Meeting was called to order by Kim Migazzi at 4:00 pm.
Present: Kim Migazzi, Pat Goldammer, Don Houston
Excused: Fred Koeller, Carl Oberhart
Others present: Mike Sponholtz, Rick Huening, Zeke Jackson, Alysa Robbins, Matt Balistreri
with the Waterford Lions Club
Minutes: Motion by Goldammer to approve the 12.19.2022 minutes. Second by Migazzi. All
aye. Motion carried.
Review of Special Even Request for a St. Patrick’s Day Parade & Pub Crawl by The Waterford
Lion’s Club to be held March 17, 2023. Motion by Houston to approve special event request as
discussed; including the use and ability to rent public parking lots for the initial year of the event.
Second by Migazzi. All aye. Motion carried.
Reports: Reports were reviewed as presented in the packet.
New Business:
1- Discussion of adding a second pier in Huening Park. Reviewed Construction options and
potential costs. Motion by Houston to proceed with a cantilevered pier. Second by Goldammer,
All aye. Motion Carried.
II – Rick Huening reviewed the report from WI-DNR Sanitary Survey and Notice of
Noncompliance. Motion by Goldammer to correct deficiencies listed in report. Second my
Migazzi. All aye. Motion carried.
Motion by MIgazzi to adjourn at 4:45 p.m. Second by Golammer. All aye. Motion carried.
Respectfully submitted by,
Alysa Robbins, Administrative Clerk
Agenda
1
VILLAGE OF WATERFORD
PUBLIC WORKS & UTILITIES COMMITTEE
January 16, 2023, 4:00 pm
DPW Building, 801 Ela Ave
1. Call to Order
2. Roll Call
3. Comments and Correspondence
4. Public Appearances:
5. Reading and Approval of Min: 12.19.22 PW&U
6. Special Event Permits: Lion’s St Patrick’s Day Parade
7. Reports: Streets Supervisor, Parks Supervisor, Engineer
New Business
1. Discuss the condition of the pier at Huening Park boat launch and the need for a new pier; Consider an
appropriate motion for action.
2. Review the Sanitary Water Report from DNR. Consider a motion to recommend approval of the
report to the Village Board.
Adjournment
Public Notice
Questions regarding the nature of the agenda items or more detail on the agenda items listed above scheduled to be considered by the governmental body
listed above can be directed to Zeke Jackson, Village Administrator at 262-806-1750 or at zjackson@waterfordwi.org. It is possible that members of and
possibly a quorum of members of other governmental bodies of the municipality may be in attendance at the above-stated meeting to gather information;
no action will be taken by any governmental body at the above-stated meeting other than the governmental body specifically referred to above in this
notice. Upon reasonable notice, a good faith effort will be made to accommodate the needs of disabled individuals through sign language interpreters or
other auxiliary aid at no cost to the individual to participate in public meetings. Due to the difficulty in finding interpreters, requests should be made as far
in advance as possible preferably a minimum of 48 hours. For additional information or to request this service, contact the Village Staff at 262-534-7912, or
by writing to the Village Administrator at the Village Administration Building, 123 N. River St, Waterford WI, 53185 Copies of reports and other
supporting documentation are available for review at the Village Administrator’s Office, Administration Building, 123 N. River St, Waterford WI 53185
during operating hours. (8 a.m. – 5 p.m. weekdays).
Posted: 1/13/2023; 4:00 p.m.
2
1 VILLAGE OF WATERFORD
2 Public Works & Utilities Committee Meeting Minutes
3 801 Ela Ave. – DPW Building
4 December 19, 2022
5
6 Meeting was called to order by Chair Koeller at 4:05 pm.
7 Present: Fred Koeller, Kim Migazzi, Pat Goldammer
8 Excused: Don Houston, Carl Oberhart
9 Others present: Rick Huening, Alysa Robbins, Members of the Waterford Lions Club
10
11 Minutes: Motion by Goldammer to approve the 11.21.2022 minutes as amended. Second by Migazzi. All
12 aye. Motion carried.
13
14 Presentation and discussion of proposed St. Patrick’s Day Parade & Pub Crawl by The Waterford Lion’s
15 Club to be held March 17, 2023.
16
17 Reports: Streets and Utilities Supervisor Huening spoke on updates in the Department of Public Works.
18
19 New Business:
20 1- Reviewed change order draft of 10 Club Park. Motion by Migazzi to proceed with project as
21 presented. Second by Goldammer, All aye. Motion Carried.
22
23 Motion by Goldammer to adjourn at 5:00 p.m. Second by Migazzi. All aye. Motion carried.
24
25 Respectfully submitted by,
26 Alysa Robbins, Administrative Clerk
3
4
5
6
7
8
9
10
11
VILLAGE OF WATERFORD
PUBLIC WORKS AND UTILITY MEETING
For additional information: http://www.waterfordwi.org
Meeting Date: January 2023
Public works:
All attachments except the snow blower have arrived at the dealer. The machine is schedule for
delivery to the dealer this month.
