Parks & Natural Resources Commission
Regular MeetingWoodbury, MN · November 14, 2023
Minutes
City of Woodbury
Woodbury City Hall
8301 Valley Creek Road
Woodbury, MN 55125
651-714-3583
Minutes of
Parks and Natural Resources Commission Regular Meeting
Tuesday, Nov. 14, 2023
Commission Members Present: Timothy Brewington, II, Anna Doherty, Charles
Eckberg, Bruce Montgomery (Co-chair), Deborah
Musser (Chair), Edward Myatt, Wallace Wadd, Noah
Yehalashet
Commission Member(s) Virtual: None
Commission Member(s) Absent: None
Council Member Virtual: Steve Morris
Staff Present: Michelle Okada, Director Parks and Recreation
Josh Kinney, Parks Planner
Jennifer McLoughlin, Environmental Resources Mgr.
Heidi Quinn, Environmental Resources Technician
Belinda Reed, Recording Secretary
Staff Virtual: Jodi Sauro, Parks and Recreation Coordinator
1. Call to Order
Chair Musser called the meeting to order at 7:00 p.m.
2. Open Forum
Mr. Wayne Schilling, 13255 – 50th Street South, Afton, Minnesota 55001, addressed the
Commission with regard to the development timeline for the future Schilling Park, located in Oak
Hill, a Pulte development, on land previously-owned and farmed by Mr. Schilling. Mr. Schilling
noted the area had served as pasture land for his dairy operation, with grassland, oak savannah,
some swamp and a water source, but currently has invasive buckthorn. It was noted that Pulte
Homes, as owner and developer of the Oak Hill property, fulfilled the required park dedication to
the city in the form of land dedication for the future park.
Mr. Schilling would like to see the open space being developed and restoration completed and
asked the Commission for their consideration when a timeline is proposed in the future.
3. Action Items
A. September 12, 2023, Parks and Natural Resources Commission Meeting Minutes
Chair Musser asked for the approval of the Minutes of the September 12, 2023, meeting of the
Parks and Natural Resources Commission.
Parks and Natural Resources Commission Minutes
November 14, 2023
Page 2
Motion: Moved by Commissioner Myatt, seconded by Commissioner Eckberg, to approve the
September 12, 2023, Parks and Natural Resources Commission Minutes.
Vote: In favor All
Against None
Absent None
4. System-wide Natural Resource Management Initial Presentation – Memorandum No.
23 – 30
Ms. Okada provided information on the city’s park dedication requirement noting that when a
landowner sells their land and a developer purchases it for development, the city requires a park
dedication. In the case of the Oak Hill development, the city chose park dedication in the form of
land. Currently, there is a parcel of land adjacent to the open space that has not yet been
developed. At this point, development timing is undetermined based on other priorities that have
happened as it relates to natural resources management. Further developed will most likely be
determined by a future master plan or development of the last parcel adjacent to the open space.
Ms. Okada introduced Heidi Quinn with the Environmental Division of the Engineering
Department.
Ms. Quinn noted that Natural Resources Management Plans (NRMPs) currently exist on some of
the city’s open spaces, going back to 1987. To address the need for a coordinated and holistic
approach, including a planning document to assist staff focus and prioritize the resources for
restoration and maintenance activities, the city entered into an agreement with Barr Engineering
Co. to complete a number of tasks, including updating the existing NRMPs and creating new ones
for a number of areas in the process of creating a final comprehensive document. Ms. Quinn noted
that the process will include upland areas, but not aquatics vegetation enhancements/water level
areas. The process for each site will determine initial and long-range steps to get those projects
underway.
Ms. Quinn outlined how the process will be approached by Barr Engineering Co. and provided an
example of a process which was used for the City of Bloomington, including scoring site attributes
to help with budgeting and planning over the long-term, followed by looking at the site specifics
and digging further into the quality of the open space, phasing out restoration as resources become
available and what can be approved over time.
The PNRC will be asked to provide feedback on the community engagement draft piece of the
process being developed over the next number of months.
A conversation ensued with regard to the identified existing NRMPs, and open spaces currently
without NRMPs. Ms. Quinn noted that site rankings and prioritization will result from community
engagement survey input, open houses, staff and Barr Engineering Co. as the natural resource
expert. Once the ranking and prioritization chart has been developed for Woodbury, the chart will
be made available.
A discussion ensued with regard to the franchise fee. Ms. Okada noted that the franchise fee is
intended to support the replacement of park and trail amenities; not new or maintenance items.
Council Member Morris noted that this is not dissimilar from the same general issue the city has
been addressing with street maintenance and the quality of the asphalt, as well as maintaining the
storm water retention ponds and the need for a steady funding source/plan.
Parks and Natural Resources Commission Minutes
November 14, 2023
Page 3
A discussion ensued with regard to effective buckthorn removal, which requires an ongoing
invasive restoration and maintenance plan.
5. Environmental Stewardship Strategic Initiative Update – Memorandum No. 23 – 31
Ms. McLoughlin provided an update on the Environmental Stewardship Strategic Initiative (ESSI).
The ESSI questionnaire, reviewed by PNRC in July, was subsequently posted on the city’s website
and promoted and communicated using all city communication avenues, in order to get the
broadest array of feedback for the initiative.
paleBLUEdot has been preparing multiple planning process documents; referred to as baseline
documents.
Ms. McLoughlin highlighted the plan team structure to include residents, business owners, up to
three PNRC members and staff. Currently, the plan team application is on the ESSI city website
page. Ms. McLoughlin encouraged the Commissioners to reach out to others in the community
that may wish to participate on the plan team or other ESSI outreach opportunities as they become
available. Ms. McLoughlin noted that currently 24 people have shown an interest online.
Ms. McLoughlin noted that in addition to getting the word out using city platforms such as InTouch
messages, website, Neighbor Nextdoor and Facebook posts, the plan is to cast as wide a net as
possible to include anyone interested in volunteering to participate. The Commissioners provided
staff ideas listing other interested parties for outreach.
Ms. McLoughlin will provide the Commissioners with an informational email that can be
forwarded to the organizations identified by the Commission.
Ms. McLoughlin noted that once the plan team is formed, staff will reach out with a poll to
determine when would be the best meeting dates/times, which will be a mix of in-person and
virtual. The commitment would be attending all of the 7-8 meetings to be scheduled.
Ms. Okada noted that Mr. Ted Redmond, with paleBLUEdot will be attending the December 5,
PNRC workshop meeting with a more detailed progress update.
A discussion ensued with regard to the online questionnaire. Ms. McLoughlin noted that although
the questionnaire will not be statistically valid, staff added questions to the 2024 biannual
Community Survey, which is statistically valid.
It was noted that in the spring, there will be other outreach opportunities for the community.
