Board of Architectural Review
Regular MeetingVienna, VA · June 17, 2021
Minutes
Town of Vienna 127 Center Street South
Vienna, Virginia 22180
p: 703.255.6341
TTY 7111
Meeting Minutes
Board of Architectural Review
Thursday, June 17, 2021 7:30 PM COUNCIL CHAMBERS-VIENNA TOWN
HALL
The Board of Architectural Review met Thursday, June 17, 2021 at 7:30 pm in the Vienna
Town Hall at 127 Center St S. and Via Zoom Webinar. Chairman Roy Baldwin, Michael
Cheselka, Patty Hanley, Paul Layer, and Linda van Doorn were present participating via
Zoom. Planner Andrea West and Board Clerk Sharmaine Abaied were present in Town
Hall.
Board of Architectural Review - Continuity of Government
Resolution for Continuity of Government
2nd: Mr. Layer
Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley
Roll Call
Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka and Ms. Hanley were present.
Approval of the Minutes:
Meeting Minutes: accepted with as submitted.
Public Hearing
245 Maple Ave W - Exterior Modification Revision - Vienna Market
Item No. 1: Request for a revised approval for Vienna Market located at 245 Maple Avenue
W., Docket No. PF-21-19-BAR (IDT No. 413426), in the MAC Maple Avenue Commercial
Zone zoning district; filed by Gregory O'Neill of Northfield Construction and
Development.
Mr. Doug D’Alexander was present to represent the application. He stated they were
working on As Built issues in conjunction with the originally approved plan. Starting
with the Church Street side Mr. D’Alexander stated the sidewalks would be brick pavers
whereas they original rendering did not indicate that. The retaining wall did not need to
go back to the drive aisle on the corner of Pleasant and Church and now shows a shorter
wall.
Mr. Layer asked which entrance location Mr. D’Alexander was speaking of. Mr.
D’Alexander stated it was the Corner of Church and Pleasant across from Councilman
Anderson’s home.
Town of Vienna Page 1 Printed on 8/30/2021
Board of Architectural Review Meeting Minutes June 17, 2021
Mr. D’Alexander moved to the bank side of Church St stating there was railing being
added with the column lines finishing above the top of wall to create an actual column.
Next, the upper area to the right of the public art will have a brick wall 5 feet in front for
the enclosed, heated elevator vestibule. In the ceiling above the first townhouse there are
sanitary, water, and stormwater coming in needing covered and conditioned which was
another reason for pulling the wall forward. The front the transition from the Maple Ave
sidewalk and building, the grade had to be brought 30 feet further right (towards the
elevator) to be able to step into the project at grade. What appears to be a 6th commercial
bay is actually an entrance to the elevator vestibule. Mr. D’Alexander also pointed out the
glass doors that would be matching and allow a lot of light. The trash enclosure was
corrected on the rendering as the original was not scaled properly. Mr. D’Alexander
stated there had been a submission for the public art area of 14 feet tall and 28 feet long.
He concluded stating a tree that had been omitted in the rendering would remain as it was
part of the approved landscape plan.
Ms. van Doorn inquired about the trash enclosure. Mr. D’Alexander stated it met all of the
requirements for the zone.
Mr. Layer asked if the grade of the building was level until it reached the second bay. Mr.
D’Alexander stated it wasn’t level, but a slight slope until the 2nd bay moving into a smooth
transition. The desired goal is for it to be wide allowing it to feel open. Mr. Layer then
asked about the entrance coming from Pleasant Street and if the sidewalk elevation at
Maple and the pedestrian way were the same. Mr. D’Alexander stated at the entrance from
Pleasant, the grade was 4.5 to 5 feet at store front grade requiring several steps to reach
the first bay. He then gave a description of being about chest high for a person talking on
the street. Mr. Layer asked if there was any difference from the first and second
drawings, and Mr. D’Alexander stated there was no change in grade from the two
renderings. Mr. Layer asked what the brown material was for the trash enclosure. Mr.
Greg O’Neil, with the construction company, stated they had two proposed types of
material; aluminum slats, or wood. The aluminum slats color would not match as well as
the wood as it could be stained to match. Mr. Layer asked if they were open or closed slats.
