Committee of the Whole Meeting Packets
Regular MeetingColumbus, WI · March 21, 2023
Agenda
COLUMBUS COMMON COUNCIL
COMMITTEE OF THE WHOLE AGENDA
TUESDAY, MARCH 21, 2023 – 6:40 PM
COLUMBUS CITY HALL
1. Roll Call
2. Notice of Open Meeting
3. Approve Agenda
4. Citizen Comments
5. Department Reports:
• DPW, Fire, Library, Police, Treasurer, WWTP
6. Discuss Beautification Advisory Board Projects – Paula Steiner, Chair
7. Discuss RFP Discussion for City Properties
8. Review Street Closing Request to use Fireman’s Park for a Run/Walk event – May 3
9. Review & discuss SMFA – Tower Drive
10. Review & discuss City Hall Roofing Proposal
11. Convene to closed session per §19.85(1)(e) deliberating or negotiating the purchase of public
properties, the investment of public funds, or conducting other public business, whenever
competitive or bargaining reasons require a closed session, specifically to discuss TID 6 Conceptual
Project, Review Agreement for Commerce Center Lot 5, discuss lease for 1149 W James St,
Midwestern LLC
12. Convene to closed session per § 19.85(1)(c) to consider employment, promotion, compensation, or
performance evaluation data of any public employee over which the governmental body has
jurisdiction or exercises responsibility, specifically discuss Administrator’s review and review draft
language clarification in Administrator’s contract
13. Adjourn
Columbus Public Works / Monthly Department Report / February 2023
Daily/Weekly/Monthly Operations
• Pavilion & Community Center rentals (before and after) weekly cleanings.
• Christmas Tree collection every Monday of every full week in January.
• Processed daily/weekly/monthly work orders for City departments as
requested.
• Weekly service of City garbage cans and all dog waste stations throughout
City.
• Equipment maintenance and repairs as needed.
• Street sweeping as weather and temps permitted. (Temps above 28
degrees).
• Tree removals as needed.
• Pothole patching as needed.
• Processing of street opening, sidewalk, driveway, and other permits.
• Process all utility locate requests.
• Took calls from and processed, inspected or responded to citizen
complaints & concerns.
• Normal daily/weekly/monthly processing of appliance & bulk item drop offs
at DPW.
• Prepared and processed all DPW deposits.
• Competed all flag lowering orders as received.
• Completed bulk pickups throughout City as requested, scheduled, and paid
for.
Additional Director & Admin. Assistant Operations
• Attend various Development Team, Department Head, Council, Public
Works Staff meetings.
• Finalizing order for new DPW small dump truck. Need final approval from
Council.
• Working with City Engineer to finalize Folsom Street 2023 construction
project.
• Still waiting on approvals for completed and submitted ATV/UTV permits
from State and County.
• Developing information for 2023 sidewalk repairs.
• Developing street candidate lists for 2023 street maintenance program.
• Coding of all DPW invoices and purchase orders from vendors.
• Weekly communications with City Administrator.
• Upload and process all DPW time management scanners and complete
monthly reports.
• Worked with City Administrator to update and renew annual Tree City USA.
• Updated and renewed Honor Tree materials (flyers, vendors, price sheets,
etc.)
• Updated and renewed Arbor Day materials (proclamation, scheduled date,
etc.). Coordinating with other City departments to plan the Arbor Day
event.
Additional DPW Operations
• Snow plowing, removal, and salting operations as needed.
• Three snow emergencies declared for month of February. Five total in
2023.
• Supply ordering as needed.
• Snow route and snow equipment training for employees.
• DPW equipment repairs and preventative maintenance as needed.
• Monthly parks & playground equipment inspections.
• Dam inspections biweekly. Water level inspections biweekly.
• Monthly safety inspections of City buildings.
• Schedule Cemetery Secretary as needed.
• Mark graves for internment as needed.
• City buildings cleaning, organizing, and repairs as needed.
• Cleaning of DPW facility as needed.
CITY COUNCIL REPORT
FOR MARCH 21, 2023 MEETING
LEVEL OF STAFFING - AS OF 02/28/2023
27 Paid on Call Firefighters - Non-Probationary Members
9 Paid on Call Firefighters - Probationary Members
1 Fire Chief
37 Total Active Members
3 Vacant Firefighter Positions
0 Hiring Process
0 Eligibility List
Full staff level for active fire personnel is 40
INCIDENT RESPONSES
February 2023
Alarm End City Rural # of
Run # Alarm Date Time Time Incident Location Incident Incident Incident Type F.F.
