Historic Triangle Recreational Facilities Authority
Regular MeetingWilliamsburg, VA · June 11, 2025
Agenda
City of Williamsburg
Agenda
Historic Triangle Recreational Facilities Authority Meeting
Wednesday, June 11, 2025 @ 3:00 PM
412 N. Boundary Street, Williamsburg, VA 23185
Page
1. CALL TO ORDER
2. ROLL CALL
3. APPROVAL OF MINUTES
3.1. Minutes from the April 9, 2025 HTRFA Meeting 2-6
HTRFA - Apr 09 2025 - Minutes
4. BOARD MEMBER ANNOUNCEMENTS
5. REPORTS
5.1. Financial Report 7 - 10
Financial Report - FY25 May 2025
5.2. Executive Director's Report
5.3. GWSEC Operator Report 11 - 21
HTRFA Operator Report 6.11.25
5.4. Construction Report 22 - 32
HTRFA Construction Presentation
HTRFA Construction Update 6.11.25
5.5. Legal Report
6. OPEN FORUM
7. CLOSED SESSION
8. PUBLIC HEARINGS
9. UNFINISHED BUSINESS
10. NEW BUSINESS
10.1. Consideration and Direction Regarding a Facility Logo for the Greater 33 - 36
Williamsburg Sports and Events Center - Kemper Sports
Agenda Item Summary - Pdf
11. ADJOURNMENT
Page 1 of 36
MINUTES
City of Williamsburg
Historic Triangle Recreational Facilities Authority
Wednesday, April 9, 2025
1. Call to Order
Chair Andrew O. Trivette called the meeting to order.
2. Roll Call
Authority Members Present:
Andrew Trivette, Chair, City of Williamsburg; Scott Stevens, Vice Chair, James
City County; Mark Bellamy, York County; Robbi Hutton, City of Williamsburg;
and John Carnifax, James City County
Also present were Dan Siegel, Legal Counsel; Robyn Hansen, Legal Counsel;
and Dustie McCay, Clerk
Absent: Brian Fuller, Secretary, York County,
Staff Members Present:
Barbara Dameron, Finance Director and Travis Dill, Purchasing Agent and Risk
Manager
3. Approval of Minutes
1. Minutes from the February 12, 2025, HTRFA Meeting
Moved by Carnifax, seconded by Hutton, to approve the minutes.
Carried 5-0-0 by a roll call vote:
Ayes: Hutton, Trivette, Stevens, Bellamy, Carnifax
Absent: Fuller
4. Board Member Announcements
Chair Trivette reported that the Executive Director position for the Historic
Triangle Recreational Facilities Authority (HTRFA) has been advertised, and 15
applications have been received to date. He provided an overview of the
applicant screening process and the hiring procedures for the position.
Chair Trivette also noted that he is currently working with Ms. Dameron on the
budget and intends to present it to the Board for review next week.
5. Reports
1. Financial Report
Page 1 of 5
Page 2 of 36
Historic Triangle Recreational Facilities Authority
April 9, 2025
Barbara Dameron, Finance Director, reported that $85,000 in revenue
was recognized in March, consisting of $52,000 in interest income and
$33,000 from the SNAP account. She further stated that operating
expenditures totaled $180,000 and capital expenditures amounted to
$3.1 million, resulting in a $3.2 million decrease in the fund balance.
2. Executive Director's Report
There was none.
3. GWSEC Operator Report
John Di Meglio, Kemper Sports, provided an update on the FF&E
report, noting ongoing equipment reviews and purchasing coordination.
The food and beverage point-of-sale system has been established
through a contract with Lightspeed. Kemper has partnered with Visit
Williamsburg for the upcoming Sports ETA trade show.
Outstanding tasks include website launch and brand development. Key
upcoming milestones include hiring the General Manager, initiating
sales, finalizing non-sports content, and launching sponsorship
programs.
Staffing efforts have yielded two finalists for General Manager, with over
40 applications also received for the reopened Marketing Director
position. Licensing processes for food, business, and alcohol are
underway.
Currently, there are 33 executed agreements, 29 committed event
dates, and strong bookings into 2026 and 2027. New and ongoing
negotiations include several sports organizations. Marketing and digital
outreach efforts are actively progressing.
