Park and Recreation Committee
Regular MeetingWeston, WI · December 16, 2019
Minutes
Village of Weston, Wisconsin
MEETING MINUTES OF THE PARK & RECREATION COMMITTEE MEETING
Monday, December 16, 2019, 4:30 p.m.
AGENDA ITEMS
1. Meeting called to order by Chairman Xiong @ 4:30 P.M.
2. Roll Call by Recording Secretary: Jessica Falkowski
Member Present
Xiong, Yee Leng (C) YES
Arndt, Jay YES
Clark, Katrina YES
Esker, Roger YES
Ziegler, Jon (VC) YES
Village Staff in attendance: Osterbrink, Falkowski (Clerk), and Wodalski.
3. Approval of minutes from previous meeting: November 25, 2019.
*M/S/P Esker/Ziegler: to approve the November 25, 2019 minutes.
Yes Vote: 5 No Vote: 0 Abstain: 0 Not Voting: 0 Result: PASS
Member Vote
Xiong, Yee Leng YES
Arndt, Jay YES
Clark, Katrina YES
Esker, Roger YES
Ziegler, Jon YES
4. Public Comments.
None
EDUCATIONAL PRESENTATIONS & REPORTS
None
POLICY ISSUES – DISCUSSIONS/RECOMMENDATIONS
Village of Weston Parks and Recreation Committee Meeting Minutes December 16, 2019
5. Discussion and possible action ranking of proposed Park and Aquatic Center Capital
Improvement Plan.
Osterbrink provided handouts to the committee listing the 29 proposed CIP projects for
the next 5 years. A discussion was held between staff and committee members for each
project. Committee members stated their scores, which staff will review and an average
number will be used for the final ranking of each project.
No action taken.
FUTURE ITEMS
6. Meeting date(s) for 2020: All at 4:30 p.m.
a. January 27, 2020
b. February 24, 2020
c. March 23, 2020
7. Topics for future meetings.
a. Weston Warming House Conversion
b. Meet with R/S Aquatic Center Pool Commission - Prices
c. Cooperative Efforts with surrounding communities
8. Remarks from Staff
Osterbrink asked the committee if they would like him to set up a meeting between them
and R/S Aquatic Center Pool Commission to go over 2020 prices. The Committee
agreed.
Osterbrink also stated that the ice rink should be open by the end of the week.
9. Remarks from Committee Members.
Ziegler stated he will not be present for the January 27, 2020 meeting.
10. Announcements.
11. Adjournment.
*M/S/P Esker/Clark: motion to adjourn the meeting at 5:59 p.m.
Village of Weston Parks and Recreation Committee Meeting Minutes December 16, 2019
Yes Vote: 5 No Vote: 0 Abstain: 0 Not Voting: 0 Result: PASS
Member Vote
Xiong, Yee Leng YES
Arndt, Jay YES
Clark, Katrina YES
Esker, Roger YES
Ziegler, Jon YES
Jessica Falkowski, Recording Secretary
Village of Weston Parks and Recreation Committee Meeting Minutes December 16, 2019
Agenda
OFFICIAL MEETING PACKET OF THE
PARKS AND RECREATION COMMITTEE
CHAIRPERSON/TRUSTEE YEE LENG XIONG PRESIDING
DIRECTOR OF PARKS AND RECREATION SHAWN OSTERBRINK; STAFF
ADVISOR
This regular monthly meeting of the Parks and Recreation Committee, composed
of five (5) appointed members, will convene at Weston Municipal Center, which
is located at 5500 Schofield Avenue, Weston, on MONDAY, DECEMBER 16,
2019, at 4:30 p.m.
Village of Weston, Wisconsin
ATTENTION – NOTICE OF PUBLIC MEETING
Meeting: PARK AND RECREATION COMMITTEE
Members: Arndt, Clark, Esker, Xiong (c), Ziegler (vc)
Ex-Officio: Sparks
Staff: Osterbrink, Falkowski, Mroczenski
Date/Time: Monday, December 16, 2019, at 4:30 p.m.
Location: Weston Municipal Center, Large Conference Room, 5500 Schofield
Avenue, Weston, WI 54476
Agenda: The agenda packet will be sent out on Thursday, December 12th or
Friday, December 13th.
Attendance: Parks and Recreation Committee Members please indicate if you will,
or will not, be attending so we may determine in advance if there will
be a quorum.
Questions: Shawn Osterbrink Jessica Falkowski
sosterbrink@westonwi.gov jfalkowski@westonwi.gov
(715) 359-9988 (715) 359-9988
PLEASE NOTE THE FOLLOWING INFORMATION:
This notice was posted at the Municipal Center, and on the Village’s website at www.westonwi.gov, and was emailed
to local media outlets (Print, TV, and Radio) on 12/10/2019 @ 1:00 p.m. Any posted agenda is subject to change up
until 24 hours prior to the date and time of the meeting.
A quorum of members from other Village governmental bodies (boards, commissions, and committees) may attend the
above-noticed meeting to gather information. Should a quorum of other government bodies be present, this would
constitute a meeting pursuant to State ex rel. Badke v. Greendale Village Bd., 173 Wis.2d 553,494 N.W.2d 408 (1993).
Wisconsin State Statutes require all agendas for Committee, Commission, or Board meetings be posted in final form,
24 hours prior to the meeting.
Any person who has a qualifying disability, as defined by the Americans with Disabilities Act, requiring that meeting or
material to be in an accessible location or format, must contact the Weston Municipal Center at 715-359-6114, so any
necessary arrangements can be made to accommodate each request.
VILLAGE OF WESTON, WISCONSIN
OFFICIAL MEETING AGENDA OF THE PARKS AND RECREATION COMMITTEE
TO THE HONORABLE TRUSTEE YEE LENG XIONG AND FOUR (4) APPOINTED MEMBERS
OF THE COMMITTEE: The following items were listed on the agenda in the Village Clerk’s
Office, in accordance with Chapter 2 of the Village’s Municipal Code and will be ready for
your consideration at the regular meeting of the Parks and Recreation Committee on
Monday, December 16, 2019 @ 4:30 p.m., in the Large Conference Room at the Weston
Municipal Center, 5500 Schofield Avenue, Weston, WI. 54476.
A quorum of members from other Village governmental bodies (boards, commissions, and committees)
may/might attend the above-noticed meeting to gather information. Should a quorum of other government bodies
be present, this would constitute a meeting pursuant to State ex rel. Badke v. Greendale Village Bd., 173 Wis.2d
553,494 N.W.2d 408 (1993). No official actions other than those of the Parks and Recreation Committee shall take
place. Wisconsin State Statutes require all agendas for Committee, Commission, or Board meetings be posted in
final form, 24 hours prior to the meeting. Any posted agenda is subject to change up until 24 hours prior to the
date and time of the meeting.
AGENGA ITEMS.
1. Meeting called to order by Chairman Xiong.
2. Roll Call by Recording Secretary: Jessica Falkowski
a. Arndt
b. Clark
c. Esker
d. Xiong (C)
e. Ziegler (VC)
3. Approval of minutes from previous meeting: November 25, 2019.
4. Public Comments.
EDUCATIONAL PRESENTATIONS & REPORTS.
