1. The meeting was called to order by Mr. Touchett at 5:02pm.
2. Roll Call: Present: Evan Touchett, Charlie Ryan, Chad Kemp. Also present: Theran Jacobson, Director of
Public Works; Carla Fischer, City Engineer, AECOM. Note: This was a remote meeting via Zoom and
phone conference, instructions on how to join were included with the posted agenda.
3. MOVED by Touchett, seconded by Kemp, to approve the minutes of the April 12, 2021 meeting of the
Public Works/Sewer and Water Committee. Motion carried 3-0.
4. MOVED by Touchett, seconded by Ryan, to recommend approval of Ordinance No. 21-981 relating to
Water Utility Rates. Motion carried 3-0.
5. MOVED by Touchett, seconded by Kemp, to recommend approval of change order no. 3 for Project ID
20018-108 Eastside Interceptor Gravity Sewer Replacement, in an amount not to exceed $3,808.00.
Motion carried 3-0.
6. MOVED by Touchett, seconded by Ryan, to recommend approval of professional services agreement
with JT Engineering for construction engineering/inspection services at the Woods at Cathedral Point
Phase 2 project, pending legal and City administration review. Motion carried 3-0.
7. DISCUSSION regarding refuse and recycling scope of services to be included in contract renewal.
Jacobson outlined that the City currently has weekly bulk waste pick-up included in standard service,
and bi-weekly recycling. Kemp said he supports keeping bulk waste included in standard service, and
not “going backwards”. Touchett commented that there may be a lot of people in the city who don’t
use the bulk waste pick-up at all. Touchett also said that he doesn’t support a weekly (as opposed to
bi-weekly) recycling pick-up. Jacobson stated that most surrounding communities have a fee-based
bulk waste pick-up. Touchett wondered at the added cost of having weekly bulk waste pick-up
included in standard service, and wondered whether fee-based might be a better option to keep
property taxes lower.
8. DISCUSSION regarding Project ID 2018-108 Eastside Interceptor Gravity Sanitary Sewer Replacement.
Jacobson stated that restoration is commencing, with seed placed in the upcoming weeks between
Bruce St and Cty Hwy M, and then through the horseshoes south of Melody Cr. Pipeline installation is
commencing east of the Lincoln Street Bridge and the bridge is currently closed. No action taken.
9. MOVED by Touchett, seconded by Kemp adjourn at 5:32pm. Motion carried 3-0.
Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes
are based on the notes of the recorder and are subject to change at a subsequent meeting.
Agenda
CITY OF VERONA
PUBLIC WORKS/SEWER & WATER COMMITTEE AGENDA
MONDAY, MAY 10, 2021
5:00 P.M.
VERONA, WI 53593
Due to the COVID-19 pandemic, the Verona Public Works/Sewer & Water Committee will
hold its meeting as a virtual meeting. The Verona Public Works/Sewer & Water Committee
will not meet at City Hall, 111 Lincoln Street. Members of the Verona Public Works/Sewer &
Water Committee and Staff will join the meeting by using Zoom Webinar, as described
immediately below.
Members of the public can join the meeting using Zoom Webinar via a computer, tablet, or
smartphone, or by calling into the meeting using phones, as described immediately below.
Join the meeting via computer, tablet, or smart phone:
https://zoom.us/j/97229466688
Webinar ID: 972 2946 6688
Join the meeting via phone by dialing:
301-715-8592
Webinar ID: 972 2946 6688
Agenda Items
1. Call to order.
2. Roll call.
3. Approval of the minutes of the April 12, 2021 meeting of the Public Works/Sewer and Water
Committee.
4. Discussion and action regarding Ordinance No. 21-981 Relating to Water Utility Water Rates.
5. Discussion and action regarding change order no. 3 for Project ID 2018-108 Eastside Interceptor
Gravity Sanitary Sewer Replacement.
6. Discussion and action regarding professional services agreement with JT Engineering for construction
engineering / inspection services at the Woods at Cathedral Point Phase 2 project.
7. Discussion regarding refuse and recycling scope of services to be included in the contract renewal.
8. Discussion and action regarding Project ID 2018-108 Eastside Interceptor Gravity Sanitary Sewer
Replacement.
9. Adjourn.
Evan Touchett
Chairperson
Notice is hereby given that a majority of the City Council may be present at the meeting of the Public Works/Sewer &
Water Committee to gather information about a subject over which they have decision-making responsibility.
POSTED: Verona City Hall
Miller’s Market
ALL AGENDAS ARE POSTED ON THE CITY’S WEBSITE AT www.ci.verona.wi.us
IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMMODATION TO
ACCESS THE MEETINGS, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE
MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST.
CITY OF VERONA
MINUTES
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, APRIL 12, 2021
1. The meeting was called to order by Mr. Touchett at 5:01pm.
2. Roll Call: Present: Evan Touchett, Charlie Ryan. Chad Kemp arrived at 5:13pm. Also present: Theran
Jacobson, Director of Public Works; Carla Fischer, City Engineer, AECOM. Note: This was a remote
meeting via Zoom and phone conference, instructions on how to join were included with the posted
agenda.
