Economic Development Authority
Regular MeetingWilliamsburg, VA · November 12, 2025
Agenda
AGENDA
City of Williamsburg
Economic Development Authority
Wednesday, November 12, 2025
A meeting of the Economic Development Authority will be held Wednesday, November 12, 2025 in the Stryker
Center, Room 127, 412 N. Boundary Street commencing at 3:00 PM.
Page
I. CALL TO ORDER
II. ROLL CALL
III. APPROVAL OF MINUTES
A. September EDA Minutes 3-7
IV. REVIEW FINANCIAL STATEMENTS
A. Financial Statements 8-9
V. CHAIRMAN REPORT
VI. ECONOMIC DEVELOPMENT DEPARTMENT REPORT
A. Revenue Sharing Incentive Program Update
Total Incentives to Date: $710,780.41
Net New Taxes to City: $1,872,753.45
B. 2025 Business Retention & Expansion (BRE) Survey Results 10
VII. OLD BUSINESS
VIII. NEW BUSINESS
A. Consideration and Action Regarding the EDA FY27 Funding Request for 11 - 13
City Budget Presentation
B. Consideration and Action Regarding Proposed Revisions to the Bike 14 - 18
Rack Grant Program
C. Consideration and Action Regarding Bike Rack Donations to Three 19
Public Facilities Located in the City of Williamsburg
IX. LIAISON REPORT
A. Business Roundtable – Ms. Dowdy 20
Page 1 of 24
B. Williamsburg Downtown – Mr. Willey 21
C. The Edge District – Mr. Willey 22
D. Tourism Development Grant Review Committee – No Report
E. Williamsburg Public Art Council (WPAC) – Ms. McBeth and Ms. Ramsey 23
F. Eastern Virginia Regional Industrial Facilities Authority (EVRIFA) – Ms.
Ramsey – No Report
G. Planning Commission – No Report
H. City Council – Ms. Ramsey 24
X. NEXT MEETING
Wednesday, December 10, 2025, at 3:00 PM in the Municipal Building in the
large conference room on the second floor (401 Lafayette Street).
XI. ADJOURN
Page 2 of 24
MINUTES
City of Williamsburg
Economic Development Authority
September 23, 2025
A meeting of the Economic Development Authority was held on September 23, 2025, at 2:00 in the
Stryker Center, Room 128, 412 N. Boundary Street.
I. CALL TO ORDER
Chair Dowdy called the meeting to order at 2:00 PM.
II. ROLL CALL
The following members were present:
Chair Odessa Dowdy, Vice Chair Robert (Robby) Willey, Elaine McBeth, and Brian
Twiddy.
Adria Vanhoozier arrived at 2:07 PM.
Staff Attending:
Director of Economic Development & Tourism Yuri Matsumoto, Tourism Division
Manager Joanna Skrabala, Administrative Coordinator Sarah Seward, Legal Counsel
Christina Shelton, and Planning Commission Liaison John Tarley.
III. APPROVAL OF MINUTES
A. July EDA Minutes
Moved by Willey, seconded by McBeth, to approve the July minutes as
presented.
Carried 4-0-0-1 by a roll call vote:
Ayes: Dowdy, McBeth, Twiddy, Willey
Nays: None
Abstain: None
Absent: Vanhoozier
IV. REVIEW FINANCIAL STATEMENTS
A. Financial Statements
Ms. Matsumoto presented the financial statements, noting that some numbers
may change as the Finance Department conducts its year-end closeout. If there
are changes, the statements will be reviewed during the following meeting.
Page 3 of 24
Expenditures on the June financial statement included nameplate purchases for
new board members, payment for safety lighting at the city-owned properties on
Capitol Landing Road, $7,400 for several conferences and business recruitment
trips attended by staff, and $586.97 in tax incentive payments.
For the July statement, Ms. Matsumoto noted interest earnings in the amount of
$650.45 and an annual insurance payment of $2,710.
The August financial statement included revenue from the Business Roundtable,
$609.16 in interest earnings, and $1,963.78 in tax incentive payments.
V. CHAIRMAN REPORT
A. Introduction of New Board Member
Chair Dowdy welcomed new board member Brian Twiddy.
VI. NEW BUSINESS
A. Consideration and Action Regarding an Application for Bond Financing from the
Colonial Williamsburg Foundation
Ms. Matsumoto shared that the Colonial Williamsburg Foundation has requested
that the EDA approve a taxable bond for capital improvements to facilities that
they own and operate in the City, refunding the outstanding principal from the
$22.5 million bond that was issued in 2013, and refinancing some outstanding
debts that Colonial Williamsburg has incurred to acquire and maintain that
infrastructure.