POLICY ISSUES – DISCUSSIONS/RECOMMENDATONS.
5. Discussion and possible action ranking of proposed Park and Aquatic Center
Proposed Capital Improvement Plan.
FUTURE ITEMS
6. Meeting date(s) for 2020: All at 4:30 p.m.
a. January 27th, 2020
b. February 24th, 2020
c. March 23rd, 2020
7. Topics for future meetings:
a. Weston Warming House Conversion
b. Meet with R/S Aquatic Center Pool Commission - Prices
c. Cooperative Efforts with surrounding communities
8. Remarks from Staff.
9. Remarks from Committee Members.
10. Announcements.
11. Adjourn.
Parks and Recreation Committee Meeting – Agenda 12/16/19
Prepared by: Shawn Osterbrink, Director of Parks, Recreation and Forestry
Village of Weston, Wisconsin
MEETING MINUTES OF THE PARK & RECREATION COMMITTEE MEETING
Monday, November 25, 2019, 4:30 p.m.
AGENDA ITEMS
1. Meeting called to order by Chairman Xiong @ 4:30 P.M.
2. Roll Call by Recording Secretary: Jessica Falkowski
Member Present
Xiong, Yee Leng YES
Arndt, Jay NO
Clark, Katrina YES
Esker, Roger YES
Ziegler, Jon YES
Village Staff in attendance: Osterbrink, Falkowski (Clerk), Mroczenski, Donner, Higgins, and
Wodalski.
3. Approval of minutes from previous meeting: October 28, 2019.
*M/S/P Ziegler/Esker: to approve the October 28, 2019 minutes.
Yes Vote: 4 No Vote: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member Vote
Xiong, Yee Leng YES
Arndt, Jay -----
Clark, Katrina YES
Esker, Roger YES
Ziegler, Jon YES
4. Public Comments.
None
EDUCATIONAL PRESENTATIONS & REPORTS
5. MC United Proposal.
Mehrdad Nazari, Vice President, from MC United presented a proposal to the
committee regarding the availability of property, five or more acres, to develop two
artificial turf fields with lighting. The fields will allow teams: access from April-
November, multiple teams to practice/scrimmage at one time, and to host tournaments
at one location. MC United is looking for partnerships, land donation, and working with
Village of Weston Parks and Recreation Committee Meeting Minutes November 25, 2019
foundations for grants. MC United currently uses the Eastbay Soccer Complex that
Wausau and Marathon County Parks maintain. MC United presented two possible sites
in Wausau but was referred to contact the Village of Weston by Jamie Polley from
Wausau and Marathon County Parks because of the urgency from MC United wanting
to move forward with the project.
POLICY ISSUES – DISCUSSIONS/RECOMMENDATIONS
6. Discussion and possible action ranking of proposed Park and Aquatic Center
Proposed CIP.
Osterbrink provided handouts to the committee listing the CIP projects and the nine
criteria to score each project. Each member will then follow the directions to rank each
project. After the scoring is complete staff will review and an average number will be
used for the final ranking. Committee members will discuss their rankings at the
December 16 meeting of which recommendations and possible action may occur.
No action taken.
7. Discussion and possible action Memorial Policy.
Osterbrink brought back the draft copy of the Memorial Policy that was drafted in May of
2018 for discussion as requested by Trustee Xiong. Currently, the committee reviews
each request individually and makes a recommendation to the Board of Trustees. The
committee would like Osterbrink to draft a set of guidelines on how memorial requests
are processed.
No action taken.
8. Discussion and possible action Facility Use Agreement
Osterbrink explained that there is no official Facility Use Agreement for large events like
Irish Fest being held on village property. A copy of an agreement drafted in 2018 was
presented to the committee. Besides Irish Fest, the village does not currently host any
other large events. The committee discussed postponing the development of a Facility
Use Agreement for large events until another request is proposed.
No action taken.
FUTURE ITEMS
9. Meeting date(s) for 2019/2020: All at 4:30 p.m.
Village of Weston Parks and Recreation Committee Meeting Minutes November 25, 2019
a. December 16, 2019
b. January 27, 2020
c. February 24, 2020
d. March 23, 2020
10. Topics for future meetings.
a. Weston Warming House Conversion
b. Aquatic Center Prices
c. Cooperative Efforts with surrounding communities
11. Remarks from Staff
Osterbrink stated that staff met with D.C. Everest School District staff about the Weston
Warming House Conversion. The Village will be transferring ownership to the school
district. The school district will complete the necessary paperwork to dedicate a portion
of Weston Elementary School property as recreational use. This will meet and
complete the requirements of the conversion process.
Donner updated the committee on the status of the Sports Complex. Donner talked
with Val Belmonte from US Sports Development Group, who stated that it is not
financially feasible to pursue the baseball/softball complex with the indoor event and
training center. Future discussions will take place with surrounding communities,
Convention and Visitors Bureau, and Marathon County regarding the Sports Complex.
12. Remarks from Committee Members.
Ziegler stated he will not be present for the January 27, 2020 meeting.
13. Announcements.
December 16, 2019 a Park & Recreation meeting will be held at 4:30pm in the large
conference room.
Village of Weston Parks and Recreation Committee Meeting Minutes November 25, 2019
14. Adjournment.
*M/S/P Esker/Ziegler: motion to adjourn the meeting at 5:55 p.m.
Yes Vote: 4 No Vote: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member Vote
Xiong, Yee Leng YES
Arndt, Jay -----
Clark, Katrina YES
Esker, Roger YES
Ziegler, Jon YES
Jessica Falkowski, Recording Secretary
Village of Weston Parks and Recreation Committee Meeting Minutes November 25, 2019
REQUEST FOR CONSIDERATION
Public Mtg/Date: Park & Recreation Committee – 11/25/2019 and 12/16/19
Description: Discussion and possible action CIP Rankings
From: Shawn Osterbrink, Director of Parks, Recreation &
Forestry
Question: Ranking of CIP Projects and Equipment for Parks and
Aquatic Center.
Background
The village has not adopted a formal CIP since 2011. Village staff has been
working on drafting a 5-year CIP for projects and equipment purchases. The
Village Board has come to a consensus that each committee that coincides with a
department shall rank the proposed projects. Once the committee ranks the
proposed CIP these rankings or prioritization will be forwarded to the Village
Board for their review. Attached is a list of criteria that will be used to prioritize
each project. We have also attached a few examples of the review forms with the
individual projects listed at the top. Each project will have their own review form
that will be given to each committee member for their ranking. Unfortunately, we
were not able to complete all the review forms for the approximately 30 projects
that are proposed prior to the packet going out but are providing a few ranking
forms to help you understand the process. All project ranking forms will be
provided at the meeting on Monday. All rankings from Committee members will
then be assembled into an average and forwarded to the Village Board for review.
Attached Docs: CIP Project Prioritization Document
Ranking Forms
Proposed CIP Document
______________________________________________________________________
Committee Action: Proposed CIP document was provided in the October 2019
meeting packet.
Fiscal Impact: Approximate cost for each project is listed in proposed CIP.
Recommendation: To rank the projects and equipment purchases in the
proposed CIP document.
Recommended Language for Official Action
I move to Recommend to the Board of Trustees to approve the CIP rankings
provided by the Park and Recreation Committee.
