Public Works, Sewer and Water
Regular MeetingVerona, WI · February 22, 2021
Agenda
CITY OF VERONA
PUBLIC WORKS/SEWER & WATER COMMITTEE AGENDA
MONDAY, FEBRUARY 22, 2021
5:00 P.M.
VERONA, WI 53593
Due to the COVID-19 pandemic, the Verona Public Works/Sewer & Water Committee will
hold its meeting as a virtual meeting. The Verona Public Works/Sewer & Water Committee
will not meet at City Hall, 111 Lincoln Street. Members of the Verona Public Works/Sewer &
Water Committee and Staff will join the meeting by using Zoom Webinar, as described
immediately below.
Members of the public can join the meeting using Zoom Webinar via a computer, tablet, or
smartphone, or by calling into the meeting using phones, as described immediately below.
Join the meeting via computer, tablet, or smart phone:
https://zoom.us/j/92830901858
Webinar ID: 928 3090 1858
Join the meeting via phone by dialing:
301-715-8592
Webinar ID: 928 3090 1858
Agenda Items
1. Call to order.
2. Roll call.
3. Approval of the minutes of the January 25, 2021 meeting of the Public Works/Sewer and Water
Committee.
4. Discussion and action regarding change order no. 1 for Project ID 2018-108 Eastside Interceptor
Replacement.
5. Discussion and action regarding change order no. 2 for Project ID 2018-108 Eastside Interceptor
Replacement.
6. Discussion and action regarding Resolution R-21-007, Accepting Public Improvements adjacent to
Verona Area High School.
7. Discussion and action regarding Project ID 2018-108 Eastside interceptor gravity sanitary sewer
replacement.
8. Adjourn.
Evan Touchett
Chairperson
Notice is hereby given that a majority of the City Council may be present at the meeting of the Public Works/Sewer &
Water Committee to gather information about a subject over which they have decision-making responsibility.
POSTED: Verona City Hall
Miller’s Market
ALL AGENDAS ARE POSTED ON THE CITY’S WEBSITE AT www.ci.verona.wi.us
IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMMODATION TO
ACCESS THE MEETINGS, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE
MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST.
CITY OF VERONA
MINUTES
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, JANUARY 25, 2021
1. The meeting was called to order by Mr. Touchett at 5:06pm.
2. Roll Call: Present: Evan Touchett, Charlie Ryan, Chad Kemp. Also present: Theran Jacobson, Director of
Public Works; Carla Fischer, City Engineer, AECOM; Dave Walker, Director of Parks and Urban Forestry.
Note: This was a remote meeting via Zoom and phone conference, instructions on how to join were
included with the posted agenda.
3. MOVED by Touchett, seconded by Kemp, to approve the minutes of the January 11, 2021 meeting of
the Public Works/Sewer and Water Committee. Motion carried 3-0.
4. MOVED by Touchett, seconded by Ryan, to recommend approval of amendment no. 2 with AECOM
for construction related services for Project ID 2017-115 Well 6. Motion carried 3-0.Touchett asked
how the city can better control and plan for amendments. Fischer answered that construction
contract amounts are always best guess estimates based on scope and schedule and that every
project varies.
5. MOVED by Touchett, seconded by Ryan, to recommend approval of professional services agreement
with Short Elliot Hendrickson for Project ID 2018-108.3 Badger Mill Creek restoration, in the amount
not-to-exceed $28,804.00, contingent upon legal and city administrator review. Motion carried 3-0.
6. Discussions regarding Project ID 2018-108 Eastside interceptor gravity sanitary sewer replacement.
Mr. Jacobson provided an overview of the recent communication and presentations regarding the
Eastside interceptor gravity sanitary sewer replacement project (ESI). Jacobson noted the following:
1. On January 11th the interceptor project was discussed at the Common Council level and action
was taken to discuss the project at the committee level for at the Parks Board and PWS&W
Committee.
2. A neighborhood meeting for this project was held on January 13th at 5:30 p.m. via Zoom. The
meeting included presentations and discussions by the City of Verona, Ice Age Trail Alliance,
Madison Metropolitan Sewerage District, and Dane County. The public had the opportunity the
ask questions after the presentation and staff responded. This meeting was broadcasted on
YouTube and recorded. This presentation can be viewed on the City YouTube channel.
3. Monthly process meetings have been scheduled and will occur on the third Wednesday of the
month by Zoom. Staff will update the public on the construction schedule and answer
questions.
