Mayor & Commission Meetings
Regular MeetingAthens-Clarke County, GA · August 9, 2022
Agenda
The meeting will be streamed and broadcast live. Interested members of the public can watch live
online via YouTube at www.youtube.com/accgov or the YouTube app, via www.accgov.com/videos,
via Facebook at www.facebook.com/accgov, or on ACTV Cable Channel 180 or at
www.accgov.com/actvlive
WORK SESSION AGENDA
UNIFIED GOVERNMENT OF ATHENS-CLARKE COUNTY, GEORGIA
Tuesday, August 9, 2022 – 5:30 PM
City Hall Commission Chamber
I. Call to Order (5:30 p.m.) Mayor Kelly Girtz
II. Items for Future Consideration
A. TSPLOST 2018 Project #15 – Atlanta Highway Corridor ....................Derek Doster
Improvements – Project Concept SPLOST Project Administrator
B. Text Amendments to Chapter 8-2 (Flood Protection) ..................... Todd Stevenson
Stormwater Administrator
C. FY23 Live Stream Pipe and Culvert Rehabilitation ...............................Jason Jones
/ Maintenance List Engineering Design Coordinator
III. Adjourn
NOTE: All reports are draft. No final action is taken at this work session.
The Work Session is open to the public; however, public comments are not received.
September 13, 2022 Work Session
SPLOST 2020 Project 25 East Side Public Library – Project Concept and Site
Selection Criteria
Food Bank of Northeast Georgia Expansion Project Update
SPLOST 2020 - Project 34 – Water Trails, Sub-Project #1 – Macon Highway Boat
Launch – Schematic Design
SPLOST 2011 - Project 26 – Road & Bridge Imp and Replacement Program, Mitchell
Bridge/Tallassee/ Oglethorpe intersection improvement – Project Concept
Planning Department Work Program
TSPLOST 2023 Draft Tier Funding Schedule
Staff will present a Draft Tier Funding Schedule for the 32 approved TSPLOST 2023
Projects
SPLOST 2020 - Project #01 – Space Modernization – SP #1 Judicial Center
Proposed Project Concept & Site Selection Criteria
TSPLOST 2018
Project 15: Atlanta Highway Corridor Improvements
Proposed Bike/Pedestrian Project Concepts for
Mitchell Bridge Road &
Timothy Road
J. Derek Doster, Project Administrator
ACCGov SPLOST Department
MAYOR AND COMMISSION WORKSESSION
August 9, 2022
Meeting Purpose & Agenda
Meeting Purpose:
Present to the Mayor and Commission User Group Project
Concept Recommendations to move to the next phase of the
development process
User Group
History
Corridor Project Review: alignments and details
Public Input Sessions & Engagement Opportunities
Budget Summary
Next Steps & Schedules
Q&A
2
Corridor User Group & Participating Dep’t
CORRIDOR USER GROUP (Voting Members)
ATLANTA HIGHWAY Organization
Janice Custis Citizen Member
Allen Jones Citizen Member
Teresa Friedlander Citizen Member
Stephen Bailey Transportation & Public Works
Jeanne Connell Landscape Management
Samantha Eberhard Planning
Supporting Staff and Departments
Josh Edwards Manager’s Office
Ilka McConnell Economic Development
Victor Pope Transit
Todd Miller Leisure Services
Bruce Lonnee Planning
Daniel Sizemore T&PW Bike/Ped Coordinator 3
History
In 2013 the Urban Land Institute completed its report on the Atlanta
Highway Corridor redevelopment strategy
On November 7, 2017, the citizens of Athens-Clarke County approved
the TSPLOST 2018 Program Referendum that included Atlanta Highway
(#15) Corridor Projects
In October 2018, the Athens in Motion (AiM) Commission completed a
Bicycle and Pedestrian Master Plan
In 2018, Planning Department was leading the effort on the Atlanta
Highway
In August 2019, the Connect Athens: Atlanta Highway – Lexington
Highway Corridor Plan was completed
History – Cont.
In December 2019, Atlanta Highway (#15) Corridor Projects User
Groups began the project development process
On May 26, 2020, M&C Work Session agenda item was discussed the
Atlanta Highway (#15) Corridor for Potential Project consideration
Between May 28 and June 28, 2020, ACCGov conducted on-line public
engagement regarding Potential Projects that the Public would want to
see on a project List
On July 7, 2020, M&C approved the Potential Projects List Atlanta
Highway Corridor Projects and authorized staff to advance the list for
prioritization and implement noted immediate impact projects
History – Cont.