REQUEST FOR CONSIDERATION
PAGES 1 OF 1
REQUEST FOR CONSIDERATION
I move to Recommend to the Board of Trustees to not approve the CIP rankings
provided by the Park and Recreation Committee.
Or, something else.
______________________________________________________________________
Additional action:
REQUEST FOR CONSIDERATION
PAGES 2 OF 1
PROJECT PRIORITIZATION
I. PROJECT CATEGORIES
The categories for capital projects may change over time with changes in public policy emphasis.
Projects shall be grouped into one of the following five categories:
A. Public Works
B. Enterprise Funds
C. Culture & Recreation
D. Facilities
E. Equipment
II. PROJECT PRIORITIZATION
Department directors shall identify project priorities to help determine which projects are
recommended for inclusion in the five-year CIP.
A matrix system will be used to establish a priority for each project in the various categories.
The system considers nine criteria to evaluate projects. A project is given a score of 0, 1, 3, or 5,
for each criterion. The maximum possible priority score will then be 45 total points.
The scoring system is to be applied as follows:
0 – the project provides no benefits in the category
1 – the project provides minimal benefits in the category
3 – the project provides some benefits in the category
5 – the project unquestionably provides benefits in the category.
The following is a description of the nine criteria:
1. REGULATORY COMPLIANCE
This criterion includes regulatory mandates, or likely mandates, requiring construction
or replacement of capital assets to protect public health and/or public safety, and/or
the environment.
• Is the project required to comply with federal, state, or local requirements?
2. NEED/NECESSITY
This criterion relates to projects that represent a need to be undertaken immediately or
in the very near future. Projects scoring high in this category must demonstrate an
immediate need or benefit.
• If this project is not funded are the direct negative consequences significant?
• Does the project prevent irreparable damage to existing facilities?
3. PUBLIC SAFETY/HEALTH IMPACT
Public safety and health impacts applies to fire protection, law enforcement,
emergency response, communications, safe roads, public health, and flood control.
Improvements to facilities and infrastructure for services which directly affect the
safety and health of citizens will score high in this category.
• Does the project directly reduce risk to the employees or property of the
Village?
• Does the project directly impact the public safety and health of the citizens of
the Village?
• If the project is not undertaken, how significant is the threat to employees
and/or the public safety/health?
4. EXISTING INFRASTRUCTURE
This criterion correlates to basic infrastructure needs of the Village. Preserving and
maintaining existing assets is a priority over constructing or acquiring new assets.
• Will the project preserve or repair the structural integrity of existing
infrastructure to extend the useful life or reduce operating costs?
• Do the resources spent on maintaining the existing infrastructure justify
upgrading or replacement?
• Does the project provide additional capacity, function, or upgrade outdated
assets?
• Has the existing asset exceeded its useful life based on industry standards?
5. CONSISTENCY WITH PLANS
This category relates to the degree the project supports the objectives of the Village as
stated in plans and policies such as the comprehensive plan, master plans, studies,
citizen surveys, and strategic plans.
• Does the project support recommendations or objectives in plan or study?
• Does the project conform to the goals of a strategic plan?
• Does the project relate to the results of a citizen survey or advisory
referendum?
6. OPERATING BUDGET IMPACT
Some projects may affect the operating budget for a short period of time or for the life
of the asset. A project requiring new staffing will have a negative effect on budget for
the life of the facility. Replacement of a roof will not require additional resources
from the operating budget for several years. Replacement of a pump station should
have positive impacts in the form of reduced maintenance and lower energy costs.
• Will the project result in lower costs for personnel and/or maintenance?
• Will the project lead to increased productivity?
• Will the project require additional capital equipment beyond what is included
in the project budget?
• Does the project result in additional revenue generating opportunities?
7. CAPITAL FUNDING
Capital projects can be funded through sources other than fund balances and
borrowing by the Village. Developer funds, grants, donations, and special
assessments are all sources of external funding. This category relates to the degree
the Village’s funding is leveraged by outside funding.
• No outside funding = 0
• 1% – 25% outside funding = 1
• 25% - 50% outside funding = 3
• 50% or more outside funding = 5
8. GROWTH/ECONOMIC DEVELOPMENT
This category relates to project which foster development, redevelopment, and
expansion of businesses and growth areas. Projects which help create jobs and
generate positive financial benefits to the Village qualify in this category.
• Does the project have the potential to promote economic development
throughout the Village?
• Will the project produce long-term jobs in the Village?
• Does the project promote economic development in the urbanized area?
9. QUALITY OF LIFE/PLACEMAKING
This category applies to the level with which a project makes the Village a favorable
place to live. Quality parks, roads, utility systems and other projects benefiting all
citizens, greatly impact the quality of life for Village residents.
• Does the project increase or enhance recreational opportunities and/or green
space?
• Does the project improve transportation efficiency?
• Does the project target the quality of life for all residents or a limited
demographic?
• Does the project increase or enhance cultural or educational opportunities?
• Does the project improve the overall health of Village residents?
After the scoring of a project is completed by all reviewers, the average of all scores will
be assigned to the project. Projects will then be given an overall priority ranking of 1
through 4 as follows:
Priority Rank = 1 = Essential Project Score 21 or above
Priority Rank = 2 = Necessary Project Score 10 to 21
Priority Rank = 3 = Desirable Project Score 5 to 10
Priority Rank = 4 = Deferrable Project Score less than 5
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Electrical Connection Upgrades
Project Background: Staff is requesting to update the electrical connections on the two slides
pumps, activity pump and two trash pumps. Currently they are hard wired,
and we have to request to have Scott or Roman disconnect and re-connect the
pumps each fall and spring when we remove and re-install or when they need
servicing.
1. Regulatory Compliance: N/A
2. Need/Necessity: Will reduce the amount of staff time needed to complete
this twice annual task of disconnecting and re-connecting these pumps.
3. Public Safety/Health Impact: Reduces the amount of interaction for staff
with the three-phase power.
4. Existing Infrastructure: If completed the cost savings for staff time will not
be realized for several years.
5. Consistency with Plans: Not listed in any plan.
6. Operating Budget Impact: Should not require additional funding and
should save operating costs as staff won’t need to disconnect and re-
connect each spring, fall or when they need servicing.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: No growth or economic benefits.
9. Quality of Life/Placemaking: N/A
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Insulate and Heat Filter Room
Project Background: Staff is requesting to insulate and heat the filter room. Currently the filter
room at the aquatic center is not insulated or heated. Due to this staff must
remove the 4 pool motors each fall otherwise there is corrosion damage and
seal damage to these motors/pumps. To prevent the damage the removal and
re-installation is completed each year. We have previously tried to leave them
in over the winter but unfortunately it can cause seal damage, which forces
staff to perform emergency removal in spring due to leaks. This emergency
work can cost $500 to $1,700 per motor depending on if it just needs a seal or
if there is other damage like bearings need to be replaced.
1. Regulatory Compliance: Would allow us to reduce the amount of time
staff utilizes non-compliant equipment to remove and install motors each
year.
2. Need/Necessity: Will extend the life of equipment within this area
significantly as it will not be exposed to the harsh conditions during the off
season.