6. Discussion Items1
A. Current Projects – Status Update – “Park Projects” website page
Mr. Kinney provided an update on various project locations nearing or at completion.
B Central Park Renovation Project
1 Discussion and updates are intended to be informational or of brief inquiry. More substantial discussion of matter
under status updates and miscellaneous should be scheduled for a future agenda.
Parks and Natural Resources Commission Minutes
November 14, 2023
Page 4
Ms. Okada noted the Central Park Renovation Project went out to bid November 3.
Staff anticipates presenting the proposed budget to the City Council at their December 13, meeting
with construction phasing beginning in early 2024.
C. Environmental Stewardship Strategic Initiative (ESSI) Update
Ms. Okada noted that staff is working diligently on the Environmental Stewardship Strategic
Initiative.
7. Monthly Update – Memorandum No. 23 – 32
Ms. Okada noted the Monthly Update continues to highlight the various division activities.
8. Council Report – Council Member Morris
Council Member Morris noted upcoming Council meetings and workshops, including the final
approval of the 2024 Budget scheduled for the December 13, meeting along with other community
events.
9. /10. Announcements/Miscellaneous1
PNRC December 5, Workshop Meeting – location information to be provided.
Central Park Art and Craft Fair – Saturday, Nov. 18, 10 a.m. – 3 p.m.
MHFVSC will be hosting the annual Coca-Cola Holiday Caravan on Wednesday,
Nov. 29, with Santa Claus present. At the event community members are asked to
donate gently used clothing.
Performances in the Park, Central Park, Sunday, Nov. 26, St. Paul Police Band
Holiday Concert, 2 p.m.
Cookies and Crafts with Santa – Saturday, Dec. 2, with five separate seatings
between 9 a.m. and 1 p.m., at Central Park
Winter/Spring 2023/2024 Parks and Recreation Brochure – in homes week of
November 19, with online registration beginning Wednesday, Nov. 29.
Community Garden Registration begins Wednesday, Nov. 29.
Ms. Okada joined Council Member Morris in thanking outgoing Student Commissioner, Noah
Yehalashet, for his service to the city, as well as wishing all the Commissioners and staff a happy
and healthy holiday season.
Parks and Natural Resources Commission Minutes
November 14, 2023
Page 5
11. Adjournment
The meeting adjourned at 8:25 p.m.
Respectfully submitted,
Belinda Reed
________________________________
Belinda J. Reed
Administrative Technician II
Approved by the Parks and Natural Resources Commission on February 6, 2024.
Agenda
Parks and Natural Resources Commission Meeting
Agenda
November 14, 2023 | 7 p.m.
Ash North/South Conference Room
City Hall, 8301 Valley Creek Road
The November 14, Parks and Natural Resources Commission Meeting is taking place
virtually and at Woodbury City Hall in the Ash North and South Conference Rooms.
Members of the public may attend the meeting in-person and may also join the meeting
using a computer, tablet or smartphone and accessing the virtual meeting link at
woodburymn.gov/VirtualMeetings
Watch the Live Meeting
Public comments will be accepted during the meeting both in-person and virtually. Virtual
questions should be submitted via the online Q&A feature within the virtual meeting link.
Questions regarding the meeting will also be taken between the hours of 8:00 a.m. to 4:30
p.m., at 651-714-3583 or at RecOnline@woodburymn.gov. Questions received after 4:30
p.m., will be responded to in the next three to seven business days.
*Please note that all agenda times are estimates
7:00* 1. Call to Order
7:00 2. Open Forum
7:05 3. Approval of the Minutes – September 12, 2023
7:10 4. System-wide Natural Resource Management Initial Presentation
– Memorandum No. 23 - 30
7:30 5. Environmental Stewardship Strategic Initiative Update - Memorandum No. 23 - 31
7:50 6. Discussion Items 1
A. Current Projects – Status Update
B. Central Park Project
C. Environmental Stewardship Strategic Initiative
8:05 7. Monthly Update – Memorandum No. 23 - 32
8:15 8. Council Report – Councilmember Morris
8:25 9. Announcements/Miscellaneous
8:30 10. Adjourn
1 Discussion and status updates are intended to be informational or of brief inquiry.
More substantial
discussion of matters under status updates and miscellaneous should be scheduled for a future agenda.
Parks and Natural Resources Commission - Agenda
November 14, 2023
Page 2
If a Commission member cannot attend this meeting, please contact Belinda Reed
at 651-714-3584 or belinda.reed@woodburymn.gov at your earliest convenience.
Thank you.
The City of Woodbury is subject to Title II of the Americans with Disabilities Act, which prohibits discrimination on the basis of
disability by public entities. The City is committed to full implementation of the Act to our services, programs, and activities.
Information regarding the provisions of the Americans with Disabilities Act is available from the City Administrator's office at 651-
714-3500. Auxiliary aids for disabled persons are available upon request at least 72 hours in advance of an event. Please call the ADA
Coordinator, at 651-714-3500 (TDD 651-714-3568) to make arrangements.
City of Woodbury
Woodbury City Hall
8301 Valley Creek Road
Woodbury, MN 55125
651-714-3583
Minutes of
Parks and Natural Resources Commission Regular Meeting
Tuesday, Sept. 12, 2023
Commission Members Present: Timothy Brewington, II, Anna Doherty, Charles
Eckberg, Deborah Musser (Chair), Edward Myatt
Commission Member(s) Virtual: None
Commission Member(s) Absent: Bruce Montgomery, Wallace Wadd, Noah Yehalashet
Councilmember: Steve Morris
Staff Present: Michelle Okada, Director Parks and Recreation
Josh Kinney, Parks Planner
Belinda Reed, Recording Secretary
Reed Smidt, Recreation Manager
Searles, Eric, Asst. Community Development Dir. /City
Planner
Staff Virtual: Jodi Sauro, Parks and Recreation Coordinator
1. Call to Order
Chair Musser called the meeting to order at 7:05 p.m.
2. Open Forum
In-person and virtual
3. Action Items
A. June 6, 2023, Parks and Natural Resources Commission Meeting Minutes
Chair Musser asked for the approval of the Minutes of the June 6, 2023, meeting of the Parks and
Natural Resources Commission.
Motion: Moved by Commissioner Myatt, seconded by Commissioner Eckberg, to approve the
June 6, 2023, Parks and Natural Resources Commission Minutes.
Vote: In favor All
Against None
Absent Commissioners Montgomery, Wadd, Yehalashet
4. Community Development/Planning Update – Memorandum No. 23 – 24
Parks and Natural Resources Commission Minutes
September 12, 2023
Page 2
Ms. Okada noted that each year Community Development provides the PNRC with a
development update. Ms. Okada introduced Assistant Community Development Director/City
Planner, Eric Searles.
