Public Works Committee
Regular MeetingTumwater, WA · January 6, 2022
Minutes
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
January 6, 2022 Page 1
CONVENE: 8:00 a.m.
PRESENT: Chair Eileen Swarthout and Councilmembers Michael Althauser and Charlie
Schneider.
Staff: City Attorney Karen Kirkpatrick, Transportation and Engineering
Director Brandon Hicks, Water Resources and Sustainability Director Dan
Smith, Operations Manager Steve Craig, Water Resources Specialist David
Kangiser, and Administrative Assistant Cathy Nielsen.
APPROVAL OF
MINUTES;
DECEMBER 9,
2021:
MOTION: Councilmember Althauser moved, seconded by Councilmember
Schneider, to approve the minutes of December 9, 2021 as presented.
Motion carried unanimously.
SELECTION OF Chair Swarthout invited nominations for Chair.
COMMITTEE
CHAIR: Councilmember Schneider nominated Eileen Swarthout to serve as Chair
during 2022. Councilmember Althauser seconded the nomination.
No other nominations were offered.
VOTE: By a unanimous voice vote, Eileen Swarthout was elected to serve as
Chair during 2022.
TUMWATER HILL Manager Carney reported the Tumwater Hill Park Hill Crosby Connector is a
PARK TRAIL – 1,200-foot gravel trail connecting Crosby Boulevard SW near Crosby Court to
COSBY the Tumwater Hill Trail, originating at Ridgeview Court near Tumwater
CONNECTOR, Elementary School. The new connector provides a permanent trail between
AUTHORITY TO the connections and improves the quality of life by providing outdoor activity
SOLICIT BIDS AND and pedestrian access to Tumwater Elementary School for the neighborhood.
RECOMMEND
AWARD OF Project elements include development of the trail using methods to minimize
CONTRACT: impacts to vegetation over the 1,200 trail on a heavily wooded hillside with a
90-foot elevation gain by constructing switchbacks with timber treads to
address elevation changes on a five-foot wide graveled path with a mid-trail
rest landing.
The scope of work includes clearing of the trail footprint, installation of a
culvert in a roadside ditch off Crosby Boulevard, placement of 2,500 tons of
crushed rock, construction of switchbacks with pressure-treated timber, and
construction of the landing for a mid-trail rest area. The engineer’s estimate
for the project is $197,467. Manager Carney invited questions from the
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
January 6, 2022 Page 2
committee.
Councilmember Schneider asked about the funding source for the trail.
Director Hicks reported the funds are from park impact fees.
Councilmember Schneider asked about the timeline for construction and the
completion date. Manager Carney said staff is finalizing the contract
documents and anticipates releasing a bid by mid-February with construction
scheduled during drier conditions (end of April/early May). The contract is
proposed to cover 20 days with potential completion of the trail by the end of
May.
CONSENSUS: The Public Works Committee unanimously authorized staff to solicit bids
for construction of the Tumwater Hill Park Trail - Crosby Connector
project and recommended the City Council authorize the Mayor to sign a
public works contract with the lowest responsible bidder.
ADDITIONAL Chair Swarthout referred to her request for the committee to receive an update
ITEMS: on the recent spill occurring in Percival Creek.
Director Smith provided the update. Since 2008, the City has received 27
reported overflows. Staff acknowledges the dataset might be incomplete,
emphasizing that overflows are not a frequent occurrence and some reporting
of smaller spills might not be included. The 27 reported overflows were
reported through the City’s regional coordination with LOTT Clean Water
Alliance and the Department of Ecology. The bulk of spills occur because of
grease blockage. The City has implemented a grease/oil program to assist
residents and business owners and to remind them not to put any type of grease
down drains. Other contributing factors for overflows are plant roots from
trees and shrubs penetrating pipes creating areas of blockages serving as
catchment areas for the accumulation of grease and other materials. The
City’s operations and maintenance program routinely inspect systems to assess
the system operationally and identify any root intrusions, leakage into and out
of sewer lines, and overall pump station operations. The City has experienced
one line break in the system. Since 2008, the estimated gallons spilled into the
environment has been approximately 12,000 gallons.
Once staff has been notified of a spill, the response is quick. To help guide the
response, the department has prepared an Emergency Overflow Emergency
Response Plan to assist in guiding the City’s response, coordination, and
reporting efforts. The plan is typically updated every one to two years. The
last update was completed in August 2020. The most recent spill afforded an
opportunity to review the plan to ensure all issues are covered, and if not, staff
plans to schedule another update.
The sewer spill first appeared in a manhole located on Somerset Hill Drive
flowing from the manhole down the hill to the stormwater system. Once the
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
January 6, 2022 Page 3
spill enters the stormwater system, stormwater slows the flow avoiding an
immediate direct discharge to the creek. However, once the flows reach a
certain capacity, the spill discharges directly to Percival Creek.