4. Information on the ESI project is located on the City’s website below and the website is
updated as the project progresses.
http://www.ci.verona.wi.us/729/Eastside-Interceptor-Gravity-Sanitary-Se
Jacobson noted the following items for discussion and potential action are as follows:
1. Engage in contract with a consultant for review and oversight of the work regarding the
Badger Mill Creek Corridor
2. Multi-use path
a. Overall needs
b. Utility access
c. Connectivity to Parks
d. Separation from Ice Age Trail
3. Tree plantings along corridor and offset from the utilities.
Discussion regarding “Engage in contract with a consultant for review and oversight of the work
regarding the Badger Mill Creek Corridor”.
Jacobson noted the following: Multiple agencies were involved in the review of the prepared
engineered plans that included the restoration plans for the ESI project. The Wisconsin
Department of Natural Resources (WDNR) was communicated with verbally, via e-mail, and
also on site. The construction engineer on site is fully capable of implementing all aspects of
the project and has been communicating with engineers and WDNR as necessary throughout
construction. WDNR has been on site with the construction engineer and has been pleased
with the project status, progress and communication. WDNR noted to staff that there is no
need for them to be on site, WDNR role is to ensure permit conditions are delivered to project
staff as stated in the issued permits and follow up with complaints. WDNR does not act as an
inspector.
Touchett added he is not in favor of using additional consultants, and would rather spend
money on trees.
Ryan stated that ecologically the corridor will be preserved and that the WDNR thinks their
participation is adequate. Ryan would like them to be notified of key milestone dates.
Jacobson noted he will have construction engineer work with WDNR of key milestone dates.
Kemp noted to Jacobson that we have been working together for three years and you have
never steered the City in the wrong direction.
Jacobson noted, as on any project, if there is a need for additional resources we have a large
network of resources with the regulatory agencies and other consultants
Discussion regarding “Multi-use path”.
Jacobson noted the following: The multi-use asphalt path will serve multiple purposes for the
sewer pipelines; maintenance path for cleaning and unexpected repairs, access for locating
utilities, and protection. The path will also serve the greater public on a day-to-day basis
providing a connection to the following: other pedestrian travel ways in the City, East View
neighborhood, and connectivity between City parks. The path’s ultimate goal is be a
segregated path from the Ice Age Trail, but Jacobson noted there may be common segments
due to on-site challenges such as topography and drainage. This path was one of the many
pedestrian improvements projects that were identified in the Ped and Bike plan prepared by
AECOM that was presented to the Common Council in spring of 2017. The plan identified
multiple improvements throughout the City with many already being constructed.
Touchett stated he recalled the plan and presentation in 2017 and was involved in the
preparation.
Ryan asked for the bike survey, and Jacobson responded there was no survey but he would
send the link to the Ped and Bike plan. Ryan noted he is in favor of pedestrian improvements.
Kemp noted he likes the path, and noted he doesn’t think a bill of goods was sold.
Discussion regarding “Tree plantings along corridor and offset from the utilities”.
Jacobson noted the following: The goal through project planning and permitting development
has been to perform a restoration plan of habitat along the Badger Mill Creek segment
common with the Ice Age Trail, after the construction of the sewer project is complete. Ice Age
Trail and Mr. Walker wanted to be able to communicate and have a visual of the landscape
after the sewer project is completed so the proper plan can be developed. Mr. Jacobson noted
the plan is to not plant any trees within the permanent limited easement to protect the sewer
pipes below. Planting outside of the permanent limited easement can occur per the direction
of Mr. Walker.
Walker discussed the tree planting schedule, path concerns, Park Board overview, and
connectivity to City parks. The rough plan for replanting is to restore grassland during the
sewer project and then go to Ice Age Trail for placement, staking out trees after the sewer
project is complete. The city is not locked into anything per the plan renderings that were
developed for presentation to the public. The schedule is to begin restoration summer/fall of
2021 for ESI project, but the true design for tree placement won’t occur until fall of 2021. Tree
placement won’t happen until 2022. Walker noted that native trees are a spring plant and
most nurseries will not provide natives trees in the fall.
Touchett asked about naming the area, and commented that he wants to keep the paved trail.
Walker responded this area has been previous know as the “East View Nature Sanctuary”.
Touchett commented that the planting approach is ideal in order to locate placement in the
field.
No action was taken by the Committee. Staff proposal was presented to the Committee. Based upon
discussion, no concerns were raised by the Committee. Staff will proceed with the ESI project and
tree planning approach.
7. MOVED by Touchett, seconded by Ryan adjourn at 5:57pm. Motion carried 3-0.
Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes
are based on the notes of the recorder and are subject to change at a subsequent meeting.
Meeting Date: February 22, 2021
PW/S&W Committee Memo
Public Works/Sewer & Water Committee
Listed below is an explanation of the items on the Public Works/Sewer & Water Committee
agenda.
