Commission Work Session - 18 Aug 2025 - No Meeting Held
Regular MeetingWalker, MI · August 18, 2025
Agenda
COMMISSION WORK SESSION AGENDA
4243 REMEMBRANCE RD. NW.
MONDAY, AUGUST 18, 2025 12:00 AM
Discussion Items
Staff Reports
1. Police Department
2. Fire Department
3. IT Department
4. Community Development Department
5. Assessing
6. Clerk
7. Department of Public Works
8. Engineering
9. Human Resources
10. WIFC/ Recreation Department
11. Income Tax
12. Treasury/Finance
13. Kent District Library - Walker Branch
Mayors, Commissioners, Managers Comments
Public Comment
Adjournment
Page 1 of 36
Page 2 of 36
Page 3 of 36
Page 4 of 36
Page 5 of 36
Page 6 of 36
Page 7 of 36
Page 8 of 36
Page 9 of 36
Page 10 of 36
Calls for Service
115 – Total for July Incident Type #
Fire 9
Station 1 – 14
Overpressure/Explosion 0
Station 2 – 41 Rescue & EMS 36
Station 3 - 60 Hazardous Condition 7
Automatic Aid Service Call 13
Good Intent 17
10 – Given
Alarm Calls 33
10 – Received Severe Weather & Natural Disaster 0
Special Incident Type 0
Smoke Alarms Installed
43 installed in 9 residences
Paid-on-Call Staff Training
1. In July, our POC members continued to 1. For the month of July, in addition to the
show their level of engagement and regularly two scheduled training sessions per
willingness to support this department. In month, on duty crews instituted “themed”
addition to responding to calls for service, daily trainings - Medical Mondays, Target
many members participated in community Hazard Tuesdays, Water Wednesdays,
events, extra training opportunities, and Technical Thursdays, Fire Fridays, Safety
worked the newly established evening shift Saturdays, and Scenario Sundays. Career
out of Station 3. staff are expected to agree on a topic and
time. Paid-on-call members are encouraged
Full-Time Staff
to attend if they are available.
1. Crews participated in a number of 2. Members completed an impressive 100.5
community events like Chalk to the Park, hours of training.
daycare visits, a foam party, and picnics. 3. Brendan Bennett and Christian Hennells
2. Various individuals have also stepped up attended the Child Passenger Safety Seat
to take the lead on new projects such as Technician Course. Both are now certified to
uniforms and air monitors. assess and install child safety seats.
FIRE PREVENTION
JULY Inspections Completed
ACTIVITY
Fire Safety Inspection(s) 37
Acceptance 3
False Alarm Follow Up 2
Plan Review 7
Hydrant Repair 1
IROL Submission Enforcement
Fire Investigation
4
1
580
0 871*
Total Fire Prevention Activity: 55
Page 11 of 36
*Total number commercial properties in the City
of Walker from business registry. Not including
home based businesses.
Page 12 of 36
CITY OF WALKER
INFORMATION TECHNOLOGY
DEPARTMENT
MEMORANDUM
TO: Mayor, Commissioners, and City Managers
FROM: Jason Rottman, Director
DATE: August 13, 2025
RE: August 2025 Monthly Staff Report
Ticket Highlights
111 Service Tickets opened in the last 30 days for the City of Walker
• No significant issues of note on the service desk this month.
Project Highlights
• Library – We were able to get ATT to move their fiber for the new driveway
construction. Joining meetings and helping as needed as the project progresses.
• Fiber/Fruitridge – Continuing to work with Engineering, DPW, Kenowa Hills,
MDOT and Turnkey (fiber contractor) on issues related to our fiber on Fruitridge.
The fiber over the EB ramp was moved, no immediate items left but there will be
work in the future to move from temporary lines to new permanent lines.
• Redundant fiber – This line is currently being installed. When that is complete,
we will test then switch the city campus to this new connection.
• PD Axon auto-tagging – Assisting the PD with the rollout of auto-tagging of
Axon videos based upon data from their records management system. We worked
with Core technology and Axon on next steps and received a quote from Core to
complete this project.
Other Highlights
• The newest member of our team, Chris Leaf, starts on Monday August 18th.
• Working with HR on an AI policy.
