Mobility & Infrastructure Committee
Regular MeetingWalker, MI · February 12, 2024
Agenda
MOBILITY & INFRASTRUCTURE COMMITTEE AGENDA
COMMISSION CHAMBERS
4243 REMEMBRANCE RD. NW.
MONDAY, FEBRUARY 12, 2024 5:30 PM
Call Meeting to Order - Record Attendance
1. Committee members: Steve Gilbert (Chair), Elaina Huizenga-Chase,
Jessica Babcock, and Alternate is Thom Burke
Discussion Items
1. Approval of Meeting Minutes from May 22, 2023
2. Parks Master Plan
https://walker.city/DocumentCenter/View/2685/OFFICIAL_PUBLICATION_2023-
Walker-Parks-Master-Plan-PDF?bidId=
3. Capital Improvement Plan
4. Future Meeting Topics for Discussion
Adjournment
Page 1 of 11
MOBILITY & INFRASTRUCTURE COMMITTEE MEETING MINUTES
COMMISSION CHAMBERS
MONDAY, MAY 22, 2023
5:00 PM
Call Meeting to Order - Record Attendance
a) Committee members: Steve Gilbert (Chair), Roxanne Deschaine, Elaina
Huizenga-Chase, and Alternate is Thom Burke
In Attendance: Frank Wash and Scott Conners
Discussion Items
a) Approval of Meeting Minutes for March 13, 2023
Motion by Roxanne Deschaine, seconded by Elaina A. Huizenga-Chase to
approve the March 13, 2023 meeting minutes. Motion Carried.
b) Sidewalk Improvement Plan
City Engineer, Scott Conners, gave a presentation to the committee on the city's
sidewalk plan. He stated that the last Sidewalk Master Plan was implemented in
1999 and included a 5 year policy and a 25 year policy. Many of the goals from
that plan have been met including work along major streets; Remembrance,
Leonard, and Richmond, as well as along Kinney and Fruit Ridge/I-96. S.
Conners also spoke of the many trail improvements around the city with one of
the major projects being connecting to the Musketawa, Kent, and White Pines
Trails. Funding options for sidewalk and trail improvements were then
discussed.
The committee reviewed the priority project list provided by Scott Conners.
Current planned projects include sidewalk improvements along Bristol, Lake
Michigan Dr., 4 Mile and Walker Ave. Priority projects include improvements
along Ferris/ Hillside, Cummings, Maplerow, and Richmond.
Commissioner Gilbert shared the sidewalk survey results with the committee. He
said that ~100 responses were received. Of the top 5 projects, 4 out of 5 are
already being addressed. He said that there were 27 responses suggesting
sidewalk improvements to Wilson Ave (East Side) between Leonard and
Richmond with concerns about crosswalks at the intersection of Wilson and
Mobility & Infrastructure Committee Minutes 5-22-23
Page
Page21ofof11
2
Leonard. S. Conners stated that there are plans to upgrade the traffic signal at
the intersection.
Discussion was held about options for Maplerow and Ferris/Hillside.
Next Steps
Comm. Gilbert likes the list provided and would like to see the priority projects
completed first followed by the remaining planned projects. He will send the
survey results to S. Conners. S. Gilbert advised the committee to continue
listening in neighborhoods and provide feedback to city staff.
Comm. Huizenga-Chase would like to see more 3rd ward projects and
suggested sidewalk improvements along Riverbend, Hall, and around the
Covenant Christian campus.
S. Conners will gather information and data regarding the area of Ferris and
Hillside. He will provide the committee with the best options for improvements to
the area.
