Technical Coordinating Meeting
Regular MeetingCleveland, TN · September 2, 2015
Agenda
1 of 10
TOM ROWLAND, CHAIRMAN
190 Church Street, N.E., P.O. Box 1519, Cleveland, TN
37364-1519
Phone (423) 479-1913 fax (423) 559 3373
http://clevelandtn.gov/index.aspx?nid=153
MPO Coordinator Greg Thomas, AICP
gthomas@clevelandtn.gov
MPO Technical Coordinating Committee
WEDNESDAY, September 2, 2015, 10:00 O’CLOCK AM, 2nd FLOOR CITY COUNCIL
MEETING ROOM, MUNICIPAL BUILDING, 190 CHURCH STREET NE, CLEVELAND, TN
AGENDA
1. Call TCC meeting to order
2. Approval of meeting minutes— August 5, 2015 p. 2
3. New Business
a. 2016 TAP Grant p. 5
b. 2040 Long-Range Transportation Plan update p. 9
4. Old Business---none
5. Comments by federal, state, local agencies
6. MPO Coordinator/staff comments p. 10
7. Public comments
8. The next regular MPO meeting date is Wednesday, November 4, 2015 at 10
a.m.
9. Adjourn
2 of 10
TOM ROWLAND, CHAIRMAN
190 Church Street, N.E., P.O. Box 1519, Cleveland, TN
37364-1519
Phone (423) 479-1913 fax (423) 559 3373
http://clevelandtn.gov/index.aspx?nid=153
MPO Coordinator Greg Thomas, AICP
gthomas@clevelandtn.gov
MPO Technical Coordinating Committee
WEDNESDAY, August 5, 2015, 10:00 O’CLOCK AM, 2nd FLOOR CITY COUNCIL
MEETING ROOM, MUNICIPAL BUILDING, 190 CHURCH STREET NE, CLEVELAND, TN
MINUTES
1. Call MPO Technical Coordinating Committee to order --- Chairman Tommy
Myers called the meeting to order. Other TCC members present included Jonathan Jobe,
Janice Casteel, and Brian Beck of the City of Cleveland, Joren Dunnavant of TDOT, Tad
Bacon of Cleveland Utilities, Chad Reese of the RPO, Bently Thomas of Bradley County,
Robert Varnell of CUATS, Greg Thomas City of Cleveland/Cleveland MPO. Others in
attendance included Brian Moran of the City of Cleveland and Joyanna Love (Cleveland
Daily Banner).
2. Approval of meeting minutes— July 8, 2015--- Chairman Tommy Myers
introduced the item and called for discussion or a motion. Brian Beck made a motion to
approve and it was seconded by Robert Varnell and approved unanimously.
3. New Business
a. Report to TCC Public hearing and adoption of Proposed 2016-2017 Unified
Planning Work Program (UPWP)--- Chairman Myers introduced the item. Greg
Thomas reported that the MPO had addressed all of the comments from TDOT,
FHWA, and FTA to the satisfaction of those agencies, and there were no public
comments. Tad Bacon had a question about the language on “cycle counts”, if that
referred to vehicle counts rather than bicycle counts; Greg Thomas reported that the
FHWA reviewer interpreted this section to refer to bicycle counts and the language
was changed to address that concern. Motion to approve by Brian Beck and second
by Greg Thomas. Approved unanimously.
b. Recommendation concerning MPO request to expand TDOT paving project
limits on Keith Street--- Chairman Myers introduced the item. Greg Thomas
reported that this had been brought up by Mr. Poe in the last MPO meeting. The
3 of 10
TDOT 2016 paving was to run from Grove Avenue to 25th Street but the part north of
25th Street to Paul Huff Parkway would not take place until later. Tad Bacon asked
how it affected other projects. Tommy Myers clarified that it would be 100% TDOT
funded. Robert Varnell made a motion to approve and agreed to amend his motion
with an additional recommendation from Tad Bacon that the traffic signal loops be
replaced with traffic signal radar by TDOT as they do the repaving which would
otherwise necessitate replacement of the traffic signal loops. The motion and the
amended motion were seconded by Brian Beck. The amended motion was approved
unanimously.