23-020 02/02 22:32 00:31 W742 Riverview Rd X Chimney Fire 10
23-021 02/03 08:30 08:37 516 River Road, #2 X EMS Assist 1
23-022 02/03 11:22 11:34 633 W James St X EMS Assist 3
23-023 02/07 07:10 07:30 445 Waterloo St X EMS Assist 5
Fire – False
23-024 02/11 18:33 19:08 1164 Farnham St X 14
Alarm
23-025 02/13 14:06 16:15 100 Continental Dr X Vehicle Fire 14
23-026 02/19 08:22 09:00 110 Stuart St X EMS Assist 9
23-027 02/21 21:56 22:50 552 W School St X EMS Assist 8
151 North near 112
23-028 02/22 13:44 15:30 X MVA 8
MM
15 Parkview Circle
23-029 02/26 15:58 16:15 X EMS Assist 7
#12
23-030 02/26 21:27 00:15 W564 Pete Reak Rd X Structure Fire 10
Current Monthly Total: 11
Total Runs by Month:
Jan 19 July
Feb 11 Aug
Mar Sep
Apr Oct
May Nov
June Dec
Year to date total 30 Last Year at this time 30
TRAININGS, MEETINGS, AND COMMUNITY ACTIVITIES
FEBRUARY 2023
02/01 Training – Crash Investigation Team – Beaver Dam FD – 6 Firefighters
02/04 Training – Intro to Wildland – Adams Friendship DNR – 6 Firefighters
02/06 Meeting – Training Division – 3 Firefighters
Meeting – Inspection – 5 Firefighters
Training – Occupational Trauma – Cedarburg FD – FF Kallas
02/07 Training – MATC Waunakee – Engine/Pumper Operator – FF N. Olson
Training – Occupational Trauma – Cedarburg FD – FF Kallas
Training – Ice Rescue – FF K. Killian and FF Peterson
Training – Ice Rescue – 22 Firefighters
02/08 Training – MATC – Poynette Fire Department – Entry Level Firefighter – 5 Firefighters
Training – Occupational Trauma – Cedarburg FD – FF Kallas
02/12 Training – MATC – Poynette Fire Department – Entry Level Firefighter – 3 Firefighters
02/13 Meeting – Officers – 10 Firefighters
02/14 Training – MATC Waunakee – Engine/Pumper Operator – FF N. Olson
Training – Firefighter Skills Fun Night – 23 Firefighters
Meeting – Regular Monthly – 23 Firefighters
Meeting – Equipment Division – 2 Firefighters
02/15 Training – MATC – Poynette Fire Department – Entry Level Firefighter – 5 Firefighters
02/18 Training – Drone – FF Olson and FF Retzlaff
Training – MATC - Waunakee – Engine/Pumper Operator – FF N. Olson
Training – MATC – On Line – FF Lamont and FF Pergande
Training – Fond du Lac – NFA Incident Safety Officer – FF Lamont
02/19 Training – Fond du Lac – NFA Incident Safety Officer – FF Lamont
02/20 Training – MATC – On Line – Fire Officer 2 – 4 Firefighters
02/21 Meeting – Apparatus Division
Training - MATC Waunakee – Engine/Pumper Operator – FF N. Olson
02/24 Training – Sun Prairie - National Fire Academy – New Chief Challenging Issues – FF Fox
02/25 Training – MATC – On Line – Fire Officer 1 – FF Lamont and FF Pergande
Training - Sun Prairie - National Fire Academy – New Chief Challenging Issues – FF Fox
Training - MATC Waunakee – Engine/Pumper Operator – FF N. Olson
02/27 Training – MATC – On Line – Fire Officer 2 – 4 Firefighters
Meeting – Truck Meeting – 7 Firefighters
02/28 Training - MATC Waunakee – Engine/Pumper Operator – FF N. Olson
Training – Railroad 101 Safety – 24 Firefighters
ITEMS OF NOTE FOR FEBRUARY
As noted in the month of February, we are up to 37 members on the roster. The trainings are up, one reason for
this is that the probationary members are taking Entry-Level Firefighter class right now, then they can do
interior firefighting. We have another member taking state certification training for pumper/operator, two
officers taking Officer 1, and 4 officers taking Officer 2.
Department trainings are being well attended by members, and with having a Training Division and Training
Committee, the trainings are better prepared, structured, and documented. We have been entering the
documentation into our software program with better description of the training, what members did, which is
required for state audits showing what each member has been participating in. We have adjusted our training
requirements to make it a little easier to meet, while also having setup a policy holding members accountable
for not at least meeting minimum training requirements.
