Welcome to the Village of Wappingers Falls meeting of the Mayor and Board of
Trustees today Wednesday, July 29, 2020, 5:00 PM.
PLEDGE OF ALLEGIANCE:
ROLL CALL BY THE CLERK OF THE VILLAGE: Mayor Alexander, Trustee Marcojohn,
Trustee Davis, Trustee Komornik, Trustee Huber, Trustee Lammers, Trustee Paonessa,
Village Attorney Wallace.
Notice of Violation 25 South Mesier , Exterior Maintenance.
Notice of Violation 10 North Street, Exterior Maintenance.
KC Engineering Project Discussion.
Projects for Discussion – Village of Wappingers Falls
2020-07-29 Village Board Workshop Meeting
2020 Construction
Village / Franny Reese Park – Ben Ciccone, Inc,
• Construction scope includes Upper Overlook and Lower Overlook
improvements.
• Work continues onsite.
• Central Hudson will set a new pole at the site this week.
• Concrete sidewalk along the frontage of this site is being built this week.
• Electrical work continues onsite.
• Paving onsite will be in August.
• Construction completion date is Sept 11, 2020. Actual completion is targeted
for August 2020.
• Village / TAP PIN 8761.74 Pedestrian Safety Improvements – Con-Tech
Construction Technology, Inc.
• Construction scope includes sidewalks and pedestrian lighting on W Main St
between the limits of the new sidewalk installed in 2019, north of County
Players and south of Ground Hog. The project does not include drainage
Improvements.
• Work continues to progress northward on the west side of W Main St. The
sequence of work generally includes curb and sidewalk demolition, curbing
1
formwork, curbing concrete pour, sidewalk formwork, and sidewalk concrete
pour.
• New sidewalk cross slope provides required minimum 4 feet wide accessible
access.
• Con-Tech is required to maintain access to homes and businesses during the
work. Residents and business owners are encouraged to contact the Con-Tech
Foreman onsite with questions.
• Construction completion date is Oct 17, 2020.
Other Projects and Assignments
• Village / Utility Improvement Contract 5
• Contract 5 will include DW Water Improvements using remaining Village
DWSRF 17419 funds and additional funds needed for the scope.
• Contract 5 scope will include water connection improvements from Village of
Wappingers Falls to the Town of Wappinger on Losee Road.
• Design and regulatory approvals are needed for Contract 5. Bidding is targeted
for late 2020 in preparation for 2021 construction.
• Moving forward with submission to Health Department and Dutchess County
DPW.
• During VWF Contract 5 Design, the Village intends to host a public meeting
with presentation by the Engineer.
• Village / Water Filter Building – Engineer Report for USDA Funding
Application
• KC is working on a USDA Engineering Report in support of a Village funding
application for the proposed Water Filter Building and Facilities at the Water
Supply Facility.
• Nearly complete. Verifying last pieces of information from Village.
• There is a rolling deadline for USDA funding.
• Village / Bain Park Survey and Masterplan
• Draft survey mapping is complete.
• The Village is planning a Project Kickoff Public Meeting for Sept 2020.
• KC Engineering work will follow including:
• Conceptual Master Plan for Bain Park
• Site Design for Playground Equipment Area
• Long Form Part 1 EAF
• Village / Grease Trap Engineering Planning Grant
• Work on the Grease Trap Engineering Planning Grant project continues.
• Project Committee meeting is to be scheduled.
2
• This is a two-year grant. Work will be completed in 2020.
• Village / EPA Grant Brownfield Assessments
• Next Steps – Phase 2 Assessments – Bleachery to move forward.
• Village / Sewer and Water Infrastructure Study – For VWF and Town of
Wappinger
• Draft Sewer and Water Report was provided to Mayor Matt Alexander in Aug
2019.
• KC will provide further circulation and/or revisions upon request of the Village.
• Village / Paggi Terrace Sewer Main and Water Main Extensions
• DCDH design approval for the Paggi Terrace Sewer Main and Water Main
Extensions was provided to the Mayor in Nov 2019.
• KC will provide additional action if requested by the Village.
RESOLUTION NO. 312020 of 2020
RESOLUTION AUTHORIZING MAYOR TO PROCEED WITH GORING HALL
RECONSTRUCTION RESTORE IV PROJECT #AB765
The following Resolution was introduced by Trustee _________________ and seconded
by Trustee _________________.
WHEREAS, the Goring Hall Building, located at 2659-2661 East Main Street in the
Village of Wappingers Falls, collapsed in November of 2012; and
WHEREAS, the Village Board desires to proceed with the reconstruction/restoration of
the former Goring Hall site; and
WHEREAS, the Mayor had submitted a grant application to New York State Empire State
Development (ESD) for a grant to help pay for the costs associated with the
reconstruction/restoration of the former Goring Hall site; and
WHEREAS, the grant application has been approved by ESD and the Village has been
requested to sign a Grant Disbursement Agreement prior to the disbursement of funds; now,
therefore
BE IT RESOLVED, that the Village Board of Trustees hereby authorizes the Mayor
proceed with the Goring Hall Reconstruction Restore IV Project #AB765; and
BE IT FURTHER RESOLVED, that the Mayor is authorized to sign the Grant
Disbursement Agreement on behalf of the Village of Wappingers Falls as well as any other
3
necessary agreements, certifications, etc. in connection with the advancement or approval of the
grant; and
BE IT FURTHER RESOLVED, that a certified copy of this Resolution be filed with the
EDC by attaching it to the Grant Disbursement Agreement in connection with this project; and
BE IT FURTHER RESOLVED, that this Resolution shall take effect immediately.
The foregoing was put to a vote which resulted as follows:
Yea Nay
Mayor Matthew Alexander ______ ______
Kevin Huber – Trustee ______ ______
Bill Marcojohn – Trustee ______ ______
Ronnie Komornik – Trustee ______ ______
Mary Paonessa – Trustee ______ ______
Scott Davis – Trustee ______ ______
Bryan Lammers – Trustee ______ ______
Dated: Wappingers Falls, New York
July 29, 2020
Approval to hire Mark Loncto as on call village carpenter consistent with bid process.
Clerk.
Approval to release last payment to Argenio Bros. contract #4.
“RESTORE NEW YORK”
Informational update. Todd Bowen
Contract Mary Ross Park.
SAFETY
Accept resignation PO Rocky Nikci effective 7-30-2020
Approval to hire P/T PO Louis Scagnelli and P/T PO Daniel Corchado
Adjourn