E1b
b. The proposed action will cause the permanent population of the city, town or village C2 9
✔ 9
in which the project is located to grow by more than 5%.
c. The proposed action is inconsistent with local land use plans or zoning regulations. C2, C2, C3 9
✔ 9
d. The proposed action is inconsistent with any County plans, or other regional land use C2, C2 9
✔ 9
plans.
e. The proposed action may cause a change in the density of development that is not C3, D1c, 9
✔ 9
supported by existing infrastructure or is distant from existing infrastructure. D1d, D1f,
D1d, Elb
f. The proposed action is located in an area characterized by low density development C4, D2c, D2d 9
✔ 9
that will require new or expanded public infrastructure. D2j
g. The proposed action may induce secondary development impacts (e.g., residential or C2a ✔
9 9
commercial development not included in the proposed action)
h. Other: _____________________________________________________________ 9 9
__________________________________________________________________
18. Consistency with Community Character
The proposed project is inconsistent with the existing community character. NO
✔ YES
(See Part 1. C.2, C.3, D.2, E.3)
If “Yes”, answer questions a - g. If “No”, proceed to Part 3.
Relevant No, or Moderate
Part I small to large
Question(s) impact impact may
may occur occur
a. The proposed action may replace or eliminate existing facilities, structures, or areas E3e, E3f, E3g 9 9
of historic importance to the community.
b. The proposed action may create a demand for additional community services (e.g. C4 9 9
schools, police and fire)
c. The proposed action may displace affordable or low-income housing in an area where C2, C3, D1f 9 9
there is a shortage of such housing. D1g, E1a
d. The proposed action may interfere with the use or enjoyment of officially recognized C2, E3 9 9
or designated public resources.
e. The proposed action is inconsistent with the predominant architectural scale and C2, C3 9 9
character.
f. Proposed action is inconsistent with the character of the existing natural landscape. C2, C3 9 9
E1a, E1b
E2g, E2h
g. Other impacts: ______________________________________________________ 9 9
__________________________________________________________________
PRINT FULL FORM Page 10 of 10
STAFF REPORT ZB 2019-60
Address: 520 Fifth Ave (80.64-6-19) Zone: B-2
Applicant: Bonnie Patterson
Project description: Bonnie Patterson seeks a Use Variance for 520 Fifth Ave (80.64-6-19) to use the existing
lot and structure for storage.
Staff Notes:
Applicant has expressed site will be kept tidy and not used for trash or junk vehicles, only items of value
the family needs to store
Neighboring properties are primarily residential
Approvals needed:
1) Per Zoning Code Section § 285-59B a Use Variance is required
USE VARIANCE
I move to approve/deny the Use Variance based on the following findings of fact:
1. The land, property, structure, or building in question can/cannot yield a reasonable economic return if used only
for a purpose allowed in the zone, because
_________________________________________________________________
2. The need for the variance was / was not caused by the applicant, because
____________________________________________________________________________
3. The use shall / shall not alter the essential character of the neighborhood, nor depreciate aesthetic or property
values of the locality, because
____________________________________________________________________________
4. The plight of the owner is / is not due to unique circumstances instead of the general conditions in the
neighborhood, which may reflect the unreasonable uses of the zoning ordinance itself, because
______________________________________________________________________
SEQRA:
Staff recommends that the Board find this proposal to be a Unlisted action with sufficient information available
upon which to make a determination that the project is not expected to cause significant environmental impact
Get email alerts for Troy
A daily email when new agendas and minutes are posted.