Ms. Matsumoto reported that the EDA’s bond counsel, Kevin White with Butler
Snow, has reviewed and approved all the documentation provided.
Chris Kulp with Hunton Andrews Kurth, bond counsel to the Colonial
Williamsburg Foundation, provided an overview of the application and offered to
answer any questions the EDA may have.
Moved by Willey, seconded by Vanhoozier, that the EDA approve
Resolution #25-02 authorizing the issuance of taxable revenue bonds in an
amount up to $350 million for the benefit of the Colonial Williamsburg
Foundation, and authorize the EDA secretary to sign the related
documents contingent upon review and approval by the EDA attorney and
bond counsel.
Carried 5-0-0-0 by a roll call vote:
Ayes: Dowdy, McBeth, Twiddy, Vanhoozier, and Willey
Nays: None
Abstain: None
Absent: None
Economic Development Authority
September 23, 2025
Page 4 of 24
VII. CHAIRMAN REPORT CONTINUED
A. Launchpad Update – Brandon Hennessey, Director of the W&M
Entrepreneurship Hub
Mr. Hennessey provided a detailed update on Launchpad activity. He highlighted
that, over the coming months, his team will be hosting several information
sessions regarding resources available to regional entrepreneurs through
Launchpad. Mr. Hennessey shared that in an effort to keep the EDA updated,
quarterly impact reports will now be provided.
Mr. Tarley asked if info sessions are available online. Mr. Hennessey responded
that they are not available online due to the nature of the event.
Mr. Willey asked how Launchpad measures success, and Mr. Hennessy replied
that they outline objectives and measure results, which are specific metrics for
Launchpad.
B. EDA Work Plan Updates
Ms. Dowdy reported that updates to the EDA Work Plan are included in the
meeting packet, noting the consolidation of the Business Retention & Expansion
(BRE) Survey and the addition of two comprehensive reports on commercial
vacancies throughout the City. She also stated that resource partner updates will
be scheduled on an as-needed basis.
VIII. ECONOMIC DEVELOPMENT DEPARTMENT REPORT
A. Revenue Sharing Incentive Program Update
Total Incentives to Date: $710,780.41
Net New Taxes to City: $1,872,753.45
IX. OLD BUSINESS
X. NEW BUSINESS CONTINUED
A. Business Retention & Expansion Survey
Ms. Matsumoto reported on changes to the Business Retention & Expansion
(BRE) Survey, referencing the change in the EDA Work Plan. The draft survey
includes both previous and additional questions, specifically addressing
workforce issues. Ms. Matsumoto asked if there were any comments or
questions regarding this change.
Mr. Tarley suggested adding additional language to the survey or providing an
example to show how feedback from previous surveys has informed decision-
making and programming.
Economic Development Authority
September 23, 2025
Page 5 of 24
B. Authorization to Purchase Signage and Collateral Related to the Designated
Outdoor Refreshment Area (DORA)
Ms. Matsumoto reported that the Colonial Williamsburg Historic Resource
Management Team has approved the signage, and the next step will be to have
it produced.
Moved by Vanhoozier, seconded by McBeth, that the EDA authorize up to
$5,000 for the purchase of signage and collateral related to the
implementation of the Designated Outdoor Refreshment Area in Merchants
Square.
Carried 5-0-0-0 by a roll call vote:
Ayes: Dowdy, McBeth, Twiddy, Vanhoozier, and Willey
Nays: None
Abstain: None
Absent: None
XI. LIAISON REPORT
A. Business Roundtable – Ms. Dowdy
Ms. Dowdy noted that the next Business Roundtable is on November 12. Edward
Harris, President & CEO of Visit Williamsburg, will be presenting a tourism
update.
Ms. Dowdy reviewed the current 12:00 PM - 1:00 PM Business Roundtable
format. In response to attendee feedback requesting additional time for
networking and presentations, staff proposed extending the event by one half
hour to 12:00 PM - 1:30 PM to accommodate this request.
B. Williamsburg Downtown – Mr. Willey
C. The Edge District – Mr. Willey
D. Tourism Development Grant Review Committee – No Report
E. Williamsburg Public Art Council (WPAC) – Ms. McBeth and Ms. Ramsey
F. Eastern Virginia Regional Industrial Facilities Authority (EVRIFA) – Ms. Ramsey
G. Planning Commission – Mr. Tarley
Mr. Tarley shared that the planning commission has approved a zoning text
amendment requiring any store in the City of Williamsburg that wants to sell
vaping products to obtain a special use permit.