4. Construction Report
Todd Walker, MBP Construction Manager,provided a construction
update, reporting that the project is currently a few days ahead of
schedule. Coordination is underway with Dominion Power and the City’s
Codes and Compliance staff to secure permanent power by August. The
PEMB is 95% complete, and roofing is expected to be finished by the
end of the month. Interior spaces including the storage area, electrical
rooms, and hub space are approximately 90% complete.
Additional updates included progress on the sanitary sewer building
(40%), slab-on-grade and brickwork for the PMBB, completion of IMP
wall panels and overhang framing, and preparations for the mezzanine
gathering area. The hub space slab is complete, and interior framing
Page 2 of 5
Page 3 of 36
Historic Triangle Recreational Facilities Authority
April 9, 2025
has begun.
Discussions are ongoing with Adventure Solutions regarding installation
of the rock-climbing sports courts. Work is progressing on underground
turf duct and electrical systems. Bi-weekly coordination meetings
continue with the OAC and Kemper Sports.
Mr. Walker presented progress photos to the Board.
Chair Trivette noted ongoing discussions with Mr. Walker regarding
contract allowances and current change orders, including modifications
such as enlarging the back door and adding epoxy flooring.
5. Legal Report
There was none.
6. Open Forum
Chair Trivette opened the Open Forum for public comments.
There were none.
Chair Trivette closed the Open Forum.
7. New Business
1. Presentation and Discussion of Phase I Asset Inventory & Valuation
Report - Justin Brodsky, The Superlative Group, Inc.
AIS-25-079
Justin Brodsky, Vice President of Analytics & Valuation, and Sean
Gallagher, Senior Director of Corporate Partnerships & Development of
the Superlative Group, provided an update on their engagement with the
Greater Williamsburg Sports and Event Center. They began work earlier
this year on an asset inventory and valuation project to support the
development of a sponsorship program.
Their efforts included identifying marketable assets for sponsorship,
evaluating naming rights opportunities for both the facility and internal
spaces, and outlining strategies for foundational partnerships.
Mr. Brodsky shared background on the Superlative Group’s expertise in
corporate sponsorship and naming rights. He noted that data collection
began in February, followed by a site visit in March and the completion
of a draft valuation report. The initial valuation focused on factors such
Page 3 of 5
Page 4 of 36
Historic Triangle Recreational Facilities Authority
April 9, 2025
as audience demographics, vehicle and pedestrian traffic, and
geographic reach.
8. Closed Session
1. Closed Session Pursuant to VA Code Sections 2.2-3711(A)(6) and 2.2-
3711(A)(29) - Discussion or Consideration of the Investment of Public
Funds Where Competition or Bargaining Is Involved, Where, If Made
Public Initially, the Financial Interest of the Authority Would Be
Adversely Affected and Discussion of the Award of a Public Contract
Involving the Expenditure of Public Funds and Discussion of the Terms
or Scope of Such Contract, Where Discussion in an Open Session
Would Adversely Affect the Bargaining Position or Negotiating Strategy
of the Public Body. (Regarding Asset Inventory, Valuation, and Naming
Rights and Potential Agreements and Expenditures for Same).
AIS-25-080
Moved by Stevens, seconded by Carnifax, to convene in closed
session pursuant to VA Code Sections 2.2-3711 (A)(6) and 2.2-3711
(A)(29) for discussion or consideration of the investment of public
funds where competition or bargaining is involved, where, if made
public initially, the financial interest of the Authority would be
adversely affected; and discussion of award of a public contract
involving the expenditure of public funds and discussion of the
terms or scope of such contract, where discussed in an open
session would adversely affect the bargaining position or
negotiating strategy of the public body regarding asset inventory,
valuation, and naming rights, and potential agreements and
expenditures for the same.
Carried 5-1-0 by a roll call vote:
Ayes: Hutton, Trivette, Stevens, Bellamy, Carnifax
Absent: Fuller
Abstain:
2. Certification of Closed Session
AIS-25-081
Moved by Stevens, seconded by Carnifax, to certify the closed
session.
Carried 5-0-0 by a roll call vote:
Ayes: Hutton, Trivette, Stevens, Bellamy, Carnifax
Absent: Fuller
9. Adjournment
Page 4 of 5
Page 5 of 36
Historic Triangle Recreational Facilities Authority
April 9, 2025
There being no additional business before the Board, the HTRFA meeting of
April 9, 2025, was adjourned at 4:25 p.m.