Item (4) Change Order No. 1 for Eastside Interceptor Replacement.
Change order no. 1 for the eastside interceptor project is for a reduction in work associated
with Project B. Project B is all Dane County prepared and financed work. Dane County staff has
reviewed and signed the change order per the Intergovernmental Agreement. The City of
Verona is the lead on the project and owner of the contract with the contractor.
• Reduction of invasive species removal area within project limits.
• Change in unit price due to density of works zones and level of efforts.
The contract notes are as follows:
• Contract award value = $7,761,804.60
• Change order No. 1 = ($31,620.00) (deduct)
• Contract value after incorporating this change order = $7,730,184.60
Staff recommends approval of change order no. 1.
Item (5) Change Order No. 2 for Eastside Interceptor Replacement.
Change order no. 2 for the eastside interceptor project is for addition work required to facilitate
construction of the sanitary sewers in Bruce Street, re-mobilization for clearing operations, and
additional erosion control best management practices to be used throughout construction.
Work changes are noted as follows:
• Window an existing 12-inch water main over the proposed force main, water main was
deeper than anticipated based upon records in this area. Work also included adding a
12-inch valve.
• Replace a 34 inch x 53 inch storm sewer apron endwall, the existing endwall was
cracked. This was a material costs only.
• Added additional erosion control measure to be used in the field above anticipated plan
erosion control measures included with the bid. This provides field staff more resources
to be used in the field to fit site conditions.
• Re-mobilization and de-mobilization of clearing and grubbing equipment for the land
just north of S. Main Street that was not acquired until January 2021.
The contract notes are as follows:
• Contract award value = $7,761,804.60
Page 1 / 2
Meeting Date: February 22, 2021
PW/S&W Committee Memo
• Previous change orders = $31,620.00 (deduct)
• Change order No. 2 = $37,925.00 (add)
• Contract value after incorporating this change order = $7,768,109.60
Staff recommends approval of change order no. 2.
Item (6) Resolution R-21-007, Accepting Public Improvements adjacent to Verona Area High
School.
The public improvements have been substantially completed as of September 24, 2020. Punch
list items have been addressed and staff recommends the City of Verona accept the newly
constructed portions of the listed streets and/or intersections below and the associated water
main and storm water infrastructure.
Public Improvement locations:
1. Stewart’s Woods Road (and bridge)
2. Wildcat Way (and bridge)
3. W. Verona Avenue (between West End Circle and Nine Mound)
4. Westridge Parkway sidewalk
5. S. Nine Mound (between W. Verona Avenue and Stewart’s Woods Road)
6. West End Circle (between Wall Street and Wildcat Way)
7. Wall Street
8. Intersection improvements, traffic signals and lighting at intersection of W. Verona
Avenue and West End Circle
9. Intersection improvements, traffic signals and lighting at intersection of W. Verona
Avenue and Nine Mound Road
10. Intersection improvements at intersection of S. Nine Mound Road and Legion Street
11. Intersection improvements at intersection of S. Nine Mound Road and Paoli Street
Item (7) Project ID 2018-108 Eastside interceptor gravity sanitary sewer replacement.
Staff will provide a construction update on the Eastside Interceptor Replacement Project.
Page 2 / 2
CHANGE ORDER NO. 1
Owner City of Verona Date 01/27/2021
Project East Side Interceptor/MMSD Pump Station 17 Force Main Relief Owner’s Contract No. 2018-108
Contractor Minger Construction Companies, Inc. Date of Contract Start October 13, 2020
You are directed to make the following changes in the Contract Documents.
These changes will be incorporated into the Project B portion of the Contract, and will be paid by Dane County.
Adding Items
Item Number Description Unit Quantity Unit Price Amount
7001.02 (CCO.01.01) Invasive Species Removal ACRE 5.1 $ 5,800.00 $ 29,580.00
Reducing/Removing Items
Item Number Description Unit Quantity Unit Price Amount
7001.0200 Invasive Species Removal ACRE 17 $ (3,600.00) $ (61,200.00)
Total Net Change = $(31,620.00)
Reason for Change Order:
Added Items:
7001.02 (CO.01.01) = Added item to revise unit price and plan quantity of original bid 7001.02 – Invasive Species Removal. Plan
areas were removed per Dane County to protect existing native species within original plan areas thus revising the plan quantity.
The areas that were removed to reduce the plan quantity were more accessible and easier to complete. The remaining areas were
more challenging to complete and warranted a revised unit price. Unit price adjustment discussed with Dane County.
Reduced Items:
7001.02 = See above discussion.