Page 13 of 36
MEMORANDUM
TO: Walker City Commission
FROM: Frank Wash, Assistant City Manager / CDD Director
DATE: 8/4/25
RE: July 2025 CDD Monthly Report
BUILDING SERVICES
Building Permits Number of Permits Fees Collected Permit Valuation
Non Residential 6 $ 27,593.00 $ 3,591,600.00
Residential 37 $ 15,614.00 $ 1,661,692.00
Total 43 $ 43,207.00 $ 5,253,292.00
Plan Review Fees
Building 16 $ 6,661.00
Electrical 4 $ 126.00
Mechanical 7 $ 449.00
Plumbing 2 $ 60.40
Total 29 $ 7,296.40
Trade Permits
Electrical 28 $ 4,936.00
Mechanical 76 $ 12,422.00
Plumbing 32 $ 4,392.40
Total 136 $ 21,750.40
PLANNING AND ZONING SERVICES
Planning Commission Total Fees Collected Escrow Fees Collected
1 $ 1,000.00 $ 2,000.00
Zoning Board of Appeals
0 $ - $ -
Zoning Verification Letters
5 $ 250.00
Zoning Permits
6 $ 400.00
Building Code Board of Appeals
0 $ - $ -
Mineral Mining Review Board
0 $ - $ -
CODE ENFORCEMENT
Total Resolved/Allowed Unresolved/Pending Abatement/Referral
38 31 0 7
Page 14 of 36
Page 15 of 36
CITY OF WALKER
ASSESSING DEPARTMENT
MEMORANDUM
TO: Mayor, Commissioners and City Managers
FROM: Kelly Smith, Assessor
DATE: August 13, 2025
RE: August Report from Assessing
Rachel and Taylor continue to work on those same tasks that take up most of their
time:
- New building permits and associated fieldwork.
- Processing documents (deeds, property transfer affidavits and principal
residence exemptions) and scanning them into our system.
- Residential 5-year reappraisal.
I have been working on our residential ECF (Economic Condition Factor) studies.
The state put out an updated cost manual, which came through last week in an update from
BS &A. That has changed and lot of things in our system, and because we (Kent County
Assessing offices) are getting audited by the State next year, I need to make sure that our
ECF studies are in great shape. I will take a month or so to get these tightened up.
I have been doing some work on our Michigan Tax Tribunal appeals as well. Here
are some quick updates on those:
1. Green Ridge Mall (2023) – this is the one that we took all the way through a
trial last fall, and we were waiting for the judge’s decision. Then, once the
judge’s decision came through in July, we had to wait 21 days to see if they
were going to appeal the decision to the Court of Appeals. They did not appeal
is further, so this appeal is completed. In the end, the judge lowered those
values by approximately 1% - very little, so I am taking this one as a win.
2. Target Corp (2024) – we had a professional appraisal done for this one, as they
were hesitant to settle. I have that appraisal and it needs to be submitted to the
Tribunal next week, which means that the Target folks must turn in their
appraisal as well. I am still hoping that once we have a chance to review their
appraisal, that we will be able to get this settled. I really do not want to go
through the cost and time of a trial again so soon – hoping to avoid that again.
Page 16 of 36
3. Walker FF LLC/Fairfield Inn & Suites (2024) – their tax rep make a settlement
offer and I counter-offered a value that was higher and followed what is
happening in the market. Hoping to have this one settled soon.
4. Jessica Pakiela (2024) – this is a small claims appeal for her new home. The
hearing has not been scheduled yet – I would think that they would do that soon.
5. ARC Hospitality/Marriot Springhill Suites (2025) – new appeal – no activity
yet.
6. Y & O Walker LLC (2025) – this is for a vacant lot by Green Orchard mall –
new for 2025 – no activity yet.
7. Macatawa Bank (2025) – last year Macatawa Bank merged with Wintrust – all
the articles pointed to this event being an uncapping – so all of us in Kent
County that had a Macatawa Bank uncapped the taxable value for 2025. They
appealed this to all our March Boards of Review and were denied. They tried
it again at our July Boards of Review and then finally took it to the Tribunal.
We shall see what happens.
We might still get a few more Tribunal appeals for 2025, only time will tell.
Moving forward, I will keep you all up to date on these appeals.
Until next month…
Kelly Smith, Assessor
Page 17 of 36
CITY OF WALKER
CLERK’S DEPARTMENT
TO: Mayor, Commissioners and City Managers
FROM: City Clerk’s Office
DATE: August 12, 2025
RE: July Clerk’s Department Report
ELECTIONS
The City of Walker will conduct a special election on November 4, 2025. All precincts will feature a
Regional Enhancement Millage proposal from the Kent ISD School District. Additionally, voters in
Precincts 5 and 6, who reside within the Grandville Public School District, will see two additional
proposals on their ballots: the Grandville Public School District’s Operating Millage Renewal Proposal
and Sinking Fund Millage Proposal.
Fun Fact: This marks the first time in nearly six years that the City of Walker will hold only one election
in a calendar year.
The graph below included in this report illustrates the following:
Yearly Trends:
• The number of elections varies each year, with certain months experiencing peaks.