Mr. Searles highlighted new single family and townhome residential developments, along with the
commercial activity located in Woodbury, including the south of Dale Road multi-year plan, south
of Bailey Road, east of Woodbury Drive at Dale Road, and northeast Woodbury, along with future
development areas estimated for 2024-2030. Mr. Searles also highlighted the park components
and storm water locations in each of the areas reviewed.
It was noted that the City of Woodbury’s policy goal is to provide 50 percent single-family and 50
percent multiple-family housing stock. Mr. Searles shared that as a result of the current shortage of
housing inventory, a little over 30 percent of all housing units being sold are new construction.
With regard to future development and growth management, Mr. Searles noted that in July, the City
Council made changes to growth management that will delay the start of some development in some
areas of the city, until the water treatment plant is operational. The City Council also directed staff
to conduct master plans in advance of the next phase opening.
Mr. Searles noted priority park acquisition parcels and highlighted five sites in Woodbury for future
development activity, which can be attributed to the investment in the Gold Line.
5. Fee Assistance Policy – Memorandum No. 23 – 25
Mr. Smidt noted that as a result of recent State of Minnesota legislation, that provides free lunch to
all Minnesota school-age students, the City’s Council Directive PKREC-7.2 Fee Assistance Policy,
requires an adjustment.
The city’s Policy, last updated in March 2020, utilizes the free and reduced lunch letter, provided to
the applicant by the local school district, to determine eligibility for the city’s fee assistance for
recreation programs. For non-student applicants, the last filed federal tax return is used to
determine eligibility, using a sliding scale calculated off of the median income level for the
Minneapolis/St. Paul area.
Mr. Smidt also noted that for special circumstances or hardships, the application is reviewed by the
Recreation Manager and Parks and Recreation Director.
In revisiting the policy to make the necessary adjustments, suggested changes include removing the
free and reduced lunch language and utilizing the HUD yearly adjusted income guidelines and/or
most recently filed federal tax return with the goal to keep the policy simple and easy to use.
The Commissioners were asked for their input and feedback or questions prior to the updated policy
being presented to the City Council for their consideration and approval.
It was noted that the Fee Assistance Policy and application are on the city’s website; Recreation
registration page, and the policy is shared with various organizations that interact with residents
throughout the community including, Woodbury Public Safety, which have contact with youth, and
SoWashCo CARES.
Commissioners commented on keeping the application form simple.
Parks and Natural Resources Commission Minutes
September 12, 2023
Page 3
There was consensus among the Commissioners to align the policy and application with a name
change: “Recreation Program Scholarship” rather than “Fee Assistance,” and to make the necessary
changes, as outlined by staff, and provide the recommendation to the City Council for their
consideration.
6. Refund and Cancellation Policy – Memorandum No. 23 – 26
Mr. Smidt providing background information on the purpose of the Administrative Directive,
PKREC-6.2, pertaining to refunds and cancellations that take place in the normal course of
business in the department, noting the City Administrator ultimately signs off on these types of
policies.
Mr. Smidt highlighted the suggested proposed changes to the policy including: removal of
household program credits, which pose administrative issues as a household may forget they have
a credit or the household may relocate outside the community without a forwarding address. By
law, staff is obligated to attempt to locate the household when a refund is available. It was noted
that if the household is not located, the credit funds are then paid out to the State of Minnesota.
Another change proposed relates to cancellation timeframes by changing the current ten (10)
business days’ notice, to fourteen (14) days’ notice, which eliminates any confusion with weekdays
and weekends (Saturday and Sunday), as well as holidays.
It was noted that if the credit card used for an initial registration transaction has expired, refunds
are then processed by check through the Finance Department. Also, if the transaction was
processed six (6) months prior, as is the case with some facility reservations, or if the credit card
has expired, then the refund will be processed by check through the Finance Department.
Another change proposed relates to facility reservations by changing the notice period to forty-five
(45) days. Mr. Smidt noted that the current thirty (30) days’ notice makes it difficult to book
another reservation as many users plan their events, such as birthday parties, anniversaries,
graduations, etc., more than thirty (30) days in advance, which limits user availability and results
in lost revenue when a cancellation occurs.
Specific cancellation information being added will also make it easier for residents to find
information pertaining to Eagle Valley Golf Course and M Health Fairview Sports Center.
Mr. Smidt noted that the city is charged a fee for every transaction, including cancellations. To
avoid Woodbury’s general taxpayer subsidizing cancellation fees, a tiered administrative fee is
charged for processing cancellations, based on the original program fee charged or facility rental
fee.
The Commissioners were in consensus with the suggested changes to the Administrative Directive
– Refunds and Cancellation Policy.
7. Mid-year Budget Review – Memorandum No. 23 – 27
Ms. Okada noted that Parks and Recreation Coordinator, Jodi Sauro, worked with the division
managers on the mid-year budget review.
Ms. Sauro highlighted the revenue and expenditure analysis update, by division, through July 2023,
noting that each division is doing well.
Parks and Natural Resources Commission Minutes
September 12, 2023
Page 4
Ms. Sauro noted that the Recreation Division, comprised of Central Park, Lookout Ridge Indoor
Playground (LOR), park facility rentals, as well as outdoor athletic fields, 2022 highlights included
overall revenue being ahead of the same period the previous year, while percentage of expenditures
has been held down.
With the sport of pickleball continuing to soar in popularity, staff added tournament opportunities
in 2023, which were very well received by the pickleball community. Woodbury continues to add
pickleball courts: Woodbury park system will have 19 pickleball courts available by the end of 2023.
Ms. Okada noted that the Community Garden plots, in partnership with Woodbury Thrives, are at
capacity.
It was noted that as a seasonal enterprise, Eagle Valley Golf Course’s (EVGC) mid-year numbers
represent a snapshot in time, and do not reflect the full complement of the remainder of the season.
Golf lessons filled along with most corresponding waitlists. Through a partnership with First Tee
Minnesota, additional practice mats are being added to the practice range.
Ms. Sauro noted that the M Health Fairview Sports Center (MHFVSC) indoor ice and field house
prime use time period is August through the end of the year. Staff’s decision to keep the walking
and open program times consistent for users, has resulted in increased visits to the facility.
In comparing the operating revenue less operating expenses, Ms. Sauro noted that in 2021,
programs were limited and there were no rentals or concessions happening until August of that
year, while expenses were minimized as well. During 2022 and into 2023, expenditures and
revenue have been more consistent.
Total visitors at the MHFVSC reflects all open programs, high school games, skating competition,
outdoor rink, tournaments, events and all the ice and field hours sold.
Ms. Okada shared how staff budgets for closer to the minimum and not the maximum, allowing for
adjustments to be made throughout the course of the year, noting that surplus in revenue occurs
when minimums are exceeded.
