1. The meeting was called to order by Mr. Touchett at 5:17pm.
2. Roll Call: Present: Evan Touchett, Mara Helmke. Rye Kimmett entered at 5:20pm. Also present: Theran Jacobson,
Director of Public Works; Carla Fischer, City Engineer, AECOM.
3. MOVED by Touchett, seconded by Helmke, to approve the minutes of the December 19, 2022, meeting of the
Public Works/Sewer and Water Committee. Motion carried 2-0.
4. MOVED by Touchett, seconded by Helmke, to recommend approving Revision 1 to Public Works Policy PW-003
– Rain Barrel Rebate. Motion carried 3-0.
5. DISCUSSION regarding 2023-101 Asphaltic Street Project.
Jacobson requests as part of the 2023 rehab project to remove the four (4) islands at the intersection at
Enterprise Drive and Silent Street. The islands were not designed properly to allow passage of winter
maintenance vehicles and they are constantly being maintained for plow damage every year. The islands do not
include a pedestrian refuge. One of the many purposes of islands is to create separation from bi-directional
traffic. Touchett notes the islands are distracting and are more points of conflict to look at within the
intersection. Removing the islands will open the vision of the intersection. Helmke noted that she has no
concerns with removing the islands. Kimmett noted she has no concerns if the pedestrian cross walks are re-
established. Jacobson noted the intersection will be re-stripped to include all the pedestrian crosswalks and stop
bars at all four approaches.
MOVED by Touchett, seconded by Kimmett, to recommend proceeding with 2023-101 Asphaltic Street Project
as presented with removal of islands at Enterprise Dr and Silent Street. Motion carried 3-0.
6. MOVED by Touchett, seconded by Helmke, to adjourn at 5:27pm. Motion carried 3-0.
Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes are based
on the notes of the recorder and are subject to change at a subsequent meeting.
Agenda
CITY OF VERONA
PUBLIC WORKS/SEWER & WATER COMMITTEE AGENDA
MONDAY, JANUARY 9, 2023
5:15 P.M.
VERONA CITY CENTER, ROOM D122
111 LINCOLN STREET
VERONA, WI 53593
Agenda Items
1. Call to order.
2. Roll call.
3. Approval of the minutes of the December 19, 2022 meeting of the Public Works/Sewer and Water
Committee.
4. Discussion and action regarding Revision 1 to Public Works Policy PW-003 – Rain Barrel Rebate.
5. Discussion and action regarding 2023-101 Asphaltic Rehabilitation project.
6. Adjourn.
Evan Touchett
Chairperson
Notice is hereby given that a majority of the City Council may be present at the meeting of the Public Works/Sewer &
Water Committee to gather information about a subject over which they have decision-making responsibility.
POSTED: Verona City Hall
Verona Library
Miller’s Market
ALL AGENDAS ARE POSTED ON THE CITY’S WEBSITE AT www.ci.verona.wi.us
IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMMODATION TO
ACCESS THE MEETINGS, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE
MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST.
CITY OF VERONA
MINUTES
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, DECEMBER 19, 2022
1. The meeting was called to order by Mr. Touchett at 5:01pm.
2. Roll Call: Present: Evan Touchett, Mara Helmke. Rye Kimmett. Also present: Theran Jacobson, Director of Public
Works; Carla Fischer, City Engineer, AECOM; Angel Gebeau, AECOM.
3. MOVED by Touchett, seconded by Helmke, to approve the minutes of the November 14, 2022, meeting of the
Public Works/Sewer and Water Committee. Motion carried 3-0.
4. MOVED by Touchett, seconded by Kimmett, to recommend approving Resolution R-22-053 Amended
Relocation Order and Determination of Necessity for County Highway PD Road Project. Motion carried 3-0.
5. MOVED by Touchett, seconded by Kimmett, to recommend approving Change Order No. 2 and Project Closeout
for Project 2020-116 CTH M/CTH PB intersection expansion. Motion carried 3-0.
6. MOVED by Helmke, seconded by Kimmett, to recommend approving Professional Services Agreement with JT
Engineering for Project ID 2023-108, N. Nine Mound Sidewalk Addition, in an amount not to exceed
$12,315.00. Motion carried 3-0.
7. MOVED by Touchett, seconded by Helmke to recommend approving Professional Services Agreement with
MSA for Project ID 2022-119, CTH PD expansion from Country View Road to Shady Oak Lane, in an amount not
to exceed $45,500.00. Motion carried 3-0.
8. Mr. Jacobson noted that Ms. Gebeau of AECOM is present to recap any discussion from the October 24, 2022
meeting regarding Well 6. Jacobson stated that the agreement for approval has a pilot testing task that was
not anticipated in the October discussion. Gebeau noted the following:
• Wisconsin Department of Natural Resources (WDNR) may require the pilot test or a full-scale test.