Monthly Distribution:
• February/March: Typically has fewer elections, as they are held when a special primary is called,
such as during presidential election years or to fill recently vacated elected positions.
• May: Generally, May sees a higher frequency of elections, as school districts prefer to place their
proposals on ballots separate from those with potentially higher voter turnout.
• August: Usually has fewer elections, primarily serving as a period for primary elections leading
up to the November general election.
• November: A November election has always been called. City elections for Mayor,
Commissioner, and City Clerk in the past were always held during odd-numbered years. However,
on February 12, 2018, the City Commission adopted Resolution 18-462, which changed the
election dates for those positions to even-numbered years, as authorized by Public Act 523 of
2012.
Election Trend: 2008 to Present
4
Number of Elections Held
3
2
1
0
Year
Feb/March May Aug. Nov.
These trends reflect electoral cycles, voter turnout patterns, and strategic timing by political parties.
Page 18 of 36
PASSPORTS
Quantity Cost Per Total
Applications Processed 43 x $ 35.00 = $1,505.00
Passport Pictures 45 x $ 10.00 = $450.00
Total Passport Revenues for the month $1,955.00
FREEDOM OF INFORMATION ACT
The City Clerk’s office received nine (9) requests for copies of public records for the month.
BID OPENINGS
There were no bid openings held in the City Clerk’s office for the month.
LICENSING
New Businesses Licensed: New Home Occupations Licensed:
• Medallion Nails LLC • The Sundae Rest
• Urban Air Grand Rapids • F.H.I. Custom Prints
• Pages & Peonies • The Editing Chick LLC
• Bricks & Minifigs • Prickly Peariso
• Federal Express Corporation • Zupe Communities LLC
New Solicitors Licensed:
• The Shield Co
• Infinity Sales LLC
Page 19 of 36
MEMORANDUM
TO: Mayor, Commissioners, and City Managers
From: Gary Postema, Director of the Department of Public Works
DATE: August 13th, 2025
RE: DPW Monthly Report – July 2025
BUILDING MAINTENANCE
• Court crew cleaned windows and pulled weeds at Station 3
• Rekeyed locks at station 2
• Working with Hoogerhyde to install a keyed bypass for the commercial doors on
the lower level of station 2. This was approved and will be paid for by IT
• Installed reinforcing brackets on top panels of garage doors at Station 3
• Found and repaired 5 roof/building leaks at Station 3
• Installed vent at PSB to reduce condensation build up in hallway duct. Currently
monitoring this.
• Completed building inspections at Stations 1&2
• Exhaust ventilation in Mechanic garage - On going
SIGN SHOP
• Made 40 signs. Installed/replaced 40
• Working on a plan for parking lot paving and machine rental
• Continued replacement ADOPT A ROAD for existing sponsors
• FD Ladder label project design and prototype made
• Continued replacement of aged out signs 12+ years old – 85 signs currently
remain
• CDL training with the crew
• Continued annual sign inspections
Page 20 of 36
GARAGE
Police
• Steady repair work and services
• The Vice car was in our shop for a fan failure that took out the radiator we
replaced a motor mount and the thermostat while it was in and completed a full
service.
• The Memorial car build is in full swing at Forge safety.
• We are working on purchasing replacement vehicles for the 2 Durangos
• We have been put on an order list for the 2026 Tahoes. We requested 3 black
Tahoes.
Fire
• Engine 5 cabinet door was rebuilt by Sparta sheet metal, and the body work was
completed by Metal Works in Coopersville. It is back in service.
• We have been knocking out write ups for lighting replacement.
• Engine 2 received a new seat cushion and cover due to wear and tear.
• Engine 3 is currently at Advantage fleet getting the pump repaired. The pump
packing seal blew out and leaked. They found the pump was ran dry and
damaged the impeller and impeller housing. They should have the Waterous
pump parts by the end of the week and get it back together next week. We are
having the emissions system cleaned while it is down for the pump repair to limit
later down time.
• Tender 1 is 98% complete and is pending a pump test and a few odds and ends.
• We are working on purchasing 2 pursuit-rated pickup trucks for the fire
department. One will be an addition, and the other will be replacing Tahoe C-2.
DPW
• We had both skid steers in the shop for post mowing season maintenance
• We Demoed a mechanical Bucher Street Sweeper in July. We learned that this
was not the right one for our operations.
• We demoed a MowerMax roadside mowing machine that was very impressive
but not sure if it fits our budget and size.
• We have purchased a new 2025 F-450 mid-size Dump truck
• We purchased a brand new left over 2023 F-250 with a western snowplow
already installed and are awaiting delivery.
