TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 1
CONVENE: 7:00 p.m.
CASE NUMBER: Craft District II, LLC Variance & Site Plan Review (TUM-22-0070
and TUM-21-0460)
DESCRIPTION The project proponent is requesting approval of a variance from sections
OF PROPOSAL: of Title 18 TMC in regards to building design and open space
requirements.
PROJECT NAME: Craft District II, LLC Apartments Variance and Site Plan Review
Approval
APPLICANT: Craft District II, LLC
John Peters
2840 Black Lake Blvd. SW, #C
Tumwater, WA 98512
Project Proponent/ Ferguson Architecture
Representative: Megan Johnson
1916 Jefferson Avenue
Tacoma, WA 98402
PUBLIC Hearing Examiner Andrew Reeves with Sound Law Center convened the
HEARING: public hearing at 7:00 p.m. to consider several variances and site plan
review approval to allow for development of a 96-unit apartment
complex with associated parking and other improvements on a 3.47-acre
vacant lot at 4300 Capitol Boulevard SE.
Examiner Reeves reported the purpose of the hearing is to collect
evidence in the form of exhibits and testimony to determine whether the
proposal complies with the City’s Comprehensive Plan, zoning
ordinances, Critical Areas Ordinances, and the specific requirements for
approval of variances under Chapter 18.58 of the Tumwater Municipal
Code (TMC), and whether the proposal complies with the requirements
for approval of site plan review under the code.
Examiner Reeves reported that prior to the public hearing he received
and reviewed the following 13 exhibits. Exhibits 14 through 17 were
added during the public hearing:
1. Staff Report Dated 04-20-2022
2. Application and Variance Narrative 02-07-2022
3. Aerial Map
4. Comprehensive Plan Map
TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 2
5. Public Notice Certification
6. Notice of Application 01-28-2022
7. NOA Comments
8. Determination of Nonsignificance 03-10-2022
9. SEPA Comments
10. Cultural Resource Assessment 04-13-2022
11. Tree Survey 01-07-2022
12. Preliminary Civil Plans 01-07-2022
13. Trail Alignment 04-15-2022
14. Preliminary Civil Plans dated January 7, 2022
15. Copy of Development Agreement
16. Copy of Letter from DAHP in support
17. Language of the Notice of Hearing
Examiner Reeves noted that the list of exhibits did not include
Preliminary Civil Plans although listed as an exhibit. The City received
several comments on the proposal with one from a community member
conveying concerns about traffic and the type of housing proposed. A
response was provided to the community member and that individual
does not appear to be participating in the public hearing. The Squaxin
Island Tribe requested a cultural resources survey, which was completed
and included within the exhibits.
Examiner Reeves admitted the 13 exhibits into the record.
Examiner Reeves reported all testimony will be under oath or affirmation
because if the decision should be appealed under the State Land Use
Petition Act, the audio recording of the hearing, admitted exhibits, and
the decision would serve as the foundation for an appeal. The order of
testimony begins with the City of Tumwater providing an overview of
the proposal and any recommendations, testimony by the Applicant to
present any additional information, testimony from the public, and
closing arguments by the City of Tumwater and the Applicant.
CITY Examiner Reeves administered the oath to Tumwater Permit Manager
TESTIMONY: Tami Merriman.
Examiner Reeves noted that the exhibits are not accurately reflected as
listed on the Staff Report. Exhibit 10 was listed as the Cultural
Resources Assessment. However, the material he received was a
Transportation Concurrency Memo as Exhibit 10. Exhibit 12 is the
Cultural Resources Assessment and not Preliminary Civil Plans as listed
on the Staff Report. He recommended adding Preliminary Civil Plans as
Exhibit 14 from January 17, 2022 with Exhibit 14 transmitted
TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 3
electronically to his office following the public hearing.
Manager Merriman noted she has several other documents that are not on
the exhibit list that will be referenced during her report. Examiner
Reeves recommended identifying the documents for inclusion as an
exhibit. Manager Merriman said one document is a Development
Agreement between the City of Tumwater and Craft District II, LLC, as
it speaks to right-of-way vacation and frontage improvements. The
second document is a letter the City received from the Department of
Archaeology and Historic Preservation (DAHP) concurring with the
results of the Cultural Resources Assessment.