Between August and December 2020, the Atlanta Highway (#15)
Corridor Projects User Group with ACCGov Department participation
developed the next phase of public engagement strategy and project
content
On January 12, 2021, M&C Work Session presentation outlined the
public engagement strategy and project material for Atlanta Highway
(#15) Corridor for Potential Project consideration
In February 2021, the Atlanta Highway Corridor Projects on-line website
launched and public engagement outreach began.
Between February and April, 2021, public engagement opportunities
were happening and project survey submissions were recorded
Between May and July, 2021, the Lexington Highway and Atlanta
Highway Corridor User Groups each developed their Priority Projects
for M&C consideration to move into the Preliminary Plan Phase of the
Project development Process
History – Cont.
On September 7, 2021, M&C approved a Priority Project list for the
Atlanta Highway Corridor Improvements to develop conceptual plans
for M&C future consideration: review shared use options, sidewalk
options, and bridge connectivity options.
Between Sept 2021, the User Group has refined the approved Priority
Projects by obtaining appropriate survey and field investigations and
deliberation with the deign team.
On July 20, 2022, the User Group affirmed moving the Proposed Project
concepts forward to M&C Work Session and follow up with additional
public input sessions.
The links to the previously mentioned reports and project data can be
found at:
TSPLOST Project 15 - Atlanta Highway Corridor Improvement webpage
History & Purpose for the Presentation
On September 7, 2021, M&C approved a CDO and authorized staff to
expend up to $979,791 to develop, with public input, conceptual plans
with cost estimates for design and construction, for the following,
bringing them to the Mayor and Commission for consideration on which
options to advance to the preliminary design phase:
a) a Multi-Use Path for all of Mitchell Bridge Road (from ATL Hwy to
Tallassee Road) and Timothy Road (from ATL Hwy to the Berkley
Hills Subdivision). This may include exploring use of different
materials, as well as addressing topography challenges and safety
considerations for any necessary street crossings.
b) a pedestrian sidewalk for all of Mitchell Bridge Road (from ATL
Hwy to Tallassee Road) and Timothy Road (from ATL Hwy to the
Berkley Hills Subdivision). This may include exploring use of
different materials, as well as addressing topography challenges and
safety considerations for any necessary street crossings.
c) Conceptual plans for each shall anticipate designs for safe
pedestrian and bicycle access along Mitchell Bridge Road at each
of the two bridges (over the Middle Oconee River and the Loop 10
Bypass).
History - For Future Presentation
On September 7, 2021, M&C approved CDO also requested that the
Atlanta Highway Corridor User Group develop a recommendation
for subprojects for use of approximately $1,500,000 of the TSPLOST
2018 Program Revenues for Project 15 - Atlanta Highway Corridor
Improvements. This recommendation should include explanations
of subprojects’ alignment with:
a) The 2019 Connect Athens Corridor Report for Atlanta Highway;
b) The TSPLOST 2018 Project Description;
c) The Athens in Motion Master Plan (as applicable for any bike-
ped projects, especially with regards to AiM project tiering);
d) Public input received for TSPLOST 2018 Project 15 Atlanta
Highway Corridor Improvements; and
e) ACCGov’s stated goals of equity with regards to project
prioritization countywide
Area
Map
Mitchell Bridge Road
Timothy Road
Shared Use Path
Ex. Sidewalk/Environmental Concerns
Ex. Sidewalk
New Bridge location
10
Mitchell Bridge Road – Considerations
Existing sidewalks both sides of road Old
No existing sidewalks - The Preserve Drive to
Fire Station #2 to The Preserve Drive
Loop 10 Bridge and
Loop 10 Bridge to 500‘ feet north of Ben Burton Park
Loop 10 Bridge and approach
Five Distinct but
Generalized Infrastructure
Configurations
Existing sidewalk on west side of road 500 feet north of Ben
11
Burton Park to Tallassee Road
Mitchell Bridge Road – Considerations (Continued)
User Group discussions and additional information during concept
development:
Reviewed existing infrastructure that could be utilized i.e. existing
sidewalks from Tallassee to 500 feet north of Ben Burton Park and
between Fire Station #2 and The Preserve Drive.
Type of future bike/ped bridge over the Athens Loop would depend on
decision between pedestrian or multi-use trails on the approached
Possible ACCGov-GDOT joint opportunities exist to rebuild existing
bridge for vehicle/bike/ped, instead of a stand alone bike/ped structure
GDOT has shown interest in part ACCGov for joint study on Atlanta
Highway/Mitchell Bridge Road/Timothy Road intersection for potential
improvements via MACORTS/MPO process.