Mr. O’Neil stated they were closed. Mr. Layer asked if they would open at the top, Mr.
O’Neil stated there would be some opening at the top for the gate to properly open in and
out. There was some discussion regarding the location of the location of the trash
enclosure. Mr. Layer suggested the aluminum would give some longevity and lower
maintenance, he then asked for their preference. Mr. O’Neil stated his preference was
wood, but was amenable to the aluminum although it is in lower supply. Mr. Layer then
asked if a composite material would work. Mr. O’Neil stated he would look into the use of
composite with commercial gates. There was continued discussion regarding the type of
material to be used for the trash enclosure.
Ms. Hanley asked about the steps going into the retail sidewalk and they would coordinate
on the left and the right. Ms. Hanley asked if the railing would match on the left hand and
right hand side. Mr. D’Alexander stated they would be the same material. Ms. Hanley
asked about the connection of the sidewalk to the retail sidewalk and if there was a grade
deviation in the spot where the railing continues. Mr. D’Alexander stated it was not high
enough to require railing, but that it was for continuity. Mr. Baldwin asked if the railing
needed to be there and Mr. D’Alexander stated it did not per code, but it was there for
continuity. There was continued discussion regarding the railing.
Mr. Baldwin asked about the color of the pavers. Ms. West asked if they were pavers in
the right of way. Mr. D’Alexander stated they were. Ms. West stated they would be the
standard town pavers and would be approved by the Department of Public Works. Mr.
Town of Vienna Page 2 Printed on 8/30/2021
Board of Architectural Review Meeting Minutes June 17, 2021
Baldwin asked about the adding of bulkhead with brick veneer under townhome promenade
to have conditioned space. He asked if that was for air conditioned space. Mr. D’Alexander
stated it would be heated space that was to the right of the future art. Mr. Baldwin asked if
the 10-15 foot long space next to the proposed art was considered for additional public art
or a sign. Mr. D’Alexander stated it was not. Mr. Baldwin stated he felt it was very
monolithic and asked that it be considered for signage or public art to break up the
monotony. Mr. Baldiwn asked staff if the site plan modifications would hinder the Board
from an approval and Ms. West stated no. Mr. Baldwin inquired about the dimensions of
the dumpster enclosure. Mr. O’Neil stated the size was 20 feet long, with a height of 10
feet. Mr. Baldwin also asked about the color change of material in the retaining wall from
masonry block to brick. Mr. O’Neil stated it would be the approved color matching the
commercial and retail space.
Mr. Cheselka asked about the trash enclosure in relation to the public art as it appeared
the public art area had been reduced. Mr. D’Alexander and Mr. O’Neil stated it was 28
foot long by 13 foot tall public art.
Ms. Hanley stated the townhomes to the far left and right show, in the original rendering, a
second cornice at the top with rustication coming up half-way to the bay window, but the
new rendering shows changes. Ms. Hanley asked if they were changes and Mr.
D’Alexander stated the NV Homes side was not making any changes. Ms. West stated
there had been a previous revision that had gone before the Board and been approved, but
that if there were any additional changes NV Homes would be required to come back before
the Board.
Mr. Layer asked if the Board could approve with both dumpster enclosure materials with a
confirmation later. Ms. West stated that would be appropriate as there was uncertainty
around the availability of material.
Ms. Hanley asked about the removal of the two planters when the stairs were removed and
if that was part of the application. Ms. West stated, the new layout would be the approved
layout. Ms. Hanley asked if the old modification would no longer be a requirement. Ms.
West stated the old modification would not need to be referenced.
Mr. Layer made a motion to approve as submitted with the provision that two materials for
the dumpster enclosure would be approved. The first material, as suggested by the
applicant, aluminum as presented at the meeting and a composite material of similar
construction and design. There would need to be a follow up as to the color matching.
Motion: Mr. Layer
Second: Ms. Hanley
Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley
5 Ayes, 0 Nays
211 Center St S.- Exterior Modification - Bowman House
Item No. 2: Request for approval of a new roof, for the Bowman House, located at 211
Center Street S., Docket No. PF-16-21-BAR (IDT No. 551475), in the RM-2 zoning
district, filled by Leon Evans of the Town of Vienna Department of Parks and Recreation.