Ms. Okada noted that weather can play a major role in estimating the number of rounds at EVGC.
A discussion ensued with regard to increasing field facilities and adding another ice sheet at
MHFVSC. Ms. Okada noted that staff work closely with all the athletic associations, hockey
association and figure skating club. While the hockey community purchases an estimated 1,400
hours of ice outside of Woodbury each year, even if a third sheet of ice were added in Woodbury, the
hockey club would still need to purchase additional ice hours outside the community.
Ms. Okada noted that as the city continue to build infrastructure, there are going to be things that
are stretched; however, it is important to make sure what we do build is going to meet the needs of
the community.
It was noted by the Commission that they now have a good understanding of where we are with
regard to facilities.
8. Hasenbank Park Public Art Update – Memorandum No. 23 – 28
Parks and Natural Resources Commission Minutes
September 12, 2023
Page 5
Mr. Kinney highlighted the ongoing city partnership with South Washington County Watershed
District (SWWD) noting that the Hasenbank Park public art concept was originally reviewed by the
PNRC in December 2022, followed by approval in March 2023.
Mr. Kinney shared conceptual depictions of the Hasenbank Park planned art installations noting
that construction had begun with completion in the summer of 2024.
The installations were described as being very specific, conceptually identifying the themes to be
explored in the park with depressions and basins formed to depict how the water works in the
landscape. Each of the installations will include an interpretation panel, text or QR code, examining
the artist’s intent for the sculpture. One of the artists uses a dialogue between pipes and water with
the use of the pipe as an anthropomorphize form, like a tree. The other artist integrates water flow
with the path.
Commissioners were delighted with the approach being taken with art to be displayed in the parks
noting the concepts look great.
9. Copper Hills Park Project Concept Plan Approval – Memorandum No. 23 – 29
Ms. Okada noted that the Copper Hills Park project was previously reviewed by the Commission at
the June 6, meeting, at which time there was consensus among the Commissioners that the plan
was proceeding in the right direction and to move the plan forward for approval as the concept plan
would serve the area well.
Mr. Kinney noted staff moved forward through the design process for construction to begin in May,
2024.
Chair Musser asked for the approval of the Copper Hills Park Concept Plan – Memorandum No. 23
- 29.
Motion: Moved by Commissioner Myatt, seconded by Commissioner Doherty, to approve the
Copper Hills Park Concept Plan – Memorandum No. 23 - 29.
Vote: In favor All
Against None
Absent Commissioners Montgomery, Wadd, Yehalashet
10. Discussion Items 1
A. Current Projects – Status Update – “Park Projects” website page.
Ms. Okada noted most projects, including Conifer Glen, Pondview, Westview and Turnberry, are
reaching completion; however, supply chain issues can extend project completion dates.
B Central Park Renovation Project –
Ms. Okada noted Central Park’s final concept and budget were brought to the City Council in July,
with approval for staff to move it forward. Staff is in the process of one last pre-construction cost
1 Discussion and updates are intended to be informational or of brief inquiry. More substantial discussion of matter under
status updates and miscellaneous should be scheduled for a future agenda.
Parks and Natural Resources Commission Minutes
September 12, 2023
Page 6
estimate. The project bid has not been finalized and there may be some alternates as some of the
final details may tip costs one way or another. Ms. Okada noted it is anticipated that final
renderings will be ready to be reviewed in the next couple of weeks.
Ms. Okada noted that during the Central Park indoor playground community engagement in
August, seven different play items were chosen. The results will be provided to the vendor to
confirm the items will fit in the playground container and if any additional components could
possibility be included.
C. Environmental Stewardship Strategic Initiative Update –
The city is seeking community input and perspective on the future of environmental stewardship in
Woodbury. The Woodbury Environmental Stewardship Questionnaire is online now. The goal is to
get a number of residents involved with a variety of voices to determine objectives and priorities.
The consultant is conducting research and reviewing our policies and ordinances that tie into the
strategic initiative, to be synthesized and analyzed and brought back to us. The PNRC will continue
to receive monthly touch points as staff continues to work in the background.
11. Monthly Update – Memorandum No. 23 – 22
Ms. Okada noted the Monthly Update continues to highlight the various division activities.
12. Council Report – Councilmember Morris
Councilmember Morris noted upcoming Council meetings and workshops along with other
community events included in the listing below.
13. /14. Announcements/Miscellaneous
• City Council Budget Workshop, Wednesday, Sept. 13, 4 p.m., in the Education Training
Center, Public Safety Building, 2100 Radio Drive.
• Monday, Sept. 18, Development Tour
• Big Truck Day, Saturday, Sept. 23, 9 a.m.-noon, Central Park
• “One Woodbury” Saturday, Sept. 30, 11 a.m.-4 p.m., Ojibway Park (rain or shine)
Mr. Smidt highlighted the Recreation fall 2023 program brochure, noting the cover photo highlights
a youth holding the large bass he caught at one of the summer fishing camps held at Carver Lake
Park.
Mr. Smidt noted that the most recent Carver Lake Park Off-road Cycling Trail expansion (jump
trail) was completed in August.
Discussion took place with regard to holding the October 3, PNRC meeting at the Eagle Valley Golf
Course Club House, with a tour of the facility held at 6:30 p.m., prior to the 7:00 p.m. meeting.
Staff will inquiry if the facility is available.
15. Adjournment
The meeting adjourned at 8:35 p.m.
Respectfully submitted,
Parks and Natural Resources Commission Minutes
September 12, 2023
Page 7
________________________________
Belinda J. Reed
Administrative Assistant
Approved by the Parks and Natural Resources Commission on November 14, 2023.
City of Woodbury
Parks and Recreation Department
Parks and Natural Resources Commission Memorandum 23 – 30 November 14, 2023
Re: System-wide Natural Resource Management Initial Presentation
The city owns thousands of acres of open, natural areas that are an asset to the community,
including shorelines, wetlands, woodlands, prairies, trail corridors, parks and out lots that include
storm water basins. Natural Resources Management Plans (NRMPs) exist for some of these open
spaces, and date back to 1987. Over the years, the city has initiated native restoration of several
existing areas and continues to add new native areas throughout the community. To ensure long-
term success of these areas there is a need for a coordinated holistic approach and planning
document to assist staff in identifying and prioritizing when to focus on each area and the
resources needed for restoration and maintenance activities. These plans are also requirements
for various grant opportunties.
To address this need and assist the city with a holistic planning approach, the city has entered
into an agreement for professional services with Barr Engineering, Co., who will complete the
following tasks:
• Review and update 10 existing NRMPs;
• Create NRMPs for approximately 20 identified areas that do not have an approved
plan;
• Provide recommendations for community engagement based on the City’s adopted
Community Engagement Guide;
• Develop a prioritization process for management activities, proposed schedule, cost
estimation for city-wide long-term management; and
• Develop a Geographic Information System (GIS) layer that can be incorporated into
the city’s Beehive GIS software for staff reference and tracking.
