5-13 Infrastructure
Regular MeetingTybee Island, GA · May 13, 2021
Minutes
City of Tybee Island
Infrastructure Committee
Draft Minutes - May 13th, 2021
In Attendance: Peter Gulbronson, Barry Brown, Shawn Gillen, Alice Jonsson,
Stan Bearden, Monty Parks
The meeting was called to order by Shawn Gillen at 10:00 AM.
Motion to Approve April 8th, 2021 Draft Minutes from Peter Gulbronson. Barry
Brown seconded. Motion approved.
Building Assessment Spreadsheet: Shawn Gillen explained that they would like to
seek bids for doing all of the roofs at once. Peter Gulbronson explained that we
could get a bundle deal.
Sidewalk Issues on Butler Avenue: At the end of Butler the road is at the same level
as the sidewalk so cars are driving over the sidewalk, creating a safety hazard.
Between 18th and 19th there’s about five feet of sidewalk at the same level of the
road. Peter Gulbronson explained myriad options. Barry Brown said this sidewalk
has been an issue for a long time. Barry Brown suggested making it one-way on
that strip as an option. Peter Gulbronson – the road is only 16 feet wide, which is a
lane and a half. Putting pylons up around it makes the most sense. Barry Brown
would like something right away, like cones. Shawn Gillen said all solutions will be
complicated, which happens sometimes. Peter Gulbronson – trying pollards is what
he thinks they could do first and then perhaps just take out the sidewalk. Shawn
Gillen asked Peter Gulbronson to notify residents on both sides of the road. Barry
Brown said people in the right-of-way need to understand that solutions might
involve them. Shawn Gillen – we will put something temporary up right away.
Bathroom in Screened Pavilion – Barry Brown suggested we could have one stall.
Peter Gulbronson said we could probably do it in-house. Barry Brown suggested it
could be accessible for wheelchairs. Monty Parks suggested we get some quotes
just to see what they would be. Shawn Gillen said it would be in the next budget.
Gas Pump Problems – Shawn Gillen and Peter Gulbronson – we have decided to
move to using the gas station instead of our own pumps. Barry Brown asked why
they seem to breakdown so much. Peter Gulbronson – in the past X number of years
– we have spent – check tape. We would need to upgrade very old software in the
pumps. Every time we lose power the whole system needs to be reset. New
software would be about $20,000. Bulk fuel is $2.80. Check tape for prices. Barry
Brown would like a three-year breakdown of how much we are spending. Over a 15
year period – Barry Brown would like a full cost breakdown. Peter Gulbronson –
key fobs are very costly. Monty Parks asked if there is any benefit to having our
own pumps. Shawn Gillen said no. Pater Gulbronson – we are not liable if there is a
spill, if we use a gas station vs. our own pumps. Peter Gulbronson said
municipalities are moving away from using their own pumps because of liability
issues. Peter Gulbronson – we replaced the tank in 2015. Shawn Gillen we will
keep using the station for now and we will bring those numbers back. Doesn’t seem
to be saving us money.
Motion to adjourn made by Barry Brown and seconded by Peter Gulbronson. There
was unanimous approval.
Meeting adjourned at (check tape)
Agenda
AGENDA
5-13 INFRASTRUCTURE
May 13, 2021 at 10:00 AM
Call to Order
Approval of Minutes
1. Approve Draft Minutes - 4/8/21
Old Business
2. Building Assessment
New Business
3. Sidewalk Issue on Butler Avenue
4. Bathroom to Screen Pavilion
5. Gas Pump Problems
City Manager Comments
Adjournment
Get email alerts for Tybee Island
A daily email when new agendas and minutes are posted.