Columbus has started meeting with other members in the area (Columbia, Dane, Jefferson, and Dodge
Counties), with Captain Tim Delaney heading that committee up. They meet to talk about recruitment &
retention, what others departments are doing, possible invites to bring other departments together in trainings,
etc. It started out slow, but gaining more attendance each month, Tim has been doing a fabulous job doing this
and deserves all the credit he is due for his efforts.
We are getting closer in determining which bid we will go with for the replacement of Engine 92 (the blue
engine), which is a 50/50 truck.
We have 3 applications into the AFG Grant program, which federal pays 95% and the city and/or rural would
pay 5%. The grants are below for what we applied for, using a grant writer to assist us in getting these.
1. 3000 Gallon Water Tanker – Under Rural Group, would replace Tender 94, 1500 gallons.
2. Radios – portable for officers, and mobile radios for trucks. This replaces old radios, and the ability to
communicate with Dane County on a monitored channel, vs. how we communicate now. If we are I a
call in Dane county, and there is one of our firefighters that go down or gets lost in the building and
calling a MayDay, currently he may not be heard when radio traffic is heavy. And applying for
interoperability reasons. We went together with Pardeeville and Doylestown Fire to make it a regional
grant. 50/50
3. SCBA Breathing Air Compressor – Applying for this again, as ARPA funds for this were delayed and
could not continue to wait. Our current compressor does not fill our SCBA air cylinders, causing a very
real danger of firefighters not having enough air to operate in IDLH atmospheres.
The station is getting very cramped and cost prohibitive to maintain, and hope that there is discussion sooner
than later to start the process of a new fire station and training tower. Most realize we need a bigger station, but
some are saying we do not need a training tower. My answer to that is, we do not get as many fires as in the
past, and getting a house to drill firefighters in firefighting environments are few, if any. By the time the
owners find out the cost of asbestos inspection and removal, they decide to tear it down. So, it is even more of a
priority to build a fire training center that CFD and possibly neighboring departments can train in to keep up
their skills. All it takes is one mistake in a fire which could cause the loss of firefighters, telling us we do not
need this without doing the research is not an answer. I would like the opportunity to at least start working on
designing a new station so there is plenty of planning, this should be done by fire personnel for design ideas,
they know what is needed for the community. With the sale of the parking lot at Old Countryside, the area left
is not worth building a station for the future, no longer big enough for a station, training tower, and parking.
Scott Hazeltine – Columbus Fire Chief
February 2023
DIRECTOR’S REPORT
LIBRARY NEWS
Amy Berry has resigned from her position as library assistant and wishes to thank everyone
for the support over the past nine years. The new window shades at the library have been
installed and are working really well for the space. The annual report for 2022 has been
completed and statistics show we have seen an increase in library visits, checkouts, and
program attendance over the previous year. The City is working on a policy and plans to
archive all social media sites on behalf of all of the departments in the city, including the
library.
PROGRAMS
The Winter Reading Program, “Spellbound! Get spellbound by a good book!” had 66 active
readers. Of those participants, 29 completed the challenge. Participants read 32,198
minutes and completed 146 activities. The Mid-Winter Medieval
Family Fun Day was a success with 55 people joining in the fun.
Take-and-Make Crafts along with an instructional video to make a
Skeleton Key Bookmark were offered in the beginning of February.
There were 47 kits picked up within the first two weeks of the month.
BUILDINGS
Mechanical Inc. dba Helm Service out of Waukesha, came to the Annex to investigate the
strong sewage smell and inspect the buildings. They put water in all of the traps that were
dry. Staff had been pouring water in the traps, but we missed the following traps: furnace in
the attic, dishwasher, shower and bathtub in upper apartments, and two drains in the
basement that we were unaware of. They resealed the vent stack to stop a water leak. The
plumber attached the bathroom from downstairs to the vent stack which was previously
vented into the attic causing moisture problems. The plumber also capped off an unused
pipe in the basement.
Columbus Water and Light sent us a letter informing us that the Lead Level from the Annex
water sample was 23.8 ug/L. The ‘Action Limit’ for Lead Levels in Wisconsin, as set forth by
the DNR, is 15 ug/L. We will be placing a water cooler in the Annex for drinking water until
filters can be installed.
Our elevator was recently inspected and it was found that the emergency phone is not
working properly. Perhaps the phone or the phone line was damaged when the library had
the power surge from the lightning strike.
DIRECTOR GOALS
I am currently focusing on my goals for Strategic Planning and Building Updates. Exit signs
for the Annex have been installed and we have fixed all of the issues on the fire inspection.
