Public Works, Sewer and Water
Regular MeetingVerona, WI · February 14, 2022
Minutes
CITY OF VERONA
MINUTES
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, FEBRUARY 14, 2022
1. The meeting was called to order by Mr. Touchett at 5:17pm.
2. Roll Call: Present: Evan Touchett, Chad Kemp, Mara Helmke. Also present: Theran Jacobson, Director of Public
Works; Jon Bublitz, Utilities Superintendent; David Yearous, Lead Water Operator; Carla Fischer, AECOM, City
Engineer; Angel Gebeau, AECOM, Water Distribution Engineer.
3. MOVED by Touchett, seconded by Kemp, to approve the minutes of the January 24, 2022 meeting of the Public
Works/Sewer and Water Committee. Motion carried 3-0.
4. MOVED by Touchett, seconded by Helmke, to recommend approval of agreement with Municipal Well & Pump
for Well 6 study, in an amount not to exceed $179,620.00. Motion carried 3-0.
Mr. Jacobson provide an overview of well 6 history as follows: well 6 was constructed in 2019-2020 and was on-
line in November of 2020. Testing has showed levels of nitrates from the well increasing but still in compliance
based upon Wisconsin Department of Natural Resource (WDNR) requirements, 10 mg/L. City staff proactively
took Well 6 off-line on October 18, 2021 and coordinated with the WDNR. AECOM and City staff have been
working to obtain information necessary to propose solutions. Modeling studies are ongoing to evaluate other
pumping options (rate and depth) and to determine the vertical and horizontal movement of water in the
aquifer at the well site. The next step to be performed by Municipal Well & Pump is to remove the pump,
perform water quality sampling of the well at various depths, perform a packer test with final water sampling,
and then to re-install the pump. The results of the work by Municipal Well & Pump and AECOM will assist in
proposing solutions for improvements necessary to bring the well back on-line. The contract before you with
Municipal Well & Pump shall not exceed $179,620.00.
Mr. Bublitz stated that all six of our wells are deep wells and that the WDNR has set testing parameters that we
follow which is executed by Mr. Yearous. Mr. Yearous provided the last round of Nitrate test results from
samples collected on February 9, 2022: well 1 – 5.01 mg/L, well 2 – 1.73 mg/L, well 3 – 5.33 mg/L, well 4 – 4.26
mg/L, and well 5 – 1.5 mg/L. Mr. Yearous provided the last well 6 nitrate reading of 9.94 mg/L from the sample
collected on October 15, 2021.
Mr. Touchett asked a series of questions as follows:
1. Have these problems been solved before?
2. What will you find? Do you test at certain levels?
3. What solutions once this testing is done?
Ms. Gebeau (response to 1) stated that nitrates are common in drinking water wells with various levels
throughout the state and there are solutions to mitigate or treat. Mitigation is the most common practice due
to costs and longer-term maintenance with treatment. Ms. Gebeau continued that AECOM has been modeling
the well to determine other flow rates at various depths to determine the theoretical vertical and horizontal
movement of water based upon the geological formations from the well log and USGS data. There are six
layers of formations within in the well according to USGS data, the well is within the upper and middle layers of
the formations.
Ms. Gebeau (response to 2) stated as part of the Municipal Well & Pump work that we will collect samples which
are at various depths in the well to determine if there is a break in the concentration levels at a certain depth
along changes in the formations. The results will help determine where to set the depth for the packer test. The
packer test will isolate the upper level of the well and collect samples in the lower level of the well to verify a
depth where the well will need to be isolated at in the future. Ms. Gebeau illustrated on the white board a cross
section of the bore hole, aquifer function, and packer test.
Ms. Gebeau (response to 3) stated that once we can determine where levels of the nitrates are at a lower
concentration in the well we would have a steel casing pipe installed to that depth and the voids between the
bore hole and the casing pipe sealed. Touchett asked do you install the new casing inside the existing? Ms.
Gebeau responded yes, the existing casing pipe is a 24-inch and a small pipe would be installed, that size will be
determined at a later date.
Mr. Kemp asked how often tests are conducted for nitrates? Mr. Yearous responded that ells 3 and 6 are tested
quarterly and wells 1, 2, 4, and 5 are tested annually.
Mr. Jacobson noted that once the testing is completed the information will be brough back to the committee for
discussion. Mr. Jacobson noted that it is likely that well 6 will be off line through 2022. The regulatory agencies
will need to be brought up to speed and likely other approvals will be needed from the WDNR and potentially
the Public Service Commission.
5. MOVED by Touchett, seconded by Kemp, to recommend approval of project closeout and change order no. 1
for Project 2021-103, Verona Street Rehabilitation Project. Motion carried 3-0.
6. MOVED by Touchett, seconded by Helmke, to recommend awarding contract for Project 2020-116, CTH M/CTH
PB Intersection Expansion Project to Parisi Construction Co, Inc, of Verona, WI, in the amount not to exceed
$1,172,113.59. Motion carried 3-0.
7. MOVED by Touchett, seconded by Helmke, to recommend approval of professional services agreement with JT
Engineering for construction engineering services at Sugar Creek Elementary, in the amount not to exceed
$59,962.50. Motion carried 3-0.
8. MOVED by Touchett, seconded by Kemp, to recommend approval of agreement with Wisconsin Department of
Transportation for design and construction of Project 1204-08-72, USH 18/151 Auxiliary Lane. Motion carried 3-
0.
9. MOVED by Touchett, seconded by Helmke, to recommend approval of professional services agreement with KL
Engineering for construction engineering services for Project 1204-08-72, USH 18/151 Auxiliary Lane, in the
amount not to exceed $410,665.20. Motion carried 3-0.
10. MOVED by Touchett, seconded by Kemp adjourn at 6:01pm. Motion carried 3-0.
Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes are based
on the notes of the recorder and are subject to change at a subsequent meeting.