Public Works Committee
Regular MeetingTumwater, WA · August 3, 2023
Minutes
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
August 3, 2023 Page 1
CONVENE: 8:00 a.m.
PRESENT: Chair Eileen Swarthout and Councilmember Charlie Schneider.
Excused: Councilmember Michael Althauser.
Staff: City Administrator Lisa Parks, City Attorney Karen Kirkpatrick,
Transportation and Engineering Director Brandon Hicks, Finance Director
Troy Niemeyer, Water Resources and Sustainability Director Dan Smith,
Assistant Transportation and Engineering Director Mary Heather Ames,
Communications Manager Ann Cook, Utilities Operations Manager Steve
Craig, Sustainability Coordinator Alyssa Jones Wood, and Administrative
Assistant Cathy Nielsen.
APPROVAL OF
MINUTES: PUBLIC
WORKS
COMMITTEE, JULY
6, 2023:
MOTION: Councilmember Schneider moved, seconded by Chair Swarthout, to
approve the minutes of July 6, 2023 as published. A voice vote approved
the motion unanimously.
AGREEMENT WITH Manager Craig reported the request is for the committee’s recommendation
CLEARCREEK to the City Council to approve Amendment #1 for the Palermo Lagoon
CONTRACTORS FOR Dredging & Maintenance project.
THE PALERMO
LAGOON DREDGING The Palermo Lagoon is located at the end of M Street adjacent to the
& MAINTENANCE Tumwater Municipal Golf Course. The lagoon removes contamination from
PROJECT groundwater prior to entering the Deschutes River. The project scope
AMENDMENT #1: included removing vegetation and accumulated sediments from the pond to
restore it to its original design and operational ability. The project is funded
by an agreement with the Washington State Department of Transportation
for up to $175,000.
Dewatering of the root sediment was difficult and required additional time
and resources. Additionally, the scope included importing sawdust material
used to mix with material to stabilize waste for transport and disposal.
Removing the sediment destabilized the saturated embankments of the pond
resulting in some sloughing during the project. As sediment was removed
from the lagoon embankment, sloughing increased resulting in the cessation
sediment removal by approximately 50% of the original design to prevent
further sloughing and to protect the integrity of the lagoon. Sufficient levels
were restored enabling effective operation of the aeration pumps and
treatment process. The pond is effectively operating as designed.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
August 3, 2023 Page 2
Additionally, the south end of the lagoon was not accessible without
affecting golf operations with no work on that end of the pond, which
affected one of the three aeration pumps. Two of three aeration pumps are in
service and operating.
The changes in scope were because of additional efforts to dewater and
stabilize the sediment for transport and disposal and importing material to
stabilize the embankment areas compromised during the project. The
original contract cost was $126,650. The amended contract cost increased
by $21,702.80 for a total contract of $148,352.80 to complete restoration and
operation of the lagoon.
Manager Craig invited questions.
Chair Swarthout asked whether the project was completed. Manager Craig
explained that one additional task is pending. The pond includes a series of
six monitoring systems used for monitoring the level of sediment. The
systems are part of the mitigation project to monitor the operation and
effectiveness of the pond. During the sloughing operation, one component
of the system was affected. Staff is negotiating with the City’s contracted
survey services to restore the component or replace the component at its
original elevation. The work performed by Clearcreek was completed.
Chair Swarthout inquired about the status of the third inoperable aeration
pump. Manager Craig responded that the original design of the pond was
based on two aeration pumps to treat groundwater effectively. The third
pump was added as a redundant source for cycling and alternating needs.
Today, the pond is operating as designed and is treating groundwater
appropriately. Future maintenance will address the south section of the
pond.
Chair Swarthout asked about the frequency of removing sediment from the
pond. Manager Craig explained that the project closeout identified future
tasks for maintaining the pond. The maintenance project is the first since the
pond was constructed. Over the years and through several flooding events
on the golf course, sediment had accumulated and created the need for the
project. Staff plans to schedule additional future maintenance and review
access improvements to ensure the pond is restored to its operational
capability.
MOTION: Councilmember Schneider moved, seconded by Chair Swarthout, to
recommend the City Council approve Amendment #1 for the Palermo
Lagoon Dredging & Maintenance Project for $21,702.80. A voice vote
unanimously approved the motion.
TUMWATER Coordinator Jones Wood updated members on the status of the Climate
CLIMATE WORK Mitigation Work Program for 2023 and 2024.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
August 3, 2023 Page 3
PROGRAM
DISCUSSION: The City Council accepted the Thurston Climate Mitigation Plan in 2021.
The plan includes greenhouse gas emission reduction goals of 45% by 2030
and 85% by 2050 based on 2015 baselines. Implementation of the strategies
and actions in the plan can be implemented by one jurisdiction independently
by all four jurisdictions together, or by one or more jurisdictions working
together.
A new template work program for each jurisdiction was developed to
communicate to the public all measures each jurisdiction is undertaking.
Each jurisdiction plans to release the same template work program in the
next several days outlining the work to be completed during specific
timeframes.
The work program outlines approximately $24 million in investments by the
City of Tumwater between 2023 and 2024. Each City project manager
assigned an action or a project aligning with the plan will be included within
the implementation actions. While the impetus of some projects might not
have involved the Thurston Climate Mitigation Plan, some components of
some projects may benefit the Thurston Climate Mitigation Plan. Of the $24
million, $7.8 million is from awarded grants and nearly $558,000 is pending
a decision from funding agency. Most of the funding invested in the
Thurston Climate Mitigation Plan implementation is from transportation and
land use. One of the strategies in the Plan is increasing the efficiency of the
transportation system with roundabouts identified as a strategy, as well as
improving pedestrian and bicycle infrastructure. The City’s $12 million I-
5/Capitol Boulevard/Trosper Improvement project achieves those specific
strategies.