3. Public Safety/Health Impact: Will reduce the amount of times staff has to
remove motors thus reducing the significant threat to staff and will protect
the investments in other mechanical equipment in the room.
4. Existing Infrastructure: If completed the cost savings of staff time and
limiting the effects of the harsh environment on all mechanical equipment
should prolong the life of all the equipment in this room. It could also
eliminate the necessity of completing the electrical upgrades on three of
the pumps as they will not have to be removed and re-installed each year.
They will only need to be removed for service. Over the past few years the
village has made investments in new pool heaters, water heater, variable
frequency drive and new circulation pump that should help preserve this
equipment also.
5. Consistency with Plans: Not listed in any plan.
6. Operating Budget Impact: Will require additional funding as there will be a
cost for gas and electricity to run to the heat and there will be future costs
when the furnace needs to be replaced. Will save labor costs as staff won’t
need to remove 4 pumps each spring and fall. Only for servicing.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: No growth or economic benefits.
9. Quality of Life/Placemaking: N/A
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Pool Controller
Project Background: Over the past couple of seasons we began experiencing an issue with the
controller returning back to the main screen while we were trying to adjust it.
We were able to make it through the 2018 season with this issue but in 2019 it
started having issues that would not allow it to read the PH level in the pool.
We had to call in a service technician to get the controller to accurately
monitor the pool water. Due to the issues the past few years and the age (21
years) of the controller replacement is suggested.
1. Regulatory Compliance: If not completed we will not be able to accurately
monitor the water and keep it compliant with ATCP 76 the state
requirements for pool water.
2. Need/Necessity: If not completed we may be forced to shut the pool down
during the season if the controller is not working.
3. Public Safety/Health Impact: Will be able to accurately monitor pool water
and keep patrons safe.
4. Existing Infrastructure: Current controller is 21 years old. Minor
modifications will need to be made to accommodate an up to date
controller but will offer the facility more benefits as it should allow us to
monitor readings from our phones or computers.
5. Consistency with Plans: This item is not listed specifically in a plan but
maintaining this asset is a necessity.
6. Operating Budget Impact: Should not require additional funding and
should save operating costs as staff won’t need to physically be at the
aquatic center to check the controller.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Since the aquatic center will be able to
remain open instead of closed due to broken equipment it will encourage
people to attend the facility and draw people to the area as an attraction.
9. Quality of Life/Placemaking: Will allow us to safely monitor and treat the
water at the Aquatic Center. It will also keep the Aquatic Center in a
reliable operating condition and maintain it as an attraction for residents
and visitors.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Slide Repairs
Project Background: During the evaluation that was completed by Water Technology in 2016 they
noticed that the start tub on the slides were showing cracking on the inside
rim. Staff has also noticed that there is separation showing on the seam of the
drop slide. The evaluation suggested that this cracking be repaired so it is not
allowed to worsen that could cause leaking or sharp edges.
1. Regulatory Compliance: If allowed to worsen and there are sharp edges,
or the seam breaks and water leaks the slides will need to be closed as
they will not be safe for patrons to use.
2. Need/Necessity: If not completed we will be forced to shut the slides and
could reduce attendance at the aquatic center.
3. Public Safety/Health Impact: Could injure a patron if not repaired or
monitored closely.
4. Existing Infrastructure: Start tub on drop slide is 21 years old and has not
been repaired. The start tub on the flume slide was previously removed
and repaired.
5. Consistency with Plans: Recommended that these repairs be completed in
the 2016 evaluation of the aquatic center.
6. Operating Budget Impact: Should not require additional funding and
should save operating costs as staff won’t need to monitor as closely for
problems if the repairs are completed.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: No growth or economic benefits.
9. Quality of Life/Placemaking: Will allow us to keep all features operating
and continue to attract patrons to the facility.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Sandhill, Kennedy, Machmueller and other Park Play Structure Replacements
Park Shop Expansion
Prohaska Park Development
Project Background:
1. Regulatory Compliance:
2. Need/Necessity:
3. Public Safety/Health Impact:
4. Existing Infrastructure:
5. Consistency with Plans:
6. Operating Budget Impact:.
7. Capital Funding:
8. Growth/Economic Development: Promotes the use of the facility and
draws in outside visitors due to providing quality facilities.
9. Quality of Life/Placemaking: Promotes the use of these facilities by
residents and enhances the recreational opportunity.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Backstop Fencing at Kennedy Park
Project Background: The backstop fencing at Kennedy Park on diamonds #1 and #2 were originally
installed in the late 70’s. The fencing is quite rusted, curled and holes have
formed where the pieces come together. The curling and holes are dangerous
to users of the fields and people that attend games as someone could be cut
by the loose fence or a stray baseball could go through a hole and hit
someone. Having nice facilities encourage outside groups to attend
tournaments at this facility. This past season D.C. Everest Youth Baseball
hosted three tournaments at Kennedy and invested time and materials to
paint and secure some of the bad fencing.
1. Regulatory Compliance: If someone would be injured due to this issue it
could affect the village’s recreational immunity and may be held
responsible.
2. Need/Necessity: Will protect players and others that attend events at
these sites. If the village is aware of the issue it must make attempts to
remedy the situation.
3. Public Safety/Health Impact: Would reduce the risk of anyone being
injured that uses these facilities.
4. Existing Infrastructure: Upgrades outdated asset. Will preserve the existing
infrastructure and extend its useful life.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document.
6. Operating Budget Impact: Will reduce the amount of maintenance needed
to the current backstops.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Promotes the use of the facility and
draws in outside visitors.
9. Quality of Life/Placemaking: Promotes the use of these facilities by
residents and enhances the recreational opportunity.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Gear Operators
Project Background: This project may not need to be completed if we are able to replace the
current gear operators and valves with current 2019 CIP borrowed funds. Since
the pool was built advancements have been made to eliminate the gear
operators that are submerged underwater. Due to them being submerged in
treated water they don’t last very long and need to be replaced every three
years otherwise they don’t operate, and these are on valves that need to be
used on a regular basis for operation and draining of the pool. If we can get
these valves/operators replaced, we won’t have to continue replacing these
operators on a regular basis.
1. Regulatory Compliance: N/A
2. Need/Necessity: If not replaced in a timely manner we will have to keep
investing in replacement gear operators on a regular basis. If gear
operators freeze up during the season, we would be forced to close the
facility.
3. Public Safety/Health Impact: N/A
4. Existing Infrastructure: Would extend the useful life of the mechanical
system and preserve the operation of the pool.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document.
6. Operating Budget Impact: Reduce the amount of time staff spends
securing necessary gear operators and changing them on a regular basis
allowing them time to work on other tasks.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Continue to draw people to the area
because of the quality of the facilities.
9. Quality of Life/Placemaking: Continue to draw people to the area because
of the quality facilities in the area.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Kennedy Park Restroom
Project Background: Originally built in 1976 and addition installed in late 80’s to comply with ADA
this facility is showing significant wear and tear. All aspects of the facility need
updating and replacement seems like the most viable option to take
advantage of new design aspects and technology. The replacement of this
structure would enhance usage of the facility, make user friendly and be
compliant with ADA regulations.