Adjourned at 6:00PM
Mobility & Infrastructure Committee Minutes 5-22-23
Page
Page32ofof11
2
CITY OF WALKER 02/08/2024
5 Year Capital Needs Improvement Plan (CIP) DDV
2023 - 2028 (Working Copy)
For 02/12/2024 Mobility & Infrastructure Meeting
Description 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 Funding Source
Technology (City Wide) (Charged to Dept 101-228 unless noted)
I.T. Department / City Wide
Computer Hardware $ 35,000 $ 70,000 $ 40,000 $ 40,000 $ 40,000 $ 4,000 General Fund - GL#101-228-956.500
Citywide Computer & Monitor Refresh Project $ 175,000 $ 250,000 General Fund - GL#101-228-956.500
Server & Network Infrastructure (Backup Upgrades) $ 50,000 $ - $ 50,000 General Fund - GL#101-228-956.500
Computer System Security Consulting $ 20,000 $ 17,600 $ 15,000 $ 15,000 $ 15,000 $ 15,000 General Fund - GL#101-228-804.100
Computer System Monitoring (through US Signal) $ 40,000 $ 40,000 $ 40,000 $ 40,000 General Fund - GL#101-228-956.100
Website Upgrade $ 40,000 $ 50,000 General Fund - GL#101-228-956.300
Firewall Renewals $ 20,000 $ 20,000 General Fund - GL#101-228-956.200
Fiber Maintenance $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 General Fund - GL#101-228-956.400
VPN Software for In-Car Systems - PD & FD $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 General Fund - GL#101-228-956.200
WIFI Upgrades $ 100,000 General Fund
Network Redundancy - Kenowa/Walker Fiber Option $ 100,000 General Fund - GL#101-228-956.400
Building Security Upgrades - City Wide (ARPA Funded) $ 612,830 $ - $ - ARPA Funds (Fund 285)
Building Security Upgrades - City Wide (General Fund) $ 20,000 $ 10,000 $ 10,000 $ 10,000 General Fund
I.T. Related Routine Maintenance
Computer Software - Various Upgrades $ 2,500 $ 2,500 $ 2,500 $ 2,700 $ 3,000 General Fund - GL#101-228-956.130
Phone System - Maintenance $ 60,000 $ 38,280 $ 39,428 $ 40,611 $ 41,829 General Fund - GL#101-228-956.450
License Services - Cloud Services $ 86,000 $ 111,600 $ 114,948 $ 118,396 $ 121,948 General Fund - GL#101-228-956.100
Department Specific
Smart Scanner Machine for Income Tax $ 28,000 General Fund - GL#101-240-956.520
HRIS System (Implementation & Annual Fee) $ 25,000 $ 15,000 $ 15,000 $ 15,000 General Fund - GL#101-270-956.150
BSA Miscellaneous Receivable Module - Finance/Treasury $ 10,000 General Fund - GL#101-191-956.150
Axon Cameras - Police Dept $ 120,000 General Fund - GL#101-301-974.300
I.T. Related General Office Equipment Replacements
Office Equipment Replacements (copiers, scanners) $ 6,000 $ 7,000 $ 7,500 $ 7,500 $ 7,500 $ 7,500 General Fund - GL#101-901-980.310
Postage Machine Replacement $ - $ 10,000 General Fund
Page 4 of 11 Page 1 of 8
CITY OF WALKER 02/08/2024
5 Year Capital Needs Improvement Plan (CIP) DDV
2023 - 2028 (Working Copy)
For 02/12/2024 Mobility & Infrastructure Meeting
Description 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 Funding Source
Vehicles & Equipment
Public Works
Air Compressor $ 25,000 Capital Equip Fund - part of rental fee
800 MHz Radios - Portables for DPW $ 75,000 $ - --> Spent $72,112 in FY 2023-2024 Capital Equip Fund - part of rental fee
Blower Attachment for Trackless Machine $ 10,500 -> 50% here; 50% DDA Fund 251 Capital Equip Fund - part of rental fee (50% paid by DDA)
Bobcat Replacement (Toolcat) $ 80,000 $ - Capital Equip Fund - part of rental fee
Bucket Truck $ 50,500 Capital Equip Fund - part of rental fee
Chipper Repair (sandblast & paint) $ 20,000 Capital Equip Fund - part of rental fee
Crack Fill Machine $ 70,000 Capital Equip Fund - part of rental fee
Front End Loader $ 180,000 Capital Equip Fund - part of rental fee
Hi-Lo Vehicle - Electric $ 17,500 -> 50% here; 50% WIFC Fund 298 Capital Equip Fund - part of rental fee (50% paid by WIFC)