Attachment A shows the geographic locations and approximate boundaries of the 30 sites that are
being evaluated as part of this effort. Attachments B & C provide a list of the sites shown on the
map.
Development of the community engagement plan and selection of prioritization criteria are
scheduled for this winter. The community engagement process is tentatively scheduled for spring
of 2024.
The final product will be a comprehensive document to be used in planning and budgeting for
future natural resources restoration and maintenance. Projects will include the removal of
invasive species and restoration of open spaces with native landscapes. By establishing a
prioritization approach, city staff can more effectively plan for, fund, implement, and maintain
natural resource management projects. The plan will also be used to inform future Capital
Improvement Plans.
Recommendation
As the project progresses, the Parks and Natural Resources Commission will be asked to review
and provide feedback on the community engagement plan and site prioritization approach as
recommended by Barr Engineering Co. and city staff.
Parks and Natural Resources Commission
Memorandum 23 – 30
November 14, 2023 Page |2
Respectfully submitted,
/s/
Heidi Quinn
Environmental Resources Technician
Attachments:
A. City of Woodbury Open Spaces Map
B. Existing NRMPs
C. Open Spaces without an approved NPMP
Attachment A City of Woodbury Open Spaces
Woodbury Lakes
Battle & Pendryn Hills
Creek Lake Wooddale West &
Turnberry Park Prairie Ridge
Pondview
Markgrafs
Lake
Evergreen
east and west Conifer Pass
Open Space
North Bluffs
Wilmes Lake
Trail Corridor
Hasenbank
Park
Tamarack
Nature
Preserve
Powers Lake &
City Hall Fish
Powers Lake E.
Campus Lake
Park (wetland) Valley
Creek Park
Brookview &
Colby Lake Lakeview Knolls
Park, Colby
Lake, Edgewater
Eagle Valley
Marsh Creek Park Golf Course
Carver Lake
Wedgewood
Hts N&S Wedgewood &
Baileys Arbor
Ridge Park
Woodland North
& Bailey Ridge
Impound Lot
East Ridge
La Lake Regional Pond
Andy's
Bark Park
Harvest
Commons/Schilling
Wetland & So of Oak Hill
Bailey Lake
Channel & Fair
Haven Pk BMP
CD-P85
Attachment B
Existing Natural Resources Management Plans
Name Year
Tamarack Nature Preserve 1979, 1985, 1987
Marsh Creek- Savanna Oaks 1999
Dale Woods (Prairie Ridge Park) 2010
Dale Road Open Space/ Andy's Bark Park 2012
La Lake 2013
Stormwater Basin Vegetation Study (various locations) 2018
Valley Creek Park 2021
City Hall Wetland Natural Resource Management Brief 2021
Hasenbank Natural Area Management Plan 2022
Fish Lake Greenway 2023
Attachment C
Open Spaces without Approved Plan**
Name
Battle Creek Lake
Evergreen Wetland (East and West)
Wilmes Lake
Powers Lake
Markgrafs Lake
Colby Lake
Edgewater Park
Bailey Lake Channel
CD-P85 Trail Corridor
Woodbury Lakes Wetland to Pendryn Hills Wetland
CD-P78 and Impound lot
Harvest Commons/Schilling Wetland & So of Oak Hill
Turnberry
East Ridge Regional Pond
North View Channel & Trail Corridor to Ridge Park
Carver Lake
Various Stormwater Basin and Wetland Buffer Areas (not in 2018 Plan)
North Bluffs Trail Corridor
Various Trail Corridors
**For the purposes of the City-Wide Natural Resources Plan and this RFP, proposed plans for
lake areas should be upland of the Ordinary High Water-Level. Proposed plans should not
include aquatic vegetation management.
City of Woodbury
Parks and Recreation Department
Parks and Natural Resources Commission Memorandum 23 – 31 November 14, 2023
Re: Environmental Stewardship Strategic Initiative Update
Environmental Stewardship Plan Questionnaire
At the July Parks and Natural Resources Commission (PNRC) Workshop meeting, staff requested
feedback from commissioners on the Environmental Stewardship Plan (ESP) Questionnaire. The
finalized document was posted online at: www.woodburymn.gov/environment following the
commission meeting. As of November 6, 2023, the city has received 390 responses.
The questionnaire has been promoted in two city newsletters, and online via InTouch, Facebook,
and Nextdoor. As of October 20, 2023, the web page featuring the questionnaire had received
over 14,500 views. In addition, environmental staff have attended Big Truck Day, One
Woodbury, and the Welcome to Woodbury Events with a banner featuring information on the
ESP and a QR code to the questionnaire. Banners are currently displayed at Central Park and M
Health Fairview Sports Center.
At this time, the questionnaire is expected to be available until November 30. Please encourage
friends, family and coworkers, who are Woodbury residents or business owners, to complete the
questionnaire.
Existing Conditions Research and Documentation
Since the July meeting, paleBLUEdot has been preparing multiple planning process documents,
referred to as “Baseline Documents” being created to support the Plan Team, staff and the PNRC
in their work. The documents that have been completed to date for the City of Woodbury include:
• Community Greenhouse Gas Emissions Inventory
• Climate Vulnerability Assessment
• DRAFT Solar Renewable Energy Potentials Study
The intent of the baseline assessments is to provide a summary of existing data to facilitate
collaborative dialogue and goal development through the Plan Team process. Staff is reviewing
the documents, and once finalized, they will be shared with the PNRC.
ESP Plan Team and Community Outreach
As detailed in Ted Redmond’s presentation in July, there will be multiple ways for residents and
business owners to be involved in the ESP process. The Environmental Stewardship page has a
“Ways to Get Involved” section, with links to the Plan Team Interest Form, the ESP questionnaire,
and links to host a group input session, sign up for email updates, and to be notified of
community input sessions. The PNRC is encouraged to participate in any of the outreach
opportunities.
The Plan Team structure is anticipated to include city staff, PNRC commissioners (up to three),
community members, Woodbury business owners, and other Woodbury based stakeholders such
as representatives from watershed district, Washington County, etc. Team members will attend a
series of 7-8 workshops (2-3.5 hours per month) between January and August 2024. They will
also be asked to complete tasks between meetings. The time commitment is expected to be
Parks and Natural Resources Commission
Memorandum 23 – 31
November 14, 2023 Page |2
approximately 8 hours per month, and depending on the month will either be in-person or virtual
(not hybrid).
Staff is creating a survey to schedule Plan Team meetings for those interested. Commissioners
can express their interest at www.woodburymn.gov/environment by clicking "Join the Planning
Team." The team's composition will depend on availability.