Mr. Leon Evans was present to represent the application. Mr. Evans stated they hired an
architect to check the roof and it was discovered that there were issues. The roof project
has two phases: correction of the structural deficiencies, and replace the roof (matching
Town of Vienna Page 3 Printed on 8/30/2021
Board of Architectural Review Meeting Minutes June 17, 2021
the police station), gutters, and downspouts.
Mr. Layer asked if the matching of the roof was the new police department, and Mr. Evans
said that was correct, same roof, and same color. Mr. Layer asked if the downspout colors
would be matching. Mr. Evans stated that was correct. Mr. Layer stated may be a better
color for the downspouts. Mr. Evans said they could make that modification.
Ms. Hanley stated she was concerned with the colors for the Bowman House and Police
Station matching to much as the Bowman House is a historic building and the roofs during
that time period were green or silvery gray roofs. Ms. Hanley also stated commercial
metal seamed roofs have a thicker seam and stated a variation could make it less
significant while still coordinating with the police station. Ms. Hanley asked if there had
been anything explored to aid in preventing icicles. Mr. Evans stated the new roof would
eliminate that issue at the front of the Bowman House.
Mr. Cheselka asked if the existing was a metal roof, Mr. Evans stated yes. Mr. Cheslka
confirmed with Mr. Layer the color white for the downspouts.
Mr. Baldwin asked if the roof color chosen would diminish the historic authenticity of the
building. Mr. Evans stated the site was not historic and was not part of the historic
registry, but that it was a historic building. He stated he would have to find out if it would
diminish the historic aspect of the building. Mr. Evans stated they were told they would not
have an issue with the type of roof that needed to be put on the building.
Mr. Layer asked about the original roof of the building. Ms. Hanley stated she thought it
was a tin roof. Mr. Layer stated if the roof had been tin it would have been gray and if it
was copper, it would be brown and eventually green and if slate it would be dark gray. Mr.
Layer said he felt matching the gray would make sense. Mr. Cheselka agreed stating it
may have been the darker gray and matching the police station would give the block a nice
feel. Mr. Layer asked what gray was being matched in the pallet. Ms. West stated it
looked blue, but that the actual sample from the police department is a lot grayer. Mr.
Cheselka made a motion to approve with the proviso that the downspouts be white.
Motion: Mr. Cheselka
Second: Mr. Layer
Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley
5 Ayes, 0 Nays
804 Tapawingo Rd SW - Exterior Modification
Item No. 3: Request for approval new rear roof structure on a townhouse, located at 804
Tapawingo Road SW, Docket No. PF-547504-BAR, in the RTH Townhouse zoning district,
filled by David Omary of Biltmore Design Galleria.
Mr. James and Mrs. Lorraine Hendry were present to represent the application.
Mr. Layer asked if the existing shingles were being matched and Mrs. Hendry stated that
was correct.
Ms. Hanley asked if the roof would remain open when going past the sliding door or if
there would be solid material in that area. Mr. Hendry stated it would be open.
Ms. van Doorn asked if there would be any lighting. Mr. Hendry stated the outside light
would be moved to the post that supports the new roof. Ms. van Doorn asked if the fixture
would be changed and what the lumens and kelvins would be. Mr. Baldwin stated the
application said lumens, 820, and kelvins, 3000. Mr. Cheselka stated he felt it was a lot of
lumens for a neighborhood and then asked what was behind the building. Mr. Hendry
stated there was a creek and vegetation behind them and Mrs. Hendry stated it was a
motion detector light. Ms. Hanley asked if it was a security light facing out and up. The
Hendry’s stated it would not be on all night and that it would face down and out.
Ms. Hanley made a motion to approve the application as submitted.
Motion: Ms. Hanley
Second: Mr. Cheselka
Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley
5 Ayes, 0 Nays
Town of Vienna Page 4 Printed on 8/30/2021
Board of Architectural Review Meeting Minutes June 17, 2021
396 Maple Ave E - Sign - Monarch Custom Homes
Item No. 4: Request for approval of a new sign for Monarch Custom Homes, located at 394
Maple Ave E, Docket No. PF-14-21-BAR, in the C-1A Special Commercial zoning district,
filed by Michael Flynn, of Allegra.