CONTRACT PRICE CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original: $7,761,804.60 Original Completion Date: 8/27/2021 9/17/2021
Previous C.O.s (ADD/DEDUCT): $0 Previous C.O.s (ADD/DEDUCT): N/A N/A
This C.O. (ADD/DEDUCT): $(31,620.00) This C.O. (ADD/DEDUCT): N/A N/A
Contract Price with all REVISED: N/A N/A
approved Change Orders: $7,730,184.60
Revised Completion Date: N/A N/A
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)
ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above,
there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
Project Forms Page 1 / 2
RECOMMENDED:
By:
ENGINEER (Theran Jacobson, P.E.) Date
ACCEPTED:
By:
OWNER (Luke Diaz, Mayor) Date
ACCEPTED:
By: Not Applicable for Project B
MADISON METROPOLITAN SEWAGE DISTRICT (Bruce Borelli, PE) Date
ACCEPTED:
By: 2/10/2021
OWNER (Dane County) Date
ACCEPTED:
By: 1/28/2021
CONTRACTOR (Minger Construction Companies, Inc.) Date
City of Verona, WI
___2018-108 /_________1_______
Project Change
Number Order No.
S:\PROJECTS\2018-108_E. SIDE INTERCEPTOR COLLECTION SYSTEM\CONSTRUCTION (PRE-CON & AFTER)\CHANGE ORDERS\CCO
#1\2018-108_CCO #1.DOCX
Project Forms Page 2 / 2
CHANGE ORDER NO. 2
Owner City of Verona Date 01/27/2021
Project East Side Interceptor/MMSD Pump Station 17 Force Main Relief Owner’s Contract No. 2018-108
Contractor Minger Construction Companies, Inc. Date of Contract Start October 13, 2020
You are directed to make the following changes in the Contract Documents.
These changes will be incorporated into the Project A portion of the Contract.
Adding Items
Item Number Description Unit Quantity Unit Price Amount
3801.0112 (CCO.02.01) 12-Inch Dia. Ductile Iron Water Main LF 20 $ 235.00 $ 4,700.00
3803.0112 (CCO.02.02) Water Valve and Valve Box 12-inch EA 1 $ 4,525.00 $ 4,525.00
Apron Endwalls for Culvert Pipe Reinforced
2522.2634 (CCO.02.03) EA 1 $ 1,200.00 $ 1,200.00
Concrete Horizontal Elliptical 34x53-Inch
1628.7504 (CCO.02.04) Temporary Ditch Checks LF 250 $ 50.00 $ 12,500.00
CCO.02.05 Clearing and Grubbing Re-Mobilization LS 1 $ 15,000.00 $ 15,000.00
Total Net Change = $37,925.00
Reason for Change Order:
Added Items:
3801.0112 (CO.02.01) = Conflict with existing 12-in Water Main and new 24-in Force Main at the Bruce Street Crossing (near Sta
602+50) per field offset measurements during installation. Portion of existing water main was required to be off set over new force
main by approx. 1.1-ft to achieve 6-in of separation between off set existing water main and new force main. Pricing included new
water main and fittings required to offset water main. Receipt of material attached and crew time per rate sheet was tracked (see
attached).
3803.0112 (CO.02.02) = A new water valve and box was required and installed as part of adding Item 3801.01 (CO.02.01). See
above discussion.
2522.2634 (CO.02.03) = At SE quadrant of Bruce Street and Badger Mill Creek an existing apron endwall and some associated
storm sewer pipe was removed and replaced at Minger’s expense to facilitate new gravity sewer installation. The existing apron
endwall was previously damaged prior to removal and Staff requested that the endwall be replaced. Price is material costs only –
see attached price.
1628.7504 (CO.02.04) = During project erosion control inspection by City Staff, Dane County, and WDNR temporary ditch checks
were needed in addition to plan erosion control. These will be utilized at silt fence reliefs, in ditch drainage areas, down stream and
up stream of culverts, as well as other areas deemed necessary. Price submitted includes 3-in to 6-in clear stone and to be
installed per Stone Velocity Check as detailed in the plan details. Unit price justified due to the location of the temporary ditch
checks and limited access to these area. Material is required to be tracked and hauled using loader or skidsteer for installation.
Added item quantity is an estimate for final plan quantity. Quantity paid will be based on field measurements.
CO.02.05 = Acquisition of property through the proposed work zone from approximate Station 621+50 to approximate Station
623+50 was not completed during initial clearing and grubbing operations. Clearing and grubbing subcontractor required to re-
mobilize to the site to complete this area once property was acquired. Price based on the required equipment costs to be delivered
to the site and then to be removed from the site (see attached).