Utilizing existing bridge over the Middle Oconee River for cost savings
12
Mitchell Bridge Road – Considerations (Continued)
AiM Plan:
Existing MBR at comfort level 4:
not comfortable for cyclist
advance rider level only
MBR proposed regional link for bike/ped facilities
Existing facilities limited to sidewalks on each end of MBR
Further review area between tie in and Tallassee for alternatives during
Preliminary plan phase or per public input responses
Consider holding on future bike facility improvements between Loop 10
and Atlanta Highway until Atlanta Highway intersection and Loop bridge
discussions and planning phases mature
Included drawings only between Loop 10 and 500 feet north of Ben
Burton Park (at existing sidewalk)
13
Mitchell Bridge Road – Shared Use Path Alignment Drawings
Path Distance 1.5 Miles
14
Mitchell Bridge Road – Typical Sections
Width varies
Width varies
15
Mitchell Bridge Road – Typical Sections
16
17
18
19
20
21
22
23
Mitchell Bridge Road – Cost Estimates
Concept Phase Shared Use Path Sidewalk Only
Atlanta Hwy to Loop (north side) (existing both sides)
$2,865,000 n/a
Loop Bridge (Bike/Ped only) (north side) (north side)
(stand alone structure) $3,169,500 $3,169,500
Loop to ex sidewalk (north side) (north side)
(north of Ben Benton Park) $6,704,500 $4,845,500
Ex sidewalk to Tallassee Rd (north side) (existing north side)
(along creek bank) $4,700,000 n/a
All segments $17,439,000 $8,015,000
Estimate includes design, row/esmt, utility relocation, construction &
contingency allowances
24
Timothy Road – Considerations Three Distinct
Generalized
Infrastructure
Configurations
Existing sidewalks both sides of road Atlanta Hwy to Timothy Park Lane
Existing sidewalks on at least one side of the road with multiple crossing points from Timothy Park Lane to Fox Trace Road
No facilities on either side of road
Fox Trace Road to Macon Highway
25
Timothy Road – Considerations (Continued)
User Group discussions and additional information during concept
development:
Reviewed existing infrastructure that could possibly be utilized i.e. existing
sidewalks from Atlanta Hwy to Fox Trace but no bike facilities
GDOT has shown interest in part ACCGov for joint study on Atlanta
Highway/Mitchell Bridge Road/Timothy Road intersection for potential
improvements via MACORTS/MPO process
Consider holding on future bike facility improvements near Atlanta Highway until
GDOT plans for Atlanta Highway intersection and Loop bridge are known
AiM Plan:
Existing Timothy Road @ comfort level 4:
not comfortable for cyclist
advance rider level only
Timothy proposed regional link for bike/pedestrian facilities
Existing facilities limited to sidewalks on approx. half of corridor near Atlanta Hwy
26
Timothy Road – Shared Use Path Alignment Drawings
1.9 miles Alignment A
1.6 miles Alignment A & Alt B
0.8 miles Alignment A
27
Timothy Road – Typical Sections
– Typical Sections
28
Timothy Road – Typical Sections
29
Timothy Road – Typical Sections
30
Alignment A
31
32
33
34
35
36
37
38
39
40
Alignment A con’t
41
42
43
44
45
46
47
48
49
50
51
52
End Alignment A
53
Alignment B
Begins @
Skyline Pkwy
54
Alignment B
55
Alignment B
56
Alignment B
57
Alignment B
58
Alignment B
59
Alignment B
60
Alignment B
61
Alignment B
End Alignment B and resume with Alignment A
62
Timothy Road – Cost Estimates
Concept Phase Shared Use Path Sidewalk Only
Atlanta Hwy to Skyline Pkwy (south side) (existing both/one side)
$3,170,000 n/a
Skyline Pkwy to Loop (south side) (south side)
(alignment alternate A) $3,870,000 $2,903,000
Skyline Pkwy to Loop (north side) (north side)
(alignment alternate B) $3,365,000 $2,525,000
Loop to Macon Hwy (north side) (north side)
$2,164,000 1,623,000
All segments $9,204,000 $4,526,000
Estimate includes design, row/esmt, utility relocation, construction &
contingency allowances (Alternate B is not included in all segment total)
63
Project #15 Atlanta Highway Corridor – Budget
Revenue from TSPLOST 2018 – Project #15 Budget Estimate
Original TSPLOST Program Budget $4,000,000
Program Administration adjustment $ 139,809
Original Revenue for the Project $ 3,860,191
Project Budget Items Amounts
Expensed or Encumbered $ 410,836
Designated Design $ 568,955
Designated other Sub-Projects $ 1,500,000
Available for Timothy Rd /Mitchell Bridge Rd Improvement $ 2,380,400
64
Public Input Sessions & Opportunities
In person drop in sessions hosted @ Unitarian Universalist
Fellowship on Timothy Road
Tuesday August 23, 5:30 PM - 7:30 PM
Thursday September 1, 5:30 PM - 7:30 PM
Online Survey & Comment Period
August 22 – September 16
65
Next Steps
Approved Project Concept/Project Prioritization
M&C Work Session
August 9, 2022
Public Input Effort
August – September 2022
User Group
Recommendation & M&C
Approval Cycle
October/November, 2022
Preliminary Plan
Development
Questions / Comments
8/4/2022
Chapter 8‐2 (Flood Protection)
Text Amendment
August 2022
Mayor & Commission Work Session
Todd Stevenson
Athens‐Clarke County Transportation & Public Works
1
Purpose
• Update Chapter 8‐2 (Flood Protection) so that Athens‐
Clarke County can
• Adopt new FEMA flood maps and
• Continue to participate in the National Flood Insurance
Program
• Allows residents to purchase federally backed flood insurance.