Coordinator Jones Wood outlined some of the activities planned over the
next 18 months. Some of the energy strategies in the Thurston Climate
Mitigation Plan include reducing energy use in existing residential buildings,
in new construction or redevelopment, and converting to cleaner fuel
sources. Some activities in 2023 and 2024 include submitting for the City’s
Sole Source Smart designation, a national program that is designed to reduce
the solar soft costs for installing residential solar, adopting the new state
building code requiring heat pumps in new construction, and continuing the
LED lighting upgrades in City facilities.
Transportation and land use strategies include increasing urban density,
increasing the efficiency of the transportation system, increasing the
adoption of electric vehicles, and increasing the mode share for lower carbon
forms of transportation, such as walking, biking, and transit. Projects
scheduled in 2023 and 2024 include the Linwood Avenue Sidewalk project,
trail improvements near the Palermo Wellfield, completion of an in-house
fleet electrification plan, energy code adoption requiring EV charging, EV
ready, and EV capable in new development, and other projects pending grant
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
August 3, 2023 Page 4
funding, such as an off-grid solar powered EV chargers at Pioneer Park.
Water and waste strategies include increasing the efficiency of water and
wastewater infrastructure, reducing water consumption, diverting solid waste
from landfills, and reducing consumption of carbon intensive goods and
services. Water and waste projects in 2023 and 2024 include the investment
grade audit of City facilities to include a water audit, composting at City
events whenever feasible, composting at City facilities, and continued
implementation of the compost procurement ordinance adopted by the
Council in January 2023.
Agriculture, forest, and prairie strategies include reducing emissions from
agricultural practices, supporting agricultural practices that sequester carbon,
preserving tree canopy, and managing forests and prairies to sequester
carbon. During 2023 and 2024 efforts include updating three sections in the
code pertaining to trees, completing an inventory of all trees on City
property, development of a maintenance plan and budget, and continuing
work on the Habitat Conservation Plan and program.
Crosscutting strategies in the Plan involving many sectors are mostly
focused on advocacy with the public and the Legislature. Work in 2023 and
2024 includes completion of the City’s Sustainability webpage, improve and
increase information available to the public on different sustainability topics,
internships, guest lectures, and pursuing the City’s legislative agenda.
Coordinator Jones Wood invited questions.
Councilmember Schneider commented on recent legislation pertaining to
wildfire buffer zones. He questioned how the new law would affect the
strategies. Coordinator Jones Wood said the new law will have some
impact. The Community Development Department was tasked with
reviewing the new legislation and how it might affect the Thurston Climate
Mitigation Plan and the City’s progress to date on revising urban forestry
codes.
Councilmember Schneider asked whether the two-year grace period for not
charging the public for EV charging would be available for the public at
Pioneer Park as well. Coordinator Jones Wood advised that the City is
offering free EV service at City Hall until the end of 2026. If the EV
charging stations at Pioneer Park are funded by a grant, the City has
committed to providing the EV stations to the public at no charge. The EV
stations will be off-grid and solar-powered to reduce electricity usage.
Chair Swarthout commented on the challenges of encouraging the public to
compost during City events. She asked about reducing the recycling options
to composting and regular waste. Coordinator Jones Wood replied that the
City is recruiting for volunteers for the Tumwater Brewfest. To date, two
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
August 3, 2023 Page 5
volunteers have signed up to serve as compost and recycling attendants
during Brewfest. The intent is to offer three designated locations.
OTHER BUSINESS: Chair Swarthout inquired about the status of the Trosper Road freeway off-
ramp. Director Hicks said the northbound on-ramp opening was delayed and
did not reopen at the same time as the off-ramp. The Trosper Road off-ramp
is now open. The contractor was able to complete the work earlier than
scheduled. Additionally, the City is completing the pavement maintenance
project throughout the City. The project along Israel Road is under
construction, and staff continues to work on the design of the new
Operations and Maintenance Facility as well as for the Southeast Reservoir
project. The department is very busy working on the capital program.
ADJOURNMENT: With there being no further business, Chair Swarthout adjourned the
meeting at 8:24 a.m.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
PUBLIC WORKS COMMITTEE
MEETING AGENDA
Online via Zoom and In Person at
Tumwater City Hall, Council Conference
Room, 555 Israel Rd. SW, Tumwater, WA
98501
Thursday, August 03, 2023
8:00 AM
1. Call to Order
2. Roll Call
3. Approval of Minutes: Public Works Committee, July 6, 2023
4. Agreement with Clearcreek Contractors for the Palermo Lagoon Dredging & Maintenance Project
Amendment #1 (Steve Craig)
5. Tumwater Climate Work Program Discussion (Alyssa Jones Wood)
6. Additional Items
7. Adjourn
Meeting Information
All committee members will be attending remotely. The public are welcome to attend in person, by
telephone, or online via Zoom.
Watch Online
https://us02web.zoom.us/j/84066007075?pwd=RjFHMklvdmYzOVVyREhMdGhIV2JzQT09
Listen by Telephone
Call (253) 215-8782, listen for the prompts, then enter the Webinar ID 840 6600 7075 and Passcode
338195.
Public Comment
The public may submit comments by sending an email to council@ci.tumwater.wa.us, no later than
5:00 p.m. the day before the meeting. Comments are submitted directly to the Committee members
and will not be read individually into the record of the meeting.
Post Meeting
Audio of the meeting will be recorded and later available by request. Please email
CityClerk@ci.tumwater.wa.us
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4128 or email ADACoordinator@ci.tumwater.wa.us.
Get email alerts for Tumwater
A daily email when new agendas and minutes are posted.