3. MOVED by Touchett, seconded by Ryan, to approve the minutes of the March 8, 2021 meeting of the
Public Works/Sewer and Water Committee. Motion carried 2-0.
4. MOVED by Touchett, seconded by Ryan, to submit the Municipal Separate Storm Sewer System (MS4)
2020 annual report to WI DNR. Motion carried 2-0.
5. MOVED by Touchett, seconded by Ryan, to recommend approval of professional services agreement
with AECOM for Project ID 2021-107, 2021 Storm Water Services, in an amount not to exceed
$17,835.00. Motion carried 2-0.
6. MOVED by Touchett, seconded by Ryan, to recommend approval of professional services agreement
with AECOM for Project ID 2018-114, Lincoln Street Storm Water Management Facility, in an amount
not to exceed $28,690.00. Motion carried 2-0.
7. MOVED by Touchett, seconded by Kemp, to recommend approval of amendment no. 2 with Brown
and Caldwell for Project ID 2018-114, Lincoln Street Storm Water Management Facility, in an amount
not to exceed $46,993.00, which brings project total to an amount not to exceed of $191,263.00.
Motion carried 3-0.
8. MOVED by Touchett, seconded by Ryan, to recommend approval of Storm Water Maintenance
Agreement with Epic Systems Corporation. Motion carried 3-0.
9. DISCUSSION of Project 2018-108, Eastside Interceptor Gravity Sanitary Sewer Replacement.
Jacobson provided a project update: both pipelines are installed through the horseshoe of Badger Mill
Creek just south of Melody Cir. They are currently east of there, progressing north towards the Lincoln
Street Bridge, between M and the Lincoln Street Bridge. The diversion channel that was south of
Melody Cir to divert Badger Mill Creek temporarily for construction is mostly diverted back to the
creek’s original location. They were able to move the force main a handful of feet to the west under
the Lincoln St Bridge after receiving some new in-field data.
Touchett mentioned the mayor was updated about concerns some citizens had about a paved path,
and that the mayor would be willing to consider it in council if it was advocated by an alderperson,
but reiterated that this committee was still in favor of a paved path.
10. MOVED by Touchett, seconded by Ryan adjourn at 5:26pm. Motion carried 3-0.
Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes
are based on the notes of the recorder and are subject to change at a subsequent meeting.
Meeting Date: May 10, 2021
PW/S&W Committee Memo
Public Works/Sewer & Water Committee
Listed below is an explanation of the items on the Public Works/Sewer & Water Committee
agenda.
Item (4) Ordinance No. 21-981 Relating to Water Utility Water Rates.
City attorney and City staff have prepared the ordinance to update the language based upon
the last tariff that was approved by the Public Service Commission. Ultimately, the water tariff
provides the governing language for the water rates and rules. The past ordinances copied the
tariff so the same language was in two places. This ordinance references the water tariff
instead of copying it. This ensures there are no inconsistencies in the language. This is common
practice as other communities have modified their ordinances in the same manner.
There are no changes to water rates due to this ordinance.
The current utility rates are located on the city website
at https://www.ci.verona.wi.us/752/Current-Utility-Rates
Item (5) Change order no. 3 for Project ID 2018-108 Eastside Interceptor Replacement.
Change order no. 3 for the eastside interceptor project is for addition work required as part of
Project B which is Dane County facilitated and financed project components.
This change order has no financial impact to the City or MMSD.
The change order is to add additional bid items to Dane County work zone:
• Temporary seeding and temporary mulching
The contract notes are as follows:
• Contract award value = $7,761,804.60
• Previous change orders = $6,305.00 (add)
• Change order No. 3 = $3,808.00 (add)
• Contract value after incorporating this change order = $7,771,917.60
Staff recommends approval of change order no. 3.
Item (6) Professional services agreement with JT Engineering for construction engineering /
inspection services at the Woods at Cathedral Point Phase 2 project.
Page 1 / 2
Meeting Date: May 10, 2021
PW/S&W Committee Memo
This agreement is for construction engineering / inspection services at “Woods at Cathedral
Point” for the phase 2 public improvements. JT Engineering is also performing the construction
engineering / inspection services for the phase 1 work.
Public Works staff is recommending that the contract with JT Engineering be approved.
This is a pass-through cost to the developer.
The contract shall not exceed $64,852.50. This agreement shall be contingent upon legal
counsel review of the contract language and approval of the Developer Agreement for Phase 2.
Item (7) Refuse and recycling scope of services to be included in the contract renewal.
City staff is drafting the contact and scope for renewing the contracted refuse and recycling
collection. Verona currently has a unique contract with expanded services available for
residences as compared to other communities of similar size. Staff will provide an overview of
the services and appreciates any feedback from the committee.
Below are timelines staff is targeting for certain tasks of the contract renewal, please note the
current contract expires on 12/31/2021.
6/4/2021 - Finalize contract and scope
7/9/2021 – Quotes back from contractors
7/23/2021 – Staff review quotes from contractors and meeting with Administration
7/26/2021 – Meeting with PW S&W Committee as necessary
9/24/2021 – Finalize contract with Contractor
10/11/2021 – PW S&W Committee to recommend council to approve contract
Item (8) Project ID 2018-108 Eastside Interceptor Gravity Sanitary Sewer Replacement.