• For presidential declared disasters, impacted residents have
access to disaster assistance funds.
• ACCGov eligible to apply for federal funds under the FEMA Post
Disaster Hazard Mitigation Grant program.
2
1
8/4/2022
History
• Athens‐Clarke County has participated in the National
Flood Insurance Program ever since unification.
• The last comprehensive FEMA flood map update for
Athens‐Clarke County was in 1992
• Flood maps were converted to digital form in 2007
3
Recent History:
Community Roles & Responsibilities
Activity Responsibility
Preliminary Issuance FEMA’s Official Draft Map Product.
September 2020
30‐day Review Allows affected communities to review the preliminary FIRMs and Flood
Insurance Study (FIS), identify any minor issues, and address revisions
accordingly
Consultation Coordination Officers Meeting organized by GA DNR with the local officials followed by a Flood
meeting and Virtual Open House Map Open House for the public to view the preliminary FIRMs. The Flood
April 2021 Map Open House will be announced in the community’s local newspaper.
90‐day public comment period Allows citizens to appeal changes in flood zones, floodways and base flood
(Appeals Period) elevations, based on scientific or technical issues.
Letter of Final Determination (LFD) Stating the preliminary FIRM will become effective in six months.
March 15, 2022 Community must adopt a compliant floodplain management ordinance
by the maps’ effective date.
Six‐month compliance period After the preceding steps are complete and the six‐month compliance
4 September 15, 2022 period ends, the FIRMs are considered effective maps and new building
and flood insurance requirements become effective.
2
8/4/2022
Partial Map
Scope: Athens‐Clarke County Revision (PMR)
19 FIRM Panels
to be Revised
New Study Miles
• Zone AE: 64.7 Miles Engineering Methods
• Zone A: 9.9 Miles • Regression Equations: 74.6 Miles
5
3
8/4/2022
Topographic Data Comparison
Typical Effective Study ‐ National Elevation Dataset (NED):
Light Detection & Ranging (LiDAR) Data USGS National Elevation Dataset (NED)
• Data likely from 1970s (or older) (Example Data: 1ft Variable Point Spacing) (1/3 arc-second; approximately 33-feet)
• +/‐ 8ft vertical accuracy
• 10m (~33ft) horizontal accuracy
RAW DATASETS
Oconee Watershed Latest Available LiDAR:
Bare Earth TIN created
• More Recent: 2010‐2015 by triangulating digital
• +/‐ 18cm (~7in) vertical accuracy topography
• 4ft horizontal accuracy
Cross Sections with
FINAL PROCESSED
Flood Elevations
TERRAIN
Ground and water-surface 10 FOOT CONTOURS
TINs intersected to identify Artificial 3D water-surface TIN
floodplain boundaries created by triangulating flood
7 elevations between cross sections
Athens‐Clarke County Draft Results
Structures within County
Special Flood Hazard Area
Community
Newly Newly
Effective Net Change
Added Removed
Town of Bogart 0 0 0 0
City of Winterville 1 0 0 0
Athens‐Clarke County 334 25 105 -80
8
4
8/4/2022
Property Owner
Notifications
Athens Banner Herald
Property Owner Notifications ‐ Post Cards
5
8/4/2022
Property Owner Notifications ‐ Post Cards
Why FEMA is Undertaking Risk Rating 2.0
• With Risk Rating 2.0, FEMA now has the capability and tools to
address rating disparities by incorporating more flood risk
variables. These include flood frequency, multiple flood types
(river overflow, storm surge, coastal erosion and heavy rainfall)
and the cost to rebuild.
• Currently, policyholders with lower‐valued homes are paying
more than their share of the risk while policyholders with higher‐
valued homes are paying less than their share of the risk.
