Public Works Committee
Regular MeetingTumwater, WA · May 22, 2025
Minutes
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
MAY 22, 2025 Page 1
CONVENE: 8:00 a.m.
PRESENT: Chair Eileen Swarthout and Councilmember Michael Althauser.
Excused: Councilmember Angela Jefferson.
Staff: City Administrator Lisa Parks, City Attorney Karen Kirkpatrick,
Assistant City Administrator Kelly Adams, Finance Department
Director Troy Niemeyer, Transportation and Engineering Department
Director Brandon Hicks, Water Resources & Sustainability Department
Director Dan Smith, City Engineer Bill Lindauer, Engineer III Ryan
Blaser, Engineer II Jared Crews, Engineer II Colby Fletcher,
Community Engagement Specialist Marnie McGrath, Water Resources
Specialist Grant Gilmore and Water Resources Specialist David
Kangiser, and Administrative Assistant Kelly Quiroz.
SERVICE PROVIDER Specialist Kangiser presented the proposal for a Service Provider
AGREEMENT WITH Agreement with Herrera for the Nutrient Reduction Enhanced
HERRERA FOR THE Maintenance Plan. Since the last briefing, Herrera requested some
NUTRIENT revisions to the agreement.
REDUCTION
ENHANCED The project involves analyzing the current maintenance program and
MAINTENANCE practices of the stormwater team to help address Budd Inlet’s dissolved
PLAN REVISION: oxygen TMDL (Total Maximum Daily Load) calculation assigned to
the City. The project is intended to reduce nutrients discharged from
the City’s stormwater system into receiving waters. A spatial analysis
will be completed for nutrient loading, as well as addressing street
sweeping requirements that were recently added to the City’s NPDES
(National Pollutant Discharge Elimination System) permit
requirements. The project will identify maintenance activities needed
for the TMDL and NPDES permit, identify required resources to meet
the requirements, and identify any data gaps. Existing spatial analysis
will assist in identifying some of the troublesome areas for pollution.
Spatial analysis will include land use as well as current stormwater best
management practices in place to treat stormwater.
Staff selected Herrera following two rounds of Request for
Qualifications (RFQs) because the company has familiarity with the
City’s project management team and experience working on other City
projects. Herrera is also performing the same work for the cities of
Bellingham and Tukwila.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
MAY 22, 2025 Page 2
The grant agreement was executed last month for $200,000. The
Herrera Service Provider Agreement is for an estimated amount of
$190,000 with project completion scheduled in 2026.
The recommended action is to place the Service Provider Agreement
with Herrera for the Nutrient Reduction Enhanced Maintenance Plan –
Revised, on the June 3, 2025 Council Consent Calendar with a
recommendation to approve and authorize the Mayor to sign.
Chair Swarthout questioned an addition of a provision within the
agreement. City Attorney Kirkpatrick advised that the provision is
required by state statute. The provision is not included in the City’s
standard template for service provider agreements. Depending on the
type of service to be performed, the language is required by statute.
MOTION: Councilmember Althauser moved, seconded by Chair Swarthout,
to place the Service Provider Agreement with Herrera for the
Nutrient Reduction Enhanced Maintenance Plan – Revised, on the
June 3, 2025 Council Consent Calendar with a recommendation to
approve and authorize the Mayor to sign. A voice vote approved
the motion.
GRANT Specialist Gilmore presented the proposal for the Pioneer Park riparian
AGREEMENT WITH restoration project. Staff is recommending two actions by the
THE DEPARTMENT committee. The first action is to approve the Department of Ecology
OF ECOLOGY FOR Water Quality Financial Assistance Agreement. The second action is
THE PIONEER PARK to recommend approval of Amendment 3 for Stantec to proceed with
RESTORATION Phase 2 design of the project.
PROJECT PHASE 2:
The project is comprised of streambank stabilization and buffer
restoration. The Deschutes River watershed encompasses 143 streams
totaling 256,000 linear miles. The project section of the river has an
attached TMDL requirement that was identified in 2015 and updated in
2018. The TMDL requires reduction of fine sediment loading by 46%
and an increase in shading cover by over 50%.
The grant award is for $500,000 to assist the City in completing Phase
2 design, permitting, and construction of the project. The project is
funded by the Stormwater Utility and is included in the Capital
Facilities Plan. The project includes two phases funded by two grants.
Phase 1 totaled $338,000 with a match requirement by the City of 25%
for a project total of $450,781.50. Phase 2 will add an additional
$500,000 with no match requirement. The total project will cost
$950,781.50.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
MAY 22, 2025 Page 3
Specialist Gilmore reviewed the recommended action to place the grant
agreement with the Department of Ecology for the Pioneer Park
Restoration Project Phase 2 on the June 3, 2025 Council Consent
Calendar with a recommendation to approve and authorize the Mayor
to sign.