WDNR direction is unknown currently.
• Pilot pump shall be installed at a precise depth.
• Full design to be completed by June of 2023 to ensure schedule with WDNR funding submittal that
occurred in October of 2023 to meet WDNR schedule.
• WDNR scoring of applications should be completed in January of 2023.
MOVED by Touchett, seconded by Helmke to recommend approving Professional Services Agreement with
AECOM for Project ID 2022-110, Well 6 Treatment Design, in an amount not to exceed $591,891.00. Motion
carried 3-0.
9. Mr. Jacobson provided an overview of the Changes to Wisconsin Administrative Code, Department of Natural
Resources (NR) 809, more specifically related to PFAS testing.
Jacobson noted that the Wis. Statutes set a limit for PFAS of 70 ng/L (ppt) and Wisconsin Department of Health
Service set a value of 20 ng/L (ppt). Ms. Gebeau noted that the EPA has not set values yet but more
information is anticipated in December 2022.
Touchett noted he wants to test more frequently for certain compounds beyond what is required but also be
fiscally responsible and understands there are limited availability of staff resources.
Gebeau noted that she would check the testing requirements of adjacent communities. Gebeau comments
that she would reach out to Joe at Madison Water Utility.
Touchett requests that we test for the PFOS & PFOA compounds. Staff to reach out to WDNR water
representative to obtain list.
NO ACTION taken.
10. MOVED by Touchett, seconded by Kimmett, to direct staff to submit the 2022 Wisconsin Information System
for Local Roads (WISLR) to Wisconsin Department of Transportation. Motion carried 3-0.
11. MOVED by Touchett, seconded by Kimmett, to adjourn at 5:57pm. Motion carried 3-0.
Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes are based
on the notes of the recorder and are subject to change at a subsequent meeting.
Meeting Date: January 9, 2023
PW/S&W Committee Memo
Public Works/Sewer & Water Committee
Listed below is an explanation of the items on the Public Works/Sewer & Water Committee
agenda.
Item (4) Revision 1 to Public Works Policy PW-003 – Rain Barrel rebate.
PW-003 rain barrel rebate policy was approved in August of 2022. Revision 1 includes the
reimbursement form and a clean up of language within the policy for clarity of whom is eligible
and identifying the cost.
A tracked changed version of the policy and a clean version with reimbursement request is
included.
Item (5) 2023-101 Asphaltic Rehabilitation project.
Staff has prepared the 2023 asphaltic street rehabilitation project plans. This is an annual
maintenance program. During the budget process streets are identified but as the year
continues this program evolves and certain street conditions can change. In December staff
evaluated the streets listed for 2023 and 2024 which were Jenna Drive and Westridge Parkway,
local residential streets. As a survey concluded of other streets Enterprise Drive was identified
of greater need due to pavement condition and higher classification of road as a collector. Staff
is working within the program budget.
Staff has included the draft plans of Enterprise Drive for reference to identify the limits, W.
Verona Avenue to approximately 400-feet north of the Silent Street intersection.
Staff would also like to discuss the removal of the landscaping islands at the intersection of
Enterprise Drive and Silent Street. A figure is included with the packet of this intersection for
reference.
Page 1 / 1
PW‐003
CITY OF VERONA
DEPARTMENTAL POLICY
Department Public Works & Utilities
Division Stormwater Utility Author: Theran Jacobson
PW, Sewer & Water
Policy Number PW‐003 8‐81‐9‐20222023
Committee Approval
Subject Rain Barrel Rebate Revision # / Date No. 0 1 / 812‐28‐2022
1. Purpose
a. To reduce stormwater run‐off and to conserve water by encouraging the installation of rain
barrels on private property.
2. Eligibility
a. Residential, Commercial, and Industrial pProperties with individual City of Verona Stormwater
Utility charges that install a minimum of a 35‐gallon capacity rain barrel which collects rainwater
from impervious areas, including roofs. There will be a limit for each eligible property as follows:
i. Maximum of four (4) rebates per address over the life of the program, with a
rebate given for every 35 gallons of capacity. Each rebate is $30 per 35 gallons.
b. Program maximum per year will be $5,000 funded by the Stormwater Utility starting in 2023.
Eligibility will be on a first‐come first‐served basis, by date of the fully completed rebate
application received by City staff. If an application is determined to be incomplete by staff, the
required additional information will be requested by staff to the applicant. Once funds are
expended for the year no further rebates will be granted during that calendar year.
c. Complete application should shall be submitted no more than three months after date on
receipt for rain barrel and/or conversion kit purchase. Complete reimbursement application
includes the following:
i. Filled out reimbursement request
ii. Legible receipt of purchase
iii. Photos of completed installation
3. Claims Process and Reimbursement
a. The Rain Barrel Rebate form must be completed and submitted to the utility as stated on the
form, along with a copy of the receipt (if purchased), and a photo(s) of the installed rain
barrel(s). Homemade rain barrels may also qualify.
b. Utility personnel may verify the rebate request qualifies according to eligibility in section 2.
c. If qualifying, and if the maximum has not been reached, either per property or annual limits for
the program, a responding one‐time credit will be placed on the stormwater utility account of
the service address.