Hookload Dumpsters (2) $ 18,000 Capital Equip Fund - part of rental fee
Hot Patcher $ 27,000 $ - Capital Equip Fund - part of rental fee
Maintenance Vehicle Replacement $ 55,000 $ - $ 40,000 Capital Equip Fund - part of rental fee
Mastic Machine $ 85,000 Capital Equip Fund - part of rental fee
Message Boards $ 45,000 Capital Equip Fund - part of rental fee
Mini Excavator $ 150,000 Capital Equip Fund - part of rental fee
Misc DPW Equipment $ 15,000 $ 15,000 $ 20,000 $ 20,000 $ 20,000 Capital Equip Fund - part of rental fee
Mower Replacements (Zero turn) $ 32,000 $ - Capital Equip Fund - part of rental fee
Mower Replacement (Industrial multi blade mower) $ 70,000 $ 80,000 Capital Equip Fund - part of rental fee
Pick-up Truck - Shop Truck with Tool Storage & Plow - 3/4 Ton $ 75,000 Capital Equip Fund - part of rental fee
Pick-up Truck Replacements - Half Ton $ 80,000 $ - $ - $ 45,000 $ 45,000 Capital Equip Fund - part of rental fee
Pick-up Truck Replacements - One Ton with plow $ 130,000 $ - $ - $ 70,000 $ 70,000 Capital Equip Fund - part of rental fee
Pool Car Replacements $ 66,000 Capital Equip Fund - part of rental fee
Pool Car Replacements $ 30,000 $ - Capital Equip Fund - part of rental fee
Power Washing Station $ 20,000 Capital Equip Fund - part of rental fee
Scissor Lift ($13,000) & Cement Mixer ($3,000) $ 16,000 $ - Capital Equip Fund - part of rental fee
Sign Shop Printer (54" Printer with Laminator) $ 25,000 Capital Equip Fund - part of rental fee
Skid Steer (Second Skid Steer for DPW fleet) $ 100,000 $ 100,000 Capital Equip Fund - part of rental fee
Brush Cutter $ 40,000 Capital Equip Fund - part of rental fee
Stump Grinder $ 8,000 Capital Equip Fund - part of rental fee
Single Axle Dump Truck with Swaploader $ 280,000 $ 315,000 $ 355,000 Capital Equip Fund - part of rental fee
Snow Pusher for Big Loader $ 24,000 Capital Equip Fund - part of rental fee
Sweeper Vehicle (Pelican/Elgin) $ 200,000 Capital Equip Fund - part of rental fee
Swivel Grapple Attachment for Skid Steer $ 14,000 Capital Equip Fund - part of rental fee
Tandom Axle Dump Truck with Swaploader $ 390,000 $ 355,000 Capital Equip Fund - part of rental fee
Tire Balancing Machine - DPW Garage $ 7,500 Capital Equip Fund - part of rental fee (GL#-590-963.661)
Trailer Replacement $ 8,000 $ 8,000 Capital Equip Fund - part of rental fee
Truck Replacement - One Ton Dump Truck $ 48,000 $ - $ 70,000 Capital Equip Fund - part of rental fee
Subtotals $ 445,000 $ 990,000 $ 1,142,000
$ 1,435,000
Page 5 of 11 Page 2 of 8
CITY OF WALKER 02/08/2024
5 Year Capital Needs Improvement Plan (CIP) DDV
2023 - 2028 (Working Copy)
For 02/12/2024 Mobility & Infrastructure Meeting
Description 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 Funding Source
Vehicles & Equipment
Police
Pursuit Rated Vehicles - Tahoes or Pickups (3 per year) $ 100,000 $ 139,000 $ 165,000 $ 180,000 $ 190,000 Capital Equip Fund - part of rental fee
PD Equipment to outfit Tahoes/Pickup $ 42,000 $ 36,000 $ 72,000 $ 45,000 $ 48,000 Capital Equip Fund - part of rental fee
Police Department Staff Cars (FY 22/23 car instead of third Tahoe above) $ 35,000 Capital Equip Fund - part of rental fee
Police Department Staff Car (2 Detective cars in FY 24/25) $ 30,000 $ - $ 80,000 $ 90,000 $ 90,000 Capital Equip Fund - part of rental fee
Transport Vehicle - Van Ordered $ 40,000 Forfeiture Fund - probably Capt Equipmt Fund
Police Command Vehicle $ 300,000 --> might be $400K-$450K, add'l not ARPA ARPA Funds (Fund 285)
Police Armored Vehcile $ 350,000 Illustrative
Fire
Vehicle Replacement Set-Aside $ - $ 200,000 $ 200,000 Capital Equip Fund - part of rental fee
Platform Truck Replacement (IPA Loan with Macatawa Bank) (#120) $ 406,000 Ordered Capital Equip Fund - part of rental fee
Ladder 1 - Replacement (#116) $ 1,500,000 ARPA Funds (Fund 285)