1. Regulatory Compliance: Upgrade to meet ADA requirements.
2. Need/Necessity: N/A
3. Public Safety/Health Impact: Not significant.
4. Existing Infrastructure: Upgrades outdated asset and add capacity to the
facility.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document.
6. Operating Budget Impact: Will reduce the amount of maintenance needed
with the current facility. Reduce water usage due to low flush toilets and
timed faucets.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Promotes the use of the facility and
draws in outside visitors.
9. Quality of Life/Placemaking: Promotes the use of these facilities by
residents and enhances the recreational opportunity.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Lifting Crane for Pool Motors
Project Background: Staff is requesting to install a lifting crane to be used for the removal of three
motors and one pump. Currently a winch is used for the three motors and a
chain hoist on a wood beam is used for the one pump. The beam where the
winch is attached is not rated and tested as required and was pointed out by
Fehr Graham during their review of the facility. Also, the wood beam is not an
approved way to remove the one pump. The installation of a lifting crane
would allow staff to pull the three motors and one pump safely with one piece
of equipment anchored in the floor of the filter room.
1. Regulatory Compliance: Would allow us to comply with state and federal
requirement by utilizing approved lifting equipment for the removal of the
motors and pumps.
2. Need/Necessity: Will protect staff from injury.
3. Public Safety/Health Impact: The current process threatens the safety of
employees tremendously and would reduce the risk significantly through
engineering practices.
4. Existing Infrastructure: Will replace existing infrastructure that is
inadequate for the task.
5. Consistency with Plans: Listed as a hazard during review of the building by
Fehr Graham.
6. Operating Budget Impact: Will require additional funding in the future as
there will be a cost for maintenance and possible replacement in the
future. Will save labor costs as will reduce the amount of time staff spends
completing this task.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: No growth or economic benefits.
9. Quality of Life/Placemaking: N/A
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Log Slice Repairs and Safety Pad Replacement
Project Background: The Aquatic Center has a lily pad walk that uses 7 log slices with a net over the
top that challenges people to walk on these foam floats while using the net to
help the process. The 7 log slices are currently 21 years old and the outer
coating is completely gone on the bottom. These floats are extremely
expensive and would cost over $30,000 to replace all 7. We can have them
recoated for just over $7,000 and would extend the life of these floats. The
second part of this project is the replacement of the safety pads along the
walls by this feature. The safety pads are also 21 years old and are
deteriorating and are looking quite worn. These are the only two safety pads in
the facility that have not been replaced yet. The other seven have been
replaced a couple of times since the facility opened.
1. Regulatory Compliance: The safety pad part of this project is required to
be in place for this feature to protect patrons. The pads must be in place to
comply with state pool construction codes. There are no regulatory issues
with the log floats.
2. Need/Necessity: N/A
3. Public Safety/Health Impact: The safety pads are crucial to protecting
patrons using this activity. New padding will renew the cushioning and
friction abilities of the padding. If allowed to deteriorate beyond the point
of providing protection the feature will have to be closed.
4. Existing Infrastructure: Have exceeded their useful life and this project will
extend their useful life. Less expensive than allowing them to deteriorate
to the point where they need to be replaced.
5. Consistency with Plans: Listed in 2016 facility evaluation and suggested to
refinish log floats and replace safety padding.
6. Operating Budget Impact: Will not affect operating budget.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Will continue to encourage patrons to
attend the facility if all features are open and in good shape.
9. Quality of Life/Placemaking: N/A
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Parking Lot Repairs
Project Background: The Aquatic Center parking lot has not had any maintenance completed on it
since 2011. There are significant cracks throughout the lot and the pavement
markings are nearly gone. The cracks are the most significant issue as there is
vegetation growing in them that causes damage and these cracks are also
entry points for water to get under the pavement. Once water gets under the
pavement it freezes and then causes the pavement to move. The pavement
markings need to be re-painted to direct traffic and designate parking spaces
to control where patrons park to get the most vehicles in the lot. The
suggested repairs for the parking lot are crack sealing, seal coating and new
pavement markings.
1. Regulatory Compliance: N/A
2. Need/Necessity: If repairs are not completed the damage will continue to
occur and replacement will be necessary at a much higher cost. These
repairs will extend the life of the surface.
3. Public Safety/Health Impact: Safely directs traffic within the parking lot
and reduces the interaction of employees and patrons with traffic.
4. Existing Infrastructure: Will preserve and extend the life of this
infrastructure.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document.
6. Operating Budget Impact: No affect on operating budget but may generate
additional revenue as we provide an attractive and maintained facility.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Continue to draw people to the area
because of the quality of the facilities.
9. Quality of Life/Placemaking: Continue to draw people to the area because
of the quality facilities in the area.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Pool Surface Replacement
Project Background: The Aquatic Center pool surface currently has several issues. There is
significant staining around pool inlets, sealant coming through crack in pool
wall, cracking along transition in pool wall, leaking joints, surface has become
rough due to periodic cleaning of stains and most recently there are voids and
holes in the surface due to the surface degrading. The pool surface has
exceeded its life expectancy by over ten years. The industry standard is that
the surface should last around 10 years and it is now 21 years old.
1. Regulatory Compliance: The rough areas will require attention as patrons
could be injured and the leaks may allow the loss of treated water into the
ground.
2. Need/Necessity: If the replacement is not completed water could get
between the aggregate surface and the concrete and cause significant
damage to the surface that could force closure of the facility.
3. Public Safety/Health Impact: Reduces the chance of injury to employees
and patrons and preserves this vital asset.
4. Existing Infrastructure: Will preserve and extend the life of this
infrastructure. Has exceeded it useful life by over 10 years.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document and this project is included in the
evaluation that was completed in 2016.
6. Operating Budget Impact: Will reduce amount of time staff spends
cleaning stained areas and allow them to work on other items. May
generate additional revenue as we provide an attractive and maintained
facility.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Continue to draw people to the area
because of the quality of the facilities.
9. Quality of Life/Placemaking: Continue to draw people to the area because
of the quality facilities in the area.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Slides and Activity Pumps Upgraded
Project Background: Currently one of our slide pumps and the activity pump are 21 years old, the
other is 10 years old. The motors on these pumps will need to be replaced
soon but this project focuses on the installation of Variable Frequency Drives
on all three of these motors. Currently these motors always run at maximum
rpm and flow is regulated by a valve to restrict the flow of the water to
appropriate levels. Instead of operating the motor at maximum output a VFD
can modulate the output of the pump by allowing the motor to run at a lower
output appropriate to the exact application and flow required at the time. By
not running the motors wide open there is significant electrical usage savings
and less wear and tear on the motors.
1. Regulatory Compliance: Reduces the amount of electricity used which is
better for the environment.
2. Need/Necessity: Will continue to use more energy than necessary to
operate the facility.
3. Public Safety/Health Impact: N/A
4. Existing Infrastructure: Will reduce operating costs, extend useful life and
upgrade outdated assets.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document. The installation of VFD’s on these
motors was recommended in the 2016 evaluation of this facility.
6. Operating Budget Impact: Reduces the amount of energy used running
these 3 motors at maximum output 9 hours per day.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Continue to draw people to the area
because of the quality of the facilities.