January 2023
MONTHLY PROGRAMS
In-Person In-Person
Virtual Virtual Take & Make
(# programs) (# views)
& Live Virtual & Live Virtual (# kits taken)
(# programs) (# attended)
Future Readers 0 0 14 201 5
Children 0 0 3 77 0
Teen 0 0 1 7 0
Adult 0 0 11 90 0
2023 2023 2022 2022
STATISTICS Month YTD YTD Total
Visits
(# door counts)
4,967 4,967 3,066 55,474
Items Borrowed
(total)
4,334 4,334 4,192 53,701
% Columbus residents 54% 55%
% Fall River residents 11% 10%
% Other Columbia County 20% 21%
% Dodge County 11% 10%
% Other 4% 4%
Digital Items Borrowed
(# checkouts)
1,211 1,211 1,384 12,984
Books by Mail
(# items sent)
18 18 29 193
Public WiFi
(# sessions)
4,771 4,771 5,962 68,502
Public Computer Use
(# sessions)
192 192 172 2,380
Wireless Printing & Faxing
(# jobs)
86 86 30 761
Community Use of Rooms
(# attended)
91 91 5 518
Patrons Added
(# added)
19 19 17 255
COLUMBUS POLICE DEPARTMENT 159 S. Ludington St.
Columbus, WI. 53925
920-623-5919 (Main)
920-623-5930 (Fax)
March 15, 2023
Mayor Arnold
Members of the Common Council
Columbus Police and Fire Commission:
RE: POLICE DEPARTMENT ACTIVITY REPORT, FEBRUARY 2023
Attached is the monthly report for the Columbus Police Department.
Please feel free to contact me at any time if you have questions.
Chief Dennis Weiner
www.cityofcolumbuswi.com Dennis R. Weiner, Chief of Police
COLUMBUS POLICE DEPARTMENT 159 S. Ludington St.
Columbus, WI. 53925
920-623-5919 (Main)
920-623-5930 (Fax)
PERSONNEL
The department is fully staffed. Current staffing as of March 15, 2023:
Authorized by Budget Actual
Sworn Officers
Full-time sworn police positions: 10 10
(Position breakdown)
Patrol Officer 6 6
Sergeant 1 1
Lieutenant 2 2
Chief 1 1
Clerical
Office Manager (full-time) 1 1
Clerk (full-time) 1 1
Current personnel: Name Date of Hire
Chief Dennis Weiner 02/18/2008
Lieutenant Roger Witthun 12/17/2001
Lieutenant Darrel Ward 09/19/2022
Sergeant Mike Rosecky 12/30/2022
Officer Matt Schultz 12/23/2002
Officer Kelly Towne 02/02/2004
Officer Dillon Donahue 05/13/2020
Officer Julia Knoll 01/03/2022
Officer Brian Johnson 01/07/2022
Officer Matt Dammen 01/03/2023
Office Manager Erika Kellar 02/04/1999
Public Safety Clerk Bonnie Langsdorf 09/30/2006
www.cityofcolumbuswi.com Dennis R. Weiner, Chief of Police
COLUMBUS POLICE DEPARTMENT 159 S. Ludington St.
Columbus, WI. 53925
920-623-5919 (Main)
920-623-5930 (Fax)
TRAINING:
Officers attended a 1 day Active Threat training with all other agencies in the county. The training was repeated 4 times over
2 weeks so everyone could attend. It was held at the Rusch Elementary School in Portage, which is no longer used by the
district. It provided for a real life training environment.
BODY CAMERA UPDATE:
Everything is in place and ready to go on our end. The body camera vendor is remotely installing software on the new server
and will spend 1 day here programming the cameras, squads and training staff. We hope to be live by the end of this month,
but we are at the mercy of the vendor’s schedule.
MUNCIPAL COURT UPDATE:
On March 1, 2023 I made the necessary changes on our system and we began issuing citations for the Eastern Columbia
County Joint Municipal Court (ECCJMC). The first court date there is May 10. This will make a large first docket for the ECCJMC,
but lighten the docket for the last Columbus Municipal Court session on April 19 so there will be fewer cases needing
resolution, such as those on that date that plead not guilty or are held open.
I have also had dialogs with Judge Breunig and Clerk Schmitt of the ECCJMC regarding various things, including which
violations should be marked as mandatory appearances (set by judge by statue), juvenile appearances, truancy, truancy-
parental responsibility, and assigned court times. I expect this transition to be seamless. We were with the ECCJMC prior to
2019 and little operationally has changed.