Mr. Michael Flynn was present to represent the application.
Mr. Cheselka inquired about the illumination. Mr. Flynn stated it was a pre-existing
lightbox that was being refaced and nothing would be changed with the lighting.
Mr. Baldwin asked if the lighting would be enough for the new sign as it would be darker
than the previous sign, Mr. Flynn said yes.
Mr. Cheselka made a motion to approve the application as submitted.
Motion: Mr. Cheselka
Second: Mr. Layer
Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley
5 Ayes, 0 Nays
301 Maple Ave W - Exterior Modification
Item No. 5: Request for approval of antenna install located at 301 Maple Avenue W, Docket
No. PF-553042-BAR, in the C-1A Special Commercial zoning district, filed by Katherine
Blackwood, Network Building + Consulting.
Ms. Katherine Blackwood was present to represent the application.
Mr. Layer asked if the color would be gray, Ms. Blackwood stated the antennas are a matte
gray finish.
Ms. Hanley asked if the existing inoperable antennas would be taken down. Ms. West
stated there are limited numbers so they would typically be taken down and replaced with
something else.
Mr. Baldwin commented that he thought there were more changes being made than what
was indicated in the staff report. He asked if there would be any changes that are visible
from the street. Ms. West stated the applicant pointed out the equipment in the elevation
drawings and the rooftop drawings. The staff report summarized the application as some
parts described in the application are not visible. Ms. West asked if the applicant could
explain the visual impact. Ms. Blackwood stated the antennas would be visible, two would
be removed, and four would be added. Mr. Baldwin asked if they would be visible from
Maple Ave and Ms. West stated she did not believe they were on the Maple Ave side. Mr.
Baldwin inquired as to the impact of the changes to resident. A picture provided by the
applicant was shown. Ms. Blackwood stated the antennas would be decreasing in size
from 60 inches tall to 33 inches tall, and they would be a little wider.
Ms. van Doorn made a motion to approve the application as submitted.
Motion: Ms. van Doorn
Second: Mr. Layer
Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley
5 Ayes, 0 Nays
Town of Vienna Page 5 Printed on 8/30/2021
Board of Architectural Review Meeting Minutes June 17, 2021
211 Mill St NE - Sign - Dulles Kitchen and Bath
No representative was present at the time agenda item 6 was presented. Ms. Hanley made
a motion to move the agenda item to the end of the agenda, Mr. Layer seconded the motion
with 5 ayes and 0 nays to move the item to the end of the agenda.
800 Maple Ave E - Exterior Modification - Westwood Country Club
Item No. 7: Request for approval of exterior modifications for Westwood Country Club
located at 800 Maple Ave E, Docket No. PF-559923-BAR, in the RS-16 residential zoning
district, filed by Braden Field, of MTFA Architecture.
Mr. Braden Field was present to represent the application. Mr. Field stated the application
was for replacement of the larger of the two bubbles that houses indoor tennis courts. It
would be replaced with a permanent indoor facility connected and accessible through the
clubhouse. The building is an engineered metal building. Mr. Field stated a lot of
emphasis was put on the East façade, facing the clubhouse. The façade will have stone
veneer and ground face masonry units. There are ribbed shadow / skin panels to help
break up the building while also breaking down the massing by using two varied colors of
green on the building.
Ms. van Doorn asked if the Nova Stone was the stone veneer, Mr. Field said yes. Ms. van
Doorn asked if it was a true stone. Mr. Field stated it was a true natural stone blend of two
stone colors matching the color of the clubhouse building stone. Ms. van Doorn asked if
Fade away green was considered as the green colors chosen are very apparent colors. Mr.
Field said he wasn’t familiar with that color, but stated that they were limited on the color
selection as they are standard panels from the engineered building manufacture. The
surrounding trees on the site are primarily Evergreen which was the reason for the green
colors chosen as well as the roof color which is green as well. Mr. Cheselka stated the
color chosen would not fade as much with the ultra violet effects on the metal. Ms. Hanley
stated going with the standard colors would be better so the panels are not painted in the
field.