• We are working on the spec and purchase of a new 265 Cat Skid steer
Page 21 of 36
• We have also been shopping for other equipment/vehicles per the budgeted CIP.
• Working with the building maintenance department on writing a spec for a
building maintenance van.
ROADS
• The Vactor is out cleaning storm sewer catch basins.
• Milling, Patching, and preparing roads for the next round of paving overlays.
• Trimming trees and vegetation within the right of way
• Road shoulder maintenance
• Picking up roadside trash and animals city wide.
• Preparing the rubber crack fill machine for fall projects
PARKS
• Weekly mowing, weed whipping, and edging
• Biweekly mowing of cemeteries
• Pond treatments to control duckweed
• Summer Concert Series
• Lots of park/pavilion rentals
• Pruning/trimming of trees and bushes at City Buildings
• Irrigation Maintenance
• Ballfield maintenance for game prep and base replacement
• Weed spraying of City/Park landscaping, parking lots, and ballfields
• Playground maintenance: Adjusting swings, replaced handrails at English Hills
• Chalk in the park to celebrate Parks and Rec month
RIGHT OF WAY
• Permits/Plan reviews
o Right of way permits = 16
o Year to date right of way permits = 206
• MISS DIG
o Normal Tickets = 749
o Emergency Tickets = 15
o Year to date Tickets = 4707
• Design Tickets/As built requests
o 5
o Year to date = 72
• Field Inspections
o (10) Driveway/sidewalk inspections
Page 22 of 36
o (2) Storm Sewer/Culvert inspections
• Editing and field verifying Storm Sewer GIS Data
• Underground Utility
o Restoration
o Traffic and Work Zone Monitoring
• AT&T
o Permitted project around West Grand Blvd.
o Fiber optic service installs city wide
• Comcast
o Permit/Design Reviews
o Pole Top maintenance/Aerial line work City Wide
o Relocated utilities in front of City Hall for the library project.
• 123.Net
o Multiple permitted projects city wide
• MCI/Verizon
o Relocated utilities in front of City Hall for the library project.
• Metronet
o Permit review
o Restoration completed around Kinney/Leonard
o Permitted underground and aerial projects around Richmond St., East and
West of Wilson Ave.
• Consumers Energy
o Pole replacements city wide
o Aerial line maintenance city wide
o Streetlights were installed on South Savannah, Lincoln Lawns, and
Waterford Village Dr.
• DTE
o Service installations, renewals, and upgrades city wide
o Installing pipeline anodes City wide
o Working on updating ~44,000’ of new gas main through most of Ward 1
▪ Ongoing
• Independent Electricity Transmission Company (ITC)/Michigan Electric
Transmission Company (METC)
o Permitted project replacing towers and right of way crossings.
o Locations: 3 Mile Rd – North Wilson – Fruitridge Ave – Northridge Dr.-
Walker Ave.
▪ Restoration on Northridge is completed
o Forestry work City Wide within power line easements.
• Water/Sewer
o N/A
• Kent County Drain Commission
o No activity
Page 23 of 36
• City Road Project meetings and updates with the Engineering Department
• Assisted Parks Department as needed.
• Assisted Road crew as needed.
• Assisted Sign shop as needed
OFFICE
• Processed Right of Way permits
• City works Asset Management system integration and training with dept. staff
• Prepared invoices for payment authorization
• Engineering/DPW website updates in progress
o Community Engagement Page
• Adopt-A-Road mid-season letter to participants
o New equipment/materials in use
• Fruitridge bridge construction coordination with MDOT and Engineering
• Event coordination with the Walker Rec Department.
• Walker/KDL Library meetings and coordination.
• Working on Performance Evaluations.
• Summer Concert series prep
• Site Plan review committee.
• Working with a local Eagle Scout for his Eagle Scout Project
• Welcomed and onboarded John Cox, our new Facilities Operations Supervisor
• Construction Standards for Public Right of Way review with the Engineering
Department.
• City Hall and DPW breakroom remodel
• Held interviews for 2 Public Works Maintenance (Laborer) position vacancies.
Page 24 of 36
CITY OF WALKER
ENGINEERING DEPARTMENT
MEMORANDUM
TO: Darrel Schmalzel, City Manager
FROM: Scott Conners, P.E., City Engineer
DATE: August 13, 2025
RE: August Staff Report - Engineering
We recently look at our traditional engineering projects and created a list of 2024
accomplishments, 2025 activity, and future efforts. We will use that list to provide a
departmental update in the paragraphs below:
Accomplishments:
Kinney Avenue Improvements
Kinney Avenue between Lake Michigan Drive and Leonard Street got a
makeover in 2024. This rural 2 lane section of roadway is not so rural anymore.