We have been changing GFI’s as needed on the snow flake.
Replacement lights for the purple lights have been delivered and we are waiting for the
contractor to replace the lights und warranty
Crews have been out salting a few times…we will probably pay for the no snow events next
month!
We are back to full staff now!!
Getting odd projects done with no snow to deal with.
Utilities:
The antenna was installed at water tower #1. The AMI reading system control box has been
installed and wired. Next step is programing of AMI control box.
Staff will be working on the DNR deficiencies list as supplies are available
Recent chemical plant fire in Illinois will not affect our chlorine supply
Rick Huening
Public Works/Utilities Supervisor
Name: i:\1. 2017 agendas\board\2017_04\02a br 2017 bridenhagen.docx Created: 4/13/2017 4:46 PM Printed: 4/14/2017 2:38 PM Author: Robert
Kufrin Last Saved By: Zeke Jackson Revision: 2
12
VILLAGE OF WATERFORD
PUBLIC WORKS AND UTILITY MEETING
Facilities and parks update
Meeting Date: January 16 2023
Facilities
-Ongoing general maintenance, cleaning and repairs of the Library, Village hall, DPW, Parks facilities and other various
facilities projects. Managing various contractors, performing PM on the HVAC, controls, and fire protection systems. Snow
removal and salting all facilities as required.
-Mitigated the sprinkler system breach and resulting flood in late December at the village hall. Still working with the
restoration contractor and insurance adjuster to restore the damaged areas.
-Finishing up the Village security upgrade. Only a few small details remain. Working on physical key assignments and
accountability and documentation.
-The baseboard type hot water registers that encompass the community room exterior walls at the library failed and
leaked on the carpet and walls. Bypassed the bad parts of the registers temporarily while we order the new Runtal type
registers.
-Working with Kathy and Alysa on Whitford park building improvement plans for the Seidel building.
-Buried power lines that service the Whitford park bathroom building and the Lions club building so we can remove the
old failing overhead poles in these areas. Upgraded wiring and timers in the bathroom building as well.
Parks
-On going garbage pick up, tree trimming, banner installations and snow removal at various park areas as required.
-Installed the rink liner and filled the rink, as well as the Edison lights and rubber mats that surround the rink. We were
open for 2 days in late December. To date January weather is well above normal and the rink has melted and lost water.
Waiting for an extended cold snap to refill and refreeze the rink.
-Made new rink sponsor signs for the new sponsors for 2023.
-Started removing all Christmas lights and decorations at the parks and other areas.
Facilities and Parks supervisor.
Mike Sponholtz
13
VILLAGE OF WATERFORD
Engineer’s Report
January 11, 2023
2022 LRIP Project - N. Milwaukee Street Resurfacing – Project 210605.90/.40
We have requested final close-out documents from the contractor.
Danielson St. & Augusta Paving / Whitford Park Paving – Project No. 221301
The bid by Stark Pavement Corp ($674,320.15) was approved by the Village on 9/12.
The contractor has completed Danielson St.
Our recommendation of payment for Danielson will be sent to the Village after the partial
lien waiver is received from the contractor.
Augusta and Whitford Park will be done in the spring. The bid prices will not increase for
Augusta and Whitford Park.
Tetzlaf “The Armory Self Storage” Review – Project No. 222115
We received plans for a self-storage facility north of Gravity Ct in the Mercury
Development.
Review comments were forwarded to the Village and design engineer on 12/21/22.
Well 6 – Intent to Apply (ITA)
An intent to apply (ITA) application has been submitted for low interest money through
the WDNR; this ITA does not commit the Village to use the funding; it may simply allow
them a lower interest rate and longer repayment terms if the project qualifies for the
funding.
The Village is waiting for an acceptance of the funding prior to moving forward.
Neumann Homes Development – Project No. 221632
Neumann Homes is interested in developing the area north of Trailside Elementary on the
east and west sides of N. Milwaukee.
We are working with the developer’s engineer to provide water and sewer service to the
property.
Foat Self Storage Review – Project No. 221784
We received plans to add an additional storage building at 421 N. Milwaukee Street.
Review comments were forwarded to the Village and design engineer on 8/24/22.
Gemini Lots 7&10 CSM – Project No. 222271
ProHeath Care is interested in constructing a clinic on Cornerstone Court across from the
lift station.
Baxter & Woodman provided a CSM to combine Lots 7&10 and provide an access
easement to the adjacent pond. We are currently waiting for review comments from the
owner.
Space Squared Self Storage Review – Project No. 220614
We received plans for a self-storage facility at the corner of STH 83 and Park Dr.
A response to our comments was received on 1/3/22. We are currently reviewing the
updates.
Page 1 of 2
P:\WATRF\General\Admin\Monthly Reports\2023\01-2023\01-11-23.docx
14
VILLAGE OF WATERFORD
Engineer’s Report
January 11, 2023
Ideal Process Review – Project No. 222586
We received plans for a building expansion project at Ideal Process on Ela Ave.
