Muyni
← Back to Verona

Public Works, Sewer and Water

Regular Meeting

Verona, WI · November 17, 2020

AgendaMinutes

Minutes

CITY OF VERONA MINUTES PUBLIC WORKS/SEWER & WATER COMMITTEE MONDAY, NOVEMBER 17, 2020 1. The meeting was called to order by Mr. Touchett at 5:12pm. 2. Roll Call: Present: Evan Touchett, Charlie Ryan. Chad Kemp. Also present: Theran Jacobson, Director of Public Works; Dave Walker, Director of Parks / Forestry; Adam Sayre, City Administrator; Luke Diaz, Mayor; and Jon Wallenkamp, Kueny Architects. Note: This was a remote meeting via Zoom and phone conference, instructions on how to join were included with the posted agenda. 3. Discussion regarding project ID 2019-111, Public Works Facility Design Jacobson and Wallenkamp presented a power point presentation which included a concept plan and renderings for the future public works, parks, and recreation department facility. Jacobson noted the purpose of the meeting was to provide sizing and overall concept updates. Wallenkamp noted that the facility planning and sizing was based upon a current staffing levels and equipment count with a forecast out 20-years which is typical for this industry. Jacobson noted that the forecast was prepared by Jacobson and Parks Director Walker, and was previously presented to Sayre the week prior to this meeting. Ultimately, each department is looking at one additional staff member every five years, all dependent of the growth of the City and budgets. Questions from committee members during the presentation: Touchett asked about the bulk water filling station. Jacobson noted this area will be size accordingly. No additional discussion. Wallenkamp noted an additional emergency operations center is planned within the large conference room. Touchett noted that proper wall space for monitors and adaptors will be needed. Ryan asked about storm water ponds and natural screening at the perimeter of the facility. Wallenkamp noted the intent is to utilize as much of the existing storm water features on site as possible but meeting the needs of today regulations and sizing for any expansion of the future. Jacobson noted that there are two perimeter berms (one southwest and one southwest) that have recently been constructed and were also planted within the last month. Jacobson stated the intent is that these will mature and provide a larger canopy and screening for when construction and future occupancy occur. Wallenkamp noted the renderings show this and revisions as necessary will be accounted for during design. Touchett asked what future expansion would be for. Wallenkamp noted this is for any expansion beyond the initial build and 20-year outlook. Jacobson noted one of the goals of the project and site was to have the ability to expand in 20 years, 40 years, or when deemed necessary. Touchett asked what is in the shops. Wallenkamp noted there are three sets of shops: (1) water utility, (2) parks department, (3) buildings & ground with the street sign storage and work area. Touchett asked the reason behind the combination door to the garage and shop. Wallenkamp noted it was for accessibility and ability to maneuver equipment without exposure to exterior elements. No spaces would be eliminated from the main garage, but if a vehicle was parked in front of the door a vehicle may need to be moved if necessary. Touchett asked if three was necessary. Jacobson noted this is an advantage, but the number and location will be evaluated in the future as needed. Touchett requested that all doors have badge entry requirement for all employees. Touchett advocated for bullet proof wall / glass entry in reception area. Touchett asked about the existing building and other open areas. Jacobson noted the existing storage building on site is intended to be removed but the timing is unknown. This area would / could be used for future cold storage or minor exterior storage. Touchett noted that we understand that there are residential properties adjacent to us but we need to keep the industrial look where not all open space is green so when expansion is necessary there is minimal resistance from the adjacent properties. Diaz agreed with Touchett on transparency with green space that space is reserved for future expansion. Diaz asked about core sustainability. Wallenkamp noted the coordination that would be done with Focus on Energy, incorporate desired green building aspects, and utilize their past experience to include a sustainable and efficient structure. Ryan questioned whether to keep space used as industrial purposes as is, and not as green space, for when future expansion needs to happen. Ryan asked about sustainability and composting possibilities. Wallenkamp noted once concept plan is finalized and design commences that they will be coordinating with Focus on Energy and also Alliant for options for using green resources. Walker noted that decades ago this was once a compost site which came with resistance due to the nature of the work and odors depending on the prevailing winds from the west affecting the East View neighborhood. Jacobson noted this is an entirely different service that we have no expertise, equipment, or personnel power to manage. Jacobson recommended third party vendors and/or personal composting operations if one desires. Mr. Kemp left at 6:15pm. Touchett and Ryan discussed calendar of events on how they would like staff to proceed. Touchett and Ryan agreed and Touchett noted that a neighborhood meeting should occur first, followed with a concept submittal to Plan Commission which will go to Common Council. Jacobson noted the neighborhood would likely occur in January to skip the holiday season. 4. MOVED by Touchett, seconded by Ryan adjourn at 6:30pm. Motion carried 3-0. Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes are based on the notes of the recorder and are subject to change at a subsequent meeting.

