Public Works, Sewer and Water
Regular MeetingVerona, WI · November 17, 2020
Minutes
CITY OF VERONA
MINUTES
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, NOVEMBER 17, 2020
1. The meeting was called to order by Mr. Touchett at 5:12pm.
2. Roll Call: Present: Evan Touchett, Charlie Ryan. Chad Kemp. Also present: Theran Jacobson, Director of
Public Works; Dave Walker, Director of Parks / Forestry; Adam Sayre, City Administrator; Luke Diaz,
Mayor; and Jon Wallenkamp, Kueny Architects.
Note: This was a remote meeting via Zoom and phone conference, instructions on how to join were
included with the posted agenda.
3. Discussion regarding project ID 2019-111, Public Works Facility Design
Jacobson and Wallenkamp presented a power point presentation which included a concept plan and
renderings for the future public works, parks, and recreation department facility.
Jacobson noted the purpose of the meeting was to provide sizing and overall concept updates.
Wallenkamp noted that the facility planning and sizing was based upon a current staffing levels and
equipment count with a forecast out 20-years which is typical for this industry. Jacobson noted that
the forecast was prepared by Jacobson and Parks Director Walker, and was previously presented to
Sayre the week prior to this meeting. Ultimately, each department is looking at one additional staff
member every five years, all dependent of the growth of the City and budgets.
Questions from committee members during the presentation:
Touchett asked about the bulk water filling station. Jacobson noted this area will be size accordingly.
No additional discussion.
Wallenkamp noted an additional emergency operations center is planned within the large conference
room. Touchett noted that proper wall space for monitors and adaptors will be needed.
Ryan asked about storm water ponds and natural screening at the perimeter of the facility.
Wallenkamp noted the intent is to utilize as much of the existing storm water features on site as
possible but meeting the needs of today regulations and sizing for any expansion of the future.
Jacobson noted that there are two perimeter berms (one southwest and one southwest) that have
recently been constructed and were also planted within the last month. Jacobson stated the intent is
that these will mature and provide a larger canopy and screening for when construction and future
occupancy occur. Wallenkamp noted the renderings show this and revisions as necessary will be
accounted for during design.
Touchett asked what future expansion would be for. Wallenkamp noted this is for any expansion
beyond the initial build and 20-year outlook. Jacobson noted one of the goals of the project and site
was to have the ability to expand in 20 years, 40 years, or when deemed necessary. Touchett asked
what is in the shops. Wallenkamp noted there are three sets of shops: (1) water utility, (2) parks
department, (3) buildings & ground with the street sign storage and work area.
Touchett asked the reason behind the combination door to the garage and shop. Wallenkamp noted it
was for accessibility and ability to maneuver equipment without exposure to exterior elements. No
spaces would be eliminated from the main garage, but if a vehicle was parked in front of the door a
vehicle may need to be moved if necessary. Touchett asked if three was necessary. Jacobson noted
this is an advantage, but the number and location will be evaluated in the future as needed.
Touchett requested that all doors have badge entry requirement for all employees.
Touchett advocated for bullet proof wall / glass entry in reception area.
Touchett asked about the existing building and other open areas. Jacobson noted the existing storage
building on site is intended to be removed but the timing is unknown. This area would / could be used
for future cold storage or minor exterior storage. Touchett noted that we understand that there are
residential properties adjacent to us but we need to keep the industrial look where not all open space
is green so when expansion is necessary there is minimal resistance from the adjacent properties.
Diaz agreed with Touchett on transparency with green space that space is reserved for future
expansion.
Diaz asked about core sustainability. Wallenkamp noted the coordination that would be done with
Focus on Energy, incorporate desired green building aspects, and utilize their past experience to
include a sustainable and efficient structure.
Ryan questioned whether to keep space used as industrial purposes as is, and not as green space, for
when future expansion needs to happen.
Ryan asked about sustainability and composting possibilities. Wallenkamp noted once concept plan is
finalized and design commences that they will be coordinating with Focus on Energy and also Alliant
for options for using green resources. Walker noted that decades ago this was once a compost site
which came with resistance due to the nature of the work and odors depending on the prevailing
winds from the west affecting the East View neighborhood. Jacobson noted this is an entirely different
service that we have no expertise, equipment, or personnel power to manage. Jacobson
recommended third party vendors and/or personal composting operations if one desires.
Mr. Kemp left at 6:15pm.
Touchett and Ryan discussed calendar of events on how they would like staff to proceed. Touchett and
Ryan agreed and Touchett noted that a neighborhood meeting should occur first, followed with a
concept submittal to Plan Commission which will go to Common Council. Jacobson noted the
neighborhood would likely occur in January to skip the holiday season.