9. Quality of Life/Placemaking: Continue to draw people to the area because
of the quality facilities in the area.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Replace Current DE Filter System with Regenerative Filter Media
Project Background: The current DE filter system consists of 39 filter grids coated with DE. The
circulation pump pulls water through the filter grids entrapping dirt and
debris. This system requires frequent flushing and re-coating. Provides great
water quality but is very a very labor-intensive system (cleaning about every
three weeks and takes about 5 hours per time), requires replacement of filter
septum’s every 5 to 7 years at a cost of around $8,000 and is dangerous for the
operators. Since construction of the facility there have been many
advancements in filter technology. The Regenerative Media system has
comparative filtering ability without the frequency of cleaning, water and
energy usage savings.
1. Regulatory Compliance: Filtering of pool water is required by the state
pool code and is safer for the operators due to DE carcinogenic properties.
2. Need/Necessity: Savings in water, energy and maintenance labor.
3. Public Safety/Health Impact: Reduces the handling of certain hazards by
staff.
4. Existing Infrastructure: Installation of this type of system will extend the
useful life of the asset, reduce operating costs and upgrade outdated
technology.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document and the replacement of the filter
system with a Regenerative Media System is included in the evaluation
that was completed in 2016.
6. Operating Budget Impact: Will reduce amount of time staff spends
cleaning and maintaining current filter system and provide savings, in
water and energy.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Continue to draw people to the area
because of the quality of the facilities.
9. Quality of Life/Placemaking: Continue to draw people to the area because
of the quality facilities in the area.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Pool Building Roof Replacement
Project Background: The current pool roof is 21 years old and is a traditional asphalt roof. It has
been deteriorating over the past several years as each year staff is replacing
shingles that have been blown off and there are areas where nearly all the
shingle granules are gone. Staff is requesting to replace the roof to preserve
the integrity of the building. Since the building is only 21 years old, we are
suggesting that the roof be replaced with either decra metal shingles or a
standing seam snap loc metal roof. Even though these types of roofs are more
expensive than traditional asphalt shingles their life expectancy is nearly
double and would reduce the amount of staff time to maintain.
1. Regulatory Compliance: N/A
2. Need/Necessity: If not replaced in a timely manner leaks could occur, and
the result would be damage to the interior of the building.
3. Public Safety/Health Impact: Building damage could occur if roof is not
replaced.
4. Existing Infrastructure: Current roof is near its useful life and replacement
is suggested. This project with extend the useful life of this building.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document.
6. Operating Budget Impact: Will reduce amount of time staff spends
completing repairs to the roof on an annual basis.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Continue to draw people to the area
because of the quality of the facilities.
9. Quality of Life/Placemaking: Continue to draw people to the area because
of the quality facilities in the area.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Shelter and Restroom Painting
Project Background: Most of the shelters and restrooms in the village have not been painted since
they were installed. Most of them are just over 20 years old and are beginning
to show their age. This past year the village invested in painting a shelter and a
restroom and it brought these facilities back to life and improved their
appearance tremendously.
1. Regulatory Compliance: Upgrade to meet ADA requirements.
2. Need/Necessity: May reduce usage of the facilities if project is not
completed. The steel structure of the shelters may be damaged if they are
not properly painted to protect from rust and corrosion.
3. Public Safety/Health Impact: Preserves these assets.
4. Existing Infrastructure: Preserves existing infrastructure and extends its
useful life.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document.
6. Operating Budget Impact: Will reduce the amount of maintenance needed
with the current facilities. May encourage additional usage of the facilities
if they are kept in good condition.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Promotes the use of the facility and
draws in outside visitors due to providing quality facilities.
9. Quality of Life/Placemaking: Promotes the use of these facilities by
residents and enhances the recreational opportunity.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Shower Upgrades
Project Background: This project involves both the indoor and outdoor shower’s, but each area has
a different need. The outdoor showers have pvc grating that is not flush with
the surrounding concrete, is uneven in places and has sharp edges in some
areas. There are also areas where the uneven grates exceed the 3/8” allowable
by ADA requirements. The recommendation is to replace with flush, leveled,
PVC grating. The indoor shower project is to save costs in lost staff time and
the loss of heated water. The showers currently have a single knob that allows
patrons to turn the water on and off. Unfortunately, there is constantly issues
with individuals turning on more showers than they need or turning them all
on and leaving them on. It is not uncommon for staff to walk in there several
times of days to finds all the showers on and no one in them. Staff is
suggesting that the showers be converted to timed buttons so they run for a
limited amount of time and staff would no longer need to walk through on a
regular basis to turn them off.
1. Regulatory Compliance: The outdoor shower areas will require attention
as patrons could be injured and some areas exceed the allowable
requirement by ADA. N/A for indoor showers.
2. Need/Necessity: If someone is injured by the outdoor shower grating this
could be detrimental to the village.
3. Public Safety/Health Impact: Reduces the chance of injury to employees
and patrons and preserves this vital asset.
4. Existing Infrastructure: Will preserve and extend the life of this
infrastructure. Has exceeded it useful life.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document and the outdoor shower grating
project is included in the evaluation that was completed in 2016.
6. Operating Budget Impact: Will reduce amount of time staff spends
checking indoor showers and allow them to work on other items. Will also
save on the loss of heated water.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Continue to draw people to the area
because of the quality of the facilities.
9. Quality of Life/Placemaking: Continue to draw people to the area because
of the quality facilities in the area.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: One-ton Truck #6
Project Background: Truck #6 is currently a 2008 GMC with approximately 70,000 on it. The typical
useful life of a one-ton for village use is 15 years. This truck is a little bit
different because when this truck was purchased it was decided to use the
plow off the previous truck #6 so the plow on the current truck is a 1998. The
plow regularly needs attention due to wiring issues; lights are frozen in place
due to the age; parts need to be manufactured or strengthened due to
deterioration or availability of parts. The plow also has holes in it due to rust.
1. Regulatory Compliance: N/A
2. Need/Necessity: If truck is not replaced it will be subject to breakdowns,
which could slow down snow removal in cul-de-sacs and at park facilities.
If broke down, it could also affect park operations as this is the only park
truck that has a dump box on it.
3. Public Safety/Health Impact: If broke down could affect snow removal on
cul-de-sacs. Could affect residents being able to access their homes.
4. Existing Infrastructure: Upgrades outdated asset.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document.
6. Operating Budget Impact: Will reduce the amount of maintenance needed
to the current truck #6.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: N/A
9. Quality of Life/Placemaking: N/A
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Play Structure Replacement
Project Background: The current play structure is 21 years old and shows significant wear and tear
and several aspects are no longer functioning. Due to the manufacturer being
out of business replacement parts are quite expensive and we are annually
purchasing new valves, operator handles, slide pieces or safety pad. The play
structure was previously painted in 2007 but there is significant fading and
chipping of paint. We previously planned on having the structure removed and
re-powder coated at a cost of $25,000 but since the evaluation in 2016 have
been considering replacement. The report suggests that the current
deficiencies present an opportunity to replace the structure and revitalize the
play value of the pool. The new structure should be replaced with a new
model with similar flow requirements to avoid unnecessary mechanical
changes.
1. Regulatory Compliance: N/A
2. Need/Necessity: If we are no longer able to purchase replacement parts
for this structure it may need to be closed if it causes a safety concern.