Support 1 - Repaint $ 75,000 Capital Equip Fund - part of rental fee
Tender 1 - Tank Replacement (still in progress, possibly $95,000 final cost) $ 35,000 Capital Equip Fund - part of rental fee
Engine 1 - Replacement $ 1,000,000 Capital Equip Fund - rental fee / set aside / loan
Engine 2 - Replacement (#127) Capital Equip Fund - rental fee / set aside / loan
Engine 3 - Replacement (#126) Capital Equip Fund - rental fee / set aside / loan
Engine 4 - Replacement (#127) $ 1,000,000 Capital Equip Fund - rental fee / set aside / loan
Engine 5 - Repaint cab & touch up chassis (Refurb) (#118) $ 100,000 Capital Equip Fund - part of rental fee
Engine 5 - Replacement (#118) Replace in FY 2029/2030
Staff Car Replacements (Pickup Trucks or Tahoes) (Car 1 in 2024/25) $ - $ 65,000 $ 70,000 Capital Equip Fund - part of rental fee
Duty Vehicle Replacement (Pick Up Truck or Tahoe - TBD) (Car 4) $ 65,000 Capital Equip Fund - part of rental fee
New Turnout Gear $ 42,000 $ 35,000 $ 35,000 $ 35,000 $ 35,000 $ 35,000 General Fund - GL#101-336-772.000
Extrication Tools for Station #3 $ 42,000 General Fund - GL#101-336-974.336
Fire Hose Replacement $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 General Fund - GL#101-336-933.000
Exhaust System for Station #2 (Replacement in FY 2024-2025) $ 17,500 $ 12,600 $ 58,000 General Fund - GL#101-336-974.336
Exhaust System for Station #3 $ 21,000 General Fund - GL#101-336-974.336
Repairs-Station #2 Kitchen Area (Flooring, Countertop, Windowsill Replace) $ 16,000 General Fund - GL#101-336-974.336
Slop Sink Installation for Station #3 $ 7,000 General Fund - GL#101-336-974.336
Extractor Washer / Turnout Dryer / SCBA Washer (Stations #2 & #3) Moved to 23/24 $ 10,000 --> Walker's match on FEMA Grant FEMA Grant (total project cost = $108,600)
Page 6 of 11 Page 3 of 8
CITY OF WALKER 02/08/2024
5 Year Capital Needs Improvement Plan (CIP) DDV
2023 - 2028 (Working Copy)
For 02/12/2024 Mobility & Infrastructure Meeting
Description 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 Funding Source
Equipment
Ice and Fitness Center (WIFC)
ICE:
Munters Unit-rebuild & upgrade (leave on roof) $ 180,000 WIFC Operating Fund - GL#298-771-976.500
Roof Replacement on Ice Side of Building $ 200,000 WIFC Operating and/or Capt Reserve / Gen Fund
Repair Ice Arena Interior Wall Repair (above player benches) - After Roof Repair $ 50,000 WIFC Operating Fund - GL#298-780-935.100
Top End Overhaul of Ice Compressors (2) $ 15,000 WIFC Operating Fund
Hockey Goals & Nets $ 5,000 WIFC Operating Fund - GL#298-771-976.500
Flooring Replacement - Hockey Locker Room Entrance $ 10,000 $ 10,000 WIFC Operating Fund - GL#298-771-976.500
Flooring Replacement - Hockey Locker Rooms (4) $ 60,000 WIFC Operating Fund
Ice Arena Sound System Upgrades $ 23,600 WIFC Operating Fund - GL#298-771-976.500
Replace Ice Rink Glass $ 15,000 $ 6,000 WIFC Operating Fund - GL#298-771-976.500
Install Protective Netting Around Ice Rink $ 20,000 WIFC Operating Fund
Replace Scoreboard in Ice Arena ?? WIFC Operating Fund
Electric Hi-LO Machine (50% paid by WIFC, 50% paid by Fund 661) $ 17,500 WIFC Operating Fund
Electric Glass Lifter $ 5,100 WIFC Operating Fund
FITNESS:
Fitness Locker Room Refurbishments $ 100,000 WIFC Capital Improvement Reserve
New Fitness Equipment $ 20,000 $ 20,000 $ 30,000 $ 30,000 $ 30,000 $ 35,000 WIFC Operating Fund - GL#298-772-976.510
New Audio Equipment for Aerobics Room $ 2,000 WIFC Operating Fund - GL#298-772-976.510
Replace Aerobic Room Flooring $ 50,000 WIFC Operating Fund - GL#298-772-976.520
Fitness Area TV Replacements & Add One TV $ 15,000 WIFC Operating Fund - GL#298-772-976.510
Stream Room Generator Replacement (through Trane) $ 10,000 WIFC Operating Fund