H. City Council – Ms. Ramsey
XII. CLOSED SESSION
Economic Development Authority
September 23, 2025
Page 6 of 24
A. Closed session pursuant to Section 2.2-3711 of the Code of Virginia pursuant to
subparagraph 5 for the purpose of discussing prospective businesses where no
public announcement has been made.
Moved by McBeth, seconded by McBeth, to go into closed session
pursuant to Section 2.2-3711 of the Code of Virginia: Pursuant to
subparagraph 5 for the purpose of discussing 47 prospective businesses
or expansion of an existing business where no public announcement has
been made.
Carried 5-0-0-0 by a roll call vote:
Ayes: Dowdy, McBeth, Twiddy, Vanhoozier, and Willey
Nays: None
Abstain: None
Absent: None
B. Certification of a closed session pursuant to Section 2.2-3712 of the Code of
Virginia.
Moved by McBeth, seconded by Vanhoozier, to approve the certification of
a closed session pursuant to Section 2.2-3712 of the Code of Virginia.
Carried 5-0-0-0 by a roll call vote:
Ayes: Dowdy, McBeth, Twiddy, Vanhoozier, and Willey
Nays: None
Abstain: None
Absent: None
XIII. NEXT MEETING
Wednesday, November 12, 2025, at 3:00 PM in the Stryker Center (412 N Boundary
Street).
XIV. ADJOURN
Chair Dowdy adjourned the meeting at 3:16 PM.
Odessa Dowdy, Chair
Yuri Matsumoto, Secretary
Economic Development Authority
September 23, 2025
Page 7 of 24
Economic Development Authority
Schedule of Revenues, Expenditures and Changes in Fund Balances - Budget and Actual - Economic Development Authority
For the Period Ended September 30, 2025
FY 2024 FY 2025 FY 2026 FY 2026 FY 2026 Variance
Year to date Year to date Budget Month to date Year to date to Budget
Beginning Fund Balance* $386,714.29
Bond Fees Received $ 250.00 $ - $ 6,831.00 $ 500.00 $ 500.00 $ 6,331.00
Contribution from City - 110,000.00 110,000.00 - - 110,000.00
Business Roundtable Revenue 449.62 401.46 2,000.00 - 366.30 1,633.70
Interest Earnings 4,098.97 3,535.06 6,000.00 611.42 1,871.03 4,128.97
Xfer from City-Tax Incentives - - 200,000.00 - - 200,000.00
Transfer from EDA Designated Funds - - - - - -
Transfer from Reserves - - 42,959.00 - - 42,959.00
Total Operating Revenue $ 4,798.59 $ 113,936.52 $ 367,790.00 $ 1,111.42 $ 2,737.33 $ 365,052.67
Legal Fees $ - $ - $ 2,000.00 $ - $ - $ 2,000.00
Professional Services - Audit - - 3,000.00 - - 3,000.00
Professional Services - Consultants - 540.19 9,300.00 - - 9,300.00
Board Expenses 524.00 24.00 3,000.00 - 95.14 2,904.86
Marketing 569.36 2,986.42 16,500.00 - - 16,500.00
Existing Business Program 579.00 - 20,000.00 - - 20,000.00
Business Roundtable 75.00 525.74 2,500.00 1,165.34 1,959.89 540.11
Postage - - 780.00 5.71 5.71 774.29
Insurance 2,425.00 2,551.00 2,710.00 - 2,710.00 -
Rental Property - Capitol Landing 318.19 551.72 5,000.00 204.76 408.44 4,591.56
New Business Recruitment 95.88 2,000.00 37,000.00 - - 37,000.00
Go Virginia Project - - 12,000.00 - - 12,000.00
Downtown Vibrancy Implementation - - 7,000.00 - - 7,000.00
Regional Entrepreneurship 36,042.50 - 42,000.00 1,542.50 1,542.50 40,457.50
Tax Incentive Payments* 12,128.19 - 200,000.00 - - 200,000.00
Contingency - - 5,000.00 - - 5,000.00
Total Operating Expenses $ 52,757.12 $ 9,179.07 $ 367,790.00 $ 2,918.31 $ 6,721.68 $ 361,068.32
7/1/25 FY 2026 FY 2026 FY 2026 FY 2026 FY 2026 Current
Reserve Revenues Revenues Expenses Expenses Commitment Reserve Assigned Unassigned
Designated Programs using Reserves Balance Month to Date Year to Date Month to Date Year to Date of Reserves Balance Reserves Reserve
Business Grants $ 34,414.27 $ - $ - $ - $ - $ - $ 34,414.27 $ - $ 34,414.27
Wmsbg Celebrates Art 8,702.15 - - - - - 8,702.15 - 8,702.15
Public Art Sculpture Program 7,255.04 - - - - - 7,255.04 - 7,255.04
Downtown Vibrancy - Main Street Implementation - - - - - - - - -
Downtown Vibrancy - Downtown Tree Illumination 50,000.00 - - - - - 50,000.00 50,000.00 -