Draft review comments were completed on 12/14/22 and sent to the Village.
7th Street (Foat) Multi-Family Review – Project No. 222587
We received plans for a two building multi-family project on 7 th Street.
Draft review comments were completed on 12/13/22 and sent to the Village.
Spanky’s Tavern Review – Project No. 230062
A new Spanky’s Tavern is proposed in the Mercury Business Park.
We are coordinating utility connection scenarios with the architect.
Page 2 of 2
P:\WATRF\General\Admin\Monthly Reports\2023\01-2023\01-11-23.docx
15
Rachel Ladewig <rladewig@waterfordwi.org>
Report
1 message
Rick Huening <rhuening@waterfordwi.org> Wed, Jan 11, 2023 at 4:19 PM
To: Rachel Ladewig <rladewig@waterfordwi.org>
1. Attached is our sanitary water report. I need the Public Works and Utility Board to acknowledge that they reviewed the
report and to be sent to the Village Board for their approval. All of the Deficiencies have been reviewed by myself and
Doug, our engineer and I have a plan to correct. ( This is an agenda item)
2. My report is attached.
--
Rick Huening
Village of Waterford
Supervisor Public Works/Utilities
801 Ela Ave.
Waterford WI 53185
Phone # 262-534-1862
Fax # 262-534-3554
www.waterfordwi.org
2 attachments
Waterford_Waterworks_SSR_25202023_05.01.2023.pdf
1724K
Supervisors Report January 2023.pdf
141K
16
State of Wisconsin Tony Evers, Governor
DEPARTMENT OF NATURAL RESOURCES
Adam N. Payne, Secretary
1027 W. St. Paul Avenue
Telephone 608-266-2621
Milwaukee, WI 53233 Toll Free 1-888-936-7463
TTY Access via relay - 711
January 5, 2023
Jennifer Pankowski, Clerk PWSID#: 25202023
Village of Waterford Region: Southeast
123 N. River St. County: Racine
Waterford, WI 53185
Subject: WI-DNR Sanitary Survey Report and Notice of Noncompliance
Dear Ms. Pankowski,
The purpose of a Sanitary Survey is to evaluate the system’s source, facilities, equipment, operation, maintenance,
and management as they relate to providing safe drinking water. The sanitary survey is also an opportunity to
update the department’s records, provide technical assistance, and identify potential risks that may adversely impact
drinking water quality. This Sanitary Survey Report also serves as a Notice of Noncompliance.
On December 13, 2022, Christopher Durgin conducted a sanitary survey of your water system, Waterford
Waterworks. During the sanitary survey Rick Huening, Utility Supervisor, was also present. At the completion of
the survey, Mr. Huening was briefed on the preliminary findings. This report outlines the final findings, discusses
problems that need to be addressed, and timelines for corrective action where appropriate.
Required action
A response to this report and a plan for corrective action must be received by the department by February 17, 2023.
The response shall include a notification that all deficiencies have been corrected, that you agree to correct the
deficiencies identified in this letter by the due dates, or with proposed alternative dates for correcting these
deficiencies. A corrective action plan and schedule is included below for your consideration. Depending on the
type of corrective action you employ, you may need to obtain prior approval and submit additional plans to the
department.
dnr.wi.gov
wisconsin.gov
17
Significant Deficiencies
During the course of the sanitary survey, no (0) significant deficiencies were identified. Significant deficiencies
indicate noncompliance with one or more Wisconsin Administrative Codes and/or represent an immediate health
risk to consumers. As such, the deficiencies listed below should be corrected as soon as possible. All codes cited
are from s. NR, Wis. Adm. Code.
Deficiencies
During the course of the sanitary survey, Five (5) deficiencies were identified. Deficiencies are problems in
drinking water systems that have the potential to cause serious health risks or represent long-term health risks to
consumers. These deficiencies indicate noncompliance with one or more Wisconsin Administrative Codes.
Corrective action should be completed for these deficiencies as soon as practical. A more detailed explanation is
provided later in the report. All codes cited are from s. NR, Wis. Adm. Code.
Code Compliance
Deficiency Brief Description of Deficiency Required Corrective Action
Violation(s) Due Date
1. Chemical Storage must have secondary containment 811.39(3)(d) 2/17/2023
2. Air releases must be downward facing with 24 mesh screen 811.37(5)(a) 2/17/2023
3. Vents must be downward facing with 24 mesh screen 811.36(1)(a) 2/17/2023
4. Elevated storage overflow lacking adequate 4 mesh screen 811.64(4)(c) 2/17/2023
5. Valves are not being exercised at an adequate frequency 810.13(2)(a) 2/17/2023
Recommendations
During the sanitary survey, Twelve (12) recommendations were identified. Recommendations are problems in the
water system that hinder your public water system from consistently providing safe drinking water to consumers.