Agenda

CITY OF VERONA PUBLIC WORKS/SEWER & WATER COMMITTEE AGENDA TUESDAY, NOVEMBER 17, 2020 5:00 P.M. VERONA, WI 53593 Due to the COVID-19 pandemic, the Verona Public Works/Sewer & Water Committee will hold its meeting as a virtual meeting. The Verona Public Works/Sewer & Water Committee will not meet at City Hall, 111 Lincoln Street. Members of the Verona Public Works/Sewer & Water Committee and Staff will join the meeting by using Zoom Webinar, as described immediately below. Members of the public can join the meeting using Zoom Webinar via a computer, tablet, or smartphone, or by calling into the meeting using phones, as described immediately below. Join the meeting via computer, tablet, or smart phone: https://zoom.us/j/94666694903 Webinar ID: 946 6669 4903 Join the meeting via phone by dialing: 301-715-8592 Webinar ID: 946 6669 4903 Agenda Items 1. Call to order. 2. Roll call. 3. Approval of the minutes of the November 9, 2020 meeting of the Public Works/Sewer and Water Committee. 4. Discussion regarding Project ID 2019-111, Public Works Facility Design. 5. Adjourn. Evan Touchett Chairperson POSTED: Verona City Hall Miller’s Market ALL AGENDAS ARE POSTED ON THE CITY’S WEBSITE AT www.ci.verona.wi.us IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMMODATION TO ACCESS THE MEETINGS, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST. CITY OF VERONA MINUTES PUBLIC WORKS/SEWER & WATER COMMITTEE MONDAY, NOVEMBER 9, 2020 1. The meeting was called to order by Mr. Touchett at 5:02pm. 2. Roll Call: Present: Evan Touchett, Charlie Ryan. Chad Kemp. Also present: Theran Jacobson, Director of Public Works; Carla Fischer, City Engineer, AECOM. Note: This was a remote meeting via Zoom and phone conference, instructions on how to join were included with the posted agenda. 3. MOVED by Touchett, seconded by Ryan, to approve the minutes of the October 26, 2020 meeting of the Public Works/Sewer and Water Committee. Motion carried 3-0. 4. MOVED by Touchett, seconded by Kemp, to recommend approval of project closeout for Project ID 2020-107 2020 Rapid Rectangular Flashing Beacon Installation. Motion carried 3-0. 5. MOVED by Touchett, seconded by Ryan adjourn at 5:05pm. Motion carried 3-0. Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes are based on the notes of the recorder and are subject to change at a subsequent meeting. Meeting Date: November 17, 2020 PW/S&W Committee Memo Public Works/Sewer & Water Committee Listed below is an explanation of the items on the Public Works/Sewer & Water Committee agenda. Item (4) Discussion regarding Project ID 2019-111, Public Works Facility Design. Jon Wallenkamp of Kueny Architects, and Theran Jacobson, Public Works Director, will be providing an update on the public works facility design and will present additional and detailed information at the meeting. Included in the packet is a concept layout that has gone through multiple iterations with staff. The following items will be presented: 1. Staffing forecast 2. Concept site layout 3. Preliminary renderings The following items staff is requesting feedback on: 1. Direction for future submittals 2. Site layout 3. Any other elements Page 1 / 1 DOT FENCE LINE MATERIAL BINS 20' Water and San Easement 20' Wat BERM er a nd S an E ase men t Existing Channel Opening GATE to be re-constructed BULK DRY POND WATER FILL SIGN REPAIR RETENTION WASH POND BAY FUTURE EXPANSION SIDE WALK FUTURE -- KEEP IN STORM VEHICLE PARKING WATER NUMBERS RAIL RAN STEEPLE POINT Employee Entry GE T 21 WAY SHOPS SPACES Existing Channel Opening to be re-constructed OFFICE Employee Entry COLD GATE 12 STORAGE 9,400 SF SALT BLDG IN GATE 13 & BRINE CURB AND 18 GUTTER NO CURB AND GUTTER RETENTION POND 20'-0" OUT GATE RECYCLE AND YARD WASTE BERM BERM 50'-0" 50' SET BACK NEW SIDE WALK MAGIC MEADOW COURT RANGE TRAIL PLAN NORTH Site Option 7 SCALE: 1" = 60'-0" kuenyarch.com ©2020 Kueny Architects L.L.C. - All Rights City of Verona - Public Works Facility 2159 Range Trail, Verona, WI 53693 November 12, 2020 A109 buildings & grounds wash bay 1087 SF 2641 SF water shop 1105 SF parks shop 2783 SF repair bay 7562 SF kitchen & vending 