Men's Streamroom Tile & Dry Sauna Board Replacement $ 8,000 WIFC Operating Fund
RECREATION:
Upper 2 Soccer Fields - Repair & Replace (listed in Parks/Rec section below) $ 300,000 General Fund - GL#101-751-974.700
Software Upgrades for Civic Rec $ 3,000 WIFC Operating Fund
New Rec Programs - Start up $ 5,000 $ 5,000 WIFC Operating Fund - GL#298-773-960.000
OTHER:
Carpet Replacements $ 5,000 WIFC Operating Fund - GL#298-780-974.500
Concession Equipment Replacement $ 6,000 $ 6,000 WIFC Operating Fund - GL#298-775-
Copy Machine Replacement $ 7,000
Floor Scrubbers (2 New Larger Units) $ 17,000 WIFC Operating Fund
Front Entrance Cement Replacement $ 18,000 WIFC Operating Fund - GL#298-780-974.500
Furniture for Fitness Sitting Area $ 9,000 WIFC Operating Fund - GL#298-780-974.500
Meeting Room Chairs (Replace Original Chairs) $ 12,000 WIFC Operating Fund
Roof Replacement (Fitness Side) $ 200,000 WIFC Capital Improvement Reserve
Washer & Dryer (New Units to Replace Original Units) $ 10,000 WIFC Operating Fund
Additional Hockey Locker Rooms Illustrative
Chiller Unit WIFC Capital Improvement Reserve
Exterior Sealant for Brick - EFIS (Last Completed June 2021) WIFC Operating Fund
Generator for WIFC Building $ 800,000 WIFC Capital Improvement Reserve
or Install Switch Gear on Building for Portable Generator Connection $ 260,000 WIFC Capital Improvement Reserve
Hockey Locker Room Refurbishments WIFC Capital Improvement Reserve
Larger Fitness Class Room WIFC Capital Improvement Reserve
Parking Lot - Resurface General Fund - GL#101-901-979.000
Rebuild Air Handling Units (AHU) WIFC Operating Fund
Remodel Childcare Room into Offices, Storage, or Hockey Locker Room WIFC Operating Fund
Page 7 of 11 Page 4 of 8
CITY OF WALKER 02/08/2024
5 Year Capital Needs Improvement Plan (CIP) DDV
2023 - 2028 (Working Copy)
For 02/12/2024 Mobility & Infrastructure Meeting
Description 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 Funding Source
Buildings & Grounds
Specific Buildings
City Hall
CC Chambers Wall Treatments $ 30,000 General Fund
Landscaping at City Hall Complex / Plan Development (outside firm) $ 20,000 General Fund - GL#101-901-824.100
Landscaping at City Hall Complex (Construction) $ 125,000 General Fund - GL#101-901-824.101
Exterior Painting $ 5,000 $ 6,000 General Fund - GL#101-901-934.802
Flooring for City Hall Lunch Room / Garage Office / DPW small bathroom $ 7,000 General Fund - GL#101-901-934.801
Window Treatments $ 20,000 General Fund - GL#101-901-934.800
Breakroom Upgrades DPW / City Hall $ 45,000 General Fund - GL#101-901-934.805
Air Compressor $ 30,000 General Fund
ADA Doors - DPW $ 5,000 General Fund - GL#101-265-935.000
Interior Signs $ 3,000 General Fund
Ventilation in the Motor Pool Garage $ 30,000 General Fund
DPW Garage Floor $ 80,000 General Fund
Library Building
Library Furnishings / Minor Improvements $ 5,000 $ 10,000 General Fund - Part of GL#101-265-935.800
New Library Building (Construction Summer 2025) General Fund / Bond
Public Safety Building (PSB)
Back-up Generator(s) / Switch Gear $ 65,000 $ 175,000 General Fund - GL#101-901-988.300
Elevator - upgrades & refurbish $ 120,000 General Fund
Carpet for Sergeant's Office/Court $ 30,000 General Fund
Building vision / redesign Illustrative (General Fund)
Fire Station #2
Roof Improvements $ 35,000 General Fund - GL#101-901-988.301
Sealant $ 35,000 $ - General Fund - GL#101-901-988.301
Breakroom Improvements $ 4,000 General Fund - GL#101-336-974.336
Flooring in Commuinity Room and Day Room on Lower Level $ 25,000 $ 150,000 General Fund
Garage Doors $ 120,000 General Fund
New Shingled Roof Cost TBD Illustrative (General Fund)
Furnace Replacements (8 in total) / Hot Water Heater Illustrative (General Fund)
Fire Station #3
ADA Upgrades to Lower Level (door openers) $ 5,000 General Fund - GL#101-265-935.000