12
6
8/4/2022
Next Steps
• Adopt amended language for Flood Protection Ordinance
(Chapter 8‐2). This allows Athens‐Clarke County to continue to
participate in the National Flood Insurance Program.
• Allows residents to purchase federally backed flood insurance.
• For presidential declared disasters, impacted residents have access to
disaster assistance funds.
• ACCGov eligible to apply for federal funds under the FEMA Post Disaster
Hazard Mitigation Grant program
13
Questions?
14
7
8/4/2022
Hydrologic Analysis
USGS Regression Equations
• SIR 2009‐5043: Magnitude and Frequency of Rural Floods in the
Southeastern United States, 2006
• Inputs: Drainage Area
• SIR 2014‐5030: Methods for Estimating Magnitude and Frequency of
Floods for Urban and Small Rural Streams in Georgia, South Carolina, and
North Carolina, 2011
• Inputs: Drainage Area and 2011 NLCD Impervious percent
Supplemented with Gage Analysis
• Bulletin 17C applied from 50% ‐ 150% of gage drainage area
1% Plus Flows
• Combined the average predictive flow error for regression equations with
the 1‐percent flows
HEC‐HMS
• To model storage along Sandy Creek and Malcolm Branch
• NOAA Atlas14 rainfall estimates
• SCS Curve Number for losses
• NRCS Unit Hydrograph for transform
• Muskingum‐Cunge for reach routing
16
8
8/4/2022
Hydraulic Analysis
FEMA
Standards
FEMA Technical Study Data Notebook
Hydrologic Flows
17
9
8/4/2022
FY23 LIVE STREAM PIPE REPLACEMENT
PROGRAM UPDATES
&
PROPOSED CULVERT
REHABILITATION/MAINTENANCE LIST
MAYOR & COMMISSION WORK SESSION
AUGUST 9 2022
PRESENTATION BY:
ACC TRANSPORTATION & PUBLIC WORKS DEPARTMENT
8/9/2022 1
PURPOSE
• PRESENT PROGRESS MADE ON THE LIVE STREAM PIPE AND CULVERT
REPLACEMENT PROGRAM TO DATE
• SEEK INPUT ON PROPOSED FY23 REHABILITATION PROJECT LIST
UTILIZING ALTERNATIVE REHAB IN LIEU OF OPEN CUT REPLACEMENT
April 2019 September2020 July 2022
Existing Culvert - Woodhaven Drive
8/9/2022 2
1
8/4/2022
PROGRAM HISTORY
Conceptual Cost Actual Cost –
SEPTEMBER 2020 – M&C APPROVED 55 PROJECT No. Street Name/Address
Estimate Streets & Drainage Div.
Project Status
CONCEPTS FOR LSPR 2020
1 Doe Run (160) $275,000 $30,000 Completed (FY21)
SINCE LSPR 2020 M&C APPROVAL – 2 Jones Rd (111) $50,000 $14,000 Completed (FY22)
• 12 OUT OF 55 CULVERT REPLACEMENT PROJECTS 3 Nowhere Rd (286) $180,000 $35,000 Completed (FY22)
HAVE BEEN COMPLETED 4 Crystal Creek Dr (185) $275,000 $19,000 Completed (FY22)
• ALL 12 REPLACEMENTS PERFORMED BY ACC 5 Lombardy Dr (282) $162,500 $21,000 Completed (FY22)
STREETS & DRAINAGE DIVISION 6 Millstone Circle (270) $120,000 $17,000 Completed (FY22)
• STAFF HAVE IDENTIFIED 3 ADDITIONAL 7 Walton Creek Rd (205) $75,000 $14,000 Completed (FY22)
CULVERTS TO BE ADDED IN FY23 8 Winterville Rd (1958) $112,500 $17,400 Completed (FY22)
• IN-HOUSE ABILITY IS LIMITED TO REPLACEMENT 9 Hickory Dr (6085) $50,000 $9,200 Completed (FY22)
OF CULVERTS WITH 60-INCH DIAMETER OR 10 Hunters Crossing Rd (159) $45,000 $17,500 Completed (FY22)
LESS & WITH LESS THAN 10 FEET OF BACK FILL. 11 Millstone Cir (345) $150,000 $37,200 Completed (FY23)
12 Charlie Bolton Rd (1450) $112,500 $19,100 Completed (FY23)
$1,607,500* $250,400*
*ABOUT $1.35 MILLION IN SAVINGS!!