Recommendations
1 Add labels to sample taps to clarify where samples should be taken
2 Eliminate dead ends by looping mains when feasible
3 Check all anti-siphon devices to ensure functionality
4 Continue to monitor screens covering chemical vents, air vents and overflows
5 Periodically review records of complaints for reoccurring problems
6 Complete comprehensive water system studies
7 Plan for the retirement of experienced staff
8 Conduct emergency “table-top” exercises to practice emergency situations
9 Acquire standards for colorimeter calibration.
10 Confirm that your system is taking adequate measures to protect against cybersecurity threats
11 System should consider a leak detection study due to water loss exceeding 10%
12 Replace undersized mains (4 inch) with more adequately sized mains to allow for greater fire flow
Waterford Waterworks Sanitary Survey Report Page 2 of 15
18
Non-Conforming Features
During the course of the sanitary survey, two (2) Non-conforming features were discovered. “Non-conforming
features” (NCF) are areas that met code requirements at the time of your public water system’s construction but
would not be allowed in the current code. Though you are not required to correct these non-conforming features at
this time, they will need to be corrected when a public health risk exists (water-borne illness, water quality
complaints, positive bacteria sampling, cross connections and potential for contamination can all be considered
when determining public health risk) or it falls within a reviewable project in the future (new water main
construction or pipe relay in the area reviewed under chs. NR 811 or DSPS 382, Wis. Adm. Code) per s. NR 811.01,
Wis. Adm. Code. This list may not be inclusive of all existing non-conforming features of your water system.
When conducting significant upgrades on your facility or pieces of equipment, it is recommended that you contact
your DNR representative to aid you in identifying such features. All codes cited are from s. NR, Wis. Adm. Code.
Feature Location Brief Description Code Violation(s)
Chemical
1 Chemical injectors are not located on the bottom half of the pipe 811.39(7)(f)
injectors
2 Well 4 and 5 Sample taps are not downstream of check valves 811.37(5)(b)(1)
Discussion and Schedule for Corrective actions
The discussion section of the paper provides a more in-depth explanation of the deficiency or recommendation, the
risk it poses to your system, and how completing the corrective action benefits you and your customers. If pictures
were taken during the survey, they will be located in either the discussion or at the end of this report in the appendix.
Deficiencies
1. S. NR 811.39(3)(d), Wis. Adm. Code requires Chemical feed equipment… “Be located within a containment
basin capable of receiving accidental spills, drainage, or overflows without an uncontrolled discharge outside
of the containment basin.” …
• By February 17, 2023, please install adequate containment or curbing for all chemical feed containers.
• Note: Chemical containment basins shall be sized to contain the volume of the largest tank that could
fail.
Waterford Waterworks Sanitary Survey Report Page 3 of 15
19
Figure 1 and 2: Chemical storage without secondary containment
2. S. NR 811.37(5)(a), Wis. Adm. Code requires “For line-shaft vertical turbine pump discharge pipes, an air-
vacuum relief valve shall be installed between the pump and the check valve. The discharge line from the relief
valve shall face downward and terminate with a 24-mesh corrosion resistant screen, at least 24 inches above
the floor.”
• By February 17, 2023, please install adequate air release vent screening at well 1
Figure 3: Well vent not downward facing
Waterford Waterworks Sanitary Survey Report Page 4 of 15
20
3. S. NR 811.36(1)(a), Wis. Adm. Code requires “For wells without pitless units, a metal vent pipe shall be
installed which terminates in a 24−mesh corrosion resistant screened “U” bend or mushroom cap at least 24
inches above the floor.
• By February 17, 2023, please install adequate well vent screening at well 5 and its associated booster
pumps
4. S. NR 811.64(4)(c), Wis. Adm. Code requires “The overflow pipe shall be provided with a 4-mesh corrosion
resistant screen installed within the pipe at a location least susceptible to damage by vandalism.”
• February 17, 2023, please install adequate overflow screening at Tower 1
• Note: Please clear the excess brush away from the overflow area
Figure 4: Tower 1 Lacking adequate 4 mesh screen
5. S. NR 810.13(2)(a), Wis. Adm. Code requires “All distribution system valves shall be exercised a minimum of
every 2 to 5 years.”
• By February 17, 2023, please submit a plan or schedule to complete valve exercising by 2028
Recommendations:
1. Labeling sample taps is a cheap and simple way to avoid miscommunication on where samples must be taken.
By including labels on all taps, the chances of samples being incorrectly taken is greatly decreased.
2. The department recommends that the Utility continue to eliminate dead end mains where feasible. Looping
mains can increase water quality, decrease maintenance, and reduce the number of homes affected by a water
main break.
3. Over time, anti-siphon devices on peristaltic chemical pumps can corrode, scale, clog, or embrittle. If negative
pressure forms and the device were to fail, there is the potential for a large quantity of chemical to be pulled
into the system creating an extremely dangerous, and preventable, situation for your customers.
Waterford Waterworks Sanitary Survey Report Page 5 of 15
21
4. Vermin entering the water system are one of the most common reasons for unsafe bacteria samples. Screens
are the last line of defense for preventing them from entering your water supply. As such, the department
recommends that you continue to ensure that all screens are checked regularly for recent or potential failures.