239 SF mud room 353 SF lunch / break womens 1627 SF locker 393 SF mens locker 922 SF laundry 149 SF vestibule 109 SF future Q room future RR jan 78 SF RR 93 SF 153 SF 96 SF street bldg. facilities lead water superintendant manager operator / active storage 158 SF SCADA data & server 211 SF city engineer operations vehicle parking 162 SF 190 SF assistant DPW 41455 SF 185 SF 200 SF future hall office 210 SF 2143 SF 113 SF future 200 SF RR construction future future future GIS 79 SF engineer small 209 SF conference construction parts Spec. engineer 260 SF manager future future 1732 SF copy & Asst. intern 180 SF supplies DPW 164 SF vestibule 72 SF reception sewer & water 113 SF rec director parks director DPW director utility clerk conference 210 SF 210 SF 230 SF 196 SF room / EOC 645 SF waiting 180 SF storage entry 30 SF 111 SF PLAN NORTH Overall Floor Plan SCALE: 1/16" = 1'-0" kuenyarch.com ©2020 Kueny Architects L.L.C. - All Rights Reserved City of Verona - Public Works Facility 2159 Range Trail November 12, 2020 A210 Verona, WI Design Study PERSPECTIVE DESIGN Site Entrance - Administration FUNCTION ARCHITECTURAL DESIGN The Site entrance is designed to draw in the public to the • Ceilings: Metal panel Soffits with light colors to lighten the entrance expierience. • Windows / Exterior Design: Large windows and rasied entrance to guide the user. front entrance. The creation of a welcoming environment • Walls: Brick and Concrete. Natural wood panel options. • Sound / Acoustics: The maintenance areas are setback to keep noise / traffic seperate from is achieved throughearth-tone colors and natural materials. • Floor: Concrete sidewalks with grass / vegetation medians. the public areas. The site is scattered with low maintenance vegetation to balance the site. Verona, WI Design Study PERSPECTIVE DESIGN Main Entrance FUNCTION ARCHITECTURAL DESIGN The mian entrance is designed to draw in the public to the • Ceilings: Light metal soffit panels. • Windows / Exterior Design: Large windows used to draw light into the main entry. front entrance wiht the large rasied roof section. Light soffit • Walls: Brick and Concrete panels. Wood Paneling options. • Sound / Acoustics: The maintenance areas are setback to keep noise / traffic seperate from panels are used to naturally capture and reflect light. • Floor: Concrete with grass areas. the public areas. Verona, WI Design Study PERSPECTIVE DESIGN Reception / Waiting FUNCTION ARCHITECTURAL DESIGN Secured reception desk to provide safe interaction between • Ceilings: Acoustical Ceiling Tile. • Windows / Exterior Design: Large windows to provide natural daylighting. Large reception the staff and public. • Walls: Painted Gypsum Board. window w/ pass-thru trays to provide view of full waiting room. • Floor: LVT / Polished Concrete option. Verona, WI Design Study PERSPECTIVE DESIGN Conference Room FUNCTION ARCHITECTURAL DESIGN Large Enclosed conference rooms. Designed for 10-14 peo- • Ceilings: 9’-0” minimum ceiling height. Acoustical Ceiling tile. • Windows / Exterior Design: Exterior windows to promote daylighting/natural ventilation, ple. Room equiped with cabinet storage, counter top space, • Walls: Latex painted Gypsum Board over metal stud framing. Vinyl wall base. interior large sidelight preferred at doorway, roller shades/privacy blinds. television and powered conference table. • Floor: Carpet tiles over sealed concrete • Sound / Acoustics: Design typical to standard conversation levels. Verona, WI Design Study PERSPECTIVE DESIGN Open Office Area FUNCTION ARCHITECTURAL DESIGN Large open office containing cubicles and Copy / Print • Ceilings: 10’-0” minimum ceiling height. Acoustical Ceiling tile. • Windows / Exterior Design: Exterior windows to promote daylighting/natural ventilation, station used by all employees. Offices overlook open office • Walls: Latex painted Gypsum Board over metal stud framing. Vinyl wall base. interior large sidelight preferred at doorways, roller shades/privacy blinds. space. • Floor: Carpet tiles over sealed concrete • Sound / Acoustics: Design typical to standard conversation levels. Verona, WI Design Study