This section of Kinney is almost entirely developed. It serves a very important
role in our transportation system as one of the primary north/south connectors.
During the summer we widened the roadway to provide a center turn lane to assist
with the dozens of residential driveways and side streets. The center turn lane is
helping drivers making left turns and allow thru-traffic to continue by as the left
turners wait for safe gaps in traffic. The enhancement also included removing the
ditches in favor of storm sewer. The new roadway cross section now fits the
standard 3 lane section we have envisioned from M-45 north to Three Mile Road.
Bristol Railroad Bridge
The 117 year old single lane underpass near the intersection of Bristol Avenue
and Pannell Street got a full makeover last summer. The improvement included a
new bridge with both northbound and southbound movements. That’s right….2-
way traffic! The new design also includes a sidewalk on the east side of the road.
The bridge consists of two arch structures that are intended to help preserve some
of the historic nature of this location and maintain the aesthetic look of a gateway
to the Alpine Estates neighborhood to the north. The bridge’s 10’ height has been
increased to 14.5’ in accordance with state design guidelines. This provides better
access to the small industrial area just north of the bridge. The sidewalk system
will be expanded north in 2026 helping to enhance pedestrian connectivity
between the Fred Meijer Pioneer Trail and West Catholic High School.
Page 25 of 36
Fun Facts:
• It was manufactured in 18 different pieces in Bay City, Michigan. It was shipped
150 miles to Walker on 18 "oversize load" semis.
• The larger arch sections weigh 50,000 pounds each, and the total weight is over
600,000 pounds.
• The monstrous crane that was used to place the arches had a rated capacity to lift
500,000 pounds!! It rents out from Erickson's for $10,000 per day. It was on
the site for three days.
• The arch bridge is designed to carry a train locomotive weighing 568,000
pounds.
• The arches are supported by a steel reinforced concrete foundations that rest on
top of 76 steel piles that go down over 50 feet into the ground. Each individual
pile can support well over 200,000 pounds.
• The road was lowered 2.5' and the train tracks were raised nearly 4 feet to gain
the increased clearance from 10 feet to 14.5 feet.
• 74,000 pounds or steel reinforcing (37 tons)
• 1,664,000 pounds of concrete (832 tons)
Center Drive Roundabout
If you have been a long time customer of the Green Ridge Shopping Center you
have probably experienced the irregular traffic pattern along Center Drive. This
is the entrance adjacent to Taco Bell, Panera Bread and Target. It also serves as
the primary access for an apartment complex, 4 hotels, and dozens of restaurants
and stores. This short section of roadway was redesigned several times to try and
enhance safety and efficiency. The access to adjacent businesses has made this
challenging. In 2024 we installed a roundabout on Center Drive at Weatherford
Drive, just east of Target. This improvement was first proposed in 2006 in
collaboration with the owners of the Green Ridge Shopping Center. The new
roundabout has eliminated an aging traffic signal and provides a safe alternative
for all the left turning vehicles. The roundabout has also greatly enhanced
efficiency at the intersection during busy hours. The new center island includes a
ledgestone structure with trees and lighting along with colored concrete around
the circle and in the divider islands. Our team of design professionals worked
closely to ensure that this single lane roundabout would be easy to understand as
well as fitting within the character of the adjacent shopping and residential
districts.
While we can’t do anything about the number of vehicles along Alpine Avenue
(M-37), this improvement has helped to upgrade safety and efficiency to a diverse
part of the city, east of the busy state highway.
Walker Avenue North
In the fall of last year we took on the difficult task of improving Walker Avenue
between Northridge Drive and Four Mile Road. As part of our preparation for
this years Fruit Ridge Interchange upgrade, we collaborated with the Kent County
Road Commission in reconfiguring and signalizing the intersection of Four Mile
Road and Walker Avenue. We also widened the roadway, with the addition of
Page 26 of 36
some private developer funding, to facilitate improved frontage for the 3
commercial lots that were within the original Walkerview Industrial Park. This
corridor work needed to be completed by November 15th to be ready take the load
of detoured traffic this year while the Fruit Ridge bridge over 1-96 is out of
service. The final layer of pavement went down on November 14th, just as the
asphalt plants were preparing to close for the season.
DDA Streetlights
The Standale Downtown Development Authority (DDA) took on an ambitious
plan to upgrade all the street lighting in the Standale Business District. This plan
included removing 30 year old lights along Lake Michigan Drive (M-45) and
replacing them with a more modern lighting system that is focused on lighting the
sidewalk. The new lights are set up to allow for flower baskets and banners to
facilitate different themes throughout the year. They also have an electrical outlet
to allow for special holiday lighting. New lighting has also been added along
Wilson Avenue (M-11) in front of the Meijer and Westown Apartments.