Project Forms Page 1 / 2
CONTRACT PRICE CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original: $7,761,804.60 Original Completion Date: 8/27/2021 9/17/2021
Previous C.O.s (ADD/DEDUCT): $(31,620.00) Previous C.O.s (ADD/DEDUCT): N/A N/A
This C.O. (ADD/DEDUCT): $37,925.00 This C.O. (ADD/DEDUCT): N/A N/A
Contract Price with all REVISED: N/A N/A
approved Change Orders: $7,768,109.60
Revised Completion Date: N/A N/A
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)
ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above,
there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED:
By:
ENGINEER (Theran Jacobson, P.E.) Date
ACCEPTED:
By:
OWNER (Luke Diaz, Mayor) Date
ACCEPTED:
By:
2/12/2021
MADISON METROPOLITAN SEWAGE DISTRICT (Bruce Borelli, PE) Date
ACCEPTED:
By: Not Applicable for Project A
OWNER (Dane County) Date
ACCEPTED:
By: 1/28/2021
CONTRACTOR (Minger Construction Companies, Inc.) Date
City of Verona, WI
___2018-108 /_________2 ______
Project Change
Number Order No.
S:\PROJECTS\2018-108_E. SIDE INTERCEPTOR COLLECTION SYSTEM\CONSTRUCTION (PRE-CON & AFTER)\CHANGE ORDERS\CCO
#2\2018-108_CCO #2_FINAL_2021-01-27.DOCX
Project Forms Page 2 / 2
Aaron McFarlin
From: Aaron McFarlin
Sent: Tuesday, December 22, 2020 9:33 AM
To: Tom Schneider
Subject: RE: 34x53 Elliptical Endwall
Hey Tom,
Just to confirm our discussion earlier this morning regarding the prices for the extra work. I am good with $1200 for the
new AEW (no grate and will need holes for joint ties). And as discussed please proceed with the water main offset at a
price of $4700. Let me know if you have any questions or if you would like to discuss further.
Thank you,
Aaron
Aaron McFarlin, P.E.
Construction Engineer
City of Verona
Department of Public Works
(608) 333-9948 (Cell Phone)
(608) 497-2082 (Direct)
aaron.mcfarlin@ci.verona.wi.us
From: Tom Schneider [mailto:toms@mingerconst.com]
Sent: Monday, December 21, 2020 11:22 AM
To: Aaron McFarlin
Subject: 34x53 Elliptical Endwall
Hey Aaron,
Cost Breakdowns you were looking for per Jason:
New Endwall:
34x53 Elliptical Endwall = $1200.00 – Email Pricing Attached.
For the 12” WM Offset:
Materials = $3463.16 – Pricing Attached.
Labor = $2000.00
Let me know if there any questions.
Thanks,
Tom Schneider
Project Manager/Estimator
1
620 Corporate Drive
Jordan, MN 55352
Ph: 952-368-9200
Fax: 952-368-9311
Cell: 612-559-9351
Toms@Mingerconst.com
Equal Opportunity Employer
Visit our website at: www.mingerconstruction.com
2
Aaron McFarlin
From: Jeremy.Roskopf@Ferguson.com
Sent: Friday, December 18, 2020 9:09 AM
To: Jeremy.Roskopf@Ferguson.com
Subject: Email Order# 0320897
Order Confirmation # 0320897
FERGUSON WATERWORKS #1479
N49 W22990 COMMERCE CENTRE DR
PEWAUKEE, WI 53072-0000
Phone : 262-691-8890
Fax : 262-691-4837
Order No...: 0320897
Order Date: 12/17/20 Req Date: 12/21/20 Ship Via..: OUR TRUCK
Writer........: JSR Terms.....: NET 10TH PROX
Sold To.......: MINGER CONSTRUCTION INC Ship To...: MINGER CONSTRUCTION INC
620 CORPORATE DRIVE S MAIN ST & LOCUST DR
VERONA EASTSIDE INTERCEPT VERONA EASTSIDE INTERCEPTOR
JORDAN, MN 55352 VERONA, WI 53593
Cust PO#..: ADD WM MATERIALS Job Name.: VERONA EASTSIDE INTERCEPT
Item Description Quantity Net Price UM Total
DI52TJPCB12 12 DI CL52 TYTON JT CBND PIPE 18 46.990 FT 845.82
DMJ4LA12 DOM 12 MJ C153 45 BEND L/A 4 403.200 EA 1612.80
E111200 12 MEGALUG F/ DI 8 76.000 EA 608.00
MJGA12 12 MJ GSKT 8 7.000 EA 56.00
CBTBNFP 3/4X4 CORE BLUE MJ T-BLT & NUT 64 2.500 EA 160.00
Subtotal: $3282.62
Inbound Freight: $0.00
Tax: $180.54
Order Total: $3463.16
WARRANTY PROVISIONS
The purchaser's sole and exclusive warranty is that provided by the manufacturer, if any. Seller makes no express or implied
warranties. SELLER DISCLAIMS ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING ALL IMPLIED
WARRANTIES OF MERCHANTABILITY AND FITNESS OR FITNESS FOR A PARTICULAR PURPOSE. IN NO
EVENT WILL SELLER BE LIABLE FOR ANY INCIDENTAL, PUNITIVE, SPECIAL OR CONSEQUENTIAL
DAMAGES ARISING DIRECTLY OR INDIRECTLY FROM THE OPERATION OR USE OF THE PRODUCT. SELLER'S
LIABILITY, IF ANY, SHALL BE LIMITED TO THE NET SALES PRICE RECEIVED BY SELLER. Complete Terms and
Conditions are available upon request or can be viewed on the web at https://www.ferguson.com/content/website-info/terms-
of-sale
1
LEAD LAW WARNING: It is illegal to install products that are not "lead free" in accordance with US Federal or other
applicable law in potable water systems anticipated for human consumption. Products with *NP in the description are NOT
lead free and can only be installed in non-potable applications. Buyer is solely responsible for product selection.