SERVICE PROVIDER Specialist Gilmore reported the project is currently in Phase 1 with 90%
AGREEMENT WITH project design completed. With the approval of Amendment 3, project
STANTEC FOR THE tasks can move forward to complete an engineered design for final plan
PIONEER PARK specifications and estimates to enable submittal of Phase 1 design
RESTORATION documents for permit approval. Phase 1 work specifically addresses
PROJECT - PHASE 2 the riparian zone with no in-water work, which will expedite the
AMENDMENT 3: permitting process to move quicker to construction in 2025/2026. The
intent is to release a Request for Proposal (RFP) in September/October
2025 to select a contractor to construct the project. The agreement also
includes Phase 2 design, engineering, and permitting with construction
estimated to occur in 2027/2028.
The proposed amendment increases the project budget for Stantec to
complete Phase 2 design and permitting to $190,285.
Staff recommends placing the Service Provider Agreement with Stantec
for the Pioneer Park Restoration Project Phase 2, Amendment 3 on June
3, 2025 Council Consent Calendar with a recommendation to approve
and authorize the Mayor to sign.
Specialist Gilmore addressed questions about the potential of the
project cost increasing because construction is not scheduled to begin
until February 2027. Excellent modeling was completed by Stantec
providing a predictable rate of erosion. The engineering design is
predicated on that rate although it is recognized that the river is a
constant moving target. Staff is confident that all data have been
identified to implement an effective design and construct the project.
MOTION: Councilmember Althauser moved, seconded by Chair Swarthout,
to place the grant agreement with the Department of Ecology for
the Pioneer Park Restoration Project Phase 2 on the June 3, 2025
Council consent calendar with a recommendation to approve and
authorize the Mayor to sign. A voice vote approved the motion.
YORKSHIRE RIGHT Engineer Crews briefed the committee on a potential right-of-way
OF WAY VACATION vacation for a private development project. The Yorkshire project is an
DISCUSSION: approved mixed-use development comprised of apartment units and
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
MAY 22, 2025 Page 4
commercial space and storage. The project site is located west of I-5
between Israel Road and Tumwater Boulevard. The project proponent
submitted a petition signed by adjacent property owners in compliance
with Tumwater Municipal Code to vacate a portion of unopened right-
of-way known as Robison Road located north of Tumwater Boulevard.
Robison Road is an old fragment of right-of-way remaining from the
original platting of the City that was never developed. The City has no
current plans to develop the right-of-way. The right-of-way includes
low vegetation, shrubs, and trees. If vacated, the right-of-way would
be returned as private property to the adjacent property owners for
potential actions within current permitting and zoning regulations. The
City has not identified the right-of-way for any future City use.
Engineer Crews identified the right-of-way on an aerial map for the
benefit of the committee.
The Transportation & Engineering Department plans to present a
petition for vacation of unopened Robison Road to the Public Works
Committee for review and feedback on pursuing a vacation. If the
committee supports the proposal, the next step is scheduling a public
hearing to receive testimony on the proposed vacation. If the vacation
is not supported, the right-of-way would remain in City ownership.
City Attorney Kirkpatrick described the steps necessary to approve a
right-of-way vacation. The first step is adopting a resolution to enable
scheduling of the public hearing. The resolution establishes the date
and time of the public hearing.
Engineer Crews provided additional information on the right-of-way.
Within the original platting of Tumwater, Thurston County, and the
greater Washington area, platting was completed by blocks with
standard parcels and lots and right-of-way located throughout those
blocks. The existing right-of-way is a fragment of the original platting
of the City. As the City developed and added roadways to include
Tumwater Boulevard and Interstate 5, the need for that right-of-way
was not required and remained vacant.
Chair Swarthout asked how the proposal might affect the future
connection of Tyee Drive to Tumwater Boulevard. Engineer Crews
affirmed the plan to connect Tyee Drive to Tumwater Boulevard;
however, the existing plan routes Tyee Drive to the south of the Israel
Road/Tyee Drive roundabout to the south/southwest connecting to
Tumwater Boulevard. The new connection of Tyee Drive to Tumwater
Boulevard will not be impacted by the right-of-way vacation. Based on
future improvements to Tumwater Boulevard and I-5, future private
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
MAY 22, 2025 Page 5
development on the vacated right-of-way could occur as long as it meets
all City codes. The property includes frontage along Tumwater
Boulevard and could include access; however, it would be heavily
restricted if developed to ensure adequate space between the future
intersection of Tyee Drive and Tumwater Boulevard, as well as setback
from the Washington State Department of Transportation (WSDOT)/I-
5 interchange project.