TRAFFIC /WINTER PARKING ENFORCEMENT:
During February 2023, officers issued 84 traffic citations, 141 warnings and 15 municipal ordinance citations.
SNOW EMERGENCY CITATIONS:
February 8/9: 19
February 16/17: 13
February 22/23: 5
CALLS OF INTEREST:
We investigated a sensitive crime that led to a search warrant being executed at a residence in Columbus. The search warrant
yielded child pornography and drugs. These drugs included marijuana, ecstasy (MDMA), hallucinogenic mushrooms and THC
wax. This case also involved another jurisdiction a few counties away, as the suspect has a residence there and spends time
here. The other agency also recovered child pornography from the suspects primary residence. The investigation continues.
Officers investigated a violent domestic abuse that included battery and strangulation. The suspect was arrested and jailed
on several charges.
A traffic stop for an equipment violation resulted in an officer finding marijuana, cocaine and drug paraphernalia in the
vehicle. The suspect was arrested and jailed for several drug related charges. His drivers license was also suspended and he
was cited for that.
www.cityofcolumbuswi.com Dennis R. Weiner, Chief of Police
COLUMBUS POLICE DEPARTMENT 159 S. Ludington St.
Columbus, WI. 53925
920-623-5919 (Main)
920-623-5930 (Fax)
In a 4 day period at the end of February and into the first days of March, we handled 3 Chapter 51 mental commitments.
These are persons who mental health crisis workers have determined are a danger to themselves or others. These calls
involve a substantial amount of officer dedicated time that takes them out of service. From start to finish can easily be an 8-
12 hours. It involves assessment, a decision by crisis workers, lab work and medical clearance, communication with the facility
to officially agree to accept the person, and transport. One of these 3 necessitated a 2 officer transport due to behavior.
These persons are transported to Winnebago Mental Health Institute in Oshkosh, which is a secure facility.
An officer attempted to stop a vehicle for a traffic violation and high speed pursuit ensued. It went into East Bristol. The
officer terminated it on Hwy VV east of USH 151. Following the pursuit we were able to identify the vehicle. The investigation
continues.
Columbus Police Department
Total CAD Calls Received, by Nature of Call 1
Nature of Call Total Calls Received
----------------------------- --------------------
911 HANG UP 25
ACCIDENT HIT AND RUN 1
ACCIDENT PROPERTY DAMAGE ONLY 2
ASSIST ANOTHER AGENCY 4
BURGLAR ALARM 2
MEDICAL ALARM 1
PANIC ALARM 2
ANIMAL COMPLAINTS 7
ANIMAL BITE 1
MENTAL HEALTH COMMITMENT 2
CHILD CUSTODY 1
CHILD SEXUAL ASSAULT 1
CITIZEN ASSIST 7
CIVIL 3
COMPLIANCE CHECKS 2
CONTROLLED 5
CRIMINAL DAMAGE TO PROPERTY 2
DISORDERLY CONDUCT 5
DEATH INVESTIGATION 3
DISABLED VEHICLE 11
DOMESTIC ABUSE 3
DOMESTIC WITH INJURY 1
DRIVING COMPLAINT 20
ELUDING 1
EMS CALL 16
EXTRA PATROL 46
GENERAL FIRE 1
VEHICLE FIRE 1
FLEET MAINTENANCE 3
FOOT PATROL 1
FRAUD 1
www.cityofcolumbuswi.com Dennis R. Weiner, Chief of Police
COLUMBUS POLICE DEPARTMENT 159 S. Ludington St.
Columbus, WI. 53925
920-623-5919 (Main)
920-623-5930 (Fax)
HARASSMENT 1
ROAD HAZARD 1
HOUSE WATCH 3
JUVENILE INCIDENT 7
KEEP THE PEACE 1
CALL IN LOBBY 1
LOST AND FOUND 2
NOISE COMPLAINT 2
OPEN DOOR 3
ORDINANCE VIOLATION 1
OWI 6
PARKING ENFORCMENT 5
PARKING VIOLATION 4
SECURITY 121
SLIDE OFF 1
SPECIAL EVENT 3
SQUAD DAMAGE 1
SUSPICIOUS 10
THEFT 2
TRAFFIC CONTROL 7
TRAFFIC STOP 167
TRAINING 1
TRANSIENT 1
TRUANCY 2
VEH LOCKOUT 3
VIOLATION OF PROBATION/PAROLE 1
WELFARE 15
------------------------------------------------------------------------
Total Calls: 553
www.cityofcolumbuswi.com Dennis R. Weiner, Chief of Police
Synopsis of Wastewater Department Activities
February 2023
Columbus Wastewater department was 100% in compliance for the month of
February.