3. Public Safety/Health Impact: The slide portion of this structure poses the
most risk. Almost annually we have to replace a section or two of the slide
at a cost of $1,200+ per piece because they are cracked. There is also a
safety pad at the bottom of this slide that needs to be replaced on a
regular basis. If the slide were to break or collapse a patron could be
injured.
4. Existing Infrastructure: The cost of replacement is tremendous compared
to maintaining the existing structure but the current state of the 21-year-
old structure does provide an opportunity to upgrade an outdated asset.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document. Recommended in 2016 evaluation to
replace with a new structure to revitalize the play value of the pool.
6. Operating Budget Impact: Will reduce the amount of maintenance needed
with current structure and may result in additional patrons at the facility
due to a new feature being provided.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Continue to draw people to the area
because of the quality of the facilities. New features tend to increase
attendance.
9. Quality of Life/Placemaking: Continue to draw people to the area because
of the quality facilities in the area. Gives more reasons to people to attend
the facility because of the new feature.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Water Riders Anchors
Project Background: There are currently 4 water riders located in the zero-depth area of the pool.
The water riders are popular for the young kids but the anchors that hold them
in place have begun to loosen and we can no longer tighten them down to the
appropriate level. Each year we remove the water riders from the pool to help
preserve these assets, but the annual removal and installation process has
made the anchors loose. Staff is requesting that these anchors be replaced so
the water riders don’t come loose from the bottom of the pool possibly
injuring someone or closing one of these features.
1. Regulatory Compliance: If one of these water riders was to come loose it
would not comply and would have to be closed for use.
2. Need/Necessity: If one would pull loose there could be damage to the
bottom of the pool that could not be fixed during the season without
draining the pool. If that was the case, we would have to close the pool.
3. Public Safety/Health Impact: Possible injury to someone using these
features if it breaks loose during use. If removed from the pool the area
would have to be closed otherwise someone may be injured by the
anchors mounted to the bottom of the pool.
4. Existing Infrastructure: Will preserve these features and extend their
useful life.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document. Recommended in 2016 evaluation to
remove existing anchors and reset new anchors.
6. Operating Budget Impact: N/A
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Continue to draw people to the area
because of the quality of the facilities.
9. Quality of Life/Placemaking: Continue to draw people to the area because
of the quality facilities in the area.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Yellowbanks Restroom Replacement
Project Background: The Yellowbanks Restroom is a pit facility originally constructed by the county
in the late 70’s. It has not been upgraded to meet ADA requirements and is
hard to access because there are not proper paths to get to the facility. This
park also sees relatively low usage because of the pit toilets without modern
plumbing. Besides the low usage at this park the pit restroom also needs some
major maintenance. The ADA requirements would be first and foremost, vent
pipes need to be replaced and the floor drains in the facility need to be
repaired. They are currently pushing up through the floor. Because of the
tremendous cost to replace with a running water facility (a well and septic
system may need to be installed along with a new building) and paved paths a
decision needs to be made if this facility should be replaced. The other option
would be to tear down the existing facility and replace with portable
restrooms each May-October. Both options would affect the operating budget
though.
1. Regulatory Compliance: Upgrade to meet ADA requirements.
2. Need/Necessity: Will continue to reduce use of the facility.
3. Public Safety/Health Impact: A new facility would be safer for employees
and patrons of the facility.
4. Existing Infrastructure: Replaced outdated asset.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document. Listed as a project in the Yellowbanks
Master Plan to replace this facility.
6. Operating Budget Impact: Will reduce the amount of maintenance needed
with the current facilities. Will increase expenses for because of the
infrastructure built for this new facility. Will encourage additional usage of
the facilities therefore increasing revenues.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Promotes the use of the facility and
draws in outside visitors due to providing quality facilities.
9. Quality of Life/Placemaking: Promotes the use of these facilities by
residents and enhances the recreational opportunity.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Yellowbanks Shelter Roof
Project Background: The Yellowbanks shelter roof needs replacement. It was replaced in 2003 but
unfortunately the shingles are not holding up due to a low quality asphalt
shingle and the conditions (trees and north facing) at this site. Staff would
propose replacement using a standing seam snap loc steel roofing. This would
double the life of the roof and only cost approximately $1,600 more than a
traditional asphalt roof.
1. Regulatory Compliance: N/A
2. Need/Necessity: If not completed this asset could be damaged due to
water leaks, etc.
3. Public Safety/Health Impact: Could be dangerous for patrons of the park if
the roof deteriorates.
4. Existing Infrastructure: Preserves existing infrastructure and extends its
useful life.
5. Consistency with Plans: Maintaining all park facilities is a goal in the
Comprehensive Planning document.
6. Operating Budget Impact: Will reduce the amount of maintenance needed
with the current facilities. Will encourage additional usage of the facilities
therefore increasing revenues.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Promotes the use of the facility and
draws in outside visitors due to providing quality facilities.
9. Quality of Life/Placemaking: Promotes the use of these facilities by
residents and enhances the recreational opportunity.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Park Shop Expansion
Project Background: The Village Park system has grown tremendously since it was originally
developed. Along with the growth of the park system additional equipment
has been acquired to maintain all the additional parks. The current park shop
was constructed in the late 1970’s and the Park Department has grown into a
full-time department with four employees. Since the park system and
department has grown over the years the village has outgrown the current
park shop for storage of all the equipment. Besides not being able to store all
the equipment in one location (some equipment is stored in 3 other locations)
the use of the facility has changed over the years. Currently staff completes all
routine maintenance at this location, storage of equipment and heated
storage for supplies that can’t freeze. Only a small area where paint, cleaning
chemicals and parts storage is heated and the main shop where all equipment
is stored is cold. Due to staff completing more tasks at this site and being too
small to meet the current needs the proposal is to expand the current facility.
There is a need to add on to the building for additional storage capacity,
insulate and heat the new section so staff can complete repairs and use as a
workshop for construction projects during the winter and a wash bay for
cleaning equipment for maintenance purposes and to also house the Zamboni
so it can be used to its full capacity. Currently, the Zamboni is only used to
shave the ice, it is not used for flooding as there is no heated building to house
it with water in the machine. If the municipal center project does move
forward, there will not be a need for as extensive work at this site as proposed
but there will still need to be work done to make the current facilities work for
different uses.
1. Regulatory Compliance: N/A
2. Need/Necessity: Will allow staff to maintain equipment better and provide
a better environment for starting and running equipment during cold
conditions. Will also reduce staff time as all equipment will be at one site
instead of four.
3. Public Safety/Health Impact: N/A
4. Existing Infrastructure: Upgrades outdated asset and allow the use of this
facility to be expanded. Extends useful life as it will provide additional
capacity. If completed the cost savings will be for staff time as equipment
will be able to wash and maintained better and staff won’t have to travel
to pick up equipment from other locations.