Moved by Hutton, seconded by Carnifax, to adjourn.
Carried 5-0-0 by a roll call vote:
Ayes: Hutton, Trivette, Stevens, Bellamy, Carnifax
Absent: Fuller
Andrew O. Trivette, Chair
Dustie McCay, Clerk
Page 5 of 5
Page 6 of 36
HISTORIC TRIANGLE RECREATIONAL FACILITIES AUTHORITY
STATEMENT OF NET POSITION
MAY 31, 2025
FY 2025 FY 2025
FULL ACCT ACCT DESCRIPTION ORGINAL REVISED
BUDGET BUDGET FY 2025 ACTUAL
007-00-0000-11001 -HTRFA CASH $ - $ - $ 5,639,156.13
007-00-0000-11002 -HTRFA CASH-PAYROLL - - -
007-00-0000-11015 BOND ESCROW CASH 24 SERIES 4,927,317.16
007-00-0000-11016 BOND ESCROW CASH INT 1,194,649.10
007-00-0000-11017 BOND ESCROW MANAGED 13,671,817.24
007-00-0000-13010 -ACCOUNTS RECEIVABLE - - -
WORKING CAPITAL - - 55,063,581.35
TOTAL ASSETS $ - $ - $ 80,496,520.98
007-00-0000-25001 -ACCOUNTS PAYABLE $ - $ - $ 3,986.06
007-00-0000-25060 -ACCRUED PAYROLL PAYABLE - - -
007-00-0000-27022 MEB ESCROW - - 2,583,342.01
BOND PAYABLE 63,985,000.00
007-00-0000-27022 BOND PREMUIM - - 2,837,912.40
TOTAL LIABILITIES - - $ 69,410,240.47
CAPITAL RESERVE (DS) $ 10,710,529.21
NET POSITION - - 375,751.30
TOTAL NET POSITON - - $ 11,086,280.51
TOTAL LIABILITIES & NET POSITION $ - $ - $ 80,496,520.98
Page 7 of 36
Page 1 of 4
HISTORIC TRIANGLE RECREATIONAL FACILITIES AUTHORITY
STATEMENT OF REVENUES, EXPENDITURES, AND CHANGES IN NET POSITION
FOR MONTH ENDED May 31, 2025
FY 2025 FY 2025
FULL ACCT ACCT DESCRIPTION ORGINAL REVISED REMAINING
BUDGET BUDGET FY 2025 ACTUAL BUDGET
REVENUE
007-00-0400-44440 - MAINT. OF EFFORT - WILLIAMSBURG $ 586,274.00 $ 586,274.00 $ 586,273.12 $ 0.88
007-00-0400-44441 DEBT SERVICE CTRB - WILLIAMSBURG 1,150,000.00 1,150,000.00 1,150,000.00 -
007-00-0400-44450 MAINT. OF EFFORT - JCC 542,302.00 542,302.00 542,302.64 (0.64)
007-00-0400-44451 JCC OPERATING SUBSIDY 400,000.00 400,000.00 - 400,000.00
007-00-0400-44460 MAINT. OF EFFORT - YORK COUNTY 321,424.00 321,424.00 241,068.18 80,355.82
007-00-0400-44461 YORK COUNTY OPERATING SUBSIDY 400,000.00 400,000.00 - 400,000.00
007-00-0400-44465 - TOURISM ALLIANCE - - - -
007-00-0400-44475 OTHER CONTRIBUTIONS - - 1,000.00 (1,000.00)
007-00-0400-44200 INTEREST INCOME 180,000.00 180,000.00 399,844.78 (219,844.78)
007-00-0400-44211 INTEREST INCOME SNAP - - 1,198,783.79 (1,198,783.79)
007-00-0400-44212 UNREALIZED GAIN/LOSS ON INVESTMENTS - - 51,076.71 (51,076.71)
TOTAL REVENUE $ 3,580,000.00 $ 3,580,000.00 $ 4,170,349.22 $ (590,349.22)
OPERATING EXPENSE
007-00-0500-51001 - SALARIES & WAGES $ 160,000.00 $ 160,000.00 $ - $ 160,000.00
007-00-0500-52001 - FICA 12,200.00 12,200.00 - 12,200.00
007-00-0500-52002 - RETIREMENT-VRS 28,800.00 28,800.00 - 28,800.00
007-00-0500-52005 - HOSPITALIZATION 16,000.00 16,000.00 - 16,000.00
007-00-0500-52006 - GROUP LIFE INSURANCE 2,100.00 2,100.00 - 2,100.00
007-00-0500-52016 - TRAINING - - 637.50 (637.50)
007-00-0500-53002 - PROFESSIONAL SERVICES 24,500.00 24,500.00 80,705.40 (56,205.40)
007-00-0500-53002K PROFESSIONAL SERVICES - SPORTS CENTER 178,998.81
Page 8 of 36