HOW ARE WE DOING? WE WANT YOUR FEEDBACK!
Enter the following link to complete a survey about your orders:
https://survey.medallia.com/?bidsorder&fc=1476&on=17252
2
Aaron McFarlin
From: Brandon Pierick <Brandon.Pierick@countymaterials.com>
Sent: Friday, December 18, 2020 8:43 AM
To: Tom Schneider
Subject: [EXTERNAL] RE: Verona - Concrete Elliptical Endwall
Good Morning Tom,
You are probably looking at something like $1200 for the endwall. I believe the ties are $41.25 a piece or something like
that.
Thanks,
Brandon Pierick
Project Coordinator
To help protect y ou r priv acy , Microsoft Office prev ented automatic download of this picture from the Internet.
3125 Lexington Ave, Madison WI 53714
Brandon.Pierick@countymaterials.com
608-405-5326 (Office)
877-375-4169 (Toll Free Fax)
www.countymaterials.com
Facebook | Twitter | Linkedin | Youtube
From: Tom Schneider <toms@mingerconst.com>
Sent: Friday, December 18, 2020 8:29 AM
To: Brandon Pierick <Brandon.Pierick@countymaterials.com>
Subject: Verona - Concrete Elliptical Endwall
Hey Brandon,
Looking to get a price for a 34x53 Elliptical – Belled Endwall along with (6) ties. We removed some storm and the City
may have a us put a new one on instead of trying to salvage the old one.
Thanks,
Tom Schneider
Project Manager/Estimator
620 Corporate Drive
Jordan, MN 55352
Ph: 952-368-9200
1
Fax: 952-368-9311
Cell: 612-559-9351
Toms@Mingerconst.com
Equal Opportunity Employer
Visit our website at: www.mingerconstruction.com
2
Aaron McFarlin
From: Aaron McFarlin
Sent: Wednesday, January 13, 2021 5:41 PM
To: Tom Schneider
Subject: RE: [EXTERNAL] Verona Eastside - Dec Pay App
Hi Tom,
Following conversations with Theran, we will plan to pay the requested re-mobilization fee/price noted below. Let me
know if you have any questions.
Thanks,
Aaron
Aaron McFarlin, P.E.
Construction Engineer
City of Verona
Department of Public Works
(608) 333-9948 (Cell Phone)
(608) 497-2082 (Direct)
aaron.mcfarlin@ci.verona.wi.us
From: Tom Schneider [mailto:toms@mingerconst.com]
Sent: Tuesday, January 12, 2021 1:51 PM
To: Aaron McFarlin
Subject: RE: [EXTERNAL] Verona Eastside - Dec Pay App
Hey Aaron,
To clean it all up in one email, Homer is requesting the following for Re-Mobilization to site:
5 land clearing machines @ $3000/each – $1500 each to MOB in and $1500 each to demobilize. This includes fuel,
heavy equipment move permits, low boy driver pay, etc.
For a Total of $15,000.00
Here is what equipment They will have on site:
• Tigercat M26 Mulcher
• Kamatsu 445 Fellerbuncher
• John Deere Tree Skidder
• Morbark Whole Tree Chipper
• Rayco Track Stump Grinder
• Circo 8500 Log Loader
Let me know if there are any further questions.