Demolition Program 99,000.00 - - - - - 99,000.00 99,000.00 -
$ 199,371.46 $ - $ - $ - $ - $ - $ 199,371.46 $ 149,000.00 $ 50,371.46
*Estimated & unaudited. Subject to change pending fiscal year end
closing entries Ending Fund Balance $ 382,729.94
Unassigned Reserves 183,358.48
Reserve Policy (10% of Annual Budget) 36,779.00
Unassigned Reserves Available $ 146,579.48
Cash $ 208,345.87
LGIP Investments $ 174,384.07
Accounts Receivable $ 50,000.00
Accounts Payable $ (50,000.00)
Total Fund Balance $ 382,729.94
Page 8 of 24
Economic Development Authority
Schedule of Revenues, Expenditures and Changes in Fund Balances - Budget and Actual - Economic Development Authority
For the Period Ended October 31, 2025
FY 2024 FY 2025 FY 2026 FY 2026 FY 2026 Variance
Year to date Year to date Budget Month to date Year to date to Budget
Beginning Fund Balance* $386,714.29
Bond Fees Received $ 250.00 $ 7,256.25 $ 6,831.00 $ - $ 500.00 $ 6,331.00
Contribution from City - 110,000.00 110,000.00 - - 110,000.00
Business Roundtable Revenue 644.09 401.46 2,000.00 - 366.30 1,633.70
Interest Earnings 5,352.80 4,639.56 6,000.00 622.18 2,498.20 3,501.80
Xfer from City-Tax Incentives - - 200,000.00 - - 200,000.00
Transfer from EDA Designated Funds - - - - - -
Transfer from Reserves - - 42,959.00 - - 42,959.00
Total Operating Revenue $ 6,246.89 $ 122,297.27 $ 367,790.00 $ 622.18 $ 3,364.50 $ 364,425.50
Legal Fees $ - $ - $ 2,000.00 $ - $ - $ 2,000.00
Professional Services - Audit - - 3,000.00 - - 3,000.00
Professional Services - Consultants - 540.19 9,300.00 - - 9,300.00
Board Expenses 524.00 24.00 3,000.00 - 95.14 2,904.86
Marketing 569.36 2,986.42 16,500.00 - - 16,500.00
Existing Business Program 618.50 - 20,000.00 - - 20,000.00
Business Roundtable 403.68 1,376.25 2,500.00 - 1,959.89 540.11
Postage - - 780.00 31.40 37.11 742.89
Insurance 2,425.00 2,551.00 2,710.00 - 2,710.00 -
Rental Property - Capitol Landing 564.64 742.75 5,000.00 210.16 618.60 4,381.40
New Business Recruitment 95.88 4,680.27 37,000.00 850.00 850.00 36,150.00
Go Virginia Project 12,000.00 12,000.00 12,000.00 - - 12,000.00
Downtown Vibrancy Implementation - - 7,000.00 - - 7,000.00
Regional Entrepreneurship 36,042.50 1,542.50 42,000.00 12,000.00 13,542.50 28,457.50
Tax Incentive Payments* 12,128.19 - 200,000.00 - - 200,000.00
Contingency - - 5,000.00 - - 5,000.00
Total Operating Expenses $ 65,371.75 $ 26,443.38 $ 367,790.00 $ 13,091.56 $ 19,813.24 $ 347,976.76
7/1/25 FY 2026 FY 2026 FY 2026 FY 2026 FY 2026 Current
Reserve Revenues Revenues Expenses Expenses Commitment Reserve Assigned Unassigned
Designated Programs using Reserves Balance Month to Date Year to Date Month to Date Year to Date of Reserves Balance Reserves Reserve
Business Grants $ 34,414.27 $ - $ - $ 7,457.46 $ 7,457.46 $ - $ 26,956.81 $ - $ 26,956.81
Wmsbg Celebrates Art 8,702.15 - - - - - 8,702.15 - 8,702.15
Public Art Sculpture Program 7,255.04 - - - - - 7,255.04 - 7,255.04
Downtown Vibrancy - Main Street Implementation - - - - - - - - -
Downtown Vibrancy - Downtown Tree Illumination 50,000.00 - - - - - 50,000.00 50,000.00 -
Demolition Program 99,000.00 - - - - - 99,000.00 99,000.00 -
$ 199,371.46 $ - $ - $ 7,457.46 $ 7,457.46 $ - $ 191,914.00 $ 149,000.00 $ 42,914.00
*Estimated & unaudited. Subject to change pending fiscal year end
closing entries Ending Fund Balance $ 362,808.09
Unassigned Reserves 170,894.09
Reserve Policy (10% of Annual Budget) 36,779.00
Unassigned Reserves Available $ 134,115.09
Cash $ 187,078.74
LGIP Investments $ 175,729.35
Accounts Receivable $ 50,000.00
Accounts Payable $ (50,000.00)
Total Fund Balance $ 362,808.09
Page 9 of 24
Economic Development Authority
Agenda Item Summary
Meeting Date: November 12, 2025 Staff Contact: Sarah Seward, Administrative Coordinator
Agenda Item Wording: 2025 Business Retention & Expansion Survey Results