In November, staff will share a draft list of stakeholders and seek input to identify any missing
groups. Please give some thought to stakeholders/interested parties who you think should be
included in the upcoming communication related to the ESP.
Ted Redmond, from paleBLUEdot, will attend the December 5 PNRC meeting to provide a more
detailed update on the status of the questionnaire and other work that has been completed to
date.
Recommendation
Staff is sharing information with the PNRC and no action is required at this time; this is an
information update only.
Respectfully submitted,
/s/
Jennifer McLoughlin
Environmental Resources Manager
City of Woodbury
Parks and Recreation Department
Parks and Natural Resources Commission Memorandum 23 – 32 November 14, 2023
Eagle Valley Golf Course – Dan Moris
Following the late October colder temperatures, the golf course
has closed for the season. The results posted for 2023 are
extremely similar to what we’ve experienced over the last few
seasons. Rounds for the year totaled 41,621, with all-time
records set in May, June and August. Even with a tough spring
weather pattern and a short fall season, Eagle Valley posted a 7
percent increase in overall revenue.
As of early November, the golf course is looking exceptional:
the late fall precipitation is just what we needed. The
maintenance staff has completed the irrigation blow-out and
prepped the turf for the winter. Staff is now focusing on winter
duties and project lists.
I would also like to thank Dave Erickson for his years of
dedicated service as our one and only superintendent over the
past 27 years. Dave has offered his letter of resignation as he moves into the next chapter of his
life; retirement. Dave’s commitment and dedication has shown throughout his tenure, and
Eagle Valley would not be the course it is today without his guidance.
Recreation Division – Reed Smidt
The Halloween Hoopla event was a spook-tacular good time! Participants came dressed in
costumes to play carnival games, picked a pumpkin at the pumpkin patch to decorate, “trunk-or-
treating” from the 10 community vendors, made a craft and played Halloween carnival games!
Thank you to the student volunteers from the local high schools and community vendors for
helping make this event a huge success.
Parks and Natural Resources Commission
Memorandum 23 – 32
November 14, 2023 Page |2
Adding to the expanding list of new East Metro Miracle League programs, the Adaptive
Halloween Hoopla was a fun-filled event where participants played Halloween carnival games,
picked a pumpkin from the pumpkin patch, and went “trunk-or-treating.” This new event was a
hit and will be brought back next year!
Central Park hosted three Performances in the Park during the month of October: Roseville
Big Band, Spirit Song Choir and Nancy Olson all performed at the amphitheater with around 50
people in attendance at each performance.
The adult softball leagues have wrapped up for the season. Leagues were played late April
through early October, at the M Health Fairview Sports Center. It was very successful year with
83 softball teams, 1,162 participants, and 727 games played.
Pickleball began in early April and is anticipated to run through late November. In 2023, the
pickleball club expanded from Shawnee Park to a second location at Pioneer Park. Club
membership increased from 401 members in 2022, to 612 members in 2023. In addition to club
play, the Parks and Recreation Department offered instructional lessons and round robin
tournaments. The 128 lesson participants learned the game rules and fundamentals skills, while
the round robins offered 76 participants tournament style matches.
The 2023 Woodbury Community Garden season came to an end on October 15, as the
gardeners finished cleaning out their individual garden plots. It was another successful season for
the 48 gardeners with an abundant harvest featuring a very diverse mix of fruits and vegetables.
The community garden was also recently highlighted in the Pioneer Press.
Respectfully submitted,
/s/
Michelle Okada
Parks and Recreation Director
2023 Development Tour Map
Angel of Hope 24. Sienna Grove
1. Temporary Water Treatment Facility 25. East Pointe
2. 2023 Road Rehabilitation Project Area 26. Air Lake North
3. Wooddale Fun Zone 27. Hartung Farms
4. Valley Creek Redevelopment 28. Briarcroft of Woodbury/Discovery Park
5. Woodlane Park and Ride for Gold Line 29. Waypointe of Woodbury
6. METRO Gold Line BRT Route 30. Glacial Valley Park
7. 748 Bielenberg Medical Office 31. Aster Landing
8. Gateway Office Building 32. Highcroft Park
9. CityPlace Development 33. Summerhill
10. Chick-Fil-A East 34. Westwind
11. Commerce Hill Retail 10 Edition
th 35. Copper Ridge 9th addition
12. Edison Apartments of Woodbury 36. Copper Hills
13. Talamore of Woodbury 37. Bridlewood Farms
14. Royal Gateway 38. Bridlewood Farms Park
15. Manning Avenue Apartments 39. Oak Hill
16. Amazon 40. Arbor Ridge
17. I-94 East Logistics 41. Arbor Ridge Park
18. Park Place Storage & Black Diamond Mini 42. Orville Commons
Storage 43. Future Water Treatment Facility
19. Spancil Hill 44. Central Park
20. Dundalk Green 45. Famous Dave’s Redevelopment
21. Conifer Glen Park
22. Valley Creek Park
23. Prelude Village
The Woodbury Development Map is always available online at
Legend
www.woodburymn.gov/DevelopmentMap. The map is updated
monthly and shows all of the city’s active development.
projects.
METRO Gold Line BRT Route
2023 Road Rehabilitation
*Updated September 2023
1) Temporary Water Treatment Facility 16) Amazon building, and an amphitheater.
• The temporary treatment plant was built in 2020 to treat four water supply wells for • Ryan Companies constructed a 517,250-square-foot distribution center that is 31) Aster Landing
per- and polyfluoroalkyl substances (PFAS). In 2022, it was expanded to treat an occupied by Amazon. • Kootenia Homes is currently constructing 25 single-family homes.
additional two wells for PFAS. The facility is helping bridge the water production gap 17) I-94 East Logistics Center 32) Highcroft Park
until the long-term permanent water treatment facility (and associated infrastructure) • NAI is currently constructing a 475,000-square-foot warehouse distribution center. • Highcroft Park is located on 4.5 acres centrally located to provide trail and sidewalk
is operational. At one point, nine of the city’s 19 water production wells were removed access to the surrounding neighborhoods while providing visual access to Bailey
from service because they exceeded Minnesota Department of Health standards for 18) Park Place Storage / MSP Storage (Black Diamond Storage Projects) Lake. Parking is not accommodated, although on street options are present along
PFAS. Six of those nine wells are now back in service with treatment at the temporary • Park Place Storage has received approvals to construct 464,100 square-feet of self Iron Horse Road. A trail connection to the north connecting Dorchester Drive with the
treatment plant. storage condo facilities. park is being considered for implementation in a future Road Rehabilitation project.