Duties and activities for February:
• Weekly/daily lab tests for: BOD, TSS, PO4, Nh3, pH, DO tests complete.
• Enter all data.
• Submit WiDNR- DMR report for January
• Decanting and pressing sludge throughout the month
• Work on updating all spreadsheets with new sewer use fees.
• Preparing DNR applications for new farmland for spreading
• Work on prepping for upcoming treatment plant projects
• Exercise LS Generators
• Snow Plowing
• All regular preventive maintenance complete
• Billing for, Fall River and Ottery
• Maintenance and checks on lift stations
• Ken Priesgen attended CDL truck driving school.
City of Columbus
Februay 2023
Time Activity Report
Total Hours
Plant Operation 600-577200-111 Laboratory 98
Plant OP Mgmt 30
Process Control 41
Treatment Plant 600-577230-111 Treatment plant Mgmt 36
TP Maintenace/Repair 16
Bio-Solids Processing 600-577250-111 Bio solids Management 31
Hauling 4
Dewatering 20
Bio Solids Maintenace/Repair 4
Collection System 600-577210-111 Collection System Management12
Collection System Repairing 1
Flowing Monitoring 0
Jetting 1
Televising 3
Projects WWTP 41
Locates WWTP 5
Lift Stations 600-577220-111 Lift stations Maintenace/Repair 3
Cleaning 0
LS Management 9
Buildings and Ground 600-577240-111 Building Maintenance 29
Cleaning 8
Painting 0
Lighting 0
HVAC 0
Yard Maintenance 0
Mowing 0
Buildings mgmt 0
Training 600-577000-191 Training 66
458
Katie Ken Tony
Laboratory 903.67 548.70 1463.20
Plant OP Mgmt 825.09 0.00 0.00
Process Control 903.67 36.00 36.58
Treatment plant Mgmt 550.06 96.00 146.32
TP Maintenace/Repair 0.00 48.00 219.48
Bio solids Management 353.61 0.00 109.74
Hauling 0.00 0.00 146.32
Dewatering 157.16 24.00 402.38
Bio Solids Maintenace/Repair 0.00 0.00 146.32
Collection System Management 78.58 0.00 146.32
Collection System Repairing 0.00 0.00 0.00
Flowing Monitoring 0.00 0.00 0.00
Jetting 0.00 0.00 0.00
Televising 0.00 0.00 0.00
Projects WWTP 0.00 180.00 475.54
Locates WWTP 0.00 12.00 73.16
Lift stations Maintenace/Repair 0.00 24.00 36.58
Cleaning 0.00 0.00 0.00
LS Management 117.87 12.00 182.90
Building Maintenance 0.00 24.00 695.02
Cleaning 0.00 48.00 73.16
Painting 0.00 0.00 0.00
Lighting 0.00 0.00 0.00
HVAC 0.00 0.00 0.00
Yard Maintenance 0.00 0.00 0.00
Mowing 0.00 0.00 0.00
Buildings mgmt 0.00 0.00 0.00
2023 AGENDA ITEM
Committee of the Whole Meeting date: __March 21, 2023_________
Council Meeting date: ____________
ITEM:_Discussion of RFP potential for City Properties_
DETAILED DESCRIPTION OF SUBJECT MATTER:
Recently there have been discussions over land the City has acquired and how the land will
or might be used. While the question is relatively straightforward, much of the work done in
the past several years makes the answer somewhat complicated. The City has taken steps
to consider the need and implications of future developments, and how the City should
address the list of public facility needs that have developed over decades. These studies
and references have different focuses, but collectively there is relevant and useful
information that provides guidance for the City.
As it stands the City has needs, resources, opportunities and options. The City should be
thoughtful to progress in the manner that best maximizes our opportunities, preserves our
options, minimizes the need for resources and serves our needs. Ideally, that process
invites a variety of outside parties to propose their uses for certain properties that the City
has, while the City considers which combination of uses and partnerships might yield the
greatest overall benefit. Typically this is done through a Request for proposal process that
solicits proposals in a controlled and competitive fashion, allowing the City to compare many
opportunities within the same timeframe.
Roadmap 2050
“The Roadmap 2050 project was initiated in 2018 to evaluate and plan upgrades or
replacements of critical city facilities, including City Hall, the Public Library, the Senior
Center, the Community Center, the Police Station, the Fire Station, and the Public Works
campus.”
