Stormwater Committee
Regular MeetingAsbury, IA · May 12, 2026
Agenda
Stormwater Committee - May 12 2026 Agenda
Tuesday, May 12, 2026 at 5:30 PM
City Hall, 5290 Grand Meadow Drive, Suite 1, Asbury, Iowa 52002
Page
1. Meeting Opening
A. Call to Order
B. Roll Call
C. Citizen Input
2. New Business
A. Minutes of the February 10, 2026 Meeting. Feb10.2026 Storm Water Comm.pdf 2
B. New member.
Jim Kane has expressed an interest in serving on the Stormwater Committee
C. Water Quality Dashboard.
D. Cost Share Program. 3
BMP Cost Estimate Summary.pdf
E. Mural Project. 11
Mural Project 2026.pdf
3. Any Other Business
4. Adjournment
A. Adjourn Meeting
Title VI Statement - The City of Asbury receives federal funding and may not discriminate against anyone on
the basis of race, color, or national origin, according to Title VI of the Civil Rights Act of 1964. For more
information or to obtain a Title VI Complaint form, call 563-556-7106.
Page 1 of 17
Storm Water Utility Committee Minutes
February 10, 2026
The meeting was called to order at 5:32 p.m. Present: Mark Schemmel, Bob Reisch, Jessica
Anderschau, Adam Mueller and Samantha Fiegen. Absent: Steve Thompson and Kathy Bahl.
Also present: Beth Bonz.
Mueller moved to approve the minutes from the 12/9/2025 Meeting. Seconded by Anderschau.
Motion carried. (all ayes)
Fiegen presented the BMP Cost Estimate – Stormwater BMP’s report she prepared to assist with
cost estimation for the cost share program for rain gardens/bioretention and soil quality
restoration. The City will put a notice in the February newsletter to accept applications for cost
share projects. A list of qualified contractors will be developed.
Update on Mowing Plan and transition to natural area. Beth will contact EOCENE for a quote to
establish a test plot of natural grasses by Asbury City Hall.
Mural Project Update. Jessica has applied for a Paint Iowa Beautiful Grant to fund the paint for
the murals. Ideas include doing an Earth Day promotion. Potential mural locations were
discussed. Final decisions will be made based on qualified applications received.
Mueller moved to adjourn at 6:35 p.m. Seconded by Anderschau. Motion carried.
Beth Bonz
Page 2 of 17
Cost Estimate – Stormwater BMPs
Dubuque County Watersheds
February 2026
1
Page 3 of 17
Soil Quality Restoration:
Existing Lawn: $ 0.30 / sq ft
New Lawn: $ 0.48 / sq ft
Deep Tine Aeration: $ 0.10 – 0.13 / sq ft
Compost Application: $ 0.12 – 0.15 / sq ft
Overseeding: $ 0.06 – 0.08 / sq ft
Straw Blanket/RECP: $ 0.20 / sq ft (new lawn only)
Native Landscaping:
Seeding: $ 0.30 / sq ft
(includes seed & labor, rate may increase for projects below 1000 sq ft)
Mowing to Monarchs:
Plugs: $ 5.00 / sq ft
(includes plants & labor)
2
Page 4 of 17
Rain Garden/Bioretention:
Total Cost ($) = $ 3.80 × [sq ft impervious] + $ 0.44 × [sq ft pervious] – $ 372
Assumptions:
- 0.10 ac: 2000 sq ft impervious
2356 sq ft pervious
- 0.25 ac: 2400 sq ft impervious
8490 sq ft pervious
- 0.50 ac: 2800 sq ft impervious
18980 sq ft pervious
- Entire yard (pervious) and driveway/roof (impervious) contribute to runoa
- No up gradient area contributing to runoa
- No soil quality restoration has been performed
- Silt loam: percolation rate ~ 0.25 in/hr
- Existing yard slope 9:1 (11%)
- Basin side slope 3:1
- 12” ponding depth, 12” freeboard
- Amended soil: 75% sand, 15% topsoil, 10% compost
- Amended soil and plant plugs cover entire ponding area
Factors that would increase/decrease cost:
- Site configuration/slope (impacts length of subdrain needed, quantity and
complexity of excavation, area contributing to runoa)
- DIY activities by resident (i.e. spreading amended soil, mulching, planting)
- Soil quality restoration (reduces runoa coeaicient of pervious areas)
3
Page 5 of 17
Cost Data (includes materials, labor, O&P)
unit unit price
Amended Soil CY $ 60.00
Subbase (6" rototilled) SY $ 6.00
Excavation CY $ 18.00
Rough Grading CY $ 2.20
Fine Grading SY $ 0.25
Geotextile Fabric SY $ 2.25
Subdrain (4") LF $ 10.00
Subdrain Outlet EA $ 325.00
Subdrain Connections EA $ 20.00
Filter Aggregate (3/8") TON $ 52.00
Storage Aggregate (1") TON $ 42.00
Plant Plugs EA $ 5.00
Mulch CY $ 65.00
Mobilization EA $ 380.00
Equipment Rentals EA $ 1,056.00
Lot Size Total Cost
0.10 ac $ 8,275.00
0.25 ac $ 12,520.00
0.50 ac $ 18,700.00
4
Page 6 of 17
Empirical Cost Relationship:
→ Fit to formula: 𝑧 = 𝐴𝑥 + 𝐵𝑦 + 𝐶
z = Total Cost ($)
x = Impervious Area (sq ft)
y = Pervious Area (sq ft)
A, B, C = Constants ($ / sq ft)
→ 3 equations, 3 unknowns:
$ 8,275 = A [2000 sq ft] + B [2356 sq ft] + C
$ 12,520 = A [2400 sq ft] + B [8490 sq ft] + C
$ 18,700 = A [2800 sq ft] + B [18980 sq ft] + C
→ Result:
A = $ 3.80 / sq ft impervious
B = $ 0.44 / sq ft pervious
C = - $ 372
Total Cost ($) = $ 3.80 × [sq ft impervious] + $ 0.44 × [sq ft pervious] – $ 372
5
Page 7 of 17
Appendix A: Basin material depths (cross section)
3” mulch
12” freeboard
6” amended soil
12” ponding depth
6” rototilled soil
trench (depth depends on site, 4’ assumed)
2” filter aggregate
8” storage aggregate
*exaggerated vertical scale
6
Page 8 of 17
Appendix B: Sample basin dimensions
Plan View (Aerial)
0.10 ac
Vstorage = 342 ft3
Vtotal = 965 ft3
Aponding = 490 ft2
Atotal = 831 ft2
0.25 ac
Vstorage = 706 ft3
Vtotal = 1810 ft3
Aponding = 920 ft2
Atotal = 1388 ft2
0.50 ac
Vstorage = 1324 ft3
Vtotal = 3178 ft3
Aponding = 1611 ft2
Atotal = 2219 ft2
*not to scale
7
Page 9 of 17
Appendix C: Sample basin cut and fill requirements
Section View (Profile)
0.10 ac
0.25 ac
0.50 ac
8
Page 10 of 17
City of Asbury Storm Drain Mural Project 2026
To-Do List:
Finalize
o Rules
o Themes
o Project timeline
o Number of murals and locations
o Artist stipend
Submit grant application for paint (due Feb. 12)
Request in-kind space rental for paint mixing
Publicize program, encourage youth involvement!!
