Muyni
← Back to Whitefish

Architectural Review Committee

Regular Meeting

Whitefish, MT · July 21, 2020

AgendaMinutes

Minutes

WHITEFISH ARCHITECTURAL REVIEW COMMITTEE MINUTES July 21, 2020 The meeting was called to order by Kathy Skemp at 8:15AM PRESENT: Stacy Caldwell, Shane Jacobs, Diane Kane, Leslie Lowe, Paul McElroy, Tracy Rossi, Kathy Skemp ABSENT: none STAFF: Wendy Compton-Ring PUBLIC COMMENT: none MINUTES: The minutes from July 7, 2020 were unanimously approved. OLD BUSINESS none NEW BUSINESS New Leaf Office/Duplex, 123 Wisconsin Ave, duplex (ARC 20-20) The applicant described the project, its location and proposed materials. The intent is to keep the mature trees to the south and west of the project, as part of the landscaping. Leslie – where will the stormwater be detained? Site review will be next week and they will be asking about using the apartment stormwater facility for their stormwater. Questions about the garages and driveways. Concerned about the small size of the planter in front of the building that is not shown on the other site plan. It is too small for the tree and seems like the afterthought. Concerned about the lack of thought on the stormwater and landscaping could have real implications for the site design. Will be looking at the some of these issues at the site review. Paul – looks like a sea of asphalt in front of the building Leslie – the project is a garage-forward design; asked about pedestrian and bicycle access – it will be shared with the driveway Shane – the project needs some further work with landscaping, access, etc. The garage- forward design is a concern; the building needs some further work to the east and west – really all four elevations need further work and tie into the landscaping Kathy – agrees the elevations need further work; the double cantilever on the front doesn't look right – typically see a post, but wouldn’t work here – maybe a bracket would work Paul – more work needs to be done with the west and south elevations, if the building is to stand the test of time; concerned with the trees going away Diane – west elevation questions: the perspective shows a window, but windows aren't on the elevations/floorplan; agrees more work is needed with the site plan and landscaping 1 Motion: Shane – move to table and direct the applicant to consider the Committee comments and take into account comments from the site review meeting next week Diane – 2nd Discussion: Paul – something needs to change to the rear elevation Vote: motion passes unanimously Don ‘K’ Service Building Addition, 6219 Hwy 93 S, Mt Creative (ARC 20-21) The applicant described the project, location, floorplan and materials. Phasing the full CUP expansion project and this is phase 1. Kathy – window materials – metal, green – as green is the accent colors Tracy – why is the roof not at the same level – variation and helps with the 2-hour separation, not sure when the 2nd phase of the expansion will occur Kathy – likes the step down of the roof as it helps to break up the building Shane – questions about the 2-hour fire wall Paul – no comments, not sure what more could be done Diane – agrees; metal siding is discouraged, but that's what is there Motion: Leslie – move to approve as submitted Diane – 2nd Discussion: none Vote: motion passes unanimously Whitefish Animal Hospital, 713 E 13th Street, Seven Hills Construction (ARC 20-22) The applicant described the project. They currently are using a tent for customers, as they are not letting people in the building. They want a better set up in front of the building. Described the small addition, location, materials and how it will be accessed. All materials will be matching the existing materials with the exception of the beam. Leslie – adds to the front of the building and is a good solution, a hose bib might be a good addition for pet water Shane – color it will match Tracy – looks better than the tent Paul – any other post/beam on the backside, but not very visible Diane – improves the entrance of the building Tracy – better for the snow shed Paul – ensure you make the same scale of the timbers and the cross beams Further committee questions about the materials, colors and details 2 Motion: Tracy – move to approve as submitted but would like to see the color of the stamped concrete Paul – 2nd Discussion: none Vote: motion passes unanimously OTHER ITEMS The Committee reviewed the updated regulations, draft InDesign layout and offered suggestions on the layout. The Committee agreed to add language: “Higher quality and easily maintained materials are strongly recommended.” and place in the Exterior Material subsection within each chapter. The August 18th meeting was canceled. Meeting adjourned at 9:40 AM 3

Agenda

Whitefish Architectural Review Committee AGENDA Tuesday, 8:15 AM, July 21, 2020 Council Conference Room 418 E 2nd Street 1. Call to Order and Roll Call 2. Public Comment 3. Approval of Minutes of the July 7, 2020 Old Business: none New Business: 1. New Leaf Office/Duplex, 123 Wisconsin Ave, duplex (ARC 20-20) 2. Don ‘K’ Service Building Addition, 6219 Hwy 93 S, Mt Creative (ARC 20-21) 3. Whitefish Animal Hospital, 713 E 13th Street, Seven Hills Construction (ARC 20-22) Other Business: • City Council Directed Amendments – on-going item • August 18th Meeting Adjourn Next meeting: August 4, 2020

Get email alerts for Whitefish

A daily email when new agendas and minutes are posted.

Report an issue with this meeting