Page 2 of 4
HISTORIC TRIANGLE RECREATIONAL FACILITIES AUTHORITY
STATEMENT OF REVENUES, EXPENDITURES, AND CHANGES IN NET POSITION
FOR MONTH ENDED May 31, 2025
FY 2025 FY 2025
FULL ACCT ACCT DESCRIPTION ORGINAL REVISED REMAINING
BUDGET BUDGET FY 2025 ACTUAL BUDGET
007-00-0500-530042- MAINTENANCE, BUILDINGS - - - -
007-00-0500-530043- MAINTENANCE, OFFICE EQUIPMENT - - - -
007-00-0500-53005B- OTHER LEGAL FEES 225,000.00 225,000.00 100,863.03 124,136.97
007-00-0500-53006 - PRINTING 500.00 500.00 - 500.00
007-00-0500-55101 - ELECTRICITY 2,000.00 2,000.00 - 2,000.00
007-00-0500-55102 - HEATING - - - -
007-00-0500-55103 - UTILITIES WATER/SEWER - - - -
007-00-0500-55201 - POSTAGE 200.00 200.00 - 200.00
007-00-0500-55203 - TELECOMMUNICATION 2,100.00 2,100.00 1,019.40 1,080.60
007-00-0500-55301 - INSURANCE - - 1,082.00 (1,082.00)
007-00-0500-55410 - UNIFORMS & APPAREL - - - -
007-00-0500-55413 - OTHER OPERATING SUPPLIES 3,000.00 3,000.00 15,457.43 (12,457.43)
007-00-0500-55501 - TRAVEL -MILEAGE - - - -
007-00-0500-55503 TRAVEL 2,000.00 2,000.00 5,870.97 (3,870.97)
007-00-0500-55801 - DUES & ASSOCIATION MEMBERSHIPS 500.00 500.00 - 500.00
007-00-0500-55838 - PRINCIPAL PAYMENTS - - - -
007-00-0500-55839 - INTEREST PAYMENTS - - 1,125,568.90 (1,125,568.90)
007-00-0500-55840 - COST OF BOND ISSUANCE - - 1,381,548.08 (1,381,548.08)
007-00-0500-55869 - CONTINGENCY 10,000.00 10,000.00 - 10,000.00
007-00-0500-55872A BANK FEES 100.00 100.00 135.00 (35.00)
007-00-0500-58001 - LEASE/RENT OF EQUIPMENT - - - -
007-00-0500-58003 - LEASE - LAND 220,000.00 220,000.00 238,633.88 (18,633.88)
TOTAL OPERATING EXPENDITURES $ 709,000.00 $ 709,000.00 $ 3,130,520.40 $ (2,421,520.40)
OPERATING INCOME $ - $ - $ 1,039,828.82 $ -
Page 9 of 36
Page 3 of 4
HISTORIC TRIANGLE RECREATIONAL FACILITIES AUTHORITY
STATEMENT OF REVENUES, EXPENDITURES, AND CHANGES IN NET POSITION
FOR MONTH ENDED May 31, 2025
FY 2025 FY 2025
FULL ACCT ACCT DESCRIPTION ORGINAL REVISED REMAINING
BUDGET BUDGET FY 2025 ACTUAL BUDGET
OTHER FINANCING SOURCES (USES)
007-00-0500-59988 TRANSFER TO OPERATING RESERVE $ 800,000.00 $ 800,000.00 $ - $ 800,000.00
007-00-0500-59989 TRANSFER TO CAPITAL RESERVE 371,000.00 371,000.00 - 371,000.00
TOTAL OTHER FINANCING SOURCRES $ 1,171,000.00 $ 1,171,000.00 $ - $ 1,171,000.00
INCOME AFTER TRANSFERS $ - $ - $ 1,039,828.82 $ -
PROJECT
007-00-505-67082 ENTERTAINMENT VENUE $ - $ - $ 1,571,445.25 $ (1,571,445.25)
INCOME (DEFICIT ) $ (531,616.43)
NET POSITION - BEGINNING $ 11,617,896.94
NET POSITION - ENDING $ 11,086,280.51
CAPITAL EXPENSE
007-00-0505-67080 - 2019-INDOOR SPORTS COMPLEX $ 1,700,000.00 $ 1,700,000.00 $ 45,332,828.84 $ (43,632,828.84)
TOTAL CAPITAL EXP $ 1,700,000.00 $ 1,700,000.00 $ 45,332,828.84 $ (43,632,828.84)
TOTAL OPERATING AND CAPITAL EXP $ 1,700,000.00 $ 1,700,000.00 $ 50,034,794.49 $ (45,204,274.09)
Page 10 of 36
Page 4 of 4
Page 11 of 36
Contents
• Introduction of General Manager
• FF&E Report
• Operational Updates
• Marketing & Sales
Page 12 of 36