Watermain Looping
Michigan’s Department of Environment, Great Lakes, and Energy (EGLE)
conducts regular reviews of our public utility systems. In our last formal review
they recommended that we make several watermain connections to ensure that
our system was adequately looped. Looping in a water system allows better flows
for fire fighting and helps to reduce stagnant water that might sit in the pipe of a
long dead end.
In 2024 we bid out a project to connect a loop along Four Mile Road between
Fruit Ridge Avenue and the existing elevated water tank. The watermain in this
area was originally designed to serve parts of Alpine Township further to the
north, but they split off and joined the Plainfield water system in the late 90’s.
This first loop is now and place and it closes that gap and improves system
reliability along Fruit Ridge Avenue. This was another critical 2024 item as it
required a short lane closure along Four Mile Road, our primary Fruit Ridge
detour for 2025.
Our 2024 looping project also includes a gap along O’Brien Road. We will be
extending watermain from Sunset Hills Avenue east to Maynard Avenue. During
this project we will likely have a temporary traffic signal to allow a single lane to
stay open. This work will take place in late September and October of 2025.
M-11 & Leonard Turn Signals
During 2024 we collaborated with MDOT to install a new traffic signal at the
intersection of Leonard Street and Wilson (M-11). The improvement brought
dedicated left turn movements to all four legs of this critical intersection. This
location becomes very busy during the school year with many students from the
West Michigan Academy of Environmental Science using the Rapid bus system
and navigating the crosswalks to get safely to their campus. Increased parent
traffic at WMAES and Kenowa’s Zinser Elementary amplify the need for this safe
left hand turning movement. They were also installed with mast arms,
Page 27 of 36
illuminated street names and countdown pedestrian timers, consistent with our
Mast Arm Policy.
Ongoing:
Walker Library
The 25,000 square foot expansion of the Walker library is approaching the
halfway point of construction. The steel frame is in place and in September the
glulam wood beams that support the roof will be installed. The entire structure
will be enclosed this fall and interior work will proceed throughout the winter.
We hope to cut the ribbon on the facility in October of 2026.
The new library will have a long list of new amenities to support KDL’s operation
of the branch along with providing resources for residents and business owners in
Walker. They include:
Two community conference rooms with space for training and events
E-Sports gaming center
Podcast room
Digital Walker history wall
Walker’s IT Department
Outdoor deck with gas fireplace
Outdoor plaza between the library space and the community center
Fruit Ridge over I-96 Interchange and Regional Trail Connector
After 5 years of aggressively pursuing funding at the local, state, and federal
level, the Fruit Ridge interchange project is actually under construction. This $32
Million effort includes:
Two 5 lane wide bridges over I-96
Three new mast arm traffic signals
A continuous center turn lane north on Fruit Ridge Avenue
Non-motorized trail connecting the Musketawa and Pioneer trails with
City Central Park and the Fred Meijer Standale Trail
A new box culvert under Fruit Ridge Avenue
Sidewalk connections throughout the corridor
New crossing arms for the Coopersville & Marne Railway crossing
Watermain Looping – South
Beginning in mid-September we will begin the second part of our water system
looping along O’Brien Road. This will increase fire flow, system reliability, and
redundancy for users along O’Brien Road, Sunset Hills Avenue, and Maynard
Avenue.
Maplerow Sidewalk
The City Commission has dedicated funding to construct a sidewalk along the
west side of Maplerow Avenue, south of Leonard Street. This street is stubbed to
the south to the old Lincoln Lawns golf course. The Waterford Village project
will be extending Maplerow south in the coming year to connect 2 new single
family home plats. While the City does not traditionally spend public dollars on
sidewalks for local roads, this situation will allow continuous non-motorized
Page 28 of 36
access through these neighborhoods from Leonard Street to Lake Michigan Drive.
North Park Street & West River Traffic Signal
We have designed a new mast arm traffic signal for this location. The signal will
upgrade the lights to LED, add countdown pedestrian timers, and include
illuminated street signs.
Alpine and Hillside Traffic Signal
We have designed a new mast arm traffic signal for this location. The signal will
upgrade the lights to LED, add countdown pedestrian timers, and include
illuminated street signs.
Future:
Bristol Improvements
Design has already begun for a fully improved Bristol Avenue from Three Mile
Road south to the Pannell bridge. This effort includes concrete curb & gutter,
storm sewer, sidewalk, and a center turn lane. We will also take the opportunity
to extend public sanitary sewer and watermain along this corridor. The proximity
to underserved areas will make it much easier to consider future public utility
expansions into the neighborhood, as additional requests come in.