Typically discussed in another order, I think it is important in this instance to first discuss the
limitations of the Study and how they arrived at their conclusions on affordability and
achievability. One of the most concerning areas of the Roadmap 2050 report was the
significant reliance on borrowing and the accumulation of debt that would match historic
highs while also planning for growth of 3% over time. “The 3% target requires a focus on
attracting growth, including building new residential units every year and continuing
to attract commercial and industrial development. That isn’t to say, however, that a
1.3% growth rate (as seen over the prior decade) renders these projects impossible.
The impact of a 1.3% growth rate is that the City would get closer to bumping up
against the statutory 5% debt limit more often and would need to push back some of
the later projects by a couple years to avoid exceeding that limit. Discomfort about
that level of debt could result in additional delays to some projects.” To achieve the
goals of the Roadmap 2050 plan, the City will require sustained growth, a reduction of the
abnormally high percentage of the land within the City that is assessed as agricultural or
undeveloped, or a significant shift in funding and services.
As it relates to our building deficiencies, the two highest priorities are the Public Works
campus and the Fire Station, in that order. The current public works facility has been in a
flood plain since the FEMA flood maps were revised early in 2016. The authors wrote that,
“Most concerning, the entire site is in the floodway, disabling and damaging it when it
is needed to respond to flooding events.” The study also noted that “The City should
watch for viable site opportunities and be ready to acquire the land at any time.
Development of the new site could occur in stages if necessary.” Locating the public
works campus was suggested at, “a different, larger, higher site..” to include a 32,000 square
foot heated building and 3,200 square feet of unheated space located on approximately 6-8
acres.
When discussing the Fire Station, they recommended a 21,000 square foot facility to replace
our current facility of 11,600 square feet. A previous Council purchased commercial land on
James Street that they suggested could be used as a Fire Station, although there have been
no specific or detailed plans developed since that purchase. The Study recommended,
“Exploration of a regional fire district is recommend before the facility program and
budget are finalized.” Currently the City and Rural Fire Group share certain vehicle
expenses and share costs for calls in the rural area. What is not shared is the cost and
maintenance of the station, so prior to the City committing to building a new Fire Station, it
will be important to work with our partners so we can identify a method that provides each
group what we need to share the costs equally for all taxpayers. There has not been
appreciable progress in this area.
Comprehensive Plan
The City of Columbus has adopted a Comprehensive Plan, which serves as a guide to the
physical, social, and economic development of the City. Among the areas specifically
detailed in this plan is housing:
The Goals for housing in the City of Columbus Comprehensive Plan are to: “Provide a
variety housing types to meeting existing housing needs and encourage future growth
within the City of Columbus”
In pursuit of that goal, the Comprehensive plan identifies the following Objectives:
1. Create attractive and safe neighborhoods that reinforce the existing architectural
character of the City and provide a stable tax base.
2. Create mixed neighborhoods that provide a range of housing types, densities, and
costs.
3. Ensure that residential developments are built and maintained according to levels
deemed safe by industry standards.
Realities of current growth pattern
The lack of land available for building homes is well known in the community, and has
several implications to consider.
First is the simple impact of growth on the community and tax base. The Roadmap 2050
study is based significantly on growth, but we are unlikely to meet their 3% goal, or even
maintain their 1.3% minimum given the current conditions. This certainly impacts the ability
to address facilities, but there are other issues to consider. As we maintain our current
infrastructure and services, costs naturally rise, squeezing the services we provide and
potentially leading to service reductions if the situation continues for long enough. Another
concern is that as our employers compete for a skilled and reliable workforce, it can become
increasingly challenging for them to grow or even maintain the employees they have without
bringing potential workers into the community with a place to live. On the consumer side of
the equation, each of our businesses feed off of a customer base, and some of them are
particularly sensitive to the local population and number of potential customers that may visit
their business. Limiting housing and residents also limits business visibility and growth
potential.
ACTION REQUESTED OF COUNCIL:
Give staff direction if there are any actions they should take regarding City property
CITY OF COLUMBUS
FOR MEETING OF: March 21, 2023
REQUEST FROM/DEPARTMENT: Recreation working with the Columbus High School
AGENDA ITEM/REQUEST: End Suicide Walk / Run, Street closing request
***************************************************
From CHS:
CHS CARES (Compassion Advocacy and Resources to End Suicide) is a peer-to-peer group at Columbus
High School whose focus is to advocate for students who are looking for confidential support when
struggling with a mental health issue. The group was put into place a few years ago when one student
wanted to find a way to help Columbus students with any mental health challenges. The group's
members are not counselors, but are trained to listen and then refer students in need to adults and
other resources for help. The goal of the group this year is to raise awareness of the club, not only to
the high school student population, but our whole district and the community of Columbus. The group
has learned of the statistics surrounding suicide and mental health challenges in our own population,
and they wanted to do something that would be fun and destigmatize mental health.