c. 2040 Long-Range Transportation Plan update--- Chairman Myers introduced the
item. Greg Thomas gave a brief staff report. The only update was that that model
review was continuing. Bob Rock at TDOT has retired and Chin Cheng Chen has
taken over his duties and is reviewing the model with Scott Walker at Parsons
Brinkerhoff.
d. 2016 TAP Grant Potential Project Guidance-- Chairman Myers introduced the
item. Greg Thomas pointed out the eight potential project ideas (see below) as
contained in his memo and asked for the TCC to evaluate and rank them. There was
consensus that the sidewalk needs in the Gaut Street area, and Blythe Avenue, and
handicapped access ADA type projects. Robert Varnell mentioned that there were
potentially more funding sources for State routes, like South Lee Highway---the
Multimodal Access Grant program might be a good resource for that. Greg Thomas
would report to the MPO the “sense of the committee” that a project should be
developed from the reported needs in the Gaut Street area, and Blythe Avenue, and
handicapped access ADA type needs.
1. Installation of all or part of the bicycle and pedestrian facilities proposed under the
most recent Multi-modal Access Grant application and Federal Lands Access Program
grant (Peerless Road south of 25th Street to 20th Street and Keith Street; the blocks
around the Post Office encompassed by 17th Street 20th Street, Georgetown Road, and
Keith Street).
2. Install sidewalks near College Hill—Gaut, Lang, and Sixth Streets. This was
requested by citizens at meeting at College Hill. The citizens said that kids were getting
off the school bus and having to walk in the ditch to get home. (note: need to look into a
future intersection improvement near Vest”s Grocery)
3. Install and /or upgrade sidewalks on South Lee Highway from near Grove Avenue to
just past Victory Drive. Sidewalks in this area generally either do not exist or are
substandard. Several neighborhoods and apartments/motels would be served by these
sidewalks. This responds to request from Councilman McKenzie.
4. Blythe Avenue Sidewalk Extension---this responds to a request from citizens and
Councilman Estes. The extensions would connect the Family Resource Center to
4 of 10
Blythe-Bower School and make a continuous loop of sidewalk around the neighborhood
with the completion of the already-awarded 2013 Multi-modal Access grant project.
5. Install sidewalks on 25th Street in area under study by MPO, basically between
Candies Lane and the Greenway
6. Install Sidewalks on Paul Huff Parkway per citizens requests
7. Install bus stop/bus shelter improvements with needed pads and sidewalk
improvements at key locations along bus routes
8. Install needed ADA sidewalk improvements along with needed sidewalk replacement
in older sidewalk areas
e. Passenger Rail Resolution--- Chairman Myers introduced the item. Greg Thomas
recounted the history of gathering support for an Amtrak extension that would come
through Cleveland. Janice Casteel made a motion in support which seconded by
Tad Bacon and it was approved unanimously.
f. Bike Lanes on Keith Street--- Chairman Myers introduced the item. Greg Thomas
reported that TDOT offered the opportunity to stripe in bike lanes when they did their
repaving of Keith Street. The City Manager and the department heads reviewed the
opportunity along with existing road conditions. The basic proposal is that bike lanes
would be striped in from Grove Avenue to just north of 17th Street (the greenway
connection from the sidewalk on the north bound side could become sort of a “slip
ramp” to the greenway); and the bike lanes would be striped in from raider Drive
north to Mouse Creek Road. A motion to approve was made by Robert Varnell and
seconded by Janice Casteel and it was approved unanimously.
4. Old Business---none
5. Comments by federal, state, local agencies---none
6. MPO Coordinator/staff comments---none
7. Public comments
8. The next regular TCC meeting date is Wednesday, September 2, 2015 at 10
a.m.
9. Adjourn
5 of 10
MEMORANDUM
TO: MPO Executive Board and TCC
FROM: Greg Thomas, AICP, MPO Coordinator
DATE: August 25, 2015
SUBJECT: Transportation Alternatives Grant application
In your last meeting several possibilities were examined for a Transportation
Alternatives grant. Three of these ideas emerged from the TCC discussion as the most
favorable based upon needs and funding criteria: Gaut Street area sidewalk
improvements; Blythe Avenue sidewalk extension; and Americans with Disabilities Act
(ADA) improvements to the downtown sidewalk grid. Staff explored these alternatives
with Neil Hansen at TDOT who is involved in the administration of this program. Based
upon that discussion, staff concluded that a Gaut Street area sidewalk project would be
the most promising.