Richmond Widening Gordenshire to Deerfield (Around M-11)
The Engineering Department is seeking proposals for the design of the Richmond
West project. The improvement will include center turn lanes on Richmond both
east and west of Wilson Avenue (M-11). We have been lobbying for similar
enhancements to M-11 along with a signal. The width of our local roadway is a
limiting factor in the ability to signalize the intersection. Our work will set the
intersection up for a future signal with pedestrian crossing controls. It will also
separate the vehicular and non-motorized traffic within this tight space.
Kinney & Three Mile Traffic Signal
We continue to target one intersection per year for signal upgrades and
modernization. The next intersection will be the Kinney Avenue and
Three Mile Road traffic signal. This location still has the older style
diagonal span wire. Industry standards now call for a box span or mast arm
configuration. The signal’s left turn light will be upgraded to match the newer
standards from the Michigan Manual of Uniform Traffic Control Devices
(MMUTCD). Countdown pedestrian crossings will also be added to assist trail
users that are navigating between the Musketawa and Fred Meijer Standale trails.
There are many other critical items taking place as we continue to work on existing and future
projects. We also remain busy with administering many of the behind the scenes program tasks
like soil erosion, stormwater audit from EGLE, Act 51 compliance, asset management, FEMA
floodwall certification, etc. And we have a big group of residential projects beginning to work
through public utility design and review. The increase in residential units appears to be very
significant. We will have a busy year in 2026 with all the associated infrastructure.
Page 29 of 36
Please feel free to have Commissioners reach out to me directly at 616-791-6792 or
sconners@walker.city if they have any questions on these high priority projects or any of the
other tasks under our supervision.
Cc: Frank Wash, Asst. City Manager
Gary Postema, DPW Director
Travis Mabry, P.E., Asst. City Engineer
Jason Washler, P.E. P&N
Dan Fredricks, P.E., LRE
Brian Hannon, P.E., M&B
Page 30 of 36
CITY OF WALKER
HUMAN RESOURCES
MEMORANDUM
TO: Mayor, Commissioners, and City Managers
FROM: Shannon Bales, SHRM-CP, HR Director
DATE: August 12, 2025
RE: Monthly Staff Report
July 2025
Recruiting / Staffing:
Current job openings include: DPW Maintenance (Full-time), Right of Way Technician
(Full-Time, Internal Only), WIFC Front Desk Attendant (Variable Part-time), Police Cadet
(Part-Time), Police Officer (Full-Time), and Paid-on-Call Firefighter (always open).
Interviews were held for the IT Specialist position. Christopher Leaf will be joining the IT
team in August. Welcome Chris!
DPW Maintenance interviews were held in July. We are sorting through details and
preparing offers of employment. One candidate has already accepted the job and will
begin soon. More details are the remaining opening positions soon.
Current employment:
8 Elected Officials
126 FT Employees
69 PT Employees
31 Seasonal Employees
17 Paid-On-Call Employees
Benefits:
Deferred compensation 457(b) plans were updated based on the SECURE 2.0 Act
changes with the service providers. These updates take effect on January 1, 2026. We
will have educational sessions for our employees to explain the changes and how that
could impact their retirement investment options.
Other:
We have a couple more policy updates for the Personnel Committee in August. A new
artificial intelligence (AI) policy and an updated travel policy are coming soon.
We continue to work on succession planning for various departments. The last few months
have focused on the DPW and Engineering. We will have details for the Personnel
Committee regarding potential changes in August.
Many other personnel and related activities were addressed this month.
Page 31 of 36
CITY OF WALKER
WALKER ICE AND FITNESS CENTER
MEMORANDUM
TO: Mayor, Commissioners and City Managers
FROM: Mary Kay Sherman
DATE: August 11, 2025
RE: July 2025– City Staff Report
Rec Dept:
• Busy with soccer, teams assembled, scheduling practices, scheduling soccer officials, game
schedule, and ordering 415 shirts this season for teams.
• Park rentals are still busy.
• Michelle is working with Rec. departments from Ada and Wyoming, planning a tri city adult
softball tournament on Aug. 23 in Ada. Our winning teams from Walker are excited to participate.
• The two new Chalk the Park events in July were well attended.
Fitness Dept:
• Walking club started on June 11 and the last day will be August 13. Around 35 seniors (Silver Sneakers)
participated this year.-
• Hired a new Personal Trainer. Jacob Gillett he started in July.