4. MOVED by Touchett, seconded by Ryan adjourn at 6:30pm. Motion carried 3-0.
Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes
are based on the notes of the recorder and are subject to change at a subsequent meeting.
Agenda
CITY OF VERONA
PUBLIC WORKS/SEWER & WATER COMMITTEE AGENDA
TUESDAY, NOVEMBER 17, 2020
5:00 P.M.
VERONA, WI 53593
Due to the COVID-19 pandemic, the Verona Public Works/Sewer & Water Committee will hold its
meeting as a virtual meeting. The Verona Public Works/Sewer & Water Committee will not meet at
City Hall, 111 Lincoln Street. Members of the Verona Public Works/Sewer & Water Committee and
Staff will join the meeting by using Zoom Webinar, as described immediately below.
Members of the public can join the meeting using Zoom Webinar via a computer, tablet, or
smartphone, or by calling into the meeting using phones, as described immediately below.
Join the meeting via computer, tablet, or smart phone:
https://zoom.us/j/94666694903
Webinar ID: 946 6669 4903
Join the meeting via phone by dialing:
301-715-8592
Webinar ID: 946 6669 4903
Agenda Items
1. Call to order.
2. Roll call.
3. Approval of the minutes of the November 9, 2020 meeting of the Public Works/Sewer and Water
Committee.
4. Discussion regarding Project ID 2019-111, Public Works Facility Design.
5. Adjourn.
Evan Touchett
Chairperson
POSTED: Verona City Hall
Miller’s Market
ALL AGENDAS ARE POSTED ON THE CITY’S WEBSITE AT www.ci.verona.wi.us
IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMMODATION TO
ACCESS THE MEETINGS, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE
MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST.
CITY OF VERONA
MINUTES
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, NOVEMBER 9, 2020
1. The meeting was called to order by Mr. Touchett at 5:02pm.
2. Roll Call: Present: Evan Touchett, Charlie Ryan. Chad Kemp. Also present: Theran Jacobson, Director of
Public Works; Carla Fischer, City Engineer, AECOM.
Note: This was a remote meeting via Zoom and phone conference, instructions on how to join were
included with the posted agenda.
3. MOVED by Touchett, seconded by Ryan, to approve the minutes of the October 26, 2020 meeting of
the Public Works/Sewer and Water Committee. Motion carried 3-0.
4. MOVED by Touchett, seconded by Kemp, to recommend approval of project closeout for Project ID
2020-107 2020 Rapid Rectangular Flashing Beacon Installation. Motion carried 3-0.
5. MOVED by Touchett, seconded by Ryan adjourn at 5:05pm. Motion carried 3-0.
Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes
are based on the notes of the recorder and are subject to change at a subsequent meeting.
Meeting Date: November 17, 2020
PW/S&W Committee Memo
Public Works/Sewer & Water Committee
Listed below is an explanation of the items on the Public Works/Sewer & Water Committee
agenda.
Item (4) Discussion regarding Project ID 2019-111, Public Works Facility Design.
Jon Wallenkamp of Kueny Architects, and Theran Jacobson, Public Works Director, will be
providing an update on the public works facility design and will present additional and detailed
information at the meeting.
Included in the packet is a concept layout that has gone through multiple iterations with staff.