5. Customer complaints can be vital information for determining things such as seasonal water quality issues,
MCL violations above the taste and odor threshold (most likely several times higher than the MCL), issues with
secondary contaminants, failures in treatment units, infiltration into wells, and many other issues. By
scheduling a day or two a year to review past complaints, emerging or seasonal issues missed by normal water
quality testing may be able to be identified.
6. Completing fire, leak, and storage studies can have many benefits to a system such as reduced insurance rates
for businesses and evidence for capacity development. The department recommends that a comprehensive
water system study be conducted every 10 years.
7. Of growing concern over recent years is insufficient staff to replace experienced individuals. It is recommended
that the utility hires enough additional staff so that if one or more individuals were to leave that there could be
dual coverage. Additionally, experienced operators are recommended to write O&M instructions for equipment
that no longer has them. This way, if they were to suddenly or unexpectedly leave the utility, a new individual
would have instructions to turn to. Furthermore, in recent years many systems have found that additional
operators are almost a necessity for completing cross-connection programs on schedule. Some systems have
also had costly mistakes made by inexperienced/undertrained/poorly supervised staff, in fact, for a few mistakes
it would have been less expensive to hire an extra operator for 3 years before an experienced operator left than
it was to hire a new operator AFTER the experienced operator retired were the mistake to be avoided.
8. With the exception of an actual emergency, the only way to know if everyone understands the emergency
procedures that have been developed is to conduct exercises of who does what in an emergency situation. More
information can be found at (https://www.epa.gov/waterresiliencetraining) or by contacting your DNR
representative. By completing such exercises, you can approach the future with more confidence that you and
your peers can handle whatever man or nature sends your way.
9. Colorimeters will gradually loose accuracy over time. To counter this, standards can be purchased to keep your
machines accurate. This can be invaluable to help ensure that the readings you see are the same as what is
actually happening in your process.
10. Cyber-attacks have been striking critical infrastructure across the United States with increased frequency in
recent years. The following best management practices can be made to prevent a cybersecurity incident:
• Update to the latest version of the operating system (e.g. Windows 10).
• Use multiple-factor authentication to access critical applications.
• Use strong passwords to protect remote access credentials.
• Update user access lists to critical programs regularly (e.g. Employee retires)
• Train users to identify and report attempts at social engineering. Identify and suspend access of users
exhibiting unusual activity.
• Ensure anti-virus, spam filters, and firewalls are up to date, properly configured and secure.
• Audit network configurations and isolate computer systems that cannot be updated.
• Only use secure networks and consider installing a virtual private network (VPN).
Waterford Waterworks Sanitary Survey Report Page 6 of 15
22
• Restrict all remote connections to SCADA systems, specifically those that allow physical control and
manipulation of devices within the SCADA network. One-way unidirectional monitoring devices are
recommended to monitor SCADA systems remotely.
11. Current water loss at Waterford Waterworks is at 16%, above the recommended maximum amount of 10%.
The department recommends the utility conduct a leak detection study if one has not been conducted recently.
12. Several areas of the Waterford Waterworks distribution system contain undersized 4 inch mains. The
department recommends replacing these with larger sizes when appropriate. Larger sized mains can be
beneficial to fire flows in emergency situations.
Water Quality Monitoring and Reporting
Your system has a good general record of compliance with monitoring and reporting requirements. We appreciate
your continued efforts in complying with the Safe Drinking Water Act requirements.
All monitoring location are required to have a unique Site ID, address, and sampled contaminates assigned to them.
If a sampling site needs to be changed, this change must be approved before the site can be officially used for
sampling.
Required Reports, Records, and Utility Programs
• Annual Monitoring Schedule: The Utility has excellent record of reporting according to the schedule. (0 M/R
violations in the last 10 years)
• Monthly pumpage reports (EMOR): The Utility has good record of submitting monthly reports. (2 missed in
the last 10 years)
• Wellhead Protection: The Utility has implemented this program in accordance with NR 811.12(6).
• Well Pump Maintenance: The Utility has implemented this program in accordance with NR 810.13(1).
• Valve/hydrant exercising/maintenance/flushing: The Utility has not implemented this program in accordance
with NR 810.13(2).
• Meter testing/Calibration: The Utility has succeeded in testing and/or calibrating master meters on wellhouses,
high lift pumping stations, booster pumping stations, and metering stations in accordance with NR
810.13(2)(e).
• Emergency Power Exercising: The Utility has succeeded to exercise emergency power in accordance with NR
810.13(1)(d).
• Extended Well Agreement: N/A
• Monitoring Assessments: A monitoring assessment application must be completed every three years to
maintain monitoring waivers and reduced monitoring for applicable SDWA contaminants
Operator Certification
Chapter NR 114 specifies the requirements for how operators must be certified. The Utility must employ at least
one person who is fully certified for all classifications/aspects of the water system. The water system must also
designate the operator in charge (OIC). All operators must attend continuing education classes and submit evidence
of attendance when renewing their certificates. The OIC must be accessible at all times (24/7) and any changes to
OIC must be reported to the department no later than 30 days after the changes have been made per NR 114.31.