Eligibility:
Applicants must reside within 10 miles of Asbury city limits
o Reasoning: Keeps stipend funds local encouraging local artist engagement
Applicants may be individuals or groups
o Reasoning: Encourages youth submissions
Open to artists of all skill levels
o Reasoning: Encourages youth submissions
Applicants are responsible for replication of submitted design onto public walkway
o Reasoning: Does not require applicant to personally replicate design but, if
physically unable, places onus on them to arrange replication with a capable
artist
Submissions must be original and demonstrate strong artistic merit
o Reasoning: Avoids copyright issues and implies replication is feasible
AI submissions will be ineligible
o Reasoning: Confirms replication is feasible
Themes: (taken from Stormwater Dept page)
Erosion and sediment control
Illicit Discharge
Best Management Practices
Help Keep Our Water Clean
Timeline:
Artists will be provided paint [courtesy of the City or the Paint Iowa Beautiful grant]
and, upon completion, receive a $500 stipend for each mural painted
Design concepts must be submitted by [4-6 weeks after announcement] through
the City’s website or mailed to [address]
Selected artists will be notified [seven days later] and storm drain murals must be
painted no later than [5 weeks later]
Page 11 of 17
Rubric:
Elements and Principles of Design
Creativity/Originality
Adherence to the Prompt
Interpretation (unambiguous/clear)
Overall Impact/Appeal
Total out of 25 (or 50) points
Designs will be reviewed by the Storm Water Utility Commission (and members of
City Council, if needed)
One award for best individual submission; one award for best group submission;
one award for best overall submission
COD Themes:
Storm water drain pollution: Only rain down the storm drain
Environmental protection: The importance of clean water
Local ecosystems: Wildlife habitats and natural beauty
Keep Iowa Beautiful (.org)
Grant Guidelines: https://keepiowabeautiful.org/grants-scholarships/grants/paint-
iowa-beautiful/
Grant application due Feb 12, 2026: https://keepiowabeautiful.org/paint-iowa-
beautiful-grant-application/
Awardees will be notified in April 2026
No carryover allowed to the following year
Paint:
White
Black
Red
Blue
Yellow
Primer
*Diamond Vogel Paint if recipient of Keep Iowa Beautiful grant
*Sherwin-Williams PRO-PARK Waterborne Tra ic Marking Paint as alternative
Key City Creative Center: Request in-kind donation of studio space rental to mix paints
City of Dubuque press release:
https://www.cityofdubuque.org/civicsend/viewmessage/message/120302
Deadline Reminder press release:
https://www.cityofdubuque.org/civicsend/viewmessage/message/122286
City Council Resolution:
Page 12 of 17
https://www.cityofdubuque.org/DocumentCenter/View/41144/City-of-Dubuque-Storm-
Drain-Mural-Pilot-Project-Resolution
Location Template examples:
https://www.cityofdubuque.org/DocumentCenter/View/46425/Template-Windsor-Ave-
and-Merz-St?bidId=
Page 13 of 17
Storm Drain Locations (in order of preference)
Asbury and Springreen (Casey’s Drain #1)
City Hall entrance
Page 14 of 17
City Park (Drain #1)
Asbury and Radford
Page 15 of 17
Asbury and Saratoga (Casey’s Drain #2)
City Park Drain #2
Page 16 of 17
Alternative Locations:
Althaus Wetland & Nature Preserve – no sidewalks; near 5599 Wintergreen
Arrowhead Park – 2159 Blackfoot (Carrie’s house) – hellstrip present – 9 houses
away from park; OR 6301 Arapho Dr – hellstrip present – no current houses but a few
parcels away from park
Clay Ridge Park – Doe Run and Fawn View – hellstrip present – 1 house away from
park
Cloie Creek Park – Sanibel Ln – far corner of parking lot
Maple Hills Park – closest drain has no sidewalk; next closest drain with sidewalk is
across from 2349 Burr Oak
Meadows Golf Club – no sidewalks or visible drains
Wedgewood Preserve – no sidewalks but drain near 2119 Palmer
Page 17 of 17
Get email alerts for Asbury
A daily email when new agendas and minutes are posted.