Examiner Reeves admitted Preliminary Civil Plans of January 7, 2022 as
Exhibit 14, the Development Agreement between the City of Tumwater
and Craft District II, LLC as Exhibit 15, and the letter from DAHP as
Exhibit 16.
Manager Merriman identified the Applicant and representatives of the
Applicant. The Applicant has requested a variance from certain sections
of Title 18 regarding building design and open space requirements.
Manager Merriman shared an illustration of the project site located at
4300 Capitol Boulevard in Tumwater. A notice of application indicating
the application was submitted and deemed complete was mailed to
property owners within 300 feet of the subject property, affected
agencies, posted on-site, and published in The Olympian on January 28,
2022.
Comments were received from Nisqually Indian Tribe stating no
concerns. Comments from the Squaxin Island Tribe recommended a
cultural resources survey and report. A local citizen contacted the City
with questions regarding development standards. Manager Merriman
said she responded to the citizen via an email but did not receive a
response.
The City of Tumwater issued a Determination of Nonsignificance on
March 10, 2022. Comments received from the Squaxin Island Tribe
recommended a cultural resources survey and report. The Applicant
completed a cultural resources survey that resulted in negative results for
any presence of cultural artifacts. The City also received comments from
the Washington State Department of Ecology. The Department of
Ecology provided guidance on existing regulations and advised that a
construction stormwater general permit may be required.
TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 4
Public notification for the April 27, 2022, public hearing was mailed to
property owners within 300 feet of the subject property and various
agencies, posted on-site, and published in The Olympian on Friday, April
15, 2022.
Manager Merriman displayed Preliminary Civil Plans and explained how
the Craft District represents more than an apartment complex as the Craft
District has developed other projects as part of the City’s Brewery
District. Existing development on the site includes the Heritage
Distillery and South Puget Sound Community College. Under
construction is a market building and other commercial projects planned
on the site to include an amphitheater. While all the projects are separate
applications, they all support development within the same area.
The Development Agreement also addresses frontage improvements
required for all development on the site as well as the redevelopment and
reconfiguration of Tumwater Valley Drive. The Development
Agreement includes details on frontage improvements to include some
specific conditions and timing factors for those improvements. One
example is a condition for the completion of a portion of Tumwater
Valley Drive at a specific time to ensure completion of the project’s
driveway. Although the Development Agreement covers the entire
redevelopment and reconfiguration of Tumwater Valley Drive, this
project is responsible for the segment directly affecting the project.
Examiner Reeves noted that the Staff Report includes a recommendation
of over 60 conditions. He asked whether any issues exist with respect to
the conditions and whether any could be eliminated with respect to the
requirements included within the Development Agreement. Manager
Merriman advised that three conditions would require some changes.
One condition for frontage improvements requires a correction as the
condition was stated inaccurately.
Examiner Reeves said he does not recall being involved in the drafting or
reviewing of the Development Agreement but is aware of the larger
context of the project and any development agreement that could
potentially supersede some requirements of the zoning code if the
Development Agreement covers those requirements as well as other
requirements. He wants to ensure that the proposal and any conditions
included are in alignment with the Development Agreement. Manager
Merriman explained that she did not realize the Development Agreement
was completed with respect to the requirements for right-of-way vacation
and frontage improvements. She followed up with the Applicant and
with the City’s Transportation and Engineering Director who provided
TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 5
confirmation of the executed Development Agreement.
Examiner Reeves asked whether the standards for the variances have
been superseded by the Development Agreement. Manager Merriman
affirmed the standards are applicable to the variance requests. Examiner
Reeves said he understand the variances are for consideration but the site
plan review is normally an administrative process by the City. He asked
whether the site plan review is considered within the other variances for
consideration or whether City staff would render an administrative
decision on the site plan review. Manager Merriman explained that the
site plan review approval is an administrative process; however, in order
to issue an approval, the variance must be approved by the Hearing
Examiner. The conditions in the Staff Report cite the approval of four
different areas, as well as the vacation of right-of-way. Her previous
history has dictated that only one open record hearing is allowed for a
development and that since the public hearing has been scheduled, the
variances and the entire project would be considered, as the site plan
approval is dependent upon the Hearing Examiner’s decision.