Page 1 / 2
PW‐003
4. Photo permission
a. By requesting a rain barrel reimbursement request I hereby give the City of Verona permission
to use the photo(s) of the installed rain barrel in their education outreach materials.
Originally Drafted by:
Kimberly Marshall
Utility Clerk
Originally Reviewed by:
Theran Jacobson
Director of Public Works
Page 2 / 2
PW‐003
CITY OF VERONA
DEPARTMENTAL POLICY
Department Public Works & Utilities
Division Stormwater Utility Author: Theran Jacobson
PW, Sewer & Water
Policy Number PW‐003 1‐9‐2023
Committee Approval
Subject Rain Barrel Rebate Revision # / Date No. 1 / 12‐28‐2022
1. Purpose
a. To reduce stormwater run‐off and to conserve water by encouraging the installation of rain
barrels on private property.
2. Eligibility
a. Properties with individual City of Verona Stormwater Utility charges that install a minimum of a
35‐gallon capacity rain barrel which collects rainwater from impervious areas, including roofs.
There will be a limit for each eligible property as follows:
i. Maximum of four (4) rebates per address over the life of the program, with a
rebate given for every 35 gallons of capacity. Each rebate is $30 per 35 gallons.
b. Program maximum per year will be $5,000 funded by the Stormwater Utility starting in 2023.
Eligibility will be on a first‐come first‐served basis, by date of the fully completed rebate
application received by City staff. If an application is determined to be incomplete by staff, the
required additional information will be requested by staff to the applicant. Once funds are
expended for the year no further rebates will be granted during that calendar year.
c. Complete application shall be submitted no more than three months after date on receipt for
rain barrel and/or conversion kit purchase. Complete reimbursement application includes the
following:
i. Filled out reimbursement request
ii. Legible receipt of purchase
iii. Photos of completed installation
3. Claims Process and Reimbursement
a. The Rain Barrel Rebate form must be completed and submitted to the utility as stated on the
form, along with a copy of the receipt (if purchased), and photo(s) of the installed rain barrel(s).
Homemade rain barrels may also qualify.
b. Utility personnel may verify the rebate request qualifies according to eligibility in section 2.
c. If qualifying, and if the maximum has not been reached, either per property or annual limits for
the program, a responding one‐time credit will be placed on the stormwater utility account of
the service address.
Page 1 / 2
PW‐003
4. Photo permission
a. By requesting a rain barrel reimbursement request I hereby give the City of Verona permission
to use the photo(s) of the installed rain barrel in their education outreach materials.
Originally Drafted by:
Kimberly Marshall
Utility Clerk
Originally Reviewed by:
Theran Jacobson
Director of Public Works
Page 2 / 2
Print Save
City of Verona, Wisconsin
Rain Barrel Rebate Form
Name
Address
Utility Account #:
Phone
E-mail
Rebates are available to properties that install a minimum of a 35-gallon capacity rain barrel which
collects rainwater from impervious areas, including roofs.
The rebate will be given as a stormwater credit on the utility bill of the eligible property. Utility accounts
without individual stormwater charges do not qualify. Maximum of four (4) rebates per address over the
life of the program, with a rebate of $30.00 given for every 35 gallons of capacity.
Program maximum of $5,000 total credit given annually across all recipients on a first-come, first-served
basis.