Staff will provide a construction update on the Eastside Interceptor Replacement Project.
Page 2 / 2
ORDINANCE NO. 21-979
AN ORDINANCE AMENDING TITLE 9, CHAPTER 1, ARTICLE A
OF THE CODE OF ORDINANCES, CITY OF VERONA,
RELATING TO WATER UTILITY WATER RATES
The Common Council of the City of Verona, Dane County, Wisconsin, do ordain that
Title 9, Chapter 1, Article A of the Code of Ordinances, City of Verona, Wisconsin is hereby
repealed and recreated to read as follows:
ARTICLE A: RATES
Section 9-1-1 – Rates.
The rates for water service provided to customers of the water utility shall be as set forth
in the tariffs filed and approved from time to time by the state public service commission, and
the rates shall be paid as and when and in the manner provided for in such filings.
The foregoing ordinance was duly adopted by the Common Council of the City of Verona
at a meeting held on __________, 2021.
CITY OF VERONA
____________________________
Luke Diaz, Mayor
(seal)
____________________________
Kayla Martin, Deputy City Clerk
ENACTED: ___________________
PUBLISHED: ___________________
1
CHANGE ORDER NO. 3
Owner City of Verona Date 03/31/2021
Project East Side Interceptor/MMSD Pump Station 17 Force Main Relief Owner’s Contract No. 2018-108
Contractor Minger Construction Companies, Inc. Date of Contract Start October 13, 2020
You are directed to make the following changes in the Contract Documents.
These changes will be incorporated into the Project B portion of the Contract, and will be paid by Dane County.
Adding Items
Item Number Description Unit Quantity Unit Price Amount
1630.0190 (CO.03.01) Temporary Seeding (DC) SY 5,600 $ 0.10 $ 560.00
1627.0300 (CO.03.02) Temporary Mulching (DC) SY 5,600 $ 0.58 $ 3,248.00
Total Net Change = $3,808.00
Reason for Change Order:
Added Items:
1630.0190 (CO.03.01) = Added item to temporarily restore the haul route for Clearing and Grubbing and Invasive Species Removal
operations. Operations were performed on Project B (Dane County Creek Restoration) and the haul route spanned from the Project
A east limits to the Badger Prairie Gardens off of Old CTH PB, on the south side of Badger Mill Creek. Temporary restorations
items were not included in the original contract.
1627.0300 (CO.03.02) = See above discussion.
CONTRACT PRICE CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original: $7,761,804.60 Original Completion Date: 8/27/2021 9/17/2021
Previous C.O.s (ADD/DEDUCT): $6,305.00 Previous C.O.s (ADD/DEDUCT): N/A N/A
This C.O. (ADD/DEDUCT): $3,808.00 This C.O. (ADD/DEDUCT): N/A N/A
Contract Price with all REVISED: N/A N/A
approved Change Orders: $7,771,917.60
Revised Completion Date: N/A N/A
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)
ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above,
there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
Project Forms Page 1 / 2
RECOMMENDED: By Theran Jacobson at 11:02 am, May 05, 2021
By:
ENGINEER (Theran Jacobson, P.E.) Date
ACCEPTED:
By:
OWNER (Luke Diaz, Mayor) Date
ACCEPTED:
By: Not Applicable for Project B
MADISON METROPOLITAN SEWAGE DISTRICT (Bruce Borelli, P.E.) Date
ACCEPTED:
By:
DANE COUNTY (Sara Rigelman) Date
ACCEPTED:
By:
4.2.21
CONTRACTOR (Minger Construction Companies, Inc.) Date
City of Verona, WI
___2018-108 /_________3_______
Project Change
Number Order No.
\\VPWDC1\SHARED\PROJECTS\2018-108_E. SIDE INTERCEPTOR COLLECTION SYSTEM\CONSTRUCTION (PRE-CON & AFTER)\CHANGE
ORDERS\CCO #3\2018-108_CCO #3_FINAL.DOCX
Project Forms Page 2 / 2
Aaron McFarlin
From: Nelson, Theresa <Nelson.Theresa@countyofdane.com>
Sent: Thursday, March 11, 2021 8:06 AM
To: Aaron McFarlin
Cc: Rigelman, Sara
Subject: RE: Badger Mill Creek Erosion Control
Thanks Aaron – that looks fine to us.
Theresa M. Nelson, P.E.
Stormwater Engineer, Water Resource Engineering Division
5201 Fen Oak Drive #208, Madison, WI 53718
Cell: (608) 577-4879 │ website │ pronouns: she/hers
From: Aaron McFarlin <aaron.mcfarlin@ci.verona.wi.us>
Sent: Wednesday, March 10, 2021 4:39 PM
To: Nelson, Theresa <Nelson.Theresa@countyofdane.com>
Cc: Rigelman, Sara <Rigelman@countyofdane.com>
Subject: RE: Badger Mill Creek Erosion Control
Hey Theresa,
Hartland was on site yesterday (3/9) and completed the temp seeding and mulching. Attached are my measurements
and the costs. The quantity I measured matched pretty close to Hartlands. Wanted to run this past you to see if you
had any questions or had any issues. If all good, I will go ahead and put this into a change order.