Examiner Reeves agreed consolidation of issues during the open record
public hearing for one hearing ruling often relates to a SEPA appeal or
another administrative decision whereby the open record public hearing
is a consolidated process allowed under state law and under the TMC
that enables an applicant or the City to essentially consolidate the
proposals into one process with the administrative portions determined
by the hearing examiner rather than the City. He asked whether there
was an expectation he would produce a decision on the variances as well
as a decision on the site review plan. If that is the case, there would be
no additional administrative site plan review process. Manager
Merriman affirmed that was the City’s intent of the public hearing.
Manager Merriman reported the project proponent attended both a
preliminary and formal site plan review conference for the project. The
site plan review approval is an administrative approval, however the
project proponent has requested a variance from some requirements of
Title 18 TMC for building architecture, frontage and corner treatments,
and minimum open space requirement. The project approval is subject to
approval of those variances.
The site is approximately 3.47 acres, and is vacant. The site is relatively
flat to the west, has a steep slope on the east, and has some trees.
The proposal is to construct 96 apartment units with associated parking.
The project proponent requests a variance from the strict interpretation of
TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 6
the City of Tumwater Municipal Code Sections 18.27.050 Development
Standards, 18.27.080(A)(5) Ground Floor Residential Units,
18.27.080(A)(6) Building Frontage, 18.27.080(B)(2)(d) Corner
Treatments, and 18.42.130(A) Open Space. Chapter 18.58 TMC
provides guidance and requires findings for the granting of a variance.
The five findings for the variances are the same:
1. That special conditions exist which are peculiar to the land, such
as size, shape, topography, or location, not applicable to other
lands in the same district, and that literal interpretation of the
provisions of this title would deprive the property owners of
rights commonly enjoyed by other properties similarly situated in
the same district under the terms of this title;
2. That the special conditions and circumstances are not the result of
actions of the applicant;
3. That the granting of the variance requested will not confer a
special privilege to the property that is denied other lands in the
same district;
4. That the granting of the variance will not be materially
detrimental to the public welfare or injurious to the property of
improvements of the vicinity and zone in which the subject
property is situated; and
5. That the reasons set forth in the application justify the granting of
the variance, and that the variance, if granted, would be the
minimum variance that will make possible the reasonable use of
the land.
A variance cannot be granted if it would permit a use that would not be
permitted as a primary, accessory or conditional use in the district
involved.
Section 18.27.080.A.5 TMC Ground Floor Residential Units: When
ground floor residential units are provided on a street-facing building
facade within ten feet of the street-facing property line, ground floor
entries to individual units must be provided. On Capitol Boulevard with
the right-of-way vacation, the building would be more than 10 feet from
the property line on the street-facing side. The Applicant is not required
to provide the unit entries; however, the Applicant is providing sidewalk
connections from Capitol Boulevard. As Capitol Boulevard is a very
heavily traveled corridor, no on-street parking is available and individual
units facing Capitol Boulevard would not be conducive. On the side of
Tumwater Valley Drive, no parking is allowed on the street and since the
area is in the location of an intersection, staff believes individual entries
were unnecessary. The City supported not requiring individual entries on
TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 7
the ground floor of the building for each unit.
Examiner Reeves asked whether the vacation on Capitol Boulevard
would result in the code no longer applicable to the requirement to
provide individual entries on the ground floor. Manager Merriman said
she believes the variance request was not applicable to Capitol Boulevard
but only to Tumwater Valley Drive because the building façade is within
10 feet of the street-facing property line. However, because of the right-
of-way vacation, the building is more than 12 feet from the property line
along Capitol Boulevard.
Examiner Reeves asked for confirmation as to the applicability of the
variance applying only to one portion of one building with residential
units fronting Tumwater Valley Drive not having individual access to the
ground floor units. Manager Merriman confirmed his interpretation of
the applicability of the variance.
Manager Merriman said the second variance applies to building frontage.
In Section 18.27.080.A.6, properties fronting more than one public street
are required to meet the minimum building frontage requirements along
both street frontages, and in so doing must locate the building in the
corner of the property within the maximum street-facing setback of both
streets. The Deschutes Subdistrict requires minimum street-facing
building frontage of 50%. The Applicant requests a variance to reduce
the street facing building frontage on Tumwater Valley Drive to 30% due
to the ingress/egress location and steep slope on the east property line.
The Applicant meets the requirement on the Capitol Boulevard side.