Number of rebates claiming: _______
Total capacity of Rain Barrel/s (installed for this application): ______________ gallons
Complete application shall be submitted no more than three (3) months after date on receipt for
rain barrel, rain barrel materials and/or conversion kit purchase. Complete reimbursement application
includes the following:
i. Completed Rain Barrel Rebate Form (this form)
ii. Legible receipt of purchase (rain barrel itself or materials for rain barrel construction), receipt must
include date of purchase
iii. Photos of completed installation
E-mail this form with attached copy of receipt/s and pictures of the rain barrels installed to:
meters@ci.verona.wi.us
Or mail or hand deliver to the address below:
City of Verona Public Works
Attn: Rain Barrel Rebate
410 Investment Court
Verona, WI 53593
Submissions will not be returned
Page 1 / 1
Enterprise Dr / Silent Street City of Verona
111 Lincoln St
Verona, WI 53593
DISCLAIMER: The City of Verona does not guarantee the accuracy of the material (608) 845 - 6495
contained here in and is not responsible for any misuse or misrepresentation of this
information or its derivatives. SCALE: 1" = 50 ' 600.00 Print Date: 12/19/2022
W
Enterprise Drive
N. Main Multi-Use Path
City of Verona GIS City of Verona
111 Lincoln St
2023 City of Verona Asphalt Rehabilitation Verona, WI 53593
2023-101
DISCLAIMER: The City of Verona does not guarantee the accuracy of the material (608) 845 - 6495
contained here in and is not responsible forSheet
Title any misuse or misrepresentation of this
information or its derivatives. SCALE: 1" = 1000 '
12,000.00 Print Date: Sheet
12/16/2022
1 of X
Remove and Replace 43 SY
7" Concrete Driveway
Remove and Replace
36 LF 30" C&G
Remove and Replace
8 LF 30" C&G
Remove and Replace
36 LF 30" C&G
Adjust Water
Valve Box - 1 EA
Remove and Replace
36 LF 30" C&G
W
Adjust Manhole
1 EA
Milling Limits
City of Verona GIS City of Verona
2023 City of Verona Asphalt Rehabilitation 111 Lincoln St
2023-101 Verona, WI 53593
PlannotSheets
DISCLAIMER: The City of Verona does guarantee the accuracy of the material (608) 845 - 6495
contained here in and is not responsible for any misuse or misrepresentation of this
information or its derivatives.
Enterprise Drive SCALE: 1" = 50 '
600.00 Print Date: Sheet
12/12/2022
2 of X
Milling Limits
Remove and Replace 10 LF 30" C&G
Adjust inlet - 1 EA
Remove and Replace 10 LF 30" C&G
Adjust inlet - 1 EA
Adjust Water
Valve Box - 1 EA
Remove and Replace
175 SF 7" Sidewalk
W
Remove and Replace
16 LF 30" C&G
Remove and Replace
25 SF 5" Sidewalk
Remove and Replace
43 SY 7" Concrete
Driveway
Remove and Replace
Remove and Replace 80 LF 30" C&G
36 LF 30" C&G
Adjust Water
Valve Box - 2 EA
City of Verona GIS City of Verona
2023 City of Verona Asphalt Rehabilitation 111 Lincoln St
2023-101 Verona, WI 53593
Plannot
DISCLAIMER: The City of Verona does Sheets
guarantee the accuracy of the material (608) 845 - 6495
contained here in and is not responsible for any misuse or misrepresentation of this
information or its derivatives.
Enterprise Drive SCALE: 1" = 50 '
600.00 Print Date: Sheet
12/12/2022
3 of X
Remove and Replace
10 LF 30" C&G
Adjust Inlet - 1EA
Remove and Replace
10 LF 30" C&G
Adjust Inlet - 1EA
Adjust Water
Valve Box - 1 EA
W
Adjust Manhole
1 EA
Remove and Replace
25 SF 5" Sidewalk
Remove and Replace
60 LF 30" C&G
Remove and Replace
75 SF 5" Sidewalk
Remove and Replace
75 SF 5" Sidewalk
City of Verona GIS City of Verona
2023 City of Verona Asphalt Rehabilitation 111 Lincoln St
2023-101 Verona, WI 53593
DISCLAIMER: The City of VeronaPlandoes notSheets
guarantee the accuracy of the material (608) 845 - 6495
contained here in and is not responsible for any misuse or misrepresentation of this
information or its derivatives. Enterprise Drive SCALE: 1" = 50 '
600.00 Print Date:Sheet 4
12/12/2022
of X
Adjust Water
Valve Box - 1 EA
Milling Limits
Remove and Replace
20 LF 30" C&G
Adjust inlet - 2 EA
Remove and Replace Remove and Replace
20 LF 30" C&G 75 SF 5" Sidewalk
Adjust inlet - 2 EA
Remove and Replace
100 SF 5" Sidewalk
Remove and Replace
50 SF 5" Sidewalk
W
Remove and Replace
75 SF 5" Sidewalk
Remove and Replace
150 SF 5" Sidewalk
Adjust Water
Adjust Manhole Valve Box - 1 EA
1 EA Milling Limits
Remove and Replace
150 SF 5" Sidewalk
Remove 415 LF C&G
and entire medians.
No Replacement
Milling Limits
City of Verona GIS City of Verona
2023 City of Verona Asphalt Rehabilitation 111 Lincoln St
2023-101 Verona, WI 53593
DISCLAIMER: The City of Verona Plan
does not Sheets
guarantee the accuracy of the material (608) 845 - 6495
contained here in and is not responsible for any misuse or misrepresentation of this
information or its derivatives. Enterprise Drive SCALE: 1" = 50 '
600.00 Print Date: Sheet
12/12/2022
5 of X
Get email alerts for Verona