Thanks,
Aaron
Aaron McFarlin, P.E.
Construction Engineer
City of Verona
Department of Public Works
(608) 333-9948 (Cell Phone)
(608) 497-2082 (Direct)
aaron.mcfarlin@ci.verona.wi.us
From: Nelson, Theresa [mailto:Nelson.Theresa@countyofdane.com]
Sent: Monday, March 8, 2021 8:22 AM
To: Aaron McFarlin
Cc: Rigelman, Sara
Subject: RE: Badger Mill Creek Erosion Control
Hi Aaron,
We would like to go ahead with temp seed and mulch just on the south side of the creek – the north side really wasn’t
very disturbed.
1
Let me know if you need anything else from us to get this done – thanks!
Theresa M. Nelson, P.E.
Stormwater Engineer, Water Resource Engineering Division
5201 Fen Oak Drive #208, Madison, WI 53718
Cell: (608) 577-4879 │ website │ pronouns: she/hers
From: Aaron McFarlin <aaron.mcfarlin@ci.verona.wi.us>
Sent: Friday, March 5, 2021 4:55 PM
To: Nelson, Theresa <Nelson.Theresa@countyofdane.com>
Subject: FW: Badger Mill Creek Erosion Control
Theresa – not sure if you got this the 1st time so resending
Aaron McFarlin, P.E.
Construction Engineer
City of Verona
Department of Public Works
(608) 333-9948 (Cell Phone)
(608) 497-2082 (Direct)
aaron.mcfarlin@ci.verona.wi.us
From: Aaron McFarlin
Sent: Friday, March 5, 2021 4:51 PM
To: Nelson, Theresa
Cc: Theran Jacobson; Cc: Rigelman, Sara; Balousek, Jeremy
Subject: FW: Badger Mill Creek Erosion Control
Hi Theresa,
See below for Minger’s pricing to complete temp stabilization along the haul routes. Also attached is the marked up
plan sheet I sent Minger for pricing. Talking to Tom (Minger), their sub would be able to come out and get this
completed next week. Let me know what you think and have a good weekend!
Thanks, Aaron
Aaron McFarlin, P.E.
Construction Engineer
City of Verona
Department of Public Works
(608) 333-9948 (Cell Phone)
(608) 497-2082 (Direct)
aaron.mcfarlin@ci.verona.wi.us
From: Tom Schneider [mailto:toms@mingerconst.com]
Sent: Friday, March 5, 2021 4:26 PM
To: Aaron McFarlin
Subject: RE: Badger Mill Creek Erosion Control
2
Hey Aaron,
Following up on our phone call pricing as requested is as follows for Temporary Restoration:
1. Mulching - $0.58/ SY Installed Estimated Total = $4,645.22
2. Temp Seeding - $0.10/SY Installed
3. Temp Seeding and Mulching - $0.68/SY Installed =$5,446.12
Like we discussed we don’t feel that option #2 with just installing Seed qualifies as stabilization. Please note none of
these options include power raking the soil which would be done only for final seeding.
Thanks,
Tom Schneider
Project Manager/Estimator
620 Corporate Drive
Jordan, MN 55352
Ph: 952-368-9200
Fax: 952-368-9311
Cell: 612-559-9351
Toms@Mingerconst.com
Equal Opportunity Employer
Visit our website at: www.mingerconstruction.com
From: Aaron McFarlin <aaron.mcfarlin@ci.verona.wi.us>
Sent: Thursday, March 4, 2021 2:18 PM
To: Aaron Hoefs <AaronH@mingerconst.com>; Tom Schneider <toms@mingerconst.com>; Jason Durham
<JasonD@mingerconst.com>
Subject: [EXTERNAL] RE: Badger Mill Creek Erosion Control
Hey Aaron – See attached for a marked up area of Temp seeding. It looks like the average width is around 20-ft ish,
some spots may be wider some may be smaller. In general, it is mainly where the equipment tracked back and
forth. Just to clarify the prices – price for just seed, just mulch, and prices for doing both, if you’re able. Thanks, Aaron
Aaron McFarlin, P.E.