Camelot Lane
8/9/2022 3 Millstone Cir
CURRENT PROGRAM STATUS
Live Stream Culvert System Evaluation and Replacement Report
(Collectors, Arterials, and Local Roads with Dead Ends) (Rev. July 14, 2022)
F: Failed F: Failed
LSPR NO Eval. Conceptual Cost LSPR NO Eval. Conceptual Cost
C: Critical Street Name/Address Project Status C: Critical Street Name/Address Project Status
(2022) Score Estimate (2022) Score Estimate
P: Poor P: Poor
1 5.00 F Seagraves Dr (191) $ 400,000 preliminary 24 3.20 C Baxter St (1088‐1080) $ 756,250 preliminary
2 4.80 F Voyles Rd (1270) $ 506,250 conceptual 25 3.20 C Athena Dr $ 918,750 conceptual
3 4.80 F Woodhaven Dr. $ 165,000 conceptual 26 3.20 C Woodhaven Dr (281) $ 45,000 conceptual
4 4.60 F Lavender Rd $ 650,000 preliminary 27 2.80 P Reese Street $ 95,000 conceptual
5 4.40 F Olympic Dr $ 650,000 preliminary 28 2.80 P Olympic Dr $ 381,250 conceptual
6A 4.40 F Cleveland Ave @ College Ave $ 606,250 preliminary 29 2.80 P Hancock Ind. Way $ 112,500 conceptual
6B 4.40 F Cleveland Ave and CHaRM $ 856,250 preliminary 30 2.80 P Riverbend Pkwy $ 50,000 conceptual
7 4.40 F Charlie Bolton Rd (1143) $ 530,000 conceptual 31 2.60 P Fortson Dr $ 550,000 conceptual
8 4.40 F Roberts Rd $ 550,000 preliminary 32 2.60 P Lavender Rd $ 731,250 conceptual
9 4.40 F W Huntington Rd (270) $ 85,000 conceptual 33 2.60 P Paris St $ 2,300,000 preliminary
10 4.20 F Old Epps Bridge Rd (385) $ 165,000 conceptual 34 2.60 P Cleveland Rd (1550) $ 800,000 conceptual
11 4.20 F Chase St $ 900,000 conceptual 35 2.40 P Hills Chapel St. (190) $ 450,000 conceptual
12 4.20 F Cedar Shoals Dr (1325) $ 668,750 conceptual 36 2.40 P Walton Creek Rd (190) $ 75,000 conceptual
13 4.20 C Riverbottom Circle (101) $ 180,000 conceptual 37 2.00 P Westlake Dr. $ 1,100,000 conceptual
14 4.00 C Idylwood Dr (255) $ 400,000 conceptual 38 2.00 P Waddell St. (905) $ 600,000 conceptual
15 4.00 C Idylwood Dr (330) $ 550,000 conceptual 39 2.00 P Riverbottom Rd (675) $ 500,000 conceptual
16 4.00 C Crossbow Cir (197) $ 550,000 preliminary 40 1.80 P Jennings Mill Parkway $ 400,000 conceptual
17 4.00 C Olympic Dr (1350) $ 918,750 conceptual 41 1.80 P Milledge Circle $ 900,000 conceptual
18 3.80 C Lavender Rd $ 112,500 preliminary 42 1.80 P N Pope St (252) $ 80,000 conceptual
19 3.80 C Rhodes Dr (282) $ 180,000 conceptual 43 1.80 P N Church St (133) $ 48,000 conceptual
20 3.60 C Cleveland Ave (132) $ 693,750 conceptual 44 1.80 P Lake Dr (126) $ 60,000 conceptual
21 3.60 C Minor St. (275) $ 650,000 preliminary 45 1.20 P Lake Dr $ 45,000 conceptual
22 3.60 C Oakbend Ct $ 200,000 conceptual Sub‐Total: $ 22,485,500
23 3.40 C King Ave (424) $ 320,000 conceptual 20% Contingency: $ 4,497,100
Total: $ 26,982,600
*$26.9M DEFICIT*
Denotes potential for ACC Streets & Drainage Construction
8/9/2022 4
2
8/4/2022
CULVERT REHABILITATION
• 45 PROJECTS REMAINING ON THE PROGRAM’S PRIORITIES LIST
• MANY ARE OUTSIDE THE SCOPE OF CONSTRUCTABILITY FOR OUR IN-HOUSE RESOURCES AND WILL REQUIRE HIGH-DOLLAR
REPAIRS/REPLACEMENT PERFORMED BY CONTRACTOR
• T&PW STAFF ARE EXPLORING OTHER OPTIONS TO MAINTAIN INFRASTRUCTURE AND AVOID EMERGENCY FAILURES
• REHABILITATION OF POOR & FAILING CULVERTS EXTENDS SERVICEABLE LIFE AND STRETCHES FUNDS ACROSS MANY PROJECTS
Baxter St
Crossbow Cir
8/9/2022 5
CULVERT REHABILITATION Woodhaven Dr
Rehab/Maintenance Options:
• Riprap / Baffles
• Geopolymer Lining
• Headwall Reconstruction
• Invert and/or Joint Grouting
• Shoulder Buildup
Criteria used in selection of projects for