Other more recent spills in Percival Creek occurred in May 2019 and
November 2020 originating from a sewer outfall (manhole) located and
obscured from the street. During the most recent incident, snow response staff
notified the department of the spill enabling a quick identification and
response to clean up the spill. The previous spill from the sewer outfall
located off the street was not detected for some time because of its location.
The City was notified of that spill by a citizen who was walking along a trail
and noticed the spill.
Part of the response of cleanup includes containment, surface cleaning, and
disinfection, as well as cleaning of soil around the area to the extent possible.
An element of the response is water quality testing by examining background
conditions to assess whether the cleanup response was successful. The spill
resulted in E. coli in excess of 2,400 colonies, which exceeds environmental
conditions and is indicative of a sewer spill. After several days following the
cleanup, testing revealed normal conditions at the outfall of 115 to 179 E. coli
colonies and downstream numbers within the state’s accepted standards for
recreational water of 320 E. coli colonies. Operations was able to clean up the
spill to the extent possible to assist in returning the system to natural operating
conditions.
Following containment and cleanup of the site, staff continues coordination
activities. When a spill enters a stormwater system, Water Resources
Specialist Kangiser becomes involved as part of the coordination with state
and local agencies. The City also coordinates with Thurston County Health
Department to advise of the spill and the quantity and level of discharge.
Those efforts result in a coordinated public health response. Signs were posted
at the site and a press release was published about the spill by another agency.
Staff was able to identify some misstatements in the press release, which were
quickly corrected by Communications Manager Cook. The original press
release identified spill volume as 3,000 gallons when the actual spill volume
was 750 gallons. Staff also coordinates closely with the LOTT Clean Water
Alliance, as LOTT is technically the permit holder for the City’s sewer system
as LOTT treats all sewer flow from the City. LOTT is also required to notify
the state of the spill and cleanup action.
Councilmember Schneider asked why the timeline was backdated to 2008
rather than another earlier date, such as 2006. Director Smith advised that the
City’s records only date back to 2008.
Councilmember Schneider asked about the process employed for containing
the spill. Director Smith explained that in circumstances where it is possible,
City crews can plug the system and install dikes around catch basins to contain
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
January 6, 2022 Page 4
the spill to prevent continued discharge to the creek or a street. The goal is to
remove the obstruction causing the spill. In the last incident, a numatic plug
used during a construction project to test water tightness of sewer lines was
inadvertently left in the pipe. Over time, the plugs eventually lose inflation.
In this case, the plug likely traveled through the system creating an obstruction
causing an accumulation of debris and grease.
Director Smith added that staff has explored some technological solutions to
prevent any future discharges from the manhole that is visually obscured. The
area has experienced some spills in the past that were not discovered quickly
because the site is obscured. Any solution would be extremely expensive and
would require a remote telemetry operated fill-level alarm system at cost of
approximately $15,000 to $20,000 per unit. Staff is evaluating the cost
associated with response efforts versus the cost factor to install a unit. As
some spill incidents still happen, staff is working with the Transportation and
Engineering and Community Development Departments to identify any
process changes or inspection changes that might help avert future spills.
Although the incidents are not common, the number of incidents have
warranted attention to explore the City’s permitting and inspection processes.
Chair Swarthout inquired as to whether the pump station for the area located
off Sapp Road is the station that serves the entire hill. Director Smith advised
that a number of lift stations are located in the Tumwater Hill area. Operations
Manager Craig explained that the lift station off Sapp Road pumps into and
through the subject gravity line. The station serves as the last pump station
from that point forward before connecting to LOTT’s system.
ADJOURNMENT: With there being no further business, Chair Swarthout adjourned the
meeting at 8:29 a.m.
Prepared by Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
PUBLIC WORKS COMMITTEE
AGENDA
Online via Zoom
Thursday, January 06, 2022
8:00 AM
1. Call to Order
2. Roll Call
3. Approval of Minutes: December 9, 2021
4. Selection of Committee Chair (John Doan)
5. Tumwater Hill Park Trail - Crosby Connector; Authority to Solicit Bids and Recommend Award of
Contract (Don Carney)
6. Additional Items
7. Adjourn
Remote Meeting Information
To comply with Governor Inslee's Proclamation 20-28, the City of Tumwater meetings will be conducted
remotely, not in-person, using a web-based platform. The public will have telephone and online access
to all meetings.
Watch Online
https://us02web.zoom.us/j/85178884333?pwd=N0FnTXFzLzlqN3RTUnlxMUgxdlVFQT09
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 851 7888 4333 and Passcode
990075.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4128 or email ADACoordinator@ci.tumwater.wa.us.