• Personal Trainer, Jeremiah last day was on July 18. He moved to Texas
• New classes added to the fitness schedule starting Aug 20. Cardio & Strength at 6:05pm & Thighs, Butt
& Guts at 7:05pm with Aimee Stevens. Saturday Zumba will return on September 6th
• Ordered new equipment. Assault Bike (just received last week). Ordered 45lbs-2.5lbs urethane grip
plates and straight and curl barbell preload bars 20lbs-110lbs. This will replace all the old metal plates.
Should receive equipment in 6 weeks.
Facility
• The next scheduled blood drive is Wed, Aug 20th from 1-6pm in Meeting Room A
• Working on front desk staff schedules as well as hiring for the upcoming hockey season in
concessions and pro shop.
• Work continues on our CIP plan.
• We gave the front desk area a paint and refresh.
• Our facility will be CLOSED on Labor Day, Mon, 9/1/25.
Page 32 of 36
• Hope Collaborative continues to help with the Little Free Food Pantry in our Lobby. They will be
making sure the shelves are stocked and help get the word out to those in need. We are always
accepting non perishables and toiletries.
Ice
• HAWK has its house evaluations the week of August 11th. This is also the last chance for
players to order any jerseys or HAWK gear through our pro shop
• HAWK has its Kick Off Party on August 17th at the WIFC from 2-4 pm. This is a 2hr open skate
for HAWK Families and an opportunity for families to meet coaches and mingle
• Pro Shop is almost completely restocked! Great deals on last year models and some exciting
new products in the shop. Mystery Mini sticks will be here in October, always quick to sell out
• Our Current Session of LTS/LTPH ends Aug 20th. the 2025/25 season of Learn to Skate and
Learn to play begins September 13th
• Cross Ice Hockey registration is now open. Practices begin in early October
Page 33 of 36
CITY OF WALKER
INCOME TAX DEPARTMENT
MEMORANDUM
TO: Mayor, Commissioners, City Managers, Finance Director
FROM: Cherie Roberts, Administrator
DATE: August 13, 2025
RE: July 2025 Monthly Staff Report
Individual Income Tax
Individual returns are separated into workflows:
1) E-filed return that come from paid preparers:
As of August 13 (the last export date) we have processed approximately 11,500 e-
filed returns.
2) Paper returns that must be entered by hand:
As of August 13, we have entered approximately 13,000 paper returns for processing.
We will continue to process refunds on returns that were missing information as all
required documents are received. We have also started processing balance due
returns and zero balance returns.
Corporate/Partnership Income Tax
We continue to process returns received with payments, carryforward requests and zero
balance returns.
Page 34 of 36
CITY OF WALKER
Finance/Treasurer Department Staff Report
August 2025
The collection of the 2025 summer property tax bills continues to proceed smoothly. The
changes approved by the Walker Board of Review in July 2025 have all been entered into
the property tax computer system and revised bills have been mailed to the appropriate
property owners. We continue to receive payments at a steady pace.
Our department continues to work on multiple items related to the end of the fiscal year
on June 30, 2025. Our auditors will be in the office the week of September 22, 2025.
I will email you a copy of the July 2025 bank balance report once I have completed it.
If you have any questions, please feel free to call me or stop in the office. Thank you.
Submitted on August 13, 2025 by:
Dan DeVries
Walker City Finance Director/Treasurer
616.791.6852
Email: ddevries@walker.city
Page 35 of 36
Walker Temporary Library
August Monthly Report
Walker Temporary Library July Statistics
In July, 13,673 physical items circulated. This included items checked out and renewed for
more loan time.
In July, we held 20 programs attended by 1,181 patrons. This is an average of 59 patrons per
program.
6,261 cardholders who live in Walker used their card in the last 12 months. This includes
individuals and families who share a library card.
Summer Wonder 2025
700 patrons completed the summer wonder program as of last week. While the Summer
Wonder program has officially wrapped up, we are still handing out prizes to visitors
through the end of this week.
During Summer Wonder, we held programs at the park, at the fire station and in the library.
During July, we even held a program in the strip mall parking lot, meet the minis. It was fun
to see families lined up to pet mini horses right in front of the temporary library!
Meet The Minis in front of the Temporary Library Intern Jacob Henk at Alligator Sanctuary
Library Updates
We’ve been keeping patrons updated about the progress of
the new library on Facebook and on the library website.
Patrons in the library can also see up to date pictures of the
construction progress on the digital signage behind the
service desk. The digital signage is easy to update, and
patrons and staff both get excited seeing the progress. We
are grateful to City of Walker Communications Manager
Nicole DiDonato for sending us pictures almost every week,
and Social Media and Content Specialist Nicki Prentler for
taking beautiful pictures! Digital Display at Walker Temporary Library
Page 36 of 36
Get email alerts for Walker
A daily email when new agendas and minutes are posted.