Thanks,
Tom Schneider
1
Project Manager/Estimator
620 Corporate Drive
Jordan, MN 55352
Ph: 952-368-9200
Fax: 952-368-9311
Cell: 612-559-9351
Toms@Mingerconst.com
Equal Opportunity Employer
Visit our website at: www.mingerconstruction.com
From: Aaron McFarlin <aaron.mcfarlin@ci.verona.wi.us>
Sent: Tuesday, January 12, 2021 12:39 PM
To: Tom Schneider <toms@mingerconst.com>
Subject: RE: [EXTERNAL] Verona Eastside - Dec Pay App
Hey Tom – Could you also have Homer provide a list of equipment to go along with this breakdown.
Thanks, Aaron
Aaron McFarlin, P.E.
Construction Engineer
City of Verona
Department of Public Works
(608) 333-9948 (Cell Phone)
(608) 497-2082 (Direct)
aaron.mcfarlin@ci.verona.wi.us
From: Tom Schneider [mailto:toms@mingerconst.com]
Sent: Tuesday, January 12, 2021 10:47 AM
To: Aaron McFarlin
Subject: FW: [EXTERNAL] Verona Eastside - Dec Pay App
Aaron,
Please see below for a breakdown from Homer on their remobilization charge.
Let me know the City’s thoughts.
Thanks,
Tom Schneider
Project Manager/Estimator
620 Corporate Drive
Jordan, MN 55352
2
Ph: 952-368-9200
Fax: 952-368-9311
Cell: 612-559-9351
Toms@Mingerconst.com
Equal Opportunity Employer
Visit our website at: www.mingerconstruction.com
From: Valerie Wunderlich <ValerieWunderlich@homertree.com>
Sent: Tuesday, January 12, 2021 9:43 AM
To: Tom Schneider <toms@mingerconst.com>
Cc: Aaron Hoefs <AaronH@mingerconst.com>; Valerie Wunderlich <ValerieWunderlich@homertree.com>
Subject: RE: [EXTERNAL] Verona Eastside - Dec Pay App
Hi Tom –
Sorry for the delay on the breakdown. Here you go:
5 land clearing machines @ $3000/each – $1500 each to MOB in and $1500 each to demobilize. This includes fuel,
heavy equipment move permits, low boy driver pay, etc.
Let me know if this works for you!
Valerie Wunderlich
Homer Tree Service, Inc.
Land Clearing Division
16464 W. 143rd St.
Lockport, IL 60441
815-512-7017 Direct
815-838-6027 Fax
valerie@homertree.com
From: Tom Schneider <toms@mingerconst.com>
Sent: Tuesday, January 12, 2021 8:19 AM
To: Valerie Wunderlich <ValerieWunderlich@homertree.com>
Cc: Aaron Hoefs <AaronH@mingerconst.com>
Subject: RE: [EXTERNAL] Verona Eastside - Dec Pay App
Valerie,
Attached I have revised your December Pay App to match what the City had approved prior to our conference call last
week, pay app had to be submitted to council prior to our meeting.. Items in yellow will be paid to full or our agreed
upon quantities on this month’s pay app.
Where do we stand with the re-mobilization charge and getting that broken down per my previous email? We got the
easement approved here this morning and need to get this resolved so we can get you guys scheduled to be back onsite.
Thanks,
Tom Schneider
Project Manager/Estimator
3
620 Corporate Drive
Jordan, MN 55352
Ph: 952-368-9200
Fax: 952-368-9311
Cell: 612-559-9351
Toms@Mingerconst.com
Equal Opportunity Employer
Visit our website at: www.mingerconstruction.com
From: Tom Schneider
Sent: Friday, January 8, 2021 10:57 AM
To: 'Valerie Wunderlich' <ValerieWunderlich@homertree.com>
Subject: RE: [EXTERNAL] Verona Eastside - Dec Pay App
Good Morning Valerie,
My apologies, I am just getting to review this now and will get back to you shortly. In regards to the remobilization price
we have to provide the city with a Lump Sum breakdown per the attached contract specifications, they will not sign off
on anything until they receive that.
I’ll get back to you on the Dec Pay App here soon, let me know if you have any questions.
Thanks,
Tom Schneider
Project Manager/Estimator
620 Corporate Drive
Jordan, MN 55352
Ph: 952-368-9200
Fax: 952-368-9311
Cell: 612-559-9351
Toms@Mingerconst.com
Equal Opportunity Employer
Visit our website at: www.mingerconstruction.com
From: Valerie Wunderlich <ValerieWunderlich@homertree.com>
Sent: Thursday, January 7, 2021 5:06 PM
To: Tom Schneider <toms@mingerconst.com>
Subject: [EXTERNAL] Verona Eastside - Dec Pay App
Hi Tom!