5. Consistency with Plans: N/A
6. Operating Budget Impact: Will lower cost for personnel as staff won’t have
to travel to wash equipment, complete maintenance or go to other sites to
pick up equipment. This will also increase productivity. The new portion of
the building won’t need as much maintenance for the first few years. Will
affect the operating budget as a larger building with heat, lights, wash bay,
etc. will cost more to operate. Should not require additional funding
beyond the project budget.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: N/A
9. Quality of Life/Placemaking: Will improve the appearance of the parks as
staff will have more time to spend on other tasks. The improved
appearance will attract more users to the parks, which will improve the
recreation opportunities in the village. Improves the quality of life and
health of families that use the parks.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Kennedy Play Structure Replacement
Project Background: Most of the play structures at Village parks were installed in the late 90’s. We
have begun to see an increase in repairs or necessary modifications to these
play structures over the past 5 years. The most recent items completed were a
platform at Sandhill, removal of slides at Williams and Yellowbanks and yearly
replacement of supporting clamps at Kennedy, Yellowbanks, Robinwood,
Sandhill, Williams and Kellyland. The supporting clamps are part of an issue
with Burke playground equipment and they are supplied to the village for free,
but staff must complete the work at the village’s cost. Also, due to the age of
the equipment they have become outdated, replacement parts are not
available in some cases and all structures are pretty much of the same variety
at each park. Staff is suggesting that we upgrade these to new structures to
increase attendance and use of the structures.
1. Regulatory Compliance: Since the parks have these play structures, we
have a responsibility to keep them in safe condition.
2. Need/Necessity: Will reduce the amount of staff time needed to complete
clamp replacement and other repairs each year.
3. Public Safety/Health Impact: If the current structures are not maintained
or replaced users could be injured.
4. Existing Infrastructure: Upgrades outdated assets. Useful life is typically
10-15 years. If completed the cost savings will be for staff time each year
making repairs to old equipment and the new equipment should not need
anything for several years.
5. Consistency with Plans: Maintaining parks is listed in comprehensive plan.
6. Operating Budget Impact: Should not require additional funding and
should save operating costs as staff won’t need to make repairs to
structures each year, which will allow them to work on other tasks.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Should help draw people to move to the
area as parks are an important reason for families to move to the area.
9. Quality of Life/Placemaking: Improves the recreation opportunities in the
village. Improves the quality of life and health of families that use the
parks.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Machmueller Play Structure Replacement
Project Background: Most of the play structures at Village parks were installed in the late 90’s. We
have begun to see an increase in repairs or necessary modifications to these
play structures over the past 5 years. The most recent items completed were a
platform at Sandhill, removal of slides at Williams and Yellowbanks and yearly
replacement of supporting clamps at Kennedy, Yellowbanks, Robinwood,
Sandhill, Williams and Kellyland. The supporting clamps are part of an issue
with Burke playground equipment and they are supplied to the village for free,
but staff must complete the work at the village’s cost. Also, due to the age of
the equipment they have become outdated, replacement parts are not
available in some cases and all structures are pretty much of the same variety
at each park. Staff is suggesting that we upgrade these to new structures to
increase attendance and use of the structures.
1. Regulatory Compliance: Since the parks have these play structures, we
have a responsibility to keep them in safe condition.
2. Need/Necessity: Will reduce the amount of staff time needed to complete
clamp replacement and other repairs each year.
3. Public Safety/Health Impact: If the current structures are not maintained
or replaced users could be injured.
4. Existing Infrastructure: Upgrades outdated assets. Useful life is typically
10-15 years. If completed the cost savings will be for staff time each year
making repairs to old equipment and the new equipment should not need
anything for several years.
5. Consistency with Plans: Maintaining parks is listed in comprehensive plan.
6. Operating Budget Impact: Should not require additional funding and
should save operating costs as staff won’t need to make repairs to
structures each year, which will allow them to work on other tasks.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Should help draw people to move to the
area as parks are an important reason for families to move to the area.
9. Quality of Life/Placemaking: Improves the recreation opportunities in the
village. Improves the quality of life and health of families that use the
parks.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Sandhill Play Structure Replacements
Project Background: Most of the play structures at Village parks were installed in the late 90’s. We
have begun to see an increase in repairs or necessary modifications to these
play structures over the past 5 years. The most recent items completed were a
platform at Sandhill, removal of slides at Williams and Yellowbanks and yearly
replacement of supporting clamps at Kennedy, Yellowbanks, Robinwood,
Sandhill, Williams and Kellyland. The supporting clamps are part of an issue
with Burke playground equipment and they are supplied to the village for free,
but staff must complete the work at the village’s cost. Also, due to the age of
the equipment they have become outdated, replacement parts are not
available in some cases and all structures are pretty much of the same variety
at each park. Staff is suggesting that we upgrade these to new structures to
increase attendance and use of the structures.
1. Regulatory Compliance: Since the parks have these play structures, we
have a responsibility to keep them in safe condition.
2. Need/Necessity: Will reduce the amount of staff time needed to complete
clamp replacement and other repairs each year.
3. Public Safety/Health Impact: If the current structures are not maintained
or replaced users could be injured.
4. Existing Infrastructure: Upgrades outdated assets. Useful life is typically
10-15 years. If completed the cost savings will be for staff time each year
making repairs to old equipment and the new equipment should not need
anything for several years.
5. Consistency with Plans: Maintaining parks is listed in comprehensive plan.
6. Operating Budget Impact: Should not require additional funding and
should save operating costs as staff won’t need to make repairs to
structures each year, which will allow them to work on other tasks.
7. Capital Funding: No outside funding.
8. Growth/Economic Development: Should help draw people to move to the
area as parks are an important reason for families to move to the area.
9. Quality of Life/Placemaking: Improves the recreation opportunities in the
village. Improves the quality of life and health of families that use the
parks.
Village of Weston Capital Improvement Plan Projects 2020-2024
Project Name: Prohaska Park Development
Project Background: The Village purchased the Prohaska property almost three years ago. The
original intention of the purchase was to develop the park into a mostly
passive use park with the development of walking and biking trails, access to
fishing the ponds and a shelter/restroom area for people to picnic. The Village
began working on an entry road and parking area back in the winter of 2017
but has not completed this work. Since this purchase was completed with the
intentions and a signed agreement with the former landowner to develop into
a park staff feels this project should be included in the CIP.
1. Regulatory Compliance: N/A
2. Need/Necessity: Will benefit the entire village as it would provide
additional recreation activities that are currently not provided.
3. Public Safety/Health Impact: Will directly affect the health of citizens by
offering additional recreation facilities which makes citizens healthier.
4. Existing Infrastructure: Will provide additional recreation activities in the
village that are currently not provided.
5. Consistency with Plans: Development of this parcel is included in both the
Comprehensive Outdoor Recreation Plan and the Comprehensive Plan.
6. Operating Budget Impact: If developed at one time this park should not
require additional capital equipment beyond what is included in the
budget. There may be a small amount of additional revenue generated
from this site due to park shelter reservations. There will be additional
operating budget impact as there will be additional annual maintenance,
long term maintenance/replacement and utility costs.
7. Capital Funding: There is development grants available through the state
and federal government for the develop of parks.
8. Growth/Economic Development: Depending on what is developed on this
site it could promote economic development. The original concept
included biking trails and if developed properly would be a site to attract
tourists to use the site.
9. Quality of Life/Placemaking: Will increase recreation opportunities and
green space. Improves the quality of life for all residents due to its passive
use so it will serve everyone. Would improve the health of all village
residents that use the facilities.
END OF
PACKET