In Section 18.27.080.B.2.d TMC Corner Treatments, buildings located at
the corner of two streets shall locate the primary building entry at or
within twenty feet of the corner of the building. In addition, these
buildings shall address the corner through one of several methods. The
Applicant requests a variance to required corner treatments due to the
residential use having no primary entrance and the limited amount of
commercial space. Staff finds that the building use is multi-family that
does not provide a primary entry. The leasing office is located at the
corner of the building and provides a covered entry, similar to the
required courtyard. Not reducing the building setback on the full height
of the building prevents reducing the site of the units located there.
Manager Merriman referred to the requirements in Section 18.42.130.A
TMC Open Space. For new residential developments in which the
majority of the dwelling units will be multifamily dwellings or rooming
houses, or five or more dwelling units as rowhouses or townhomes, and
TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 8
the land is not being divided, a minimum of fifteen percent of the gross
site area shall be set aside for park and open space area, with 50% active
and 50% passive recreation. Open space areas are required to be separate
from required yards, setbacks, and landscaping areas. The requirement is
challenging and staff believes the recommendation is a good outcome.
The challenge was fitting open space on such a narrow lot after
deducting for infrastructure and other requirements. Different ideas were
discussed with the Applicant proposing to provide a corner area for an
active play area. The Applicant proposed providing a connection to a
jogging path located off the property along Tumwater Valley Drive.
With the new creation of Tumwater Valley Drive, a sidewalk will be
added to provide another safe pathway to a different area along
Tumwater Valley Drive creating a loop system. Additionally, with the
amphitheater planned on the adjacent lot and other buildings and uses
proposed for area, the area will offer many activities for residents within
walking distance. Staff supports the variance for open space
requirements based on the proposal.
Examiner Reeves asked whether the difficulty pertains to not meeting the
50% active space as part of the 15%. Manager Merriman affirmed that
was the reason for the variance request.
Manager Merriman reported that following reviews by staff of each
variance, findings for each variance were provided citing special
conditions existing on the property due to the shape and topography. The
property is rectangular and encumbered by a steep slope and wetland
buffer on the east property line creating a hardship for meeting some of
the strict standards. In terms of site plan review findings, the project is
located within the Deschutes Subdistrict of the Brewery Zoning District
and is subject to Brewery District design guidelines. Some specific
design standards are applicable and through the preliminary and formal
site plan reviews, staff worked with the Applicant to develop a plan that
meets all the requirements of the zoning districts with several exceptions.
The first exception is the building setbacks, which are required to be a
minimum of five feet. The requirement is satisfied with the vacation of
right-of-way as part of the Development Agreement. Ground floor
residential entries and building frontage would be satisfied with the
approval of the variance. The Applicant proposes a refuse enclosure
abutting Capitol Boulevard. The conceptual site plan does not meet the
requirement where the trash enclosure is located adjacent to Capitol
Boulevard unless additional screening is provided. Buildings located at
the corner of two streets shall locate the primary building entry at or
within twenty feet of the corner of the building. The conceptual site plan
meets this requirement with the approval of the variance. Only 15% of
TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 9
the designated parking stalls can be assigned for compact vehicles. The
Applicant proposes a maximum of 22 stalls to be designated as compact
parking, which is more than the authorized amount and can be addressed
during site development and grading. Wheel stops are required for
parking stalls, which can be confirmed during the site development and
grading process.
The proposal includes specific sign permit requirements within the
Brewery District zone district. Sign permits are reviewed under a
separate permit process. The open space requirement can be met with
the approval of the variance. A transportation concurrency review was
completed and issued by the City’s Transportation Manager on March 4,
2022. The Tree Report requires the retention of 41 trees. The report
documents the retention of 40 to 42 trees to meet the minimum
requirements; however, additional onsite parking and landscaping tree
plantings will exceed the minimum requirements. The cultural resources
assessment submitted to the City suggested preparation of an Inadvertent
Discovery Plan with the site development/grading plan. That plan is a
standard requirement for the City’s development and grading plan. The
City also received a concurrency letter from DAHP.
Findings for the building will be focused on fire, fire flow, meeting fire
codes, and ADA access. The conditions of approval reflect all the
requirements as being in compliance.
The Staff Report also refers to the Development Agreement between the
City of Tumwater and Craft District II, LLC as under draft. The findings
are based on that assumption; however, the Development Agreement has
been executed between the parties. The findings reflect how the
Development Agreement defines the timing of when required
improvements will be completed.