Mr. Layer asked to see elevations of what the members would see. Elevations were brought
up, and Mr. Field stated that members on the golf course may be able the only members
who would be able to see the exterior of the building. Mr. Layer asked what the existing
roofs colors were; Mr. Field stated it was a gray asphalt roof shingle. Mr. Layer stated the
new building’s roof and existing building’s roof would not blend and the green on top of the
building would create a very heavy image. Mr. Layer continued stating how he felt the
material of the new building conflicts with the existing clubhouse. Mr. Layer asked what
material was under the deck on the exiting pool house. Mr. Field stated it was hard-panel
with stone on the north face, facing the new tennis building. Mr. Layer inquired about the
member’s perspective of the new building. Mr. Field stated the membership and club
standpoint, they were happy with the elevation. Mr. Layer asked about landscaping. Mr.
Field stated landscaping was added on the south face where the parking lot is against it to
breakdown the scale of the building. The building is against the exiting flood plain so they
were limited on what could be done on the other faces of the building. Mr. Layer asked if
staff had reviewed the plan. Ms. West stated it had gone through the site plan process and
the Board meeting was at the end of the site plan process. Mr. Layer asked what the white
rectangles were, Mr. Field stated they were slightly recessed windows, but instead of glass
they are a translucent polycarbonate material. Mr. Layer stated he was struggling with
the application as it was large and very different from the existing materials at that
facility. Mr. Layer asked if any vegetation can be planted in the floodplain. Mr. Layer
inquired about the roof colors again and Mr. Field stated that with the options presented,
Town of Vienna Page 6 Printed on 8/30/2021
Board of Architectural Review Meeting Minutes June 17, 2021
the darker green would tie together better as a back drop building although it won’t match
the other buildings.
Ms. Hanley stated that according to Ms. Horner, town’s technical lead on flood plain,
certain materials may be planted in the flood plain. Ms. Hanley stated the massing is a bit
overwhelming, and there may be some missed opportunities to disguise the massive
structure, but it was not visible from the street.
Mr. Baldwin asked about signs for the buildings. Mr. Field stated there was nothing
anticipated for building mounted signage.
Mr. Layer stated, he was used to buildings of that size coming to the Board at a work
session giving some input on the proposal for the development of a project. Ms. West
stated a work session was not recommended by staff, to which Mr. Layer stated it was a
missed opportunity and that he would not be able to vote for the project.
Ms. van Doorn asked if a lighter color would make it appear less massive. She also asked
if enclosing the tennis courts gives less flexibility. Mr. Field stated the roof line and
height are limited by allowable building height as well as clearance guidelines for indoor
tennis.
Ms. van Doorn made a motion to approve the application as submitted.
Motion: Ms. van Doorn
Second: Mr. Cheselka
Ayes: Ms. van Doorn, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley
Nays: Mr. Layer
4 Ayes, 1 Nays
Ms. Hanley offered a post approval work session with the applicant to aide in reducing the
masing
333 Maple Ave E - Sign - Amity Nail Spa
Item No. 8: Request for approval of a replacement sign panel for Amity Nail Spa, located at
333 Maple Avenue E., Docket No. PF- 557318-BAR, in the C-2 General Commercial
zoning district, filed by William Rosenberg, of Econo Sign Inc.
Mr. William Rosenberg was present to represent the application. Mr. Rosenberg stated it
was a replacement / reface.
Mr. Cheselka made a motion to approve as submitted
Motion: Mr. Cheselka
Second: Ms. Hanley
Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley
5 Ayes, 0 Nays
Item No. 6: Request for approval of a sign for Dulles Kitchen and Bath, located at 211 Mill
St NE, Docket No. PF- 555101-BAR, in the CM Limited Industrial zoning district, filed by
Mustafa Ozdemir of Dulles Kitchen & Bath.
No one was present to represent the application. Mr. Baldwin stated he did have questions
for the application. Mr. Layer stated he would prefer to the item.
Town of Vienna Page 7 Printed on 8/30/2021
Board of Architectural Review Meeting Minutes June 17, 2021
Motion: Mr. Layer
Second: Ms. Hanley
Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley
5 Ayes, 0 Nays
Meeting Adjournment
Mr. Baldwin inquired as to when the Board members were allowed to meet in person. Ms.