Background Information:
As referenced in the updated EDA Work Plan, the EDA has transitioned from issuing multiple Business Retention &
Expansion (BRE) surveys throughout the year to conducting a single, comprehensive city-wide survey. This change
consolidates the previous practice of issuing seven separate surveys targeting different commercial areas into one
annual effort.
The 2025 BRE Survey was sent to 732 businesses across the City of Williamsburg. This accounts for every City of
Williamsburg business, excluding those located in Quarterpath and The Edge District, as both commercial districts
were issued BRE surveys earlier in the year. 28 responses were received.
Previous Relevant Action:
None
Staff Recommendation:
N/A
Sample Motion:
N/A
Page 10 of 24
Economic Development Authority
Agenda Item Summary
Meeting Date: November 12, 2025 Staff Contact: Yuri Matsumoto, Director of Economic Development & Tourism
Agenda Item Wording: Consideration and Action Regarding the EDA FY27 Funding Request for City Budget Preparation
Background Information:
FY27 funding requests are now due to the City’s Finance Director.
After conferring with the EDA Chair, staff recommends that the EDA request the same funding level as last year
($110,000). The attached draft funding request letter outlines the request and the intended use of funds.
The EDA will adopt its FY27 budget at its June 2026 meeting after City Council adopts the City’s FY27 budget, which
will specify the amount of the EDA’s allocation from the City.
Previous Relevant Action:
None
Staff Recommendation:
That the EDA request level funding of $110,000 for FY27 and authorize the Chair to sign the attached FY27 Funding
Request letter to the City’s Finance Director.
Sample Motion:
I move to authorize the Chair to sign the FY27 Funding Request letter to the City of Williamsburg Finance Director
requesting $110,000.
Page 11 of 24
C ITY OF W ILLIAMSBURG
Economic Development Authority
November 12, 2025
Barbara Dameron
Finance Director
City of Williamsburg
401 Lafayette Street
Williamsburg, Virginia 23185
Subject: EDA Outside Agency Funding Request for FY27
Dear Ms. Dameron:
Thank you for the City’s ongoing support of the efforts of the Williamsburg Economic
Development Authority (EDA). The City’s support and funding allows the EDA to implement
programs towards its shared objectives with City Council:
1. Existing businesses grow and prosper in the City.
2. The economy of the City is more diversified, building on its current strengths in retail
trade, tourism/hospitality, and education, while growing emerging areas of cultural arts,
the creative economy, research/development and professional service offices.
3. Williamsburg is known for its positive business environment.
4. The infrastructure (parking, technology, sidewalks, water, sewer, streets) of
Williamsburg supports the growth of quality business in the City.
5. Williamsburg maintains a high-quality sense of place that appeals to citizens, students
and visitors. Williamsburg remains a specialty entertainment, cultural and retail center
of the Historic Triangle.
To this end, for FY27 the EDA requests flat funding of $110,000 for its operating budget.
Operating Funds
The operating funds will be used for the following annual expenses.
Item Amount
Administration (legal fees, annual audit, dues and $15,000
memberships, insurance, postage, legal ads)
New Business Recruitment $30,000
Existing Business Programs $12,500
Entrepreneurship and Launchpad $42,000
401 Lafayette Street, Williamsburg, Virginia 23185-3617 / (757) 220-6120 / fax (757) 259-8046 / EDA@williamsburgva.gov
Page 12 of 24
Item Amount
Business Roundtables $2,500
Professional Services $8,000
Total $110,000
Thank you for your consideration. We look forward to our continued efforts to assist the City of
Williamsburg with economic development.