Thanks for all of your help. Let me know if this looks OK to you!
4
Valerie Wunderlich
Homer Tree Service, Inc.
Land Clearing Division
16464 W. 143rd St.
Lockport, IL 60441
815-512-7017 Direct
815-838-6027 Fax
valerie@homertree.com
5
R-21-007
CITY OF VERONA
RESOLUTION NO. R-21-007
A RESOULTION ACCEPTING PUBLIC IMPROVEMENTS ADJACENT TO
VERONA AREA HIGH SCHOOL
WHEREAS, the Common Council approved a development agreement for the public improvements at
the Verona Area High School that was dated May 7, 2018 and recorded under document 5414123 on
June 5, 2018.
WHEREAS, the contractor for the public improvements project adjacent to the Verona Area High School
has substantially completed the work as of September 24, 2020; and
WHEREAS, the Public Works Department has reviewed the status of the public improvements and
recommends the City of Verona accept the newly constructed portions of the listed streets and/or
intersections below and the associated water main and storm water infrastructure; and
Public Improvement locations:
1. Stewart’s Woods Road (and bridge)
2. Wildcat Way (and bridge)
3. W. Verona Avenue (between West End Circle and Nine Mound)
4. Westridge Parkway sidewalk
5. S. Nine Mound (between W. Verona Avenue and Stewart’s Woods Road)
6. West End Circle (between Wall Street and Wildcat Way)
7. Wall Street
8. Intersection improvements, traffic signals and lighting at intersection of W. Verona Avenue
and West End Circle
9. Intersection improvements, traffic signals and lighting at intersection of W. Verona Avenue
and Nine Mound Road
10. Intersection improvements at intersection of S. Nine Mound Road and Legion Street
11. Intersection improvements at intersection of S. Nine Mound Road and Paoli Street
WHEREAS, the Public Works Committee met on February 22, 2021 to review the recommendation to
accept these public improvements.
Page 1 / 2
R-21-007
NOW THEREFORE BE IT RESOLVED, that the Common Council of the City of Verona, Dane County,
Wisconsin, hereby accept the public improvements constructed as part of the Verona Area High School
public improvement project.
Passed, signed and dated this _______________ day of _________________, 2021.
CITY OF VERONA
_______________________________
Luke Diaz, Mayor
_______________________________
Kayla Martin, Deputy City Clerk
Page 2 / 2
R-21-007
CITY OF VERONA
RESOLUTION NO. R-21-007
A RESOULTION ACCEPTING PUBLIC IMPROVEMENTS ADJACENT TO
VERONA AREA HIGH SCHOOL
WHEREAS, the Common Council approved a development agreement for the public improvements at
the Verona Area High School that was dated May 7, 2018 and recorded under document 5414123 on
June 5, 2018.
WHEREAS, the contractor for the public improvements project adjacent to the Verona Area High School
has substantially completed the work as of September 24, 2020; and
WHEREAS, the Public Works Department has reviewed the status of the public improvements and
recommends the City of Verona accept the newly constructed portions of the listed streets and/or
intersections below and the associated water main and storm water infrastructure; and
Public Improvement locations:
1. Stewart’s Woods Road (and bridge)
2. Wildcat Way (and bridge)
3. W. Verona Avenue (between West End Circle and Nine Mound)
4. Westridge Parkway sidewalk
5. S. Nine Mound (between W. Verona Avenue and Stewart’s Woods Road)
6. West End Circle (between Wall Street and Wildcat Way)
7. Wall Street
8. Intersection improvements, traffic signals and lighting at intersection of W. Verona Avenue
and West End Circle
9. Intersection improvements, traffic signals and lighting at intersection of W. Verona Avenue
and Nine Mound Road
10. Intersection improvements at intersection of S. Nine Mound Road and Legion Street
11. Intersection improvements at intersection of S. Nine Mound Road and Paoli Street
WHEREAS, the Public Works Committee met on February 22, 2021 to review the recommendation to
accept these public improvements.
Page 1 / 2
R-21-007
NOW THEREFORE BE IT RESOLVED, that the Common Council of the City of Verona, Dane County,
Wisconsin, hereby accept the public improvements constructed as part of the Verona Area High School
public improvement project.
Passed, signed and dated this _______________ day of _________________, 2021.
CITY OF VERONA
_______________________________
Luke Diaz, Mayor
_______________________________
Kayla Martin, Deputy City Clerk
Page 2 / 2
Get email alerts for Verona
A daily email when new agendas and minutes are posted.