rehabilitation consideration:
• High replacement cost
• Total culvert length
• Site constraints limiting traditional
open-cut replacement
• Culvert systems with adequate
hydraulic capacity
• Culvert systems with minor deflection,
soil loss
• Culvert systems accommodating of
aquatic organism passage
Olympic Dr
8/9/2022 6
3
8/4/2022
CULVERT REHABILITATION
Example of rehabilitative lining
Situation
Corrosion in the invert weakened the culvert and also caused
Collapsing culvert prior to rehabilitation erosion and soil loss
The Rehab – Lining Process
Culvert after full structural rehabilitation using polymer lining. Lining can be hand or spray applied depending on shape
and condition of the culvert
8/9/2022 7
CULVERT REHABILITATION
• 45 PROJECTS REMAINING ON FY23 REPLACEMENT LIST
• ESTIMATED $26.9 M COST FOR REPLACEMENT
• THE FOLLOWING 6 PROJECTS ARE PROPOSED BY STAFF FOR REHABILITATIVE LINING
F:
Failed ACC Conceptual Cost
Eval. Street Pricing Quote –
No. C: Pipe Length Pipe Diameter Estimate – Open Cut
Score Name/Address Rehab Lining
Critical Replacement
P: Poor
Charm site College
1 4.40 F 670’ 84” $1,462,500 $839,854
Ave
2 4.00 C Crossbow Cir (197) 65’ x 2 96” & 60” $550,000 $199,426
3 3.80 C Lavender Rd 60’ 24” $112,500 $48,007
4 3.60 C Minor St. (275) 45’ 72” $650,000 $74,368
Baxter St (1088‐
5 3.20 C 612’ 48” $756,250 $332,214
1080)
6 2.60 P Paris St 370’ 60” $2,300,000 $227,460
$5,831,250 $1,721,329
Total Cost w/20%
$6,997,500 $2,065,594
Contingency:
• REDUCE REPLACEMENT PROJECTS LIST TO 39
• EXTEND SERVICE LIFE OF REHABILITATED CULVERTS ~25-50+ YEARS
• ESTIMATED REPLACEMENT COST FOR REMAINING PROJECTS: $19.9 M
8/9/2022 8
4
8/4/2022
PROGRAM FUNDING OUTLOOK
Stormwater Enterprise SPLOST 2020 TSPLOST 2023
SPLOST 2011‐27 Program Total:
Capital Funds (future Tiers) (future Tiers)
Unexpensed Program Funds (Current): $1,158,890 $2,254,465 $490,000 $3,558,000 $7,461,355
Project:
Seagraves Drive [LSPR #1] ($299,890) ($299,890)
Charlie Bolton Culvert Rehab [LSPR #5] ($500,000) ($500,000)
Olympic @ GP Transmission Lines [LSPR #3] ($525,000) ($525,000)
Lavender Road [LSPR #2] ($600,000) ($600,000)
Roberts Road [LSPR #7] ($490,000) ($490,000)
Designated Funds Total: ($299,890) ($2,115,000) ($2,414,890)
Undesignated Funds Available (Current): $859,000 $139,465 $490,000 $3,558,000 $5,046,465
Current & Future Fund Total: $7.46M
(minus) Proposed Rehab Cost: $2.07M
Unexpensed Program Funds: $5.39M (potential for grant match funding)
(minus) Currently Programmed Projects: $2.42M
Remaining Program Funds available: $2.93M*
Upcoming:
Potential emergency failure
Federal grant opportunity – need for local match funds**
*Reduces deficit from $26 million to $16 million
8/9/2022 9
FUTURE PROGRAM SNAPSHOT
Live Stream Culvert System Evaluation and Replacement Report
(Collectors, Arterials, and Local Roads with Dead Ends) (Rev. July 15, 2022)
F: Failed F: Failed
LSPR NO Eval. Conceptual Cost LSPR NO Eval. Conceptual Cost
C: Critical Street Name/Address Project Status C: Critical Street Name/Address Project Status
(2022) Score Estimate (2022) Score Estimate
P: Poor P: Poor
1 5.00 F Seagraves Dr (191) $ 400,000 preliminary 26 3.20 C Woodhaven Dr (281) $ 45,000 conceptual
2 4.80 F Voyles Rd (1270) $ 506,250 conceptual 27 2.80 P Reese Street $ 95,000 conceptual
3 4.80 F Woodhaven Dr. $ 165,000 conceptual 28 2.80 P Olympic Dr $ 381,250 conceptual
4 4.60 F Lavender Rd $ 650,000 preliminary 29 2.80 P Hancock Ind. Way $ 112,500 conceptual