Construction Engineer
City of Verona
Department of Public Works
(608) 333-9948 (Cell Phone)
(608) 497-2082 (Direct)
aaron.mcfarlin@ci.verona.wi.us
From: Aaron Hoefs [mailto:AaronH@mingerconst.com]
Sent: Thursday, March 4, 2021 1:45 PM
3
To: Aaron McFarlin; Tom Schneider; Jason Durham
Cc: Aaron Hoefs
Subject: RE: Badger Mill Creek Erosion Control
Hi Aaron
Any chance you can send us a marked up plan sheet showing the limits of the temporary seeding areas? We will send to
our subcontractor (Hartford Landscapes), and have them send us some pricing
Thanks
Aaron Hoefs
Estimator / Project Manager
620 Corporate Drive
Jordan, MN 55352
Ph: 952-368-9200
Fax: 952-368-9311
Cell: 612-418-7363
aaronh@mingerconst.com
Equal Opportunity Employer
Visit our website at: www.mingerconstruction.com
From: Aaron McFarlin <aaron.mcfarlin@ci.verona.wi.us>
Sent: Thursday, March 4, 2021 1:19 PM
To: Tom Schneider <toms@mingerconst.com>; Aaron Hoefs <AaronH@mingerconst.com>; Jason Durham
<JasonD@mingerconst.com>
Subject: [EXTERNAL] FW: Badger Mill Creek Erosion Control
Tom/Aaron/Jason – See below for a request from Dane County to temp seed and mulch the haul route area that Homer
used during clearing, grubbing, and invasive species removal. This is the area from the sewer project limits essentially to
the gardens. It be to just temp stabilize these areas that were disturbed until the restoration work begins. If you are
able, can you provide a price for each item. Let me know if you have any questions, or need any more information.
Thanks, Aaron
Aaron McFarlin, P.E.
Construction Engineer
City of Verona
Department of Public Works
(608) 333-9948 (Cell Phone)
(608) 497-2082 (Direct)
aaron.mcfarlin@ci.verona.wi.us
From: Nelson, Theresa [mailto:Nelson.Theresa@countyofdane.com]
Sent: Thursday, March 4, 2021 11:17 AM
To: Aaron McFarlin
4
Cc: Rigelman, Sara; Balousek, Jeremy; Theran Jacobson
Subject: RE: Badger Mill Creek Erosion Control
Hi Aaron,
Thanks for the update. Please ask Minger for price for mulching and for temp seeding. It appears that the specs Verona
has for Mulching (1627.02) and Temp Seeding (1630.0190.S) would be appropriate for this work. Once we know cost we
can decide if we want to do one or both.
Also, when we were out on Tuesday, it looked like the access at the community gardens had been used recently (snow
plowed, tracks) – was this for something with the sewer project?
Thanks,
Theresa M. Nelson, P.E.
Stormwater Engineer, Water Resource Engineering Division
5201 Fen Oak Drive #208, Madison, WI 53718
Cell: (608) 577-4879 │ website │ pronouns: she/hers
From: Aaron McFarlin <aaron.mcfarlin@ci.verona.wi.us>
Sent: Wednesday, March 3, 2021 5:36 PM
To: Nelson, Theresa <Nelson.Theresa@countyofdane.com>; Theran Jacobson <theran.jacobson@ci.verona.wi.us>
Cc: Rigelman, Sara <Rigelman@countyofdane.com>; Balousek, Jeremy <balousek@countyofdane.com>
Subject: RE: Badger Mill Creek Erosion Control
CAUTION: External Email - Beware of unknown links and attachments. Contact Helpdesk at 266-
4440 if unsure
Hi Theresa,
Thanks for letting me know about these erosion issues.
Regarding Item 1 – Minger was planning to address this tomorrow. They will be putting in a tracking pad off of Arbor
Vitae and while they are in the area they are planning to stabilize that crossing’s slopes as well as place some perimeter
protection.
Regarding Item 2 – I did discuss this with Minger this afternoon. They can provide a price for mulching and/or temp
seeding to be added per change order to Contract B. They did mention that the bid price for mulching (item 103) also
was not for temp stabilization, so not sure if they would be willing to place at this bid price. My thoughts is that temp
seeding would be the easiest and cheapest route to temp stabilize. It doesn’t sound like they are planning to do any of
the Dane County work for a few months yet (focusing on the sewer portion for now). Let me know if you want me to ask
for a price for temp seed, temp mulch, or both to be added to Contract B, or if you have any other thoughts.
Thanks,
Aaron
Aaron McFarlin, P.E.
Construction Engineer
City of Verona
5
Department of Public Works
(608) 333-9948 (Cell Phone)
(608) 497-2082 (Direct)
aaron.mcfarlin@ci.verona.wi.us
From: Nelson, Theresa [mailto:Nelson.Theresa@countyofdane.com]
Sent: Wednesday, March 3, 2021 3:33 PM
To: Theran Jacobson; Aaron McFarlin
Cc: Rigelman, Sara; Balousek, Jeremy
Subject: Badger Mill Creek Erosion Control
Hi Theran and Aaron,
Sara and I walked some of the project site yesterday and noticed a couple erosion control issues:
1) The temporary crossing put in near the ice age trail bridge needs erosion controls along the perimeter – see
attached photo. As it is, soil is free to wash into the side channel.
2) Also, any of the haul routes that were disturbed last fall that won’t be used right away this spring should be
temporarily stabilized (straw, mulch, etc.). Let us know what you need from us for getting this done as we did
not include the quantities for the temporary stabilization in our original quantities.
With the continued melting and chance of rain next week, now is the time to get things taken care of. Please let me
know if you’d like to discuss.
Thanks,
Theresa M. Nelson, P.E.
Stormwater Engineer, Water Resource Engineering Division
5201 Fen Oak Drive #208, Madison, WI 53718
Cell: (608) 577-4879 │ website │ pronouns: she/hers
6
CONTRACT AGREEMENT
BETWEEN
JT ENGINEERING, INC.