• An additional health advisory was issued on a 10th well in July 2023 and this well • MSP Storage is currently constructing 180,000- square-feet of self storage facility. The improvements include benches, shade trees, a picnic area, and a playground.
remains available for service to meet short duration peak water demand in the 19) Spancil Hill 33) Summerhill
summer months. However, operationally it is placed low in use order, eliminating its • Lennar Homes is currently constructing 91 single-family homes on 40 acres. • Charles Cudd Custom Homes is constructing 38 detached townhomes units on
use on most summer days and limiting its use on those days of peak demand. It is 20) Dundalk Green approximately 11 acres.
one of three wells that will receive on-site interim well treatment for PFAS in 2024 • Watermark is currently constructing 89 single-family rental homes on 25.88 acres. 34) Westwind
until the future water treatment plant is operational. 21) Conifer Glen Park • Maplewood Development is currently constructing 248 single-family homes, 57
2) 2023 Road Rehabilitation • The park is located on .7 acres centrally located to provide trail and sidewalk access detached townhomes and 144 attached townhome units on 128.9 acres.
• The 2023 Roadway Rehabilitation project includes the Royal Oaks neighborhood and from Dancing Waters, Spancil Hill and North Bluff. The park was cited adjacent to the 35) Copper Ridge 9th Addition
will include watermain replacement, sanitary and water service replacement, full curb storm water and tree preservation areas of the development to expand the visual • DB Land Company is currently constructing 111 townhomes on 19.1 acres.
and street replacement, and trail construction and rehabilitation. The project is presence of the park. Parking is accommodated via bump-outs along Conifer Pass 36) Copper Hills
expected to be completed in October 2024. similar to Bridlewood and Oehlke Parks. The improvements include a dual lined • D.R. Horton is currently constructing 112 townhomes and single-family homes as part
3) Wooddale Fun Zone tennis/pickle ball court, a playground, picnicking opportunities, benches, and conifer of Copper Hills 1st Addition.
• Peter Corniea has retrofit the previous Wooddale Fun Zone to accommodate new trees. Native plantings along the park perimeter provide pollinator habitat and • D.R. Horton has received approvals to construct an additional 6 single-family homes
recreational uses, which are Legacy Pickleball Club and Legacy Hoops. enhanced storm water quality. as part of Copper Hills 2nd Addition.
4) Valley Creek Redevelopment 22) Valley Creek Park 37) Bridlewood Farms
• RJ Ryan has applied for a permit to build a multi-tenant retail building next to the • The park project was created in three phases; entry drive, parking lot and storm • Lennar is constructing 179 single-family homes and 141 townhomes.
existing Chick-fil-A. water, Miller Barn stabilization, and paved trail walking loop in the woods to the 38) Bridlewood Farms Park
5) Woodlane Park and Ride northeast portion of the park. The park includes a destination playground with a • The project was completed in August 2022 and includes a playground, open lawn
• The Metropolitan Council is currently proposing a 478 stall, three-story park and ride prairie and geology theme. The park opened July 16, 2022. area, benches, picnic tables and trail connections. Due to the proximity to the
facility to accommodate the Gold Line BRT. 23) Prelude Village of Woodbury roundabout at Bailey Lake Road and Chestnut Street a split rail fence and planted
6) Metro Gold Line BRT • Emmaus Companies are currently constructing 20 senior housing units on buffer was included to increase the buffer from traffic in the neighborhood.
• Construction to begin in 2022; expected to be operational in 2025. approximately 6 acres. 39) Oak Hill
• Three stations in Woodbury, including a Park and Ride at the end of the line. 24) Sienna Grove • Pulte Homes is currently constructing 78 detached townhomes.
• Frequent all day bi-directional bus transit service between Woodbury & St. Paul. • D.R. Horton has received approvals for 172 single family homes on 75.27 acres to be 40) Arbor Ridge
7) 748 Bielenberg Medical Office constructed over multiple phases. • Robert Thomas and Hansen Builders are currently constructing 138 single-family and
• MSP Commercial has constructed a 30,000-square-foot medical office building within 25) East Pointe 38 detached townhomes.
the Tamarack Hills Development. • Lennar is currently constructing 41 single-family homes, 48 detached townhomes and 41) Arbor Ridge Park
8) Gateway Office Building 50 attached townhomes on 40.19 acres. • The project was completed in August 2022 and includes a playground, open lawn
• St. Paul Development Corp has constructed a 11,500-square-foot medical office 26) Air Lake North area, benches, picnic tables, and a trail connection through an Oak tree stand to the
building with the Tamarack Hills Development. • Pulte Homes is constructing 108 single-family homes, 73 detached townhomes and east.
9) City Place Development 104 attached townhomes on 79.81 acres. 42) Orville Commons
• Meridian at CityPlace is currently constructing 91 townhome units located within 5 27) Hartung Farms • Dominium has constructed a four-story affordable apartment building with 211 units,
and 6 unit buildings. • Michael Lee Homes is currently constructing 26 single-family homes on 9.95 acres. along with 24 townhouses onsite.
• CityPlace Specialty Healthcare has received approvals to build a 50,000-square-foot 28) Briarcroft of Woodbury 43) Future Water Treatment Facility
medical building with the opportunity to expand to 70,000-square-feet. • Creative Homes is currently constructing 82 single-family homes on the southern • The water treatment plant project is in the design phase, with construction slated to
10) Chick-fil-A East portion of the site begin as early as fall 2024. It will include installing 17 miles of piping and is expected
• Chick-fil-A East is proposing a 2,868 square-foot drive through and pick-up only • Discovery Park is located on 6.15 acres centrally located to provide trail and sidewalk take significant time over multiple construction seasons. Learn more at
restaurant. access from Briarcroft, Sienna Grove, and Air Lake North. The park was cited woodburymn.gov/WaterTreatment.
11) Commerce Hill Retail 10th Addition adjacent to the storm water ponding areas of the development to expand the visual 44) Central Park
• Woodbury Developers, LLC has received approvals for a 6,120-square-foot multi- presence of the park. Parking is accommodated via a 38 car parking • Central Park renovation is entering the construction document phase with bid release
tenant building to be located within the Commerce Hill Development. lot. Improvements include benches, shade trees, picnicking opportunities, a anticipated for Nov 2023 and construction beginning in Q1 2024.
12) Edison Apartments of Woodbury combination soccer/softball field, a basketball court, a single pickleball court, and a 45) Famous Dave’s Redevelopment
• JPL Development has constructed a 174-unit apartment building and 30 rental playground. Native plantings along the parks perimeter provide pollinator habitat and • Launch properties redeveloped the former Famous Dave’s site into a multi-tenant
townhome units enhanced storm water quality. retail building and a Starbucks drive-thru coffee business. The multi-tenant building
13) Talamore of Woodbury 29) Waypointe of Woodbury includes Spitz Mediterranean Restaurant.