Waterford Waterworks Sanitary Survey Report Page 7 of 15
23
As a reminder, all certified waterworks operators must complete at least 18 hours of approved training every three
years to retain their certification.
As a reminder, all certified waterworks operators must complete at least 18 hours of approved training every three
years to retain their certification.
Water System Security
We recommend that you conduct a daily security check of your entire drinking water system to insure doors are
locked and windows secured and free of any potential vandalism. It is recommended that any areas with ground
level storage have motion activated security cameras to alert the system of potential threats.
Capacity Development Evaluation
This sanitary survey serves as an evaluation of the capabilities of your water system. Your system appears to have
adequate technical, managerial, and financial capacity to provide safe drinking water at the time of this inspection.
The ability to plan for, achieve, and maintain compliance with applicable drinking water standards appears to be
adequate.
• Citing information from the Utility and the PSC, the Utility appears to have an average net operating income
(NOI) of 250,000 per year.
• Citing information from the Utility and the PSC, the Utility appears to have 90 days of operating cash on hand.
Water System Analysis
From a preliminary source capacity analysis, storage capacity analysis, and distribution system analysis from data
provided by the Utility, it appears that the Utility meets the standards for source capacity, storage capacity, total
capacity, and distribution system.
Water Loss Evaluation
Per PSC 185.85, the Waterford Waterworks is a Class C Utility (between 1,000 and 4,000 connections) is higher
than 10%, the recommended limit set by the DNR, but is in compliance with the PSC water loss limits set by PSC
185.85. The latest water loss data is as follows:
• Non-Revenue Water Loss is 16%. (Limit is 30%)
• Total Water Loss is 7%. (Limit is 15%)
PSC may require a public utility to conduct a leak detection survey of its distribution system if, for three consecutive
years, the public utility's percentage of water loss exceeds 15%.
The department recommends that the Utility continue to find and correct sources of water loss.
System Summary
The Waterford water system is owned and operated by the Village of Waterford and serves a population of
approximately 5000 people. The water system consists of:
• one pressure zone(s)
• Aeration system for the ascetic treatment of iron
• Hypochlorite chemical addition for disinfection
• 4 wells and 3 wellhouses
Waterford Waterworks Sanitary Survey Report Page 8 of 15
24
Well # Pumping Capacity Depth (feet) Constructed
(GPM)
1 300 135 04/07/1981
3 220 136 10/13/1997
4 540 82 04/16/2001
5 550 402 11/09/2001
Storage Size (Million gallons) Last Inspection Inspection Type
Tower 1 0.2 2018 Drain Down
Tower 2 0.4 2021 Drain Down
The next sanitary survey of your system is scheduled to take place in 2025. You will be contacted prior to the
survey to schedule a date that is convenient for you.
I would like to thank Mr. Huening, and the Village of Waterford for their cooperation and experienced insight
during the DNR inspection of the facilities on the date of my visit. If you have any questions, please contact me at
414-389-7356, or by e-mail at Christopher.Durgin@wisconsin.gov.
Sincerely,
___________________________
Christopher Durgin
Water Supply Engineer - DNR
1027 W. St. Paul Avenue
Milwaukee, WI 53233
cc: Bureau of Drinking Water & Groundwater – DG/5
Jesse Jensen, DNR Drinking Water & Groundwater Field Supervisor
Rick Huening, Utility Supervisor
Waterford Waterworks Sanitary Survey Report Page 9 of 15
25
Appendix
Water System Summary Information
System ID: 25202023
System Name: WATERFORD WATERWORKS
County: Racine
Type: Municipal Community
Basin: Fox River
Population: 5368
Service Connections: 1988
Owner: WATERFORD VILLAGE CLERK
123 N RIVER ST
Waterford, WI 53185-4149
(262) 534-3980 Fax: (262) 534-3573
Date Security VA Complete: 04/01/2015
Date ERP Complete: 04/01/2015
Date ERP Last Exercised/Updated: 04/01/2015
Emergency Phone: (262) 492-7746
Emergency Fax:
Emergency E-mail: RHUENING@WATERFORDWI.ORG
Certified Operators
Name Lic. # Expires Phone/Fax/E-mail Address 1 City, State, Zip
RICK 31679 05/01/2025 (262) 534-1862rhuening@waterfordwi.org 31415 RED WATERFORD, WI