AND
THE CITY OF VERONA
This Contract Agreement is made and entered into this 27th day of April 2021 by and between THE CITY OF VERONA,
hereinafter referred to as the CITY, and JT Engineering, Inc. 6325 Odana Road, Suite 2, Madison, Wisconsin 53719,
hereinafter referred to as the CONSULTANT.
The CONSULTANT acknowledges by endorsement of this Contract Agreement that:
(a) CONSULTANT has the expertise and has a thorough knowledge of the professional services required to complete the
proposed work and is qualified to render such professional services
(b) CONSULTANT shall comply with all applicable laws, regulations, and orders in the performance of the work
(c) the work shall be performed in a manner consistent with that level of care, quality and skill ordinarily exercised by others
performing similar work under similar circumstances.
The parties agree as follows:
CONSULTANT shall furnish Construction Inspection Services to the CITY for the Project as described below.
CONSULTANT shall furnish the Basic Services as outlined in the attached scope of services if contract is executed by May
21, 2021 and shall be completed by May 1, 2022.
For all Basic Services, the CITY agrees to compensate CONSULTANT as follows:
Specific hourly rates, including equipment needed to complete the work and mileage, to be used for hours in which the
CONSULTANT’s employees are directly engaged in performing the work or services required by this contract:
Employee Classification Hourly Rate
Project Engineer I $95.00(1)
Project Engineer II $113.50(1)
Project Manager $120.00
Project Administrator $140.00
Accountant $99.00
(1) Rate includes dedicated GPS unit for use on project.
Compensation for all services provided by the CONSULTANT under the terms of this contract shall not exceed $64,852.50
based on the estimated working schedule attached.
Section I – BASIC SERVICES
1.1 Basic Services
The Basic Services to be performed under this Contract include construction inspection services as identified in the attached
scope of services commentary.
Section II – RESPONSIBILITIES
2.1 CITY’s Responsibilities
2.1.1 Assist and cooperate with the CONSULTANT in completing the work in a timely and effective manner.
2.1.2 Make available to the CONSULTANT drawings, specifications and data which the CONSULTANT considers
pertinent to the CONSULTANT’s responsibilities hereunder, all of which the CONSULTANT may rely upon in
performing services hereunder except as may be specifically provided otherwise in writing.
JT ENGINEERING, INC -1-
2.1.3 Give prompt written notice to the CONSULTANT whenever the CITY observes or otherwise becomes aware of
any development that affects the scope, timing, or performance of services of the CONSULTANT.
Section III – TIME SCHEDULE
3.1 Authorization
Unless otherwise directed by the CITY, the CONSULTANT shall commence the performance of the Basic Services upon
execution of this Contract by both parties which shall constitute Authorization to Proceed.
3.2 Expeditious Performance
The CONSULTANT recognizes that the services under this Contract are to be performed as expeditiously as practical after
Authorization to Proceed. Every reasonable effort will be made to substantially complete the Basic Services within the
period described above.
Section IV – INVOICES AND PAYMENT
4.1 Invoices
Invoices shall be submitted once a month or upon completion of services, whichever occurs earlier, for services provided
under Section 1.
4.2 Payment
4.2.1 The CITY shall pay the CONSULTANT based on the monthly invoices, with total payment not to exceed the total
contract amount.
4.2.2 It is expressly understood and agreed by both parties that the CONSULTANT will be paid by the CITY within 30
days after receipt of the invoice provided by the CONSULTANT. The CITY agrees to process the
CONSULTANTS invoices promptly.
Section V – CHANGES
5.1 Written Authorization
THE CITY or CONSULTANT may, at any time, by written order, make changes in the services or work to be performed
within the general scope of this Subcontract.
5.2 Equitable Adjustment
If such changes cause an increase or decrease in the CONSULTANTS cost of, or time required for, performance of any
services under this Contract, an equitable adjustment shall be made, and this Contract shall be modified in writing
accordingly.
Section VI – DISPUTES
6.1 Resolution Procedure
Except as this Contract otherwise provides, in all claims, counter-claims, disputes, and other matters in question (Dispute)
between the CITY and CONSULTANT arising out of or relating to this Contract or the breach of it, the CITY and
CONSULTANT will negotiate a resolution of the Dispute at a reasonable time and location set by the CITY and
CONSULTANT. Should negotiation be unsuccessful, mediation of the Dispute by a third party shall follow. Mediation shall
be conducted in Dane County, WI, unless the CITY and CONSULTANT agree to another location. CONSULTANT and the
CITY agree that those disputes not settled by mediation will be decided by binding arbitration, unless the CITY or
CONSULTANT elect to have said Dispute resolved in a court of competent jurisdiction.
6.1.1 Negotiation Following written notice of a Dispute, two (2) face-to-face meetings (or less if the Dispute is resolved)
shall be held.
6.1.2 Mediation If negotiation is unsuccessful, a mutually acceptable third party (Facilitator) having expertise in the
subject of the dispute shall be engaged to mediate the Dispute. Should the CITY and CONSULTANT be unable to
reach agreement on a Facilitator, either party may request a Circuit Judge Dane Co., WI to appoint said Facilitator.