Chair Swarthout questioned the possibility of the City requiring the
right-of-way to accommodate the extension of Tyee Drive to Tumwater
Boulevard. Engineer Crews displayed a preliminary approved site plan
for the Yorkshire project reflecting the route of the Tyee Drive
extension project. He identified how the extension project would not
be impacted by the subject right-of-way. Potentially, the City may need
to secure additional right-of-way through dedication if any of the
Tumwater Boulevard improvements are outside of the prescribed right-
of-way that has been identified.
Discussion ensued on the timing of the proposal and completion of the
vacation. Engineer Crews advised that the proposal is not encompassed
with a specific timeline as the property is owned by the City and can be
considered based on resources. However, the City is required to
respond timely to the applicant as it may affect plans for the applicant’s
project. City Attorney Kirkpatrick added that following adoption of the
resolution, timelines are required for specific actions.
In response to questions surrounding the impact of the proposal on
existing workloads and current projects, City Administrator Parks
advised that the City is responsible to respond to an application. The
City continues to monitor and adjust City priorities and schedules daily.
Director Brandon affirmed the ability of staff to manage the proposal at
this time because of the ability of staff to manage priorities and because
the City is obligated to consider and respond to the applicant.
The committee agreed to move forward to the next step of preparing the
resolution for scheduling a public hearing.
LOCAL AGENCY Engineer Blaser reported the project is located between Linwood
AGREEMENT AND Avenue and B Street. The Safe Routes to School project is a non-
PROJECT circular roundabout (double mini-roundabout) at the Linwood Avenue
PROSPECTUS WITH and 2nd Avenue intersection. From the intersection to B Street, other
THE WASHINGTON roadway, pedestrian, and bicycle improvements are included.
STATE Construction is anticipated to begin in late 2025 or in spring 2026.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
MAY 22, 2025 Page 6
DEPARTMENT OF
TRANSPORTATION The proposal is to initiate the construction phase of the project and the
FOR THE 2ND agreement between the City and WSDOT to enable the City to utilize
AVENUE BICYCLE $2.1 million in state funding from the Safe Routes to School Fund.
& PEDESTRIAN
IMPROVEMENTS: Chair Swarthout reviewed the requested action.
MOTION: Councilmember Althauser moved, seconded by Chair Swarthout,
to place the Local Agency Agreement and Project Prospectus with
the Washington State Department of Transportation for the 2nd
Avenue Bicycle & Pedestrian Improvements on the June 3, 2025
Council Consent Calendar with a recommendation to approve and
authorize the Mayor to sign the Prospectus; and the
Transportation and Engineering Director to sign the Local Agency
Agreement. A voice vote approved the motion.
LOCAL AGENCY Engineer Blaser reported the proposal is an agreement between the City
AGREEMENT AND and WSDOT for the engineering phase of the project. The project is
PROJECT located at Somerset Hill Drive SW along Percival Creek to correct a
PROSPECTUS WITH fish barrier with the intent to return the stream to more natural
THE WASHINGTON conditions, stabilize banks from further erosion, and protect existing
STATE utility infrastructure located adjacent to the stream. Construction is
DEPARTMENT OF anticipated to begin in 2027. The proposal moves the project to the
TRANSPORTATION preliminary engineering phase to enable the City to utilize $600,000 in
FOR THE federal funding. Project funds include $4 million in federal funding
SOMERSET HILL from the PROTECT (Promoting Resilient Operations for
FISH PASSAGE Transformative, Efficient, and Cost-saving Transportation Program)
BARRIER Fund. Approximately $3.4 million has been secured for construction
REMOVAL: after completion of the engineering phase.
Chair Swarthout reviewed the requested action.
MOTION: Councilmember Althauser moved, seconded by Chair Swarthout,
to place the Local Agency Agreement and Project Prospectus with
the Washington State Department of Transportation for the
Somerset Hill Fish Passage Barrier Removal on the June 3, 2025
Council Consent Calendar with a recommendation to approve and
authorize the Mayor to sign the Prospectus; and the
Transportation and Engineering Director to sign the Local Agency
Agreement. A voice vote approved the motion.
LOCAL AGENCY Engineer Blaser reported the proposal is removal of a fish passage
AGREEMENT AND barrier along Sapp Road. The proposed action moves the project
PROJECT forward to the construction phase. The project entails replacement of a
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
MAY 22, 2025 Page 7
PROSPECTUS WITH fish culvert and installing a new culver to return Percival Creek to a
THE WASHINGTON more natural condition in addition to roadway improvements.