HUENING OAK LN 53185
DAVID KOCH 37096 11/01/2025 (262) 534-3980dkoch@waterfordwi.org 801 ELA WATERFORD, WI
AVE 53185
ADAM 36162 05/01/2023 (262) 534-3980aschaefer@waterfordwi.org 801 ELA WATERFORD, WI
SCHAEFER AVE 53185
Affiliations
Name Affiliation Start Date End Date Primary? Phone
RICK HUENING SAMPLER 12/23/2020 Y 262-534-3980
WATERFORD VILLAGE PLAN_CON 06/02/2006 Y 262-534-3980
CLERK
WATERFORD VILLAGE OWNER 01/01/1960 Y 262-534-3980
CLERK
RICK HUENING MANAGER 01/25/2017 Y 262-534-3980
RICK HUENING EMERGENCY 12/23/2020 Y 262-534-3980
CHRISTOPHER DURGIN DNR_REP 07/26/2021 Y 414-389-7356
WATERFORD VILLAGE SAMPLER 01/26/2017 N 262-534-3980
CLERK
Entry Points and Sources of Water (Basic Data)
Source Name WUWN Status Type Source Depth Cased Grouted
ID
1 BG745 Active ENTRY PT/SOURCE Ground Water Source 135 60 60
2 BG746 Perm ENTRY PT/SOURCE Ground Water Source 1520 418 418
Abandoned
3 LK017 Active ENTRY PT/SOURCE Ground Water Source 136 103 100
4 MK471 Active SOURCE OF WATER Ground Water Source 82 67 62
5 RX226 Active SOURCE OF WATER Ground Water Source 402 402 404
Waterford Waterworks Sanitary Survey Report Page 10 of 15
26
Source Name WUWN Status Type Source Depth Cased Grouted
ID
200 BLENDING Active ENTRY POINT Permanent Ground
OF WELLS 4 Water Entry Point
& 5 - IRON
FILTRATION
Entry Points and Sources of Water (Misc. Data)
Source ID PLSS Lat./Long. Pump Cap. Pump Type Lube Aux. Power?
1 T4, R19E, S35, Q-NE 42.76416N x 450 Vertical_Turbine Yes
QQ-SE 88.21336W
2 T4, R19E, S35, Q-NE 42.76873N x 400 Submersible Unknown
QQ-NW 88.21597W
3 T3, R19E, S2, Q-NW 42.75066N x 225 Vertical_Turbine Yes
QQ-SW 88.22511W
4 T4, R19E, S25, Q-SE 42.77390N x 600 Vertical_Turbine Yes
QQ-SW 88.19658W
5 T4, R19E, S25, Q-SE 42.77222N x 550 Submersible Yes
QQ-SW 88.19848W
200 T, RE, S, Q- QQ- NxW 1200 Yes
Storage
ID/Location Type Vol. (gal) Firm Height to Overflow Aux. Mfg. Model
Pumping Overflow Elev. (sea- Power?
Capacity (ft.) level, ft.)
(gpm)
north of well 2 ELEVATED 200000 Unknown
TANK
Idustrial Park ELEVATED 400000 Unknown
TANK
Treatment Summary Data
Source Type Description Begin End Objective(s) Comments
ID
1 000 0 03/01/2000 02/11/2009 No Treatment at Source
1 421 Hypochlorination, Post 02/12/2009 Disinfection Sodium hypochlorite
2 000 0 03/01/2000 02/11/2009 No Treatment at Source
2 421 Hypochlorination, Post 02/12/2009 Disinfection Sodium hypochlorite
3 000 0 03/06/2000 02/11/2009 No Treatment at Source
3 421 Hypochlorination, Post 02/12/2009 Disinfection Sodium hypochlorite
4 000 0 09/12/2007 No Treatment at Source
4 421 Hypochlorination, Post 02/12/2009 02/12/2009 Disinfection Sodium hypochlorite
5 000 0 09/12/2007 No Treatment at Source
5 421 Hypochlorination, Post 02/12/2009 02/12/2009 Disinfection Sodium hypochlorite
200 143 Aeration, Diffused 04/06/2006 Iron Removal
~Radionuclides
Removal
200 147 Aeration, Slat Tray 05/08/2017 Radionuclides Removal
200 421 Hypochlorination, Post 02/12/2009 Disinfection Sodium hypochlorite
Waterford Waterworks Sanitary Survey Report Page 11 of 15
27
System Evaluation Summary
Inspector/Reviewer Date Report Type Agency Response Response
Date Due Recd
DURGIN, 12/13/2022 01/04/2023 SURVEY DNR 02/17/2023
CHRISTOPHER
RATARASARN, 09/16/2020 11/15/2020 SURVEY DNR 12/30/2020
THANINTR
RATARASARN, 06/06/2017 07/05/2017 SURVEY DNR
THANINTR
SZYMASZEK, 07/07/2014 07/29/2014 SURVEY DNR 09/12/2014 08/21/2014
STEVE
RATARASARN, 08/18/2011 11/16/2011 SURVEY DNR
THEERA
RATARASARN, 02/12/2009 04/17/2009 SURVEY DNR 06/05/2009 06/05/2009
THEERA
RATARASARN, 03/26/2008 04/09/2008 ANNUAL DNR
THEERA
RATARASARN, 04/19/2007 05/04/2007 ANNUAL DNR
THEERA
RATARASARN, 04/05/2006 04/06/2006 ANNUAL DNR
THEERA
RATARASARN, 05/25/2005 05/31/2005 ANNUAL DNR
THEERA
TOYINGTRAKOON, 02/18/2004 03/22/2004 SURVEY DNR
PETWARA
TOYINGTRAKOON, 02/11/2003 03/12/2003 ANNUAL DNR
PETWARA
SCHROEDER, JEFF 02/05/2002 02/05/2002 ANNUAL DNR
TOYINGTRAKOON, 10/24/2000 10/25/2000 ANNUAL DNR
PETWARA
TOYINGTRAKOON, 12/09/1999 01/10/2000 SURVEY DNR
PETWARA
FUJA, FRANK 02/16/1998 02/23/1998 ANNUAL DNR
FUJA, FRANK 01/14/1997 01/24/1997 ANNUAL DNR
FUJA, FRANK 10/03/1995 10/18/1995 SURVEY DNR
Janet Vosberg 08/11/1994 08/23/1994 ANNUAL DNR
08/13/1992 SURVEY DNR
05/29/1991 ANNUAL DNR
Bacteriological Sampling History
Year Distribution Distribution Confirmed Missed Raw Raw Fecal
Safe Unsafe Unsafe Samples Safe Unsafe Positive?