INTRODUCTION OF GENERAL MANAGER
Ben Hardouin brings over 30 years of high-level
executive leadership experience in the health, fitness, and recreational
industry, managing a wide scope of state-of-the-art projects including
campus recreational centers, medical fitness centers, big box fitness
centers, sports performance centers, multi-purpose recreational
centers, and smaller niche boutique studios. Ben's background began
in fitness management as a trainer who specifically focused on youth
obesity; He holds both a Bachelor's and a Master's degrees in Exercise
Physiology, with a certification from the National Academy of Sports
Medicine.
Ben has written and published two books on youth obesity, is an
accomplished public speaker, is an Adjunct Professor of Leadership, and
owns a Leadership/Business Development consulting business.
He is married (Susan), has two amazing kids (Eason and Emmalene),
and an overly rambunctious golden retriever (Linus). Ben is a lifelong
avid fisherman. In his spare time, he owns and operates a registered
non-profit fishing club (Rising Tides Project) that works with young
people navigating difficult seasons of mental health.
Ben and Susan feel extremely blessed to have this opportunity to lead
the Greater Williamsburg Sports and Events Center and are excited to
become part of the vibrant Historic Triangle community.
Page 13 of 36
FF&E
Key Action Items:
• Facility Signage
• KSM review key wayfinding sings to ensure appropriate circulation and
ease of guest facility navigation and provided recommendations to MBP
• Computer / POS / Electronics
• KSM has provided budget quotes and a list of technology hardware needs
for the facility including staff computers and facility POS hardware
• Sports FF&E
• All budgetary quotes were provided we are moving from budgetary quotes
to final selections of specific equipment.
• Formal specifications of sports equipment are being reviewed by Ben and
KSM team we will review formal bid specifications begin the formal
procurement process
Page 14 of 36
Operational Updates
Project Management Report
Overall Status: On Track
Completed Task Last 4 Weeks Highlights
• On-Boarded General Manager
• Developed Full hiring timeline of all line level staff and key
salaried positions
• Developed technology plan for operations
• Created Vendor list based on KSM preferred vendors and
strategic partners
• Executed internal vendor filing system
• Launched Website
• Further Developed key brans assets
Incomplete Tasks Last 4 Weeks
• Hire sales and marketing director
Pending Tasks
• Hire Sales and marketing director
• Implement pre-opening phone system
Next Milestones
▪ Implement pre-opening phone system
▪ Coordinate local sports calendar an utilization analysis
▪ Finalize Facility SOP’s
▪ Develop Sponsorship sales program
▪ Create Grand Opening plan with the board
▪ Further develop conference services sales content
Page 15 of 36
Operational Updates
Facility Staffing
• General Manager:
• Welcome Ben!
