Architectural Review Board
Regular MeetingWebster Groves, MO · September 3, 2020
Minutes
ARCHITECTURAL REVIEW BOARD
MINUTES
September 3, 2020
Meeting remotely conducted with ARB & applicants through Zoom format
Present Absent
ARB MEMBERS: Bob Buckman __X___ ______
Angela Thompson __X___ ______
Tracy Collins __X___ ______
Carol Duenke __X___ ______
Ken Burns __X___ ______
Kyle Wilson (alt) ______ ______
Mark Vogl (alt) ______ ______
OTHERS PARTICIPATING: Mara Perry, Director of Planning & Development
Will Penney, Plan Reviewer
Kellie Campbell, Permit Technician
5:00 PM WORK SESSION:
Examination of proposed projects and board policies
5:30 PM REGULAR MEETING
5:30 PM REGULAR MEETING
Approval of minutes from August 20, 2020 meeting
Unanimous decision
PUBLIC HEARING
1. 33 Plant - Convert sunroom doors to windows
Approved as submitted with clarification from the applicant that there will be a piece of
trim between the new windows and the infill panel and the new railing style will match
the existing
Unanimous decision
2. 221 S Maple – Construct pool house
Approved as submitted
Unanimous decision
RESUBMITTAL
None
SUBMITTAL
3. 724 Fairview – Construct detached garage
Approved as submitted with clarification from the applicant that the window grill patterns
will be updated to match windows in the house
Unanimous decision
4. 550 Olive Ct – Construct detached garage
Approved as submitted
Unanimous decision
5. 326 Helfenstein - Construct 1 1/2 story detached garage, covered patio & deck
Approved as submitted
Unanimous decision
6. 359 Calvert - Construct rear covered patio
Approved as submitted
Unanimous decision
7. 532 Elizabeth – Construct rear deck
Approved as submitted with clarification from the applicant that a larger square
foundation will be used on the piers for the stone columns and fireplace
Unanimous decision
8. 240 Chestnut – Renovate front porch
Approved as submitted with clarification from the applicant that the entire house is being
resided and all trim is being reused; the fish scale siding at the front gable will remain;
the sides of the porch steps will either be lattice or solid panels and the railing and
column details will match additional information submitted by the applicant
Unanimous decision
9. 311 Hillside – Construct front sunroom
Approved as submitted with clarification from the applicant that below the deck will be
closed off with lattice or other decorative material
Unanimous decision
10. 741 Landscape – Construct 1 story addition & expand 2nd story & rear deck
No vote was taken, ARB members requested more information and suggested changes.
Discussion included trim for chimney, a ladder effect on the railing, type of roofing
material, bland west elevation - consider windows, lower window on east elevation, add
basement windows
11. 630 N Bompart – Construct rear screened porch
Approved as submitted with clarification from the applicant the materials will be as noted
in the additional information submitted 9/2/2020
Unanimous decision
12. 719 Fairview – Install solar panels
Approved as submitted with clarification from the applicant that the rail system and
mounting pieces are to be matte black to match the panels
4 board members approved, 1 disapproved
13. 530 E Lockwood – Install new signage
Approved as submitted with clarification from the applicant that the signs are painted
aluminum with vinyl graphics
Unanimous decision
PRELIMINARY
14. 357 Sylvester - Construct new house
Approved as submitted with clarification from the applicant that the canopy over the rear
door will be lowered, the front door will be a 2 panel solid door, the gable over the front
door will be an open gable, the front slab will have a finished edge, vertical board &
batten will be used on the rear entry area, matching permacast columns will be used on
the front and rear, a window will be added to the powder room on the left elevation,
gable vents will be triangular to match trim and architectural shingles will be used
4 board members approved, 1 disapproved
Agenda
ARCHITECTURAL REVIEW BOARD
AGENDA
September 3, 2020
Due to the regulations issued by St. Louis County, Meeting of the Architectural Review
Board will be available to the public via teleconference. Instructions on listening through
your phone or computer to the teleconference will be made available five days in
advance of the meeting date at www.webstergroves.org/teleconference
Present Absent
ARB MEMBERS: Bob Buckman ______ ______
Tracy Collins ______ ______
Angela Thompson ______ ______
Carol Duenke ______ ______
Ken Burns ______ ______
Kyle Wilson (alt) ______ ______
Mark Vogl (alt) ______ ______
OTHERS PRESENT: Mara Perry, Director of Planning & Development
Kellie Campbell, Permit Technician
Will Penney, Plan Reviewer
5:00 PM WORK SESSION:
Examination of proposed projects and board policies
5:30 PM REGULAR MEETING
Approval of minutes from August 20, 2020 meeting
PUBLIC HEARING
1. 33 Plant - Convert sunroom doors to windows
2. 221 S Maple – Construct pool house
RESUBMITTAL
None
SUBMITTAL
3. 724 Fairview – Construct detached garage
4. 550 Olive Ct – Construct detached garage
5. 326 Helfenstein - Construct 1 1/2 story detached garage, covered patio & deck
6. 359 Calvert - Construct rear covered patio
7. 532 Elizabeth – Construct rear deck
8. 240 Chestnut – Renovate front porch
9. 311 Hillside – Construct front sunroom
10. 741 Landscape – Construct 1 story addition & expand 2nd story & rear deck
11. 630 N Bompart – Construct rear screened porch
12. 719 Fairview – Install solar panels
13. 530 E Lockwood – Install new signage
PRELIMINARY
14. 357 Sylvester - Construct new house
Individuals who require an accommodation (sign language, interpreter, listening devices, etc.) to
participate in the meeting should contact the City Clerk at 963-5318 (fax number 963-7561) or
Relay Missouri at 1-800-735-2966 (TDD) at least two working days prior to the meeting.