2023 0 N
2022 72 0 16 N
2021 74 0 16 N
2020 72 0 16 N
2019 72 0 16 N
2018 72 0 16 N
2017 72 0 16 N
Waterford Waterworks Sanitary Survey Report Page 12 of 15
28
Chemical Sampling History
Year Sample Source Samples Missed MCL
Group ID Taken Samples Violations
2022 NITRATE 200 1 0 0
2022 VOC 200 1 0 0
2022 RAD 200 1 0 0
2022 NITRATE 1 1 0 0
2022 DBP 2 0 0
2022 VOC 1 1 0 0
2022 NITRATE 3 1 0 0
2021 NITRATE 200 1 0 0
2021 RAD 200 1 0 0
2021 VOC 200 1 0 0
2021 RAD 4 1 0 0
2021 RAD 5 1 0 0
2021 NITRATE 1 1 0 0
2021 DBP 2 0 0
2021 VOC 1 1 0 0
2021 NITRATE 3 1 0 0
2020 PBCU 20 0 0
2020 VOC 200 1 0 0
2020 RAD 200 1 0 0
2020 IOC 1 1 0 0
2020 SOC 1 0 0
2020 SOC 200 1 0 0
2020 IOC 200 2 0 0
2020 VOC 3 1 0 0
2020 IOC 3 1 0 0
2020 RAD 1 1 0 0
2020 DBP 1 1 0
2020 VOC 1 1 0 0
2020 RAD 3 1 0 0
2019 NITRATE 200 1 0 0
2019 RAD 200 1 0 0
2019 VOC 200 1 0 0
2019 NITRATE 1 1 0 0
2019 DBP 2 0 0
2019 VOC 1 1 0 0
2019 NITRATE 3 1 0 0
2018 NITRATE 200 1 0 0
2018 RAD 200 1 0 0
2018 VOC 200 1 0 0
2018 NITRATE 1 1 0 0
2018 DBP 2 0 0
2018 VOC 1 1 0 0
2018 NITRATE 3 1 0 0
2017 PBCU 20 0 0
2017 RAD 200 1 0 0
2017 VOC 200 1 0 0
2017 IOC 1 1 0 0
2017 SOC 200 1 0 0
2017 VOC 3 1 0 0
Waterford Waterworks Sanitary Survey Report Page 13 of 15
29
Year Sample Source Samples Missed MCL
Group ID Taken Samples Violations
2017 IOC 3 1 0 0
2017 IOC 200 1 0 0
2017 SOC 1 1 0 0
2017 RAD 1 1 0 0
2017 DBP 2 1 0
2017 VOC 1 2 0 0
2017 RAD 3 1 0 0
2017 SOC 3 1 0 0
Sample Last
Group Sampled
BACTI 2022
SOC 2020
VOC 2022
NITRATE 2022
RAD 2022
PBCU 2020
DBP 2022
IOC 2020
MCL Violations
Source Contaminant Concentration MCL Units Viol. Viol. Continuing
ID Start End Operation?
None
Definitions
MCL = Maximum Contaminant Limit (as set by the Environmental Protection Agency (EPA))
BACTI = Bacteriological Sample
IOC = Sample for Inorganic Compounds
NITRATE = Nitrate Sample
PBCU = Lead and Copper Sample
RAD = Sample for Radioactivity
SOC = Sample for Synthetic Organic Compounds
VOC = Sample for Volatile Organic Compounds
FLUORIDE = Fluoride from Fluoridation
TTHM = Total Trihalomethane Sample
Waterford Waterworks Sanitary Survey Report Page 14 of 15
30
Pictures of Deficiencies
Figure 1 and 2: Chemical storage without secondary containment
Figure 3: Well vent not downward facing Figure 4: Tower 1 Lacking adequate 4 mesh screen
Waterford Waterworks Sanitary Survey Report Page 15 of 15