New Generator for Building $ 100,000 General Fund
Slop Sink $ 7,000 General Fund
Elevator - Upgrades & Refurbish $ 150,000 General Fund
City Wide Building & Grounds
City Signage $ 27,500 $ 75,000 $ 15,000 $ 15,000 General Fund - GL#101-901-978.000
Facilities Sinking Fund (Set Aside - Fund 120) $ 100,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 General Fund - GL#101-970-995.120
HVAC Upgrades (DPW works with Trane to annually determine bldg/system) $ 25,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 General Fund - GL#101-901-980.600
Parking Lot Repairs $ 85,000 $ 85,000 $ 170,000 $ 75,000 $ 75,000 General Fund - GL#101-901-979.000
Salt Building Roof (Reshingle) $ 150,000 General Fund - GL#101-901-
Salt Building (Siding) General Fund - GL#101-901-
Office Furnishings (New Furniture/Chairs) General Fund - GL#101-265-
Page 8 of 11 Page 5 of 8
CITY OF WALKER 02/08/2024
5 Year Capital Needs Improvement Plan (CIP) DDV
2023 - 2028 (Working Copy)
For 02/12/2024 Mobility & Infrastructure Meeting
Description 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 Funding Source
Parks & Rec / Sidewalks / Trails
Parks
Other Park Improvements / Maintenance $ 55,000 $ 75,000 $ 65,000 $ 65,000 $ 65,000 $
70,000 GF / Grants / Donations - GL#101-751-934.400
Upper 2 Soccer Fields - Repair & Replace $ 300,000 General Fund - GL#101-751-974.700
Park Improvements as Prioritized by Mobility/Infrastructure Committee $ 200,000 $ 500,000 General Fund - GL#101-751-974.700
Playground Equipment Replacements (city wide) $ - $ - --> wait for Mob/Infr Comm recommend General Fund
Alpine Estates Park Upgrades $ - $ - --> wait for Mob/Infr Comm recommend General Fund
Chesterfield Pocket Park - Structures $ - $ - --> wait for Mob/Infr Comm recommend General Fund
Community Park Improvements - Electrical $ - $ - --> wait for Mob/Infr Comm recommend General Fund
English Hills Park Equipment $ - $ - --> wait for Mob/Infr Comm recommend General Fund
Harmon Park Improvements - Restroom / Trail Head $ - $ - --> wait for Mob/Infr Comm recommend General Fund
Lincoln Lawns Improvements - Standale Trail Connection COMPLETED General Fund
Orchard Ridge Playground $ - --> wait for Mob/Infr Comm recommend General Fund
Inline Hockey $ 25,000 General Fund - GL#101-751-
Pickleball Courts General Fund - GL#101-751-
Sunset Hills Property Development (38 acres) Illustrative (Mobility & Infrastructure Committee)
Land Acquisitions Illustrative (Mobility & Infrastructure Committee)
Parks Sinking Fund (for Grant Matches) Illustrative (Mobility & Infrastructure Committee)
Sidewalks
Sidewalk Repair / ADA / Gap Fill $ 20,000 $ 25,000 $ 25,000 $ 50,000 $ 50,000 $ 50,000 General Fund - GL#101-444-934.150
Bristol Sidewalk - City Limit to 3 Mile Road - Design $ 100,000 General Fund
Bristol Sidewalk - City Limit to 3 Mile Road - Construct (total est cost = $1M) $ 1,000,000 General Fund / Grant
Bristol Sidewalk - City Limit to 3 Mile Road - Grant Proceeds $ (700,000) General Fund / Grant
Maplerow Sidewalk - Design (delay project?) $ 50,000 Major Street Fund / Act 51 - GL#202-450-985.275
Sunset Hills & 10th Ave Sidewalk projected Major Street Fund / Act 51
4 Mile Sidewalk (East of English Hills) In Progress 100% CDBG Funded
Lincoln Lawns Sidewalk (LMD) - Design $ 25,000 General Fund
Lincoln Lawns Sidewalk (LMD) - Construction (includes Shusta piece) $ 250,000 Grant
St Clair Sidewalk - North of M-45 $ 100,000 DDA - Fund 248
Kings Row Sidewalk - Kinney to Cummings $ 200,000 Illustrative
Waldorf Sidewalk - Bristol to Walker $ 175,000 Illustrative
Bristol - North of Three Mile under I-96 $ 400,000 Illustrative
Trails
Trail Maintenance $ 20,000 $ 20,000 $ 20,000 $ 50,000 $ 50,000 $ 50,000 GF or T&A (Fund 701) / West MI Trail & Greenway Col