West stated they could start coming in person, but staff would need to know in advance to
be able to prepare for the meeting. There was continued discussion regarding the ability
to meet in person.
The Board also discussed having larger projects come to the prior to the meeting. Ms.
West stated at any point before the decision, the Board could make recommendations.
Ms. Hanley mentioned the sign at Wawa that had peeling paint asking if staff could speak
with Wawa to fix the sign.
Motion to adjourn: Mr. Cheselka
Second: Ms. Hanley
With no objections the meeting adjourned at 9:34
Respectfully Submitted,
Sharmaine Abaied
Board Clerk
THE TOWN OF VIENNA IS COMMITTED TO FULL COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT
STANDARDS. TRANSLATION SERVICES, ASSISTANCE OR ACCOMMODATION REQUESTS FROM PERSONS WITH DISABILITIES
ARE TO BE REQUESTED NOT LESS THAN 3 WORKING DAYS BEFORE THE DAY OF THE EVENT. PLEASE CALL (703) 255-6304,
OR 711 VIRGINIA RELAY SERVICE FOR THE HEARING IMPAIRED.
Town of Vienna Page 8 Printed on 8/30/2021
Agenda
Town of Vienna 127 Center Street South
Vienna, Virginia 22180
p: 703.255.6341
TTY 7111
Meeting Agenda
Board of Architectural Review
Thursday, June 17, 2021 7:30 PM COUNCIL CHAMBERS-VIENNA TOWN HALL
To participate via Zoom, click the Zoom link here:
https://us02web.zoom.us/webinar/register/WN_HnijX3-qSYa-jiPKu3qbpA and register for the
Board of Architectural Review meeting.
BAR21-233 Board of Architectural Review - Continuity of Government
Attachments: June 17, 2021 BAR Resolution - Continuity of Government
Roll Call
Approval of the Minutes:
Public Hearing
Old Business
BAR21-234 245 Maple Ave W - Exterior Modification Revision - Vienna Market
Attachments: 00 - sr - PF-21-19-BAR_245 Maple Ave W_Vienna Market
00A - Application_245 Maple Ave W_Vienna Market_Revision
001 - Sheet E1A Elevations for Presentation-1a - update comparison
001A - Sheet E1 Elevations for Presentation - 1 - Update comparison
002 - Sheet E2 Elevations for Presentation-2 - update comparison
003 - Sheet E3 Elevations for Presentation-3 - update comparison
03 - Vienna Market_Approved Site Plan_3-24-2021_Sheet 7
004 - Sheet E4 Elevations for Presentation-4 - update comparison.psd
New Business
BAR21-235 211 Center St S.- Exterior Modification - Bowman House
Attachments: 01_sr_PF-16-21-BAR_211 Center St S_Bowman House
02_Application_211 Center St S_Bowman House
ATAS Color Chart_211 Center St S_Bowman House
Pages from 2020.05.21 VPD_BAR Presentation
Roof Images_211 Center St S_Bowman House
Scope of Work_211 Center St S_Bowman House
Structural Roof Repair plans_211 Center St S_Bowman House
Page 1 Printed on 6/17/2021
Board of Architectural Review Meeting Agenda June 17, 2021
BAR21-236 804 Tapawingo Rd SW - Exterior Modification
Attachments: 01_sr_PF-547504-BAR_804 Tapawingo Rd SW_
02_Application_PF-547504-BAR_804 Tapawingo Rd SW
03_000_Cover Sheet_PF-547504-BAR_804 Tapawingo Rd SW
04_S001_Structural 1
05_S002_Structural 2
06_S003_Structural 3
07_Hendry Shingle Sell Sheet
07_XT-25 Declaration of Performance