The fee and expenses of the Facilitator shall be shared equally by the parties to the Dispute. The parties may present
JT ENGINEERING, INC -2-
evidence and arguments to the Facilitator. Unless the Facilitator and the parties agree otherwise, one (1) face-to-face
meeting shall be held within the sixty (60) day period beginning on the date of the Facilitator’s engagement.
Following the meeting, the Facilitator shall report to the parties whether he believes the Dispute is resolvable
through mediation. At that point the parties shall elect (a) to continue mediation, (b) replace the Facilitator and
continue mediation, or (c) end mediation. If the mediation is ended or otherwise unsuccessful in the resolution of
said Dispute, the Dispute shall be resolved by binding arbitration upon the request of either party or in the
alternative, by judicial adjudication.
6.1.3 Arbitration If the dispute is arbitrated, (a) the arbitration shall be decided in accordance with the current
construction Industry Arbitration Rules of the American Arbitration Association; (b) the demand for arbitration may
not be made more than one (1) year after the date on which the claim in dispute arose; and (c) the arbitration
proceeding may not include, by consolidation or otherwise, any third person. Any decision rendered by the
arbitrator(s) shall be final. Judgment may be entered upon the decision in any court having jurisdiction. The decision
shall not be subject to modification or appeal except to the extent permitted by Sections 10 and 11 of the Federal
Arbitration Act (9 U.S.C. 10, 11).
Section VII – SUSPENSION OF WORK
7.1 Convenience of the CITY
The CITY may order CONSULTANT to suspend, delay, or interrupt all or any part of the CONSULTANTS services for
such period of time as the CITY may determine to be appropriate for the convenience of the CITY.
7.2 Adjustment in Schedule
If the performance of all or any part of the CONSULTANTS services is, for an unreasonable period of time, suspended,
delayed, or interrupted by an act of the CITY, an appropriate extension of time shall be made for any such delay in the
performance of this Contract necessarily caused by such unreasonable suspension, delay, or interruption, and the Contract
modified in writing accordingly.
Section VIII – TERMINATION OF CONTRACT
8.1 Written Notice
It is expressly understood and agreed that the CITY may terminate this Contract at any time by giving the CONSULTANT
10 days written notice in writing either personally at one of the offices of the CONSULTANT or sent by registered mail,
return receipt requested, to the principal office of the CONSULTANT. The CONSULTANT may terminate this Contract
upon 30 days written notice in the event of nonpayment by the CITY of CONSULTANTS’ invoices rendered for a period of
60 days or in the event the CITY otherwise substantially fails to fulfill its obligations under this Contract.
8.2 Adjustment for Services Performed
In the event that this Contract is terminated by either the CITY or the CONSULTANT, the CONSULTANT shall be
compensated for all services performed to the date of termination including reimbursable expenses then due.
Section IX – INSURANCE
9.1 Coverage
Prior to commencing work, the CONSULTANT shall obtain and maintain in effect for the duration of this Contract at its own
expense the insurance with insurance companies licensed in the State where the project is located.
9.2 Minimum Coverage
The minimum required coverage is the following:
9.2.1 Worker’s Compensation and Employer’s Liability Worker’s Compensation and Employer’s Liability in
compliance with the statutory requirements of the State of Wisconsin.
JT ENGINEERING, INC -3-
9.2.2 General Liability Commercial general liability insurance covering operations, completed operations, contractual
agreements, and independent contractors, each with minimum limits of liability on an occurrence basis as set forth
below:
General Aggregate $2,000,000
Each Occurrence $1,000,000
Operations Aggregate $2,000,000
Personal Injury $1,000,000
9.2.3 Professional Liability Liability insurance in an amount of at least $1,000,000 total limit of liability per claim and
aggregate with a maximum deductible amount of $50,000.
Section X – GENERAL PROVISIONS
10.1 Independent
CONSULTANT represents that it is an independent contractor and is not an employee of the CITY.
10.2 Indemnification
CITY hereby agrees to indemnify, pay for defense, and hold CONSULTANT harmless from and against any and all losses,
damages, settlements, costs, charges, or other expenses or liabilities of every kind and character arising out of or relating to
any and all claims, liens, demands, obligations, actions, proceedings, or causes of action of every kind and character relating
to the negligent acts, errors, and/or omissions of the CITY, its employees, agents and third parties who perform any of the
services of CITY hereunder, and anyone else for whose acts the CITY is responsible under this contract.
CONSULTANT hereby agrees to indemnify, pay for defense, and hold the CITY harmless from and against any and all
losses, damages, settlements, costs, charges, or other expenses or liabilities of every kind and character arising out of or
relating to any and all claims, liens, demands, obligations, actions, proceedings, or causes of action of every kind and
character relating to the negligent acts, errors, and/or omissions of CONSULTANT, its employees, agents and third parties
who perform any of the services of CONSULTANT hereunder, and anyone else for whose acts CONSULTANT is
responsible under this contract.
10.3 Interpretation
Interpretation and enforcement of this Contract shall be in accordance with the laws of the State of Wisconsin.