STATE Construction is scheduled to begin in 2026 with the release of the RFP
DEPARTMENT OF for construction within the next several months. Following approval of
TRANSPORTATION the agreement, the City could utilize $2.3 million in federal and state
FOR THE PERCIVAL funding with $2 million from PROTECT Fund and $257,000 from the
CREEK FISH Salmon Funding Recovery Board fund from the state.
PASSAGE BARRIER
REMOVAL: Chair Swarthout asked whether the project would include installation
of a new bridge. Engineer Blaser advised that the project includes
removing an existing culvert and replacing it with a large concrete box
culvert. The Somerset Hill project will likely include a larger structure
that could possibly be a bridge.
Chair Swarthout reviewed the requested action.
MOTION: Councilmember Althauser moved, seconded by Chair Swarthout,
to place the Local Agency Agreement and Project Prospectus with
the Washington State Department of Transportation for the
Percival Creek Fish Passage Barrier Removal on the June 3, 2025
Council Consent Calendar with a recommendation to approve and
authorize the Mayor to sign the Prospectus; and the
Transportation and Engineering Director to sign the Local Agency
Agreement. A voice vote approved the motion.
R2025-010 SIX YEAR Director Hicks presented the proposed 2025-2031 Transportation
TRANSPORTATION Improvement Program (TIP). The briefing focused on projects
IMPROVEMENT removed or added to the TIP. A public hearing on the proposed TIP is
PROGRAM: scheduled during the June 3, 2025 City Council meeting.
Adoption of the TIP each year is a requirement of RCW 35.77.010 to
adopt an annual TIP by June 30 each year. The program must include
transportation projects that are expected to be initiated within the next
six years. The emphasis is on regional significant projects or projects
the City anticipates will receive federal or state funds. The program
demonstrates that the City has advanced plans for a coordinated
transportation system. The TIP is utilized to communicate with
members of the community, neighboring communities, the state, and
grant agencies to pursue funding opportunities. The City’s TIP is
incorporated within the Regional TIP administered through Thurston
Regional Planning Council in coordination with other jurisdictions in
Thurston County. The Regional TIP is forwarded to the state for
inclusion in the State TIP.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
MAY 22, 2025 Page 8
Projects proposed for inclusion in the TIP are separated into general
project types of capacity, preservation, maintenance, and enhancement,
and multimodal. A map of projects does not include all multimodal
projects included on the TIP, which will be revised prior to the public
hearing.
Director Hicks reviewed new capacity and multimodal projects.
Capacity:
• Tumwater Boulevard and Henderson Boulevard Roundabout -
Design for a roundabout at the intersection of Tumwater
Boulevard and Henderson Boulevard.
Multimodal:
• 93rd Ave, Tigerlilly Street to City Limits - Reconstruction of
93rd Avenue to accommodate bike lanes and sidewalk in
addition to lowering the roadway at a large hill to improve site
distance for safety. Funding assumes a development agreement
with expected development on abutting properties.
• 2nd Avenue Pedestrian and Bicycle Improvements -
Construction of a roundabout (non-circular) at the intersection
of 2nd Avenue and Linwood Avenue and multimodal
improvements on 2nd Avenue from B Street to Linwood
Avenue.
Director Hicks reviewed projects removed from the TIP:
• Deschutes Valley Trail Segments A2, B, C, D - Individual
segments were removed and replaced as one project with
different segments to align with one overall design project.
• Tumwater Boulevard Interchange - The large project will be
combined into two separate phases with the focus on the
northbound on/off ramp first followed by the southbound on/off
ramp in the next six years. Staff is proposing to modify the lane
configuration on the bridge to accommodate multimodal
facilities.
• Old Highway 99 Corridor - 73rd Avenue to 79th Avenue is a
similar project to the Tumwater Boulevard Interchange project
by splitting a large project into different phases. The TIP
includes the 79th Avenue Roundabout and the Henderson
Boulevard Roundabout projects.
• Brewery District Plan - Streetscape Improvements are proposed
for removal because they are not considered regionally
significant. Staff also does not anticipate acquiring any grant
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
MAY 22, 2025 Page 9
funding. Improvements proposed in the project would be
incorporated into other larger roundabout and street projects.
• Rural Road - The project consists of shoulder widening to afford
space for pedestrians and bicyclists. The project is not
regionally significant and poses substantial environmental
implications. The project will likely be transferred as a
multimodal project in the TIP. It is also unlikely the project
would be constructed within the next six years because of
permitting and potential endangered species implications.