The following items will be presented:
1. Staffing forecast
2. Concept site layout
3. Preliminary renderings
The following items staff is requesting feedback on:
1. Direction for future submittals
2. Site layout
3. Any other elements
Page 1 / 1
DOT FENCE LINE
MATERIAL BINS
20' Water and San Easement
20'
Wat
BERM er a
nd S
an E
ase
men
t
Existing Channel Opening GATE
to be re-constructed
BULK
DRY POND WATER FILL
SIGN
REPAIR
RETENTION WASH
POND
BAY
FUTURE
EXPANSION SIDE WALK
FUTURE -- KEEP IN STORM
VEHICLE PARKING WATER NUMBERS
RAIL
RAN
STEEPLE POINT
Employee Entry GE T
21
WAY
SHOPS SPACES
Existing Channel Opening
to be re-constructed OFFICE
Employee Entry
COLD GATE 12
STORAGE
9,400 SF SALT BLDG
IN GATE 13
& BRINE
CURB AND
18 GUTTER
NO CURB AND
GUTTER
RETENTION
POND
20'-0"
OUT GATE
RECYCLE AND YARD WASTE
BERM
BERM
50'-0"
50' SET BACK
NEW SIDE WALK
MAGIC MEADOW COURT
RANGE TRAIL
PLAN NORTH
Site Option 7 SCALE: 1" = 60'-0"
kuenyarch.com ©2020 Kueny Architects L.L.C. - All Rights
City of Verona - Public Works Facility
2159 Range Trail, Verona, WI 53693
November 12, 2020 A109
buildings &
grounds wash bay
1087 SF 2641 SF
water shop
1105 SF
parks shop
2783 SF
repair bay
7562 SF
kitchen &
vending
239 SF mud room
353 SF
lunch / break womens
1627 SF locker
393 SF
mens locker
922 SF
laundry
149 SF
vestibule
109 SF
future Q room
future RR jan
78 SF RR 93 SF
153 SF 96 SF
street
bldg. facilities lead water superintendant
manager operator /
active storage
158 SF SCADA
data & server 211 SF city engineer operations vehicle parking
162 SF 190 SF assistant DPW 41455 SF
185 SF
200 SF
future hall office
210 SF 2143 SF 113 SF
future
200 SF RR
construction future future future GIS 79 SF
engineer small
209 SF conference construction parts
Spec. engineer 260 SF manager
future future 1732 SF
copy & Asst. intern 180 SF
supplies DPW
164 SF vestibule
72 SF
reception sewer & water
113 SF rec director parks director DPW director
utility clerk
conference 210 SF 210 SF 230 SF
196 SF
room / EOC
645 SF
waiting
180 SF
storage
entry
30 SF
111 SF
PLAN NORTH
Overall Floor Plan SCALE: 1/16" = 1'-0"
kuenyarch.com ©2020 Kueny Architects L.L.C. - All Rights Reserved
City of Verona - Public Works Facility
2159 Range Trail
November 12, 2020 A210
Verona, WI Design Study
PERSPECTIVE DESIGN
Site Entrance - Administration
FUNCTION ARCHITECTURAL DESIGN
The Site entrance is designed to draw in the public to the • Ceilings: Metal panel Soffits with light colors to lighten the entrance expierience. • Windows / Exterior Design: Large windows and rasied entrance to guide the user.
front entrance. The creation of a welcoming environment • Walls: Brick and Concrete. Natural wood panel options. • Sound / Acoustics: The maintenance areas are setback to keep noise / traffic seperate from
is achieved throughearth-tone colors and natural materials.
• Floor: Concrete sidewalks with grass / vegetation medians. the public areas.
The site is scattered with low maintenance vegetation to
balance the site.
Verona, WI Design Study
PERSPECTIVE DESIGN
Main Entrance
FUNCTION ARCHITECTURAL DESIGN
The mian entrance is designed to draw in the public to the • Ceilings: Light metal soffit panels. • Windows / Exterior Design: Large windows used to draw light into the main entry.
front entrance wiht the large rasied roof section. Light soffit • Walls: Brick and Concrete panels. Wood Paneling options. • Sound / Acoustics: The maintenance areas are setback to keep noise / traffic seperate from
panels are used to naturally capture and reflect light.
• Floor: Concrete with grass areas. the public areas.
Verona, WI Design Study
PERSPECTIVE DESIGN
Reception / Waiting
FUNCTION ARCHITECTURAL DESIGN
Secured reception desk to provide safe interaction between • Ceilings: Acoustical Ceiling Tile. • Windows / Exterior Design: Large windows to provide natural daylighting. Large reception
the staff and public. • Walls: Painted Gypsum Board. window w/ pass-thru trays to provide view of full waiting room.
• Floor: LVT / Polished Concrete option.
Verona, WI Design Study
PERSPECTIVE DESIGN
Conference Room
FUNCTION ARCHITECTURAL DESIGN
Large Enclosed conference rooms. Designed for 10-14 peo- • Ceilings: 9’-0” minimum ceiling height. Acoustical Ceiling tile. • Windows / Exterior Design: Exterior windows to promote daylighting/natural ventilation,
ple. Room equiped with cabinet storage, counter top space, • Walls: Latex painted Gypsum Board over metal stud framing. Vinyl wall base. interior large sidelight preferred at doorway, roller shades/privacy blinds.
television and powered conference table.
• Floor: Carpet tiles over sealed concrete • Sound / Acoustics: Design typical to standard conversation levels.