Examiner Reeves said he received a copy of the language for the Notice
of Application and the public notice certification; however, he lacks the
Notice of Hearing. As several individuals experienced some challenges
signing on to the hearing, it would be important to have a copy of the
Notice of Hearing included as Exhibit 17. Based on challenges
associated with several individuals having trouble in joining the meeting,
he has some concern that if there was an issue with the Notice of Hearing
it might create other issues. He suggested leaving the record open for
some period to enable individuals to contact the City to submit
comments. Additionally, leaving the record open for additional time
affords time for staff to complete a revised or redlined Staff Report
highlighting changes to any conditions and how the Development
TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 10
Agreement aligns with some of the conditions or prepare a supplemental
memorandum explaining how the Development Agreement affects
specific conditions.
Manager Merriman agreed with the recommendation to extend the record
but was unsure as to the length of time. Examiner Reeves said he does
not anticipate a major delay, as he would prefer not learning that a citizen
indicated they did not have an opportunity to participate in the hearing
and filed an appeal. He recommended leaving the record open for one
week.
Manager Merriman explained that the information for accessing the
virtual meeting was included on the Public Hearting Notice. The only
individuals encountering difficulty in accessing the meeting were the
panelists. Examiner Reeves asked that staff provide a copy of the Public
Hearing Notice and a memorandum that addresses changes to the
conditions. He prefers to have a set of conditions that are clear and
concise.
Manager Merriman advised that the main list of conditions include
standard conditions required as part of the site
development/grading/building plan submittals. The requirements
involving the vacation request and additional screening around the refuse
area and number of compact stalls are included in the conditions. She
reviewed three conditions that should be amended with an offer to follow
up with written documentation following the public hearing. The first
finding is Condition #31: “The water main shall be “looped” through the
site. Fire protection shall be from parking area not Capitol Boulevard.”
Manager Merriman said she reviewed the requirement with the City’s
Building Official and will defer to the Applicant as to whether the
condition should remain. However, based on their conversation,
hydrants along Capitol Boulevard are pulled and relocated onto the site
covering all buildings with an appropriate hydrant. Fire protection would
be provided from the parking area rather than from Capitol Boulevard.
Additionally the looping of the water main through the site for fire flow
is important but the situation could require a small looping between
hydrants as opposed to looping the entire water system, which is why the
Building Official retained the condition. The Applicant proposes small
looping between hydrants rather than a full looped system as long as the
project meets fire flow.
Examiner Reeves asked whether the intent of Condition 31 would
essentially entail fire protection for the site meeting fire flow
requirements as determined by the City’s Building Official and Fire
TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 11
Marshal. Manager Merriman replied that to meet fire flow requirements,
the Applicant may need to loop between the fire hydrants. Examiner
Reeves recommended revising the condition to reflect, “Fire protection
shall be designed such that fire flow requirements are met as determined
by the Building Official/Fire Marshal. Manager Merriman added that in
addition, Condition 58 stating that the project must meet minimum fire
flow requirements could be deleted.
The next condition is Condition 51 stating, “Proponent’s traffic engineer
shall verify the access location on Tumwater Valley Drive is far enough
from the intersection as to not create any issues at Capitol Boulevard.”
Condition 51 was previously addressed during formal site plan review
and the location proposed by the Applicant is acceptable. The condition
has been satisfied.
The last condition is Condition 54: “Frontage improvements are
required” should be deleted as it was included by error.
Examiner Reeves said based on the explanations, he recommends
deleting the requirements within Conditions 31, 51, and 54 and retaining
the numbering sequence of all conditions.
Examiner Reeves said the Development Agreement governs the right-of-
way vacation on Capitol Boulevard, which eliminates the scope to some
degree of the first variance request (individual entry to units from Capitol
Boulevard). The remaining provisions within the Development
Agreement do not speak to any other impacts for the purposes of his
review.
APPLICANT Examiner Reeves administered the oath to John Peters.
TESTIMONY:
John Peters reported he is the owner/Applicant of the property. He
shared that the difficulty he encountered in joining the meeting was of
his doing as he was running late.
Examiner Reeves said he only suggested extending the public hearing as
it could evolve into a larger issue. However, based on Manager
Merriman’s testimony, he does not believe there is a need to extend the
public hearing unless the Applicant prefers leaving the record open for
several days to enable submittal of written comments in lieu of public
testimony. Mr. Peters recommended leaving the record open until close
of business on Friday, April 29, 2022.
Examiner Reeves agreed to leave the record open until Friday, April 29,
TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 12
2022.