10.4 Notices
Written notices may be delivered in person or by certified mail, or by facsimile, or by courier. All notices shall be effective
upon the date of receipt by the party. Notices shall be delivered or sent to the designated representative of the other party at
the address given on the last page of this Contract. An address may only be changed by written notice.
10.5 Applicable Law
If applicable to this Contract, CONSULTANT will comply with the requirements of:
10.5.1 The Equal Employment Opportunity clause in Section 202 of Executive Order 11246, as amended.
10.5.2 Utilization of Small and Disadvantaged Business Concerns (Public Law 95-507), and
10.5.3 All other federal, state and local laws and regulations or orders issued under such laws.
10.6 Entire Agreement
This Contract, including any schedules, attachments and referenced documents, is the entire agreement between the CITY
and the CONSULTANT. Any prior or contemporaneous agreements, promises, negotiations or representations not expressly
stated herein are of no force and effect. Any changes to this Contract shall be in writing and signed by the CITY and
CONSULTANT.
JT ENGINEERING, INC -4-
10.7 Execution Authority
This Contract is a valid and authorized undertaking of the CITY and CONSULTANT. The representatives of the CITY and
CONSULTANT who have signed below have been authorized to do so. IN WITNESS WHEREOF, the parties hereto have
made and executed this Contract as of the day and year shown on the cover page.
JT Engineering, Inc. City of Verona
6325 Odana Road, Suite 2 111 Lincoln Street
Madison, WI 53719 Verona, WI 53593
By: By:
Doug Sina, PE Luke Diaz, Mayor
President
Date: 4/27/2021 Date
By: By:
Ellen Clark, City Clerk
Date: Date
JT ENGINEERING, INC -5-
SCOPE OF SERVICES COMMENTARY
PROJECT: The Woods at Cathedral Point Phase II
CITY OF VERONA, DANE COUNTY
GENERAL – This is a subdivision development project that will include earthwork, aggregate base course,
installation of sanitary sewer, water main, and storm sewer utilities, ancillary concrete, and HMA paving.
The expected scope of the construction work is assumed to generally follow the plans prepared by
D’Onofrio Kottke and Associates, Inc.
For the estimate of construction engineering costs, the scope is as follows:
A. Inspection – Construction oversight and inspection to verify that the construction complies with
the plans and specifications. Inspection staff will provide a daily report to the City documenting
details about the work that was completed. Inspector’s daily reports will be filed on Microsoft
Teams and shared with the City. Full-time inspection based on a 5-day work week (Monday –
Friday) is anticipated as attached in the Estimated Construction Inspection Schedule.
B. Survey – Verification survey for use in as-built drawings and for the City’s Geographic
Information System. No project staking by JT staff is included, as this is the responsibility of
others. JT will supply a dedicated GPS unit for data collection of underground utilities and as
directed by the City.
C. Project Records – The following project records will be completed and submitted to the City of
Verona at the conclusion of the project:
1. As-built plan set depicting the actual construction of the project and any significant plan
changes
2. Review of shop drawings
3. Materials records and documentation submittals from the contractor
4. Project diaries including project photos
City of Verona Estimated Construction Inspection Schedule
The Woods at Cathedral Point
Project Project Project
Classification Project Engineer Manager Engineer II Administrator Accountant
Hourly Wage $95.00 $120.00 $113.50 $140.00 $99.00
Hours Hours Hours Hours Hours Hours Hours Hours
Week Begin Week End
Number of Weeks Sunday Saturday
4-Apr-21 10-Apr-21
11-Apr-21 17-Apr-21
18-Apr-21 24-Apr-21
25-Apr-21 1-May-21
2-May-21 8-May-21
9-May-21 15-May-21
16-May-21 22-May-21
23-May-21 29-May-21 44 1 1 0.5 0.5
30-May-21 5-Jun-21 40 1
6-Jun-21 12-Jun-21 47 1
13-Jun-21 19-Jun-21 47 1
20-Jun-21 26-Jun-21 47 1
27-Jun-21 3-Jul-21 47 1
4-Jul-21 10-Jul-21 47 1
11-Jul-21 17-Jul-21 47 1
18-Jul-21 24-Jul-21 47 1
25-Jul-21 31-Jul-21 47 1
1-Aug-21 7-Aug-21 40 1
8-Aug-21 14-Aug-21 40 1
15-Aug-21 21-Aug-21 40 1
22-Aug-21 28-Aug-21 40 1
29-Aug-21 4-Sep-21 40 1
5-Sep-21 11-Sep-21
12-Sep-21 18-Sep-21
19-Sep-21 25-Sep-21
26-Sep-21 2-Oct-21 0.5 0.5
3-Oct-21 9-Oct-21
10-Oct-21 16-Oct-21
17-Oct-21 23-Oct-21
24-Oct-21 30-Oct-21
31-Oct-21 6-Nov-21
Totals 660 15 1 1 1 0 0 0
Cost $62,700.00 $1,800.00 $113.50 $140.00 $99.00 $0 $0 $0
Mileage
Meals
Total Estimated Contract Amount $64,852.50