• Ryan Companies has constructed a four-story senior living facility that has • Tradition Development is currently constructing 97 single-family homes and 48
independent, assisted living and memory care units. detached townhomes.
14) Royal Gateway • Acclaim of Woodbury is currently constructing 62 rental homes and a clubhouse on
• Greystar Development Central, LLC is currently constructing two warehouse the west portion of the site.
distribution buildings with total square footage of 435,000. 30) Glacial Valley Park
15) Manning Avenue Apartments • The future Glacial Valley Park is a natural landscape project in partnership with South
• Oppidan has received approvals for a 237 unit multi-family apartment. Washington County Watershed District. The park will include trails, a restroom
Parks and Recreation 2023
Mid-year Analysis
September 12, 2023
Recreation Division Mid-year Analysis through July 2023
Recreation Division Overall Revenue through July
$900,000
$808,503
$800,000
$708,120 $709,868
$700,000 $669,776
$596,820
$600,000
$500,000
$400,000 $324,008
$300,000
$200,000
$100,000
$0
2018 2019 2020 2021 2022 2023
Daily Admissions through July Birthday Parties Private Parties through July
2021 2022 2023 2021 2022 2023 2021 2022 2023
1,865 * 10,583 11,996 Closed 98 156 Closed 69 112
*Limited opening in late 2021
Parks and Recreation 2023
Mid-year Analysis
Eagle Valley Golf Course Mid-year Analysis through July 2023
25,178 15,116
Rounds through July Range Buckets
25,144 in 2022 13,193 in 2022
27,002 in 2021 10,910 in 2021
Performance Metrics Comparison
481
427 436
427
376
Operating Revenues less Operating Expenses
353
251 252
2021 2022 2023 210
235
$581,000 $545,971 $590,064 128 220
205
99 218 115 203 100 100
185 170 182
163 152
2020 2021 2022 2023
Days Available for Play Rounds per day Lesson Participants
Parks and Recreation 2023
Mid-year Analysis
M Health Fairview Sports Center
Mid-year Analysis through July 2023
2021 2022 2023 2021 2022 2023 2021 2022 2023
16,873 32,692 37,812 187,954 216,912 238,236 1,475 3,964 3,942
Field House Program Visitors Ice Program Participants
Participants
Operating Revenues Food Service
less Operating Expenses
2021 2022 2023 2021 2022 2023
$317,068 $114,034 $173,409 $1,365 $65,836 $76,686
Total Hours Sold through July
2023
1,381
Field House
2022
1,348 2021
1,290
2,020
Ice Arena
1,799
West Rink was closed for
repairs April-mid July 2022
2,112
0 500 1,000 1,500 2,000 2,500
Parks and Recreation 2023
Mid year Analysis
Community
Development Update
South of
Dale
Master
Plan
South of Dale Master Plan
Adopted in September 2021.
Only Phase 2A, 2B and 2C is open for development.
Entire plan represents ~600 acres
Copper
Hills
Copper Hills
112 single family and
70 townhomes
DR Horton
Westwind
Westwind
248 single family, 57 villas and 144 townhomes
Maplewood Development (Lennar builder)
South of Bailey Road
Developments
Orville Commons and Arbor Ridge
Orville Commons
211 apartment units and 24 townhomes 60% AMI
future medical office/clinic space
Arbor Ridge Dominium
138 single family Harvest Park
38 detached townhomes
Arbor Ridge Park
AirLake North
East of
108 single family
73 detached townhomes
104 row townhomes
Woodbury Pulte
Waypointe of Woodbury
Drive at 97 single family
111 detached townhomes
Dale Road
Tradition Development
Hartung Farm
26 single family
Thone Development
East Pointe
41 single family
48 detached townhomes
50 townhomes
Lennar
Sienna Grove
172 single family
DR Horton
Discovery Park
Northeast Woodbury
Developments
Spancil Hill
91 single family homes
Lennar
Northeast
Residential
Dundalk Green
89 rental detached
townhomes
Watermark
Conifer Glen
Northeast
Commercial
Area
Projects
I-94 Logistics Royal Gateway
Distribution center Light Industrial /Warehouse
475,000 square feet 435,000 sf
Meridian
@
City
Place
Meridian @ City Place
91 Rental townhomes
Watermark Residential
Future Development
Areas
2024-2030 (estimated)
Growth
Management
Sub-
phase 2D
Jordan
Property
SE
Bailey
Property
Gold Line
Master Plan
Questions?
Hasenbank Park
Public Art Review
September 12, 2023
Parks and Natural Resources Commission Meeting
Presentation Outline
1. Update/Overview
2. Themes and Concepts
Project Update/Overview
Project Progress to Date:
• The project continues ongoing City partnership with SWWD.
• PNRC project concept review December 2022.
• PNRC project concept approved in March 2023.
• Construction started in August.
Public Art Progress Update:
• Continued collaboration with artists to create an immersive experience.
• Focus is on depicting water's role in the landscape.
• Emphasizing the importance of water management.
Art Installations Project Overview:
• Public art installations show how “Water Works” in the park
• Creates a blend of artistic expression with education.
• Enhancing appreciation and understanding for water related systems.
Themes and Concepts
Root and Tree Structures:
• Tree trunk and branch network depicted using pipes.
• Large prairie plant (purple cone flower) atop roots depicted as a pipe
network.
• Celebrating natural vegetation and the role of roots.
• +/- 15’ tall sculptures.
Themes and Concepts
Water Flow Path Integration:
• Artistic representation of water flow path in pathway from Fish Lake.
• Enhancing understanding of water management systems.
• Pattern/color applied to walking paths with informational signage.
Stepping Stones (Gears) and Water Levels:
• Stones mark key water levels in the park's storm water system.
• Inscribed with water volume and elevation information.
• Stones depict large gears suggestive of the theme "Water Works."
Questions
- Thank you
Artists
Fee Assistance Policy
CD-PKREC-7.2
Proposed Revisions
• Remove free and reduced lunch language
• Utilize the HUD income guidelines, and most
recently filed federal tax return
• Maintain a simple application form
• Special circumstances/hardships
Recommendation
Staff is requesting the Commission provide
feedback related to the recommendations for
updating the Fee Assistance Policy for City
Council consideration.
Refund and Cancellation
Policy
AD-PKREC-6.2
Policy Updates Under Consideration
• Remove household credit option
• Change timeframe for program cancellations
• Change timeframe for facility reservation
cancellations
Policy Updates Under Consideration
• Add refund transaction process language
• Consider adding specific cancellation
information for the Sports Center and Eagle
Valley Golf Course
Recommendation
Staff is requesting the Commission consider
the information presented, and provide
feedback related to the Refund and
Cancellation Policy.