08_Townes of Moorefield Community Association Apporved Application Form for Architectural Cahnges
BAR21-237 396 Maple Ave E - Sign - Monarch Custom Homes
Attachments: 01_sr_PF-14-21-BAR_396 Maple Ave E_Monarch Custom Homes
02_Application_PF-14-21-BAR_396 Maple Ave E_Monarch Custom Homes
03_Existing Conditions_PF-14-21-BAR_396 Maple Ave E_Monarch Custom Homes
04_Sign Rendering_PF-14-21-BAR_396 Maple Ave E_Monarch Custom Homes
Page 2 Printed on 6/17/2021
Board of Architectural Review Meeting Agenda June 17, 2021
BAR21-238 301 Maple Ave W - Exterior Modification
Attachments: 01_sr_PF-17-21 BAR_ 301 Maple Ave W_NBC
02_Application_PF-553042-BAR_301 Maple Ave W_BAR
001_GeneralNotes
002_SitePlan_F-17-21 BAR_ 301 Maple Ave W_NBC
003_RooftopPlan
004_EquipmentPlans
005_WestElevation
006_EastElevation
007_AntennaSchedule
008_AntennaOrientationPlans
009_AntennaSpecifications&Details
010_EquipmentSpecifications&Details
AIR 6449 Antenna Specs - 301 Maple Ave W
E011_CablingDetails&RFPlumbingDiagram
E012_ElectricalDetails
E013_GroundingDetails
Mount Analysis - 301 Maple Ave W
S014_AntennaMountingDetails
Site Photos - 301 Maple Ave W
Structural Analysis - 301 Maple Ave W
000_TitleSheet
BAR21-239 211 Mill St NE - Sign - Dulles Kitchen and Bath
Attachments: 01_sr_PF-555101-BAR_211 Mill St NE_Dulles Kitchen & Bath
02_Application_PF-555101-BAR_211 Mill St NE_Dulles Kitchen & Bath
03_Renderings_PF-555101-BAR_211 Mill St NE_Dulles Kitchen & Bath
Page 3 Printed on 6/17/2021
Board of Architectural Review Meeting Agenda June 17, 2021
BAR21-240 800 Maple Ave E - Exterior Modification - Westwood Country Club
Attachments: 01_sr_PF-559923-BAR_800 Maple Ave E_Westwood_Tennis Court
800 Mpale Ave W - Westwood Country Club Applicaiton
000-CS - COVER SHEET
BAR-01 - ARCHITECTURAL SITE PLAN - EXISTING
BAR-02 - EXISTING CONDITIONS
BAR-03 - ARCHITECTURAL SITE PLAN - PROPOSED
BAR-05 - LEVEL 1 FLOOR PLAN
BAR-06 - LEVEL 2 FLOOR PLAN
BAR-07 - ROOF PLAN
BAR-08 - EXISTING BUILDING ELEVATIONS
BAR-09 - EXISTING BUILDING ELEVATIONS
BAR-10 - BUILDING ELEVATIONS
BAR-11 - BUILDING ELEVATIONS
BAR-12 - EXTERIOR MATERIAL FINISHES
BAR-13 - BUILDING SECTIONS
C301 EXISTING CONDITIONS
C302 EXISTING CONDITIONS & DEMOLITION PLAN
C400 OVERALL SITE PLAN
C401 SITE PLAN
C402 SITE PLAN
C403 GRADING PLAN
C404 GRADING PLAN
L200 LANDSCAPE AND TREE PRESERVATION PLAN
L201 LANDSCAPE AND TREE PRESERVATION PLAN
L202 LANDSCAPE, TREE PRESERVATION NOTES AND DETAILS
BAR21-241 333 Maple Ave E - Sign - Amity Nail Spa
Attachments: 01_sr_PF-557318-BAR_333 Maple Ave E_Amity Nail Spa
02_Application_PF-557318-BAR_333 Maple Ave E_Amity Nail Spa
03_Rendering_PF-557318-BAR_333 Maple Ave E_Amity Nail Spa
Meeting Adjournment
THE TOWN OF VIENNA IS COMMITTED TO FULL COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT
STANDARDS. TRANSLATION SERVICES, ASSISTANCE OR ACCOMMODATION REQUESTS FROM PERSONS WITH
DISABILITIES ARE TO BE REQUESTED NOT LESS THAN 3 WORKING DAYS BEFORE THE DAY OF THE EVENT.
PLEASE CALL (703) 255-6304, OR 711 VIRGINIA RELAY SERVICE FOR THE HEARING IMPAIRED.