Sincerely,
Odessa Dowdy
EDA Chair
Page 2
Page 13 of 24
Economic Development Authority
Agenda Item Summary
Meeting Date: November 12, 2025 Staff Contact: Yuri Matsumoto, Director of Economic Development & Tourism
Agenda Item Wording: Consideration and Action Regarding Proposed Revisions to the Bike Rack Grant Program
Background Information:
The Williamsburg Economic Development Authority (EDA) Bike Rack Grant Program originated in 2014 when former
City of Williamsburg Planning Director Reed Nester received a Williamsburg Health Foundation Award in the amount
of $5,000 and designated his stipend toward expanding bicycle parking opportunities for local businesses. The EDA
matched that contribution, creating the foundation for the Bike Rack Grant Program.
The program supports the City of Williamsburg’s commitment to being a bicycle-friendly community. Through
assistance with bike rack installation, the program encourages active transportation, supports environmental
sustainability, and contributes to the vibrancy and accessibility of Williamsburg’s commercial districts.
The program guidelines have not been updated since the program’s inception in 2014, and staff proposes updating
the guidelines to reflect current operations and procedures. Key changes include:
• Formalizing the current process of the program being administered by the department of economic
development and tourism
• Requiring the businesses sign an authorization form granting the Department of Public Works & Utilities
permission to access private property for bike rack installation
• Noting the program’s move from a paper application to the online grant portal which houses all other City of
Williamsburg and EDA grants
Previous Relevant Action:
March 7, 2015 – The EDA adopted the original program guidelines for the Bike Rack Grant, adding the program to its
suite of grant programs available to existing businesses in the City of Williamsburg
Staff Recommendation:
That the EDA approve the proposed revisions to the Bike Rack Grant program guidelines.
Sample Motion:
I move that the EDA approve the proposed revisions to the Bike Rack Grant program guidelines as presented.
Page 14 of 24
Bike Rack Grant
Program Guidelines
Overview
The Williamsburg Economic Development Authority (EDA) Bike Rack Grant Program
supports the City’s commitment to being a bicycle-friendly community. Through
assistance with bike rack installation, the program encourages active transportation,
supports environmental sustainability, and contributes to the vibrancy and accessibility of
Williamsburg’s commercial districts.
The program originated in 2014 when former City of Williamsburg Planning Director Reed
Nester received a Williamsburg Health Foundation Award in the amount of $5,000 and
designated his stipend toward expanding bicycle parking opportunities for local
businesses. The EDA matched that contribution, creating the foundation for the Bike Rack
Grant Program.
Today, the EDA continues to administer the program in collaboration with the City of
Williamsburg Department of Public Works & Utilities and Department of Planning & Codes
Compliance.
Grant Details
Each standard bike rack (including installation) costs approximately $300. Grantees
contribute a non-refundable $25 per rack, and the EDA covers the remaining cost and
coordinates installation.
Grants are available on a first-come, first-served basis while program funds remain
available. Businesses may request up to three (3) bike racks, each rack accommodating
two bicycles.
Qualification Criteria
• The applicant must be located within the City of Williamsburg and hold a current
City of Williamsburg Business License.
• If the applicant is a tenant, written permission from the property owner is required
for installation.
Approval Criteria
Applications will be considered if:
• The property has no bicycle parking, or
• Existing bicycle parking is insufficient to meet demand, or
• Existing bicycle parking needs improvement.
Application Process
The Department of Economic Development and Tourism manages all applications and
program administration.
Revised November 2025 Page 1 of 2
Page 15 of 24
1. Applicant completes the grant application on the City of Williamsburg Grant
Application Portal.
2. If approved, the business must sign an authorization form granting the City’s
Department of Public Works & Utilities permission to access private property for
bike rack installation.
3. The Department of Planning & Codes Compliance will contact the applicant to
schedule an on-site meeting to determine a suitable bike rack location
4. The applicant must submit a non-refundable payment of $25 per bike rack to the
EDA by the date of installation.
5. The Department of Public Works & Utilities will complete the installation of the bike
rack(s).
6. Once installed, the grantee (business) assumes ownership and ongoing
maintenance responsibility for the bike racks.
Revised November 2025 Page 2 of 2
Page 16 of 24
Bike Rack Grant Program Guidelines
Overview
The Williamsburg Economic Development Authority (EDA) has partnered with
the Williamsburg Health Foundation and Planning Director Reed Nester to help
private businesses located in the City of Williamsburg provide bicycle parking.