The proposed project limits would be on 6th Street at the terminus of the existing
sidewalk at the parking lot for the sports field at the College Hill Recreation Center
running generally west on 6th Street to Gaut Street, thence south on Gaut Street to
Inman Street, and crossing Inman Street and running south on Dooley Street to an
existing sidewalk connection to Wildwood Avenue. The total length is approximately 0.7
miles. There is existing sidewalk on about half of the 0.7 miles but curb and gutter is
lacking in some locations so new sidewalk, curb, and gutter will be needed to ensure
proper drainage along the route. Retaining walls and accommodation of transit stops
are also needed, e.g. a bus shelter is needed in front of the Health Department.
Improvement of the pedestrian crossing with crosswalks and pedestrian signals is
needed at Inman Street, a State highway. Depending upon cost estimates, some
portion of this scope would be included in the project grant proposal, being mindful of
the need for logical termini and an upper cost limit which does not generally exceed
$1M.
This project would serve a low-income neighborhood where many residents need to
walk or ride transit. It would connect with existing sidewalks, improving sidewalk and
transit access to public housing sites, schools, social services, parks, heath services,
shopping, and employment. The Gaut Street sidewalk was proposed by neighborhood
Page 1 of 4
6 of 10
residents who stated that school bus riders and other pedestrians are basically now
forced into a ditch on Gaut Street. A transit shelter has been sought by the health
Department to serve its clients who ride the bus. The City of Cleveland has installed
sidewalk along East Street at 6th Street at the northern limit of the proposed project
(sidewalk exists at the southern limit).Sidewalk along Central Avenue is now under
design and its eastern terminus is Gaut Street in the heart of this proposed project,
providing an important connection to the central business district, government services,
and Lee University.
By providing needed sidewalk improvements, this project would facilitate the
implementation of the transit stops on the Red Route recommended in the 2013 Transit
Study. That study made recommendations for inbound and outbound stop locations for
each transit route and proposed route. It recommended creating fixed stops in specific
locations as opposed to the current practice that relies heavily on flag stops. The
recommendations included stops near 6th and East Street (northern project terminus),
Central Avenue (major intersecting street with new sidewalk under design), a pair of
stops on either side of Inman Street, and a stop on Dooly Street near the Health
Department and Wildwood Avenue (southern project terminus).
Page 2 of 4
7 of 10
Page 3 of 4
8 of 10
Page 4 of 4
9 of 10
MEMORANDUM
TO: MPO Executive Board and TCC
FROM: Greg Thomas, AICP, MPO Coordinator
DATE: August 25, 2015
SUBJECT: 2040 RTP update
The modeling is advancing. The E+C (existing plus committed projects) network
conditions should be ready to review in about 2 weeks. The next major step is to
conduct a meeting for public input on transportation needs. Staff is planning an evening
meeting in mid-October for this purpose. Public notice on this meeting will be
forthcoming soon.
Page 1 of 1
10 of 10
MEMORANDUM
TO: MPO Executive Board and TCC
FROM: Greg Thomas, AICP, MPO Coordinator
DATE: August 28, 2015
SUBJECT: MPO Coordinators Report 2040 RTP update
1. Attended regional transportation meeting hosted by Thrive 2055 on July 23,
2015.
2. Opened SCI Exhibit, including transportation-related projects, at noon Rotary on
July 28, 2015.
3. Attended statewide bicycle pedestrian conference call July 29, 2015.
4. Prepared MPO materials for August 5, 2015 MPO meeting.
5. Attended area transit stakeholders meeting in Chattanooga on August 11, 2015.
6. Completed MPO quarter PL billing and submitted to TDOT on August 17, 2015.
7. Conducted research and prepared concept for 2016 TAP grant application.
8. Prepared materials for September 2, 2015 MPO meeting.
9. Submitted TIP Adjustment 2015-02 on August 28, 2015 to add $5M in NHPP
funds to TIP Project 6110, the National Highway Routes 3R Grouping.
10. Bicycle Pedestrian camera recording for counts on the 25th Street corridor was
completed in August 2015 and that data is ready to be processed.
11. Continued development of a Bicycle Pedestrian “Big Concepts” map for long
range transportation planning purposes.
Page 1 of 1
Get email alerts for Cleveland
A daily email when new agendas and minutes are posted.