• Director of Sales & Marketing and Sports Manager:
• General Manager actively conducting interviews KSM
senior team will conduct second and third interviews
prior to sending final candidates for board
recommendation
• Sports Director:
• Have reposted that role
• Operations:
• Began the process for both the facility business license
and food handlers licenses
• Began process for liquor license for facility with KSM
liquor license attorney
• Transitioning all sales leads to General Manager
Page 16 of 36
Marketing & Sales
SALES UPDATE
• Active Leads:
• New Leads: 5
• Committed Dates: 30
• 2026 Weekend Dates: 9
• 2027 Weekend Dates: 25
• 2028 Weekend Dates: 5
Current Year to Date Analysis Future Bookings
Actual Total Future Contract
MONTH Revenue Number of Events Pipeline MONTH Revenue Next Year Pipeline
January2026 $ - - $ - January2027 $ 30,000 $ -
February2026 $ - - $ - February2027 $ 40,000 $ -
March2026 $ - - $ - March2027 $ 50,000 $ -
April2026 $ - - $ - April2027 $ 80,000 $ 15,000
May2026 $ - - $ - May2027 $ 66,000 $ 15,000
June2026 $ - - $ - June2027 $ 20,000 $ -
July2026 $ - - $ - July2027 $ 60,000 $ -
August2026 $ - - $ 19,000
August2027 $ 9,000 $ -
September2027 $ - $ -
September2026 $ - - $ 38,000
October2027 $ - $ -
October2026 $ - - $ -
November2027 $ - $ -
November2026 $ - - $ 27,000
December2027 $ - $ -
December2026 $ - - $ -
Total $ 355,000 $ 30,000
Total $ - - $ 84,000
Page 17 of 36
Marketing & Sales
Executed Contracts:
• Cheer Festival 3,
• Rich Comley
• Hype Nation Volleyball
• Blue Silver Volleyball 5 weekends
• Phenom hoops 7
• Junior 3ssb Open Gym
• 3SSB Circuit Open GYM
• Big Shots 4
• NTBA
• Southern Volleyball Tournaments
Contracts Pending Completion or Under Negation (at time of
report):
• Catchball, AmeriCheer, Catfest, Burgquest, NCRS Corvette Show
New Inquiries:
• CVCU Volleyball, Super 32 Wrestling, NASP Virginia, Jaimee Kitt Gymnastics
Lost Business
Page 18 of 36
• Made Hoops
Marketing
Website
• Website has launched
• Home - Greater Williamsburg Sports and Events Center
Social Media Channels:
• Launched both Instagram and Facebook will circulate to
boost followers:
• Instagram: greater_williamsburg_sports
• Facebook: Greater Williamsburg Sports and Event Center
• Marketing Dashboard was developed will share at next
HTRFA meeting
Page 19 of 36
Marketing Dashboard EXAMPLE
Page 20 of 36
Thank You!
Page 21 of 36
Greater Williamsburg
Sports & Event Center
HTRFA Con s tr u ct i on Up da te – 0 6/ 11 /2 0 25
By: MPB Todd Wal ker, Cons t ru cti on Ma na ge r &
Me re di th Shi rl e y, CMIT
Page 22 of 36
REAR EQUIPMENT
PADS
Page 23 of 36
Interior Concrete
Complete
Page 24 of 36
Exterior Brick Work
Page 25 of 36
Exterior IMP Panels i n Hub Space
Page 26 of 36
Interior Framing
Page 27 of 36
FIRE SPRINKLER ROUGH-IN
Page 28 of 36
PLUMBING
ON-GOING
Page 29 of 36
Sports Court
Area
Page 30 of 36
HTRFA Construction Updates
GREATER WILLIAMSBURG SPORTS & EVENTS CENTER
Client: HTRFA Client Project #:
Location: 250 Visitor Center Dr. Williamsburg, Va Date: 06/11/2025
MBP: Todd M. Walker Construction Manager MBP No.: J23183.001
Contractor: MEB Architect: CLARKNEXSEN,
Guernsey & Tingle Architect
Substantial Completion: 6.10.26 Final Completion: 8.4.26
HTRFA COMMITTEE
COW Andrew Trivette- Chair Robbi Hutton- City of Williamsburg
JCC Scott Stevens- Vice Chair John Carnifax- JCC
York Co. Brian Fuller- Secretary Mark Bellamy-York Co.