On behalf of Reed Nester’s 2014 Williamsburg Health Foundation’s Annual
Award, a $5,000 stipend was provided for Mr. Nester to contribute to a cause of
his choosing. Mr. Nester designated that the $5,000 be used to encourage
businesses to install bike racks on their properties. The EDA has matched this
$5,000 stipend, creating a total program fund of $10,000. The Williamsburg EDA
will purchase the bicycle racks to be used by grantees as detailed below.
Grant Details
Each bike rack (including installation) costs approximately $200. The Grantee
(business) contribution is $25 (non-refundable) per rack, and the EDA will pay the
remaining cost of the bike rack(s) and installation. Grants are made on a first-
come, first-served basis until the funds are no longer available.
• Applicants may request up to three bike racks, to accommodate up to six
bikes. Each rack individually accommodates two bikes.
• City Planning Staff will work with the Grantee to determine the best
location for the bike rack(s).
• Bike rack installation will be provided at no cost by the City of Williamsburg
Planning Department.
• Once installation is completed, the property owner and/or business will
assume ownership of and maintenance responsibility for the bike rack(s).
Qualification Criteria
• Grantees must be located in the City of Williamsburg and have a current
City of Williamsburg Business License.
• If the grantee does not own the property on which the bicycle rack(s) will
be installed, the grantee must obtain permission from the property owner.
401 Lafayette Street, Williamsburg, Virginia 23185-3617 / (757) 220-6104 / fax (757) 259-8046 / EDA@williamsburgva.gov
Page 17 of 24
Approval Criteria
• The applicant has no bicycle parking, or
• The applicant's existing bicycle parking is insufficient to meet demand, or
• The applicant’s existing bicycle parking needs improvement.
Application Process
Applicant must first download and print the application.
1. Applicant schedules an onsite meeting with the Williamsburg Planning
Department (757-220-6130 or planning@williamsburgva.gov) to determine
the need and location for the bike rack(s).
2. Applicant completes, signs, and submits the grant application via email
(EDA@williamsburgva.gov), fax (757-259-8073), mail (Williamsburg
Economic Development, 401 Lafayette Street, Williamsburg, Virginia
23185), or in person (401 Lafayette Street, Williamsburg, Virginia.)
3. Economic Development staff email notification to the applicant
acknowledging receipt of the application.
4. Economic Development staff email the applicant to announce
application approval or disapproval within 30 days of receiving an
application.
5. If the application is approved, Economic Development staff place an
order for the bike rack(s) and notify the Planning Department of the
approval, so that installation can be arranged with the
applicant/grantee.
6. Applicant must submit a non-refundable payment of $25 per bike rack to
the Williamsburg EDA by the date of installation.
7. Planning Department installs bike rack(s) in location(s) determined in step
1.
401 Lafayette Street, Williamsburg, Virginia 23185-3617 / (757) 220-6104 / fax (757) 259-8046 / EDA@williamsburgva.gov
Page 18 of 24
Economic Development Authority
Agenda Item Summary
Meeting Date: November 12, 2025 Staff Contact: Yuri Matsumoto, Director of Economic Development & Tourism
Agenda Item Wording: Consideration and Action Regarding Bike Rack Donations to Three Public Facilities Located in
the City of Williamsburg
Background Information:
In 2014, the Williamsburg Economic Development Authority (EDA) established the Bike Rack Grant Program to
promote Williamsburg as a bicycle-friendly community and support multimodal transportation options for residents,
visitors, and employees.
The intent of the program is to encourage bicycle use as a means of transportation and to enhance accessibility and
vibrancy in Williamsburg’s commercial areas. The program has not received an application since 2018.
To advance the program’s original intent and support the City’s continued efforts to be a bicycle-friendly community,
staff recommends that the EDA donate bike racks to the following new facilities in the City of Williamsburg:
• Williamsburg Police Station
• Williamsburg Fire Station
• Greater Williamsburg Sports and Events Center
These facilities are significant public destinations that will benefit from the availability of secure bicycle parking.
Previous Relevant Action:
None
Staff Recommendation:
That the EDA approve the donation of bike racks from the Bike Rack Grant Program to be located at the Williamsburg
Police Station, Williamsburg Fire Station, and Greater Williamsburg Sports & Events Center.
Sample Motion:
I move that the EDA approve the donation of bike racks from the Bike Rack Grant Program to be located at the
Williamsburg Police Station, Williamsburg Fire Station, and Greater Williamsburg Sports & Events Center.