PERSPECTIVE DESIGN Lunch / Training FUNCTION ARCHITECTURAL DESIGN Enclosed room used by all employees for sound-controlled • Ceilings: 10’-0” minimum ceiling height. Acoustical Ceiling tile. 12’-0” ceiling • Windows / Exterior Design: Exterior windows to promote daylighting/natural ventilation, in- access to various kitchen, table/ seating area, hoteling, and height is desired. terior large sidelight preferred at doorway. South wall to have continuous curtain wall 8’-0” vending supplies. A hoteling station area consists of multi- • Walls: Latex painted Gypsum Board over metal stud framing. Vinyl wall base. off finish floor to create adequate daylighting while offering access to patio area. ple workstations for temporary users in one location. The design allows for direct exterior access to an outdoor patio • Floor: LVT floor planks, Sealed or polished concrete optional. Verona, WI Design Study PERSPECTIVE DESIGN Lunch / Training FUNCTION ARCHITECTURAL DESIGN Enclosed room used by all employees for sound-controlled • Ceilings: 10’-0” minimum ceiling height. Acoustical Ceiling tile. 12’-0” ceiling • Windows / Exterior Design: Exterior windows to promote daylighting/natural ventilation, in- access to various kitchen, table/ seating area, hoteling, and height is desired. terior large sidelight preferred at doorway. South wall to have continuous curtain wall 8’-0” vending supplies. A hoteling station area consists of multi- • Walls: Latex painted Gypsum Board over metal stud framing. Vinyl wall base. off finish floor to create adequate daylighting while offering access to patio area. ple workstations for temporary users in one location. The design allows for direct exterior access to an outdoor patio • Floor: LVT floor planks, Sealed or polished concrete optional. Verona, WI Design Study PERSPECTIVE DESIGN Lunch / Training - Outdoor Seating FUNCTION ARCHITECTURAL DESIGN Outdoor patio seating option for Lunch / Training area. In • Ceilings: Metal soffit panels. • Windows / Exterior Design: Landscape design to provide privacy to seating area. Lunch addition close proximity to Employee Entrance. • Walls: Brick and Concrete panels. / Training placed around Southern side in the floor plan to create seperation from main • Floor: Sealed concrete and lrass landscaped areas. entrance. Verona, WI Design Study PERSPECTIVE DESIGN Maintenance - Architectural Design FUNCTION ARCHITECTURAL DESIGN Veihicle Parking Bays and Maintenance / Shop Areas. • Ceilings: 22’-0” minimum to fixtures and structure, HPC painted. • Windows / Exterior Design: Exterior windows to promote daylighting. Large windows at Enclosed secure storage area for various sized department • Walls: Sealed CMU or Sealed Precast wall panels. Soild and grease resistant. corners to create exterior views. vehicles. Room of open bays used for maintenance / repair Painted light color or natural concrete finish. of fleet vehicles. Included room for tire repair. Enclosed shops for use by respected DPW trades. Verona, WI Design Study PERSPECTIVE DESIGN Exterior View - Public Material Bins FUNCTION ARCHITECTURAL DESIGN View of entering the site from Range Trail Road. Design • Ceilings: Light metal soffit panels. • Windows / Exterior Design: Large windows and rasied entrance to guide the user. of the Public Bin storage used to blend into Administration • Walls: Brick and Concrete panels. Wood Paneling options. • Sound / Acoustics: The maintenance areas are setback to keep noise / traffic seperate from building design. • Floor: Concrete with grass areas. the public areas. Verona, WI Design Study PERSPECTIVE DESIGN Street View Study - Southern Perpspective FUNCTION ARCHITECTURAL DESIGN Landscape Berm used to screen new DPW facility from • Ceilings: Metal Roof and soffit panels. • Sound / Acoustics: Landscape berm and Courtyard layout used to block sound and views new housing. Brick and natural materials used to blend Bin • Walls: Brick and Concrete. to maintenance yard. storage into landscape. • Floor: Asphalt and Concrete Pad

Get email alerts for Verona

A daily email when new agendas and minutes are posted.

Report an issue with this meeting