5 4.40 F Olympic Dr $ 650,000 preliminary 30 2.80 P Riverbend Pkwy $ 50,000 conceptual
6A 4.40 F Cleveland Ave @ College Ave $ 606,250 preliminary 31 2.60 P Fortson Dr $ 550,000 conceptual
6B 4.40 F Cleveland Ave and CHaRM $ 856,250 preliminary 32 2.60 P Lavender Rd $ 731,250 conceptual
7 4.40 F Charlie Bolton Rd (1143) $ 530,000 conceptual 33 2.60 P Paris St $ 2,300,000 preliminary
8 4.40 F Roberts Rd $ 550,000 preliminary 34 2.60 P Cleveland Rd (1550) $ 800,000 conceptual
9 4.40 F W Huntington Rd (270) $ 85,000 conceptual 35 2.40 P Hills Chapel St. (190) $ 450,000 conceptual
10 4.20 F Old Epps Bridge Rd (385) $ 165,000 conceptual 36 2.40 P Walton Creek Rd (190) $ 75,000 conceptual
11 4.20 F Chase St $ 900,000 conceptual 37 2.00 P Westlake Dr. $ 1,100,000 conceptual
12 4.20 F Cedar Shoals Dr (1325) $ 668,750 conceptual 38 2.00 P Waddell St. (905) $ 600,000 conceptual
13 4.20 C Riverbottom Circle (101) $ 180,000 conceptual 39 2.00 P Riverbottom Rd (675) $ 500,000 conceptual
14 4.00 C Idylwood Dr (255) $ 400,000 conceptual 40 1.80 P Jennings Mill Parkway $ 400,000 conceptual
15 4.00 C Idylwood Dr (330) $ 550,000 conceptual 41 1.80 P Milledge Circle $ 900,000 conceptual
16 4.00 C Crossbow Cir (197) $ 550,000 preliminary 42 1.80 P N Pope St (252) $ 80,000 conceptual
17 4.00 C Olympic Dr (1350) $ 918,750 conceptual 43 1.80 P N Church St (133) $ 48,000 conceptual
18 3.80 C Lavender Rd $ 112,500 preliminary 44 1.80 P Lake Dr (126) $ 60,000 conceptual
19 3.80 C Rhodes Dr (282) $ 180,000 conceptual 45 1.20 P Lake Dr $ 45,000 conceptual
20 3.60 C Cleveland Ave (132) $ 693,750 conceptual Subtotal $ 13,874,250
21 3.60 C Minor St. (275) $ 650,000 preliminary 20% Contingency $ 2,774,850
22 3.60 C Oakbend Ct $ 200,000 conceptual
23 3.40 C King Ave (424) $ 320,000 conceptual Total Program Estimate $ 16,649,100
Project list showing total remaining costs after all projects with designated funds/proposed rehabilitation have been completed
8/9/2022 10
5
8/4/2022
FEDERAL FUNDING THROUGH THE
WHITE HOUSE BIPARTISAN
INFRASTRUCTURE INVESTMENT AND JOBS ACT
a. NOFO summer 2022
b. Staff will pursue
Replacement funding for
design and construction
c. Will likely require
matching funds of 20%
8/9/2022 11
STORMWATER ADVISORY COMMITTEE
(SWAC)
Stormwater Advisory Committee began work in 2021
The Stormwater Advisory Committee charged by M&C to:
• Review the current stormwater level of service and associated funding
level
• Recommend any modifications that would serve the ideal public interest
Currently the SWAC is working on Level of Service exploring various options
and assigning magnitude of cost to the various services, activities, and
responsibilities performed.
8/9/2022 12
6
8/4/2022
NEXT STEPS
If M&C OK with approach, next steps
1. Agenda Approval Regular Session - October 4
a. Adopt the updated Live Stream Pipe Replacement Program Priorities List
b. Approve the 45 project concepts as part of the Live Stream Pipe Replacement
Program
c. Authorize staff to develop preliminary construction plans on 45 pipe replacement
projects.
d. Approve preliminary plans for the rehabilitation of the Live Stream Pipe Replacement
Projects
e. Authorize Mayor and appropriate staff to execute contract with Vortex Lining
Systems as part of state HGAC contract to perform rehabilitation of the Live Stream
Pipe Replacement Projects
2. Apply for the National Culvert Replacement Grant Program - Fall 2022
3. SWAC work session for Level of Service Review – Spring 2023
8/9/2022 13
QUESTIONS & FEEDBACK
8/9/2022 14
7