Kemper Sports Steve Goris, John Di Meglio, Ben Hardouin
MILESTONE UPDATES
1. Permanent Power- Aug ‘25
2. Roof Complete
3. Building Dried in
a. PEMP- June ‘25
b. HUB- July ‘25
CONSTRUCTION % COMPLETE
1. Site Work- 40% complete.
a. Completed all SS repair and CIPP.
b. Exterior Mechanical pads are 100% complete.
2. Building Progress- Total Complete: 60%
a. All interior concrete is complete
b. Started and continuing Brick on South side of building.
c. Continue IMP wall on east side of HUB. 90% complete.
d. Started and continuing Interior framing in all areas of GWSEC.
e. Began and continue Sprinkler R/I
f. Continued MEP R/I throughout.
3. HUB space- Total Complete: 40%
a. 90% with Kitchen framing.
b. Completed installing divider curtain tracks in Banquet area.
c. Exterior metal stud framing complete.
Page 1 of 2 MBP
www.mbpce.com
Page 31 of 36
HTRFA Construction Updates
GREATER WILLIAMSBURG SPORTS & EVENTS CENTER
d. Continuing design discussions rear Feature Gym ongoing.
4. Sports Courts (PEMB)- Total Complete: 35%
a. Under slab R/I Complete.
b. Began painting ceiling of PEMB. 40% complete
c. Below Grade Turf Duct 100% complete.
d. All interior Sports Court concrete slab is complete.
e. All Turf equipment concrete pads complete.
MEETINGS
1. Continued regularly scheduled OAC- Bi-Weekly: Next Meeting: 06/19/25
2. Additional meetings- Kemper Teams meeting every other Thursday for Operator
coordination with Construction Management group for construction coordination.
CONSTRUCTION CHANGE ORDER REVIEW
1. See attached Change Order Summary
Page 2 of 2 MBP
www.mbpce.com
Page 32 of 36
Staff Contact
Andrew Trivette, City Manager
Agenda Item Wording
Consideration and Direction Regarding a Facility Logo for the Greater Williamsburg Sports
and Events Center - Kemper Sports
Background Information
Over the last few months Kemper Sports has been working to identify an identity and logo for
the Greater Williamsburg Sports and Events Center. They have presented numerous
options to board members and advisory panels in an effort to narrow the review. Kemper
Sports will present the results of their efforts, recommending a primary and a secondary logo
for use in merchandising and official promotions.
Previous Relevant Action
None
Staff Recommendation
Staff recommends that the Board approve the two logos selected by Kemper to represent
the Greater Williamsburg Sports and Events Center, giving Kemper discretion on when a
primary or a secondary logo is most appropriate.
Attachments
Kemper's Final Logo Recommendation
Page 1 of 4
Page 33 of 36
Logo Recommendation:
Logo Recommendation for the Greater Williamsburg Sports and Events Center
Following a series of revisions and valuable input from the HTRFA board, as well as insight
gathered from local market feedback, KemperSports is pleased to present the finalized logo
recommendations for the Greater Williamsburg Sports and Events Center.
To support the facility's branding and marketing efforts, we have developed both a primary and
a secondary logo. This dual-logo approach ensures maximum flexibility and consistency across
a wide range of applications, from digital and print to merchandise and signage.
Primary Logo
The primary logo is the visual cornerstone of the brand. It will be featured on all official print
collateral, digital media, facility signage, and communications. This logo was designed to be
bold, memorable, and instantly recognizable—serving as the definitive brand identity of the
Greater Williamsburg Sports and Events Center.
Page 2 of 4
Page 34 of 36
Secondary Logo
We recommend the adoption of a secondary logo as a complementary brand asset. The
secondary logo will be used selectively for:
• Merchandise and apparel where alternate sizing or layout is preferred
• Event signage and specialty banners
• Marketing assets that benefit from varied brand expression
This secondary mark allows for greater creative flexibility while maintaining visual consistency
and enhancing brand reach, particularly in spaces where the primary logo may not scale or apply
effectively.
Upon board approval, KemperSports will finalize both logos in high-resolution formats and
integrate them into the facility's official Brand Guide, which outlines usage, color palettes, and
positioning across platforms. These assets are essential in creating a unified and professional
identity for the Center as we expand its presence in the regional and national event landscape.
Page 3 of 4
Page 35 of 36
We appreciate the board’s engagement and direction throughout this process and look forward to
finalizing the visual identity of this remarkable facility.
Page 4 of 4
Page 36 of 36