• Traffic Signal Controller and Detection Upgrade - The project
should be completed in 2025.
Staff requests placing the R2025-010 Six Year Transportation
Improvement Program (TIP) update for 2026 - 2031 on the June 3,
2025, Council meeting agenda under Council Considerations for a
public hearing and consideration with a recommendation to adopt.
Councilmember Althauser questioned the removal of the trail segments
because he understood each segment was included to ensure the
segments were competitive for grants. Director Hicks explained that
when the City pursues grant funding for a larger corridor project, it is
possible to pursue grants for single components of the larger project.
The intent to consolidate all segments is to align with design as the City
received $5.8 million from the state with $1 million obligated for design
of the entire trail as one project. It may be possible to pursue additional
funding required for the entire trail within the next six years as a single
project.
Director Hicks added that the Safe Routes to School program is
included on the TIP as a placeholder to enable the City to pursue
funding for other projects.
Chair Swarthout asked whether the replacement of the Henderson
Boulevard bridge was previously included in the TIP. Director Hicks
said the project is included as a capacity project and renamed as the
Henderson Boulevard - 58th Avenue to Bridge project. The prior project
name was changed as the project included widening the bridge;
however, it is possible to install a stand-alone shared use path bridge
because the existing bridge is structurally sound. The pathway would
be installed on the park side of the river. Another addition to the project
is a proposed roundabout at the entrance to Pioneer Park because of the
high traffic use at the entrance to the park.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
MAY 22, 2025 Page 10
MOTION: Councilmember Althauser moved, seconded by Chair Swarthout,
to place the R2025-010 Six Year Transportation Improvement
Program (TIP) update for 2026 - 2031 on the June 3, 2025, City
Council meeting under Council Considerations for a public hearing
and consideration with a recommendation for adoption.
ADDITIONAL Chair Swarthout reminded everyone of the planned Public Works picnic
ITEMS: at Tumwater Historical Park to celebrate Public Works Week. Director
Smith said the catered lunch will also feature an assortment of games.
Mayor Sullivan is scheduled to welcome everyone at noon later in the
day.
ADJOURNMENT: With there being no further business, Chair Swarthout adjourned
the meeting at 9:17 a.m.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
PUBLIC WORKS COMMITTEE
MEETING AGENDA
Online via Zoom and In Person at
Tumwater City Hall, Council Conference
Room, 555 Israel Rd. SW, Tumwater, WA
98501
Thursday, May 22, 2025
8:00 AM
1. Call to Order
2. Roll Call
3. Service Provider Agreement with Herrera for the Nutrient Reduction Enhanced Maintenance Plan
Revision (Water Resources and Sustainability Department)
4. Grant Agreement with the Department of Ecology for the Pioneer Park Restoration Project Phase 2
(Water Resources & Sustainability Department)
5. Service Provider Agreement with Stantec for the Pioneer Park Restoration Project - Phase 2
Amendment 3 (Water Resources and Sustainability Department)
6. Yorkshire Right of Way Vacation Discussion (Transportation & Engineering Department)
7. Local Agency Agreement and Project Prospectus with the Washington State Department of
Transportation for the 2nd Avenue Bicycle & Pedestrian Improvements (Transportation and
Engineering Department)
8. Local Agency Agreement and Project Prospectus with the Washington State Department of
Transportation for the Somerset Hill Fish Passage Barrier Removal (Transportation and Engineering
Department)
9. Local Agency Agreement and Project Prospectus with the Washington State Department of
Transportation for the Percival Creek Fish Passage Barrier Removal (Transportation and
Engineering Department)
10. R2025-010 Six Year Transportation Improvement Program (Transportation and Engineering
Department)
11. Additional Items
12. Adjourn
Meeting Information
All committee members will be attending remotely. The public are welcome to attend in person, by
telephone or online via Zoom.
Watch Online
https://us02web.zoom.us/j/85032179450?pwd=wdhYSzzyZwp2vURcqGzIuJWtVLK6in.1
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 850 3217 9450 and Passcode
503889.
Public Comment
The public may submit comments by sending an email to council@ci.tumwater.wa.us, no later than
5:00 p.m. the day before the meeting. Comments are submitted directly to the Committee members
and will not be read individually into the record of the meeting.
Post Meeting
Video of this meeting will be recorded and posted on our City Meeting page: https://tumwater-
wa.municodemeetings.com.
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City’s ADA Coordinator
directly, call (360) 754-4129 or email ADACoordinator@ci.tumwater.wa.us. For vision or hearing
impaired services, please contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384.
Get email alerts for Tumwater
A daily email when new agendas and minutes are posted.