(GL#:101-751-934.600)
Standale Trail Tunnel - Enhancements $ 10,000 $ 13,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 Private / Grant / Millage / DDA support
GL#248-572-807.400
Page 9 of 11 Page 6 of 8
CITY OF WALKER 02/08/2024
5 Year Capital Needs Improvement Plan (CIP) DDV
2023 - 2028 (Working Copy)
For 02/12/2024 Mobility & Infrastructure Meeting
Description 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 Funding Source
Roads / Traffic Signals / Streetlights
Roads
Alpine Overlay Construction (Hillside to Ann) - pay out of Major St overlays $ - $ 300,000 Major Street Fund (GL#:202-449-984.100)
Alpine Overlay Design (Hillside to Three Mile NW) projected Major Street Fund
Alpine Overlay Construction (Hillside to Three Mile NW) projected Major Street Fund + Grant = $800K
Bristol / Pannell RR Bridge - Design $ 50,000 Major St (GL #:202-450-985.260)
Bristol / Pannell RR Bridge - Construction (total estimated cost $2.575M) $ 200,000 $ 2,375,000 $ 2,000,000 Major St (GL #:202-450-985.261) - Const Sum 2024
Bristol / Pannell RR Bridge - Grant Proceeds $ (1,700,000) Net Est Cost to Walker = $2,875,000 + CMRR incidentals
Center / Weatherford Round-A-Bout - Design $ 125,000
Center / Weatherford Round-A-Bout - Construction $ 700,000 $ 1,103,000 Major St (GL #:202-450-985.266) - Const Sum 2024
Center / Weatherford Round-A-Bout - Grant Proceeds $ (878,000) Net Est Cost to Walker = $925,000
Road Treatments / Overlays (Major) $ 500,000 $ 200,000 $ 500,000 $ 500,000 $ 500,000 Act 51 / General Fund - GL#202-449-984.100
Road Treatments / Overlays (Local) $ 600,000 $ 600,000 $ 600,000 $ 600,000 $ 600,000 Act 51 / General Fund - GL#203-449.984.100
Wilson / Richmond Intersection (Center Turn Lane - Gordonshire to Deerfield) --> For Improvements on Richmond St
Engineering - Year TBD $ 200,000 Act 51 / General Fund (not grant eligible)
Construction - Year TBD $ 1,100,000 Act 51 / General Fund (not grant eligible)
Kinney (M45 to Leonard) - Widen with Curb & Gutter - Design $ 200,000
Kinney (M45 to Leonard) - Widen with Curb & Gutter - Construction $ 1,200,000 $ 2,000,000 Major St (GL #:202-450-985.271) - Const Sum 2024
Kinney (M45 to Leonard) - Widen with Curb & Gutter - Grant Proceeds $ (1,350,000) Net Est Cost to Walker = $1,850,000
Walker Avenue North (South of 4 Mile Intersection) - Design $ 95,000
Walker Avenue North (South of 4 Mile Intersection) - Construction $ 2,000,000 Major St (GL #:202-450-985.) - Const Sum
Walker Avenue North (South of 4 Mile Intersection) - Reimb from 3 RBC lots $ (436,000) Net Est Cost to Walker = $1,564,000
Walker Ave/Four Mile Intersection (Kent County Project) $ 150,000 Major St (GL #:202-450-985.285) - Walker's Portion
3 Mile / Keyline - Design --> Year TBD Illustrative
3 Mile / Keyline - Construction --> Year TBD Illustrative
Cummings (Lake Michigan Dr to O'Brien) - Widen with Curb & Gutter $ 3,000,000 Illustrative (Local Street)
Kinney (Remembrance to Leonard) - Widen with Curb & Gutter --> Year TBD Illustrative
Ferndale Ave South of M-45 to Meet Connector South of Meijer East to M-11 --> Year TBD Illustrative (Developer / Grant)
Northridge Drive Extension through Engman property --> Year TBD Illustrative (Developer / Grant)
Update Three Mile Center Turn Lane - Walkent to Bristol
Engineering & ROW Acquisition - Year TBD $ 300,000 Illustrative (Potential MEDC grant)
Construction - Year TBD $ 1,400,000 Illustrative (Potential MEDC grant)
Widen Three Mile to 5 lanes between Fruit Ridge and Walker Ave and Remove RR Bridge --> total project est over $8M - year TBD Illustrative
Traffic Signals
Traffic Signals - Maintenance $ 75,000 $ 75,000 $ 80,000 $ 85,000 $ 85,000 $ 90,000 Major Street Fund (GL#202-482-802.000)