Verona, WI Design Study
PERSPECTIVE DESIGN
Open Office Area
FUNCTION ARCHITECTURAL DESIGN
Large open office containing cubicles and Copy / Print • Ceilings: 10’-0” minimum ceiling height. Acoustical Ceiling tile. • Windows / Exterior Design: Exterior windows to promote daylighting/natural ventilation,
station used by all employees. Offices overlook open office • Walls: Latex painted Gypsum Board over metal stud framing. Vinyl wall base. interior large sidelight preferred at doorways, roller shades/privacy blinds.
space.
• Floor: Carpet tiles over sealed concrete • Sound / Acoustics: Design typical to standard conversation levels.
Verona, WI Design Study
PERSPECTIVE DESIGN
Lunch / Training
FUNCTION ARCHITECTURAL DESIGN
Enclosed room used by all employees for sound-controlled • Ceilings: 10’-0” minimum ceiling height. Acoustical Ceiling tile. 12’-0” ceiling • Windows / Exterior Design: Exterior windows to promote daylighting/natural ventilation, in-
access to various kitchen, table/ seating area, hoteling, and height is desired. terior large sidelight preferred at doorway. South wall to have continuous curtain wall 8’-0”
vending supplies. A hoteling station area consists of multi-
• Walls: Latex painted Gypsum Board over metal stud framing. Vinyl wall base. off finish floor to create adequate daylighting while offering access to patio area.
ple workstations for temporary users in one location. The
design allows for direct exterior access to an outdoor patio • Floor: LVT floor planks, Sealed or polished concrete optional.
Verona, WI Design Study
PERSPECTIVE DESIGN
Lunch / Training
FUNCTION ARCHITECTURAL DESIGN
Enclosed room used by all employees for sound-controlled • Ceilings: 10’-0” minimum ceiling height. Acoustical Ceiling tile. 12’-0” ceiling • Windows / Exterior Design: Exterior windows to promote daylighting/natural ventilation, in-
access to various kitchen, table/ seating area, hoteling, and height is desired. terior large sidelight preferred at doorway. South wall to have continuous curtain wall 8’-0”
vending supplies. A hoteling station area consists of multi-
• Walls: Latex painted Gypsum Board over metal stud framing. Vinyl wall base. off finish floor to create adequate daylighting while offering access to patio area.
ple workstations for temporary users in one location. The
design allows for direct exterior access to an outdoor patio • Floor: LVT floor planks, Sealed or polished concrete optional.
Verona, WI Design Study
PERSPECTIVE DESIGN
Lunch / Training - Outdoor Seating
FUNCTION ARCHITECTURAL DESIGN
Outdoor patio seating option for Lunch / Training area. In • Ceilings: Metal soffit panels. • Windows / Exterior Design: Landscape design to provide privacy to seating area. Lunch
addition close proximity to Employee Entrance. • Walls: Brick and Concrete panels. / Training placed around Southern side in the floor plan to create seperation from main
• Floor: Sealed concrete and lrass landscaped areas. entrance.
Verona, WI Design Study
PERSPECTIVE DESIGN
Maintenance - Architectural Design
FUNCTION ARCHITECTURAL DESIGN
Veihicle Parking Bays and Maintenance / Shop Areas. • Ceilings: 22’-0” minimum to fixtures and structure, HPC painted. • Windows / Exterior Design: Exterior windows to promote daylighting. Large windows at
Enclosed secure storage area for various sized department • Walls: Sealed CMU or Sealed Precast wall panels. Soild and grease resistant. corners to create exterior views.
vehicles. Room of open bays used for maintenance / repair
Painted light color or natural concrete finish.
of fleet vehicles. Included room for tire repair. Enclosed
shops for use by respected DPW trades.
Verona, WI Design Study
PERSPECTIVE DESIGN
Exterior View - Public Material Bins
FUNCTION ARCHITECTURAL DESIGN
View of entering the site from Range Trail Road. Design • Ceilings: Light metal soffit panels. • Windows / Exterior Design: Large windows and rasied entrance to guide the user.
of the Public Bin storage used to blend into Administration • Walls: Brick and Concrete panels. Wood Paneling options. • Sound / Acoustics: The maintenance areas are setback to keep noise / traffic seperate from
building design.
• Floor: Concrete with grass areas. the public areas.
Verona, WI Design Study
PERSPECTIVE DESIGN
Street View Study - Southern Perpspective
FUNCTION ARCHITECTURAL DESIGN
Landscape Berm used to screen new DPW facility from • Ceilings: Metal Roof and soffit panels. • Sound / Acoustics: Landscape berm and Courtyard layout used to block sound and views
new housing. Brick and natural materials used to blend Bin • Walls: Brick and Concrete. to maintenance yard.
storage into landscape.
• Floor: Asphalt and Concrete Pad