Economic Development
Regular MeetingWaupun, WI · February 19, 2025
Agenda
AGENDA
CITY OF WAUPUN ECONOMIC DEVELOPMENT
COMMITTEE
Waupun City Hall – 201 E. Main Street, Waupun WI
Wednesday, February 19, 2025 at 3:00 PM
The Waupun Economic Development Committee will meet In-person, virtual, and teleconference. Instructions
to join the meeting are provided below:
Virtual: https://us02web.zoom.us/j/83531261171?pwd=6uWv0tVpTh242jZJVDTbqhPPtdrokF.1
Meeting ID: 835 3126 1171
Passcode: 487452
Phone: 312 626 6799 US (Chicago)
CALL TO ORDER
ROLL CALL
CONSIDERATION - ACTION
CONSIDERATION - ACTION
1. Approve January 27, 2025 Economic Development Committee Minutes
2. Approve January 27, 2025 Economic Development Committee Closed Session Minutes
ADJOURN TO CLOSED SESSION
The Waupun Common Council will adjourn in closed session under Section 19.85 (1) of the WI Statutes for:
(e) Deliberating or negotiating the purchasing of public properties, the investing of public funds, or conducting
other specified public business, whenever competitive or bargaining reasons require a closed session.
3. Proposed Housing Development on Dodge County, Parcels 29213150641006, 29213150641002,
29213150641003, and 29213150641004
4. Possible Land Acquisition Abutting Libby Street
5. Possible Land Acquisition Abutting Edgewood Dr., Meadowview Circle and STH 49
6. Possible Land Acquisition Along Gateway Drive
RECONVENE TO OPEN SESSION
The Economic Development Committee will reconvene in open session under Section 19.85(2) of the WI Statutes.
ACTION FROM CLOSED SESSION
DISCUSSION
7. Review Possible Projects for Dodge County Community Development Grant
ADVANCED PLANNING
ADJOURNMENT
Upon reasonable notice, efforts will be made to accommodate disabled individuals through appropriate aids and
services. For additional information, contact the City Clerk at 920-324-7915.
1
Item 1.
MINUTES
CITY OF WAUPUN ECONOMIC DEVELOPMENT
Waupun City Hall – 201 E. Main Street, Waupun WI
Monday, January 27, 2025 at 3:00 PM
Meeting called to order at 3 pm by Chairperson Westphal.
Roll call taken. Members present include Westphal, Kaczmarski, Siebers (online), McArthur, Brooks, Mayor
Bishop. Also present, Attorney Vande Zande, Administrator Schlieve, Assistant Administrator Langenfeld, Director
of Public Works Jeff Daane.
No one present for Public Comment.
Motion McArthur, second Brooks, to approve Minutes for open and closed session from October 30, 2024
Economic Development Committee meeting. No further discussion. Carried unanimously.
Motion Siebers, second Kaczmarski to move into closed session under Section 19.85 (1) of the WI Statutes for:
(e) Deliberating or negotiating the purchasing of public properties, the investing of public funds, or conducting
other specified public business, whenever competitive or bargaining reasons require a closed session. Carried
unanimously.
Motion Siebers, second Brooks to reconvene to open session under Section 19.85(2) of the WI Statutes. Carried
unanimously.
No action taken from closed session.
Motion McArthur, second Kaczmarski to adjourn meeting at 4:30 pm. No further discussion. Carried
unanimously.
2
Item 7.
3
Item 7.
4
Item 7.
5
Item 7.
6
Item 7.
7
Item 7.
8
Item 7.
9
Item 7.
10
Item 7.
11
Item 7.
12
Item 7.
ESTIMATE OF PROBABLE CONSTRUCTION COST
Shaler Drive Extension (Termini to Termini)
Estimated Length (feet) = 1800
Estimated Width (feet) = 32
Note: This project includes the extension of an existing public street along Shaler Drive to connect into the two dead
ends of the street east of the Bayberry Lane intersection. This estimate includes the installation of storm sewer piping
and structures along the new public street. This estimate also includes the installation of the new roadway gravel base,
asphalt, and curb (both sides of the street). Assume 80' wide R/W. Assume the new street will be approximately 37'
wide from back of curb to back of curb.
EST. UNIT
ITEM QNTY. UNITS PRICE TOTAL
STORM SEWER CONSTRUCTION
Storm Inlet (2'x3') 5 Ea. $3,000 $15,000
Storm Manhole (4' I.D.) 3 Ea. $5,000 $15,000
Storm Manhole (5' I.D.) 1 Ea. $6,000 $6,000
Storm Sewer Main (12" RCP) 110 L.F. $70 $7,700
Storm Sewer Main (18" RCP) 440 L.F. $80 $35,200
Storm Sewer Main (24" RCP) 450 L.F. $100 $45,000
Connect to Ex. Storm Manhole 1 Ea. $1,500 $1,500
Trucked-in Trench Backfill 1100 Ton $12 $13,200
Subtotal Storm Sewer Construction $138,600
Contingency (15%) $20,790
Total Storm Sewer Construction $159,390
STREET CONSTRUCTION
Mobilization, Bonds, & Insurance 1 L.S. $30,000 $30,000
Traffic Control 1 L.S. $3,000 $3,000
Erosion Control 1 L.S. $6,000 $6,000
Unclassified Excavation & Removals (Street Only) 1 L.S. $80,000 $80,000
Over-Excavation and Sub-Base Repair with Breaker Run 900 C.Y. $35 $31,500
Stabilization Fabric for Sub-Base Repair 8600 S.Y. $4 $34,400
Crushed Breaker Run Base Course (8" Thick) 8600 S.Y. $7 $60,200
Crushed Aggregate Base Course (4" Thick) 8600 S.Y. $6 $51,600
Asphaltic Binder Pavement (3.0" Thick) 7040 S.Y. $12 $84,480
Asphaltic Surface Pavement (2.0" Thick) 7040 S.Y. $10 $70,400
Concrete Curb & Gutter (30") 3600 L.F. $17 $61,200
Restoration and Clean-up 8800 S.Y. $6 $52,800
Subtotal Street Construction $565,580
Contingency (15%) $84,840
Total Street Construction $650,420
Design Engineering (Estimated - 6% of total) $48,590
Construction Engineering (Estimated - 7% of total) $56,690
Total Estimate of Probable Construction Cost $915,090
General Notes:
1. The quantities and prices are the best estimate at this time and should be re-computed after a more detailed
engineering study is performed and plans are prepared. The costs associated with administration, financing, inflation
(due to delayed project phasing), etc. are not included. All costs are assumed to be 2025 construction costs.
2. The utility pipe sizes and quantities are estimated and will require further study to determine the appropriate sizes,
types, and configurations. The cost for site earthwork and grading is estimated and should be re-computed after a more
detailed engineering study is performed and plans are prepared.
3. Costs are based upon "normal" construction conditions. There is no allowance for poor sub-soil conditions, poor
native backfill conditions, high bedrock, high groundwater, or any other un-foreseen conditions that would require extra
effort from the contractor.
4. Costs for engineering are an estimate at this time based on a percentage of the total construction costs. These costs
should be re-computed after a more detailed engineering scope/proposal is determined thru consultation with the City.
13
1/23/2025 00212056 Shaler Drive Extension.xls