Page 19 of 24
Business Roundtable – Odessa Dowdy
For the current Business Roundtable schedule and registration information, visit
yeswilliamsburg.com/roundtable
2026 Tentative Schedule:
• February 10, 2026
o Topic: Economic Outlook
• May 12, 2026
o Topic: Small Business Spotlight
• August 11, 2026
o Topic: City Project Update
• November 10, 2026
o Topic: Williamsburg Tourism
Page 20 of 24
Williamsburg Downtown – Robby Willey
Grant Updates
Director Miller-Moore recently submitted grant reports to the City for the Tourism
Promotion Contingency Fund grant (for Wi-Fi extenders downtown) and the FY26
Q1 Outside Agency Funding (annual funding). She also submitted the
organization’s FY27 Outside Agency request, which includes for continued
support for the wi-fi project (including a generator) and funding to purchase a
secondhand outdoor movie screen.
Trick-or-Treating Event
The first annual downtown Trick-or-Treating event was a great success! Lots of
feedback about how amazing it was to see hundreds of kids in costume running
all over downtown. The organization is considering two events for next year to
capitalize on demand.
Update Santa Events
The board is seeking downtown partners for a bingo-card-style coupon. We are
currently working with The Christmas Shop, The Fallen Acorn Bookshop, Flemings
Engraving, and The Kimball Theater. We are also soliciting some other holiday-
themed ideas to keep people flowing through the area. Director Miller-Moore
will be sending out some media story pitches related to Santa Season signature
events.
Next Meeting
The next Williamsburg Downtown board meeting is scheduled for November
13th at 4 pm.
Page 21 of 24
The Edge District – Robby Willey
On October 14, a meeting was held with Virginia Beer Co., Column 15, Parkway
Printshop, Copper Fox, the Rochambeau Roadside Inn, and Consociate Media.
Topics included a shared Mardi Gras event and promotions for the
Rochambeau's upcoming opening of their outdoor & event spaces. In addition,
a formal resolution was made to formally begin the process of establishing a
501(c) for the EDGE to build out the area's business association in 2026.
The next meeting to plan out 2026 goals will take place on 11/18 with Virginia
Beer Co., Column 15, Parkway Printshop, Parker & Peony Boutique, Shoofly Dairy
Bar, Copper Fox, and Consociate Media to begin building out the 2026 board.
Page 22 of 24
Williamsburg Public Art Council (WPAC) – Elaine McBeth and
Barbara Ramsey
September Meeting Highlights:
• Poet Laureate: The Williamsburg Public Art Council approved an allocation
of up to $1,400 from its FY26 budget to support a Williamsburg Poet
Laureate initiative. The initiative includes an after-school poetry program
at Lafayette and Warhill High Schools, culminating in a student showcase
at the Hennage Auditorium in February 2026.
October Meeting Highlights:
• 2026 Planning – Temporary Installations: The Williamsburg Public Art
Council approved funding not to exceed $150,000 from its FY26 budget
for the installation of the Touring Musical Swings at the Williamsburg
Community Building Lawn, subject to approval by the Williamsburg City
Council. The request will go before City Council at its December meeting.
Page 23 of 24
City Council – Barbara Ramsey
Work Session – Monday, November 10th at 4:00 PM
Background Presentations
• Presentation and discussion regarding a Municipal Land Lease for solar
and energy storage adjacent to Waller Mill Reservoir
• Updated presentation and discussion regarding the recommendations of
the Library Evaluation Committee
Business Meeting – Thursday, November 13th at 2:00 PM
Public Hearings
• Consideration and action regarding PCR #25-018 and PCR #25-024, two
special use permits to allow for a Colonial Williamsburg Arrival Center and
a parking master plan along Lafayette Street
• Consideration and action regarding proposed Resolution #25-20,
authorizing the issuance of water and sewer utility system revenue bonds
in an aggregate principal amount not to exceed $10M
Departmental Operating Report
• The Police Department will provide an update on the construction of the
new Police Station
New Business
• Consideration and action regarding proposed Resolution #25-22,
establishing the City’s 2026 Legislative Agenda
• Consideration and action regarding the bids for the FY25 State of Good
Repair resurfacing of York Street, Jamestown Road, and Richmond Road
• Consideration and action regarding the purchase of a bucket truck for
the Department of Public Works & Utilities
• Consideration and action to amend the Republic Services contract to
include recycling services
• Consideration and action on replacement of the generator at
Quarterpath Recreation Center
• Consideration and action regarding proposed Resolution #25-21,
approving the HTRFA financing and amended support agreement
Page 24 of 24