Mr. Peters thanked the City and Examiner Reeves for taking time to
consider the proposal. The proposal has completed three preliminary
reviews and one formal development review. The project team and the
City have discussed the conditions and have narrowed the list to what
makes sense for the site given the unique nature of some of the
requirements.
Examiner Reeves said he clarified his decision-making with staff and
understands he would render decisions on the variances and the site plan
review. Typically, the Applicant is involved in the decision-making
process. Mr. Peters agreed with the Examiner’s recommendation to
assist in streamlining the process.
Examiner Reeves administered the oath to Tyrell Bradley.
Tyrell Bradley reported he is the Civil Engineer for the project. He
supported the site plan review variance decision by the Examiner on
behalf of the Applicant given his history with Examiner Reeves as the
City’s Examiner because it would afford the quickest path. He supported
the removal of three conditions especially the looping of the water main,
which could entail an additional several hundred thousand dollars to the
project cost. He believes the project can meet fire flow with the current
configuration.
Megan Johnson, Project Architect, Ferguson Architecture, did not offer
additional testimony.
PUBLIC There was no public testimony.
TESTIMONY:
CITY Examiner Reeves asked Community Development Director Michael
TESTIMONY: Matlock to speak to the consolidation/decisional process and the
provisions within the Development Agreement.
He administered the oath to Director Matlock.
Director Matlock advised that he has served as the City’s Community
Development Director for approximately 12 years. He affirmed the
Examiner’s interpretation of the decisional process for the variance
requests and the site review plan.
Director Matlock added that the Examiner was not involved in the
TUMWATER HEARING EXAMINER
MINUTES OF VIRTUAL MEETING
April 27, 2022 Page 13
Development Agreement between Craft District II, LLC, and the City of
Tumwater. Examiner Reeves noted that in some jurisdictions,
development agreements are reviewed by the hearing examiner.
Examiner Reeves reviewed outstanding items to be provided to his
office:
Preliminary Civil Plans dated January 2022 (Exhibit 14)
Copy of Development Agreement (Exhibit 15)
Copy of Letter from DAHP in support (Exhibit 16)
Language of the Notice of Hearing (Exhibit 17)
The record will remain open until the close of business on Friday, April
29, 2022. On Monday, May 2, 2022, staff will advise his office of any
communications received from the public. Within 10 business days of
April 29, 2022, the Applicant should receive the decision on the
proposal. Examiner Reeves thanked everyone for attending.
ADJOURNMENT: Examiner Reeves adjourned the public hearing at 8:08 p.m.
Prepared by Valerie L. Gow, President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
HEARING EXAMINER
MEETING AGENDA
Online via Zoom
Wednesday, April 27, 2022
7:00 PM
The Tumwater Hearing Examiner is an appointed official of the City, and rules upon land use and zoning
matters. Within 10 business days of the conclusion of the hearing, the Examiner shall render a decision,
including findings and conclusions. Questions on the operation and procedures of the Hearing Examiner
may be directed to the Community Development Department at 360-754-4180.
1. Call to Order
2. Public Hearing
a. Craft District II, LLC Variance & Site Plan Review (TUM-22-0070 and TUM-21-0460)
3. Adjourn
Remote Meeting Information
To comply with Governor Inslee's Proclamation 20-28, the City of Tumwater meetings will be conducted
remotely, not in-person, using a web-based platform. The public will have telephone and online access
to all meetings.
Watch OnlineGo to http://www.zoom.us/join, and enter the Webinar ID 856 7889 0752 and Passcode
336196.
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 856 7889 0752 and Passcode
336196.
The City of Tumwater Hearing Examiner will hear testimony from interested parties via computer audio
or by telephone by registering in advance to provide comment.
Public Comment – Register in advance for this webinar:
https://us02web.zoom.us/webinar/register/WN_fCG_L19pSh61E35ONUR1IA
After registering, you will receive a confirmation email containing information about joining the webinar.
Written comments may be submitted to City of Tumwater, Community Development Department, 555
Israel Road SW, Tumwater, WA 98501, or by email at tmerriman@ci.tumwater.wa.us or by fax at (360)
754-4138, and must be received by 6:00 p.m. on April 27, 2022.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4128 or email ADACoordinator@ci.tumwater.wa.us.
Get email alerts for Tumwater
A daily email when new agendas and minutes are posted.