Traffic Signals - Improvements (cellular connections-monitoring & programing) $ 10,000 Major Street Fund (GL#202-478-
3 Mile / Remembrance Signal - Local Leg (Walker's match for grant) Major Street Fund
Kinney / Remembrance Signal - Design $ 60,000 Major Street Fund (GL#202-450-985.230)
Kinney / Remembrance Signal - Construction $ 440,000 $ 480,000 --> Completed by Dec 2023 Major Street Fund (GL#202-450-985.231)
Northridge / Fruit Ridge Signal - Construction COMPLETED Major Street Fund (GL#202-450-985.251)
West River / North Park Signal Replacement - Design $ 45,000 Major Street Fund (GL#202-452-985.280)
West River / North Park Signal Replacement - Construction $ 390,000 Major Street Fund
Alpine / Hillside Signal Replacement - Design $ 55,000 Major Street Fund
Alpine / Hillside Signal Replacement - Construction $ 490,000 Major Street Fund
Streetlights
LED Streetlight Bulb Replacements General Fund
Weatherford/Center Streetlight Upgrades $ 50,000 General Fund (GL#101-448-
Page 10 of 11 Page 7 of 8
CITY OF WALKER 02/08/2024
5 Year Capital Needs Improvement Plan (CIP) DDV
2023 - 2028 (Working Copy)
For 02/12/2024 Mobility & Infrastructure Meeting
Description 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 Funding Source
Bridges
Bridge Maintenance $ 5,000$ 5,000 $ 50,000 $ 50,000 $ 50,000 Gen Fund (Design) / Major (Const - 202-449-934.940)
Bristol Railroad Bridge Reconstruction (listed under Road projects above) --> Construction Summer 2024 Major St / Grant
Fruitridge / I-96 Bridge Reconstruction --> Walker was awarded $25M MDOT grant in Jan 2023; Construction in Summer 2025 Various Sources / MDOT / State of Michigan
Drains
Grand River Floodwall & Embankment Improvements $ 21,168 $ 20,608 $ 20,049 $ 19,489 $ 18,930 $ - GF / Grant - GL#101-901-989.000 (Paid Off-Nov 2026)
Misc Drain Projects (Completed by Walker) $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 General Fund - GL#101-445-934.200
SAW Grant Asset Management Projects (no specific expense line) $ 10,000 --> All required actions have been satisfied per S. Conners GL#101-445-934.210
Cogswell Drain Project (separate from Alpine resurfacing project) $ 330,000 General Fund - GL#101-445-934.200
Alpine - Walker Drain $ 45,000 General Fund - GL#101-445-934.200
Drain Repair/Maintenance Expenditures from Kent County $ 150,000 General Fund - GL#101-445-934.
Waldorf Area Drainage / Retention Pond
Study and Design $ 50,000 General Fund
Construction of Structure $ 100,000 General Fund
Utility Projects (Initially Paid out of Walker' Revolving Fund, Then Reimbursed by GR)
English Hills Pump Station Upgrades System Funding
Bristol Bridge - Water Loop $ 100,000 System Funding
Bristol Bridge - Sanitary Relocation $ 130,000 System Funding
General Sewer and Water Oversizing $ 100,000 System Funding
Fenske Area Sanitary Pump Station $ 750,000 System Funding / Developer - Year TBD
Watermain Interconnect - Alpine Township $ 75,000 System Funding (Bundled Together as One Project)
Four Mile Road Watermain Looping $ 1,400,000 System Funding (Bundled Together as One Project)
O'Brien Watermain Looping - Sunset Hills to Maynard $ 1,300,000 System Funding (Bundled Together as One Project)
South Walker Water - Phase III $ 2,000,000 System Funding
Northridge Drive Extension through Engman property (water/sewer) TBD / SAD?
Bond Payments
Fire Station #2 (2017 Refunding Bond) $ 184,370 --> Final paymt May 2023 DDA - Fund 248
Riverbend Area Watermain (2009 Special Assessment Bond) $ 46,695 --> Final paymt Oct 2023 Special Assessments - Fund 854
Downtown Development Authority (DDA) Improvements
Street Lighting Improvements $ 2,000,000 DDA - Fund 248 (GL#248-572-984.020)
Blower Attachment for Trackless Machine $ 10,500 -> 50% here; 50% Capt Equip Fund 661 DDA Streetscape - Fund 251 (GL#251-574-976.495)
Page 11 of 11 Page 8 of 8