Our group is known for the green bandanas that are tied to backpacks. This indicates that they are a
safe person to go to if someone is looking for a nonjudgmental and confidential peer for support. They
decided to have a color run for the district and the community. The run will be held on May 3 in the
afternoon in one-hour increments among school buildings and the Columbus community. There will be
signs along the route with messages of kindness, empathy (for all walkers) and statistical information
about mental health and suicide prevention (for the older students/community), as well as
informational signs that explain what CHS CARES is all about. We are excited to put together this event,
with the help of the city of Columbus.
Enclosed is the route within Fireman’s Park to be held on May 3, 2023.
DESCRIPTION AND SCOPE OF PROJECT/ITEM WITH KEY ISSUES NOTED:
PREVIOUS ACTION TAKEN (IF APPLICABLE):
BUDGET AND FINANCING INFORMATION:
Account #: _________________________ Department: __________________________
Acct. # Approved Budget: ______________ Current Balance in Acct #: ________________
Remaining Balance in Acct #: _______________ (after approval)
2023 AGENDA ITEM
Committee of the Whole Meeting date: _3/21/2023__________
Council Meeting date: ___4/3/2023____________
ITEM:_Approve State Municipal Agreement Tower Drive_
DETAILED DESCRIPTION OF SUBJECT MATTER:
In 2022, the City applied for funds under the Bipartisan Infrastructure Law. Project
eligibility was limited in scope, but were funded at 80% grant funds and 20% local
share. The City was awarded funds to replace the pavement on Tower Drive from
Faith Drive to Hwy K, with a total project cost estimated at $903,852. The City’s
share at that level would be $191,964. This project is scheduled for State fiscal year
2025.
The first step in the process is to sign the State Municipal Agreement for the project.
The DOT said they sent this out in December, but our email system does not show
receipt of this, and we had to reach out to DOT to check the status ourselves. That
being said, they are anxious to receive our signed agreement so we can move on to
the next phase of the project. Because this is funded with federal dollars, including
the design work, we will need to conduct a QBS process to select to most qualified
engineering firm to design the project on a competitive basis. That process will be
forthcoming.
LIST ALL SUPPORTING DOCUMENTATION ATTACHED:
DOT Letter
STATE/MUNICIPAL AGREEMENT FOR A STATE- LET STP-URBAN
PROJECT
ACTION REQUESTED OF COUNCIL:
Approve the State/Municipal Agreement
WisDOT Division of Transportation System Development Governor Tony Evers
Southwest Region – La Crosse Office Secretary Craig Thompson
3550 Mormon Coulee Road wisconsindot.gov
La Crosse, WI 54601 Telephone: (608) 789-7879
FAX: (608) 785-9969
Email: robert.winterton@dot.wi.gov
December 22, 2022
MARY ARNOLD
MAYOR
CITY OF COLUMBUS
105 NORTH DICKASON BOULEVARD
COLUMBUS, WI 53925
Ms. Arnold:
Enclosed for signature is the project agreement for the following project that has approved funds in the FFY 2023-2026
Bipartisan Infrastructure Law (BIL) STP-Urban Program.
Project I.D.: 6217-01-02/72
City of Columbus, Tower Drive
Faith Drive to CTH K
Please sign and return one (1) copy of the agreement. Electronic signatures are acceptable. Return the copy of the
agreement by e-mail to the Department with signatures by Friday, February 3, 2023 to this address:
michael.erickson@dot.wi.gov
Note the cost ratios for each project phase and any federal/state funding limits which may exist. The Municipality is
responsible for the entire cost of non-participating items as well as any costs which exceed the funding limits, if
applicable.
An agreement is not considered fully approved unless it has been approved by both the Municipality and the State, and
it is not considered fully executed unless a fully approved copy has been returned to the Municipality.
The Municipality and its consultants (or any other parties hired by the Municipality) MUST NOT begin work on a
federal/state-funded project phase until the State has provided notice of project authorization. Any such work would be
ineligible for federal/state funding. Authorization will coincide with the currently scheduled year that is stated in the
agreement.
Our office will be working with the local sponsor as we move forward with these design and construction projects. Della
Koenig is the Local Program Project Manager (LPPM) for these projects, and you can contact her at: (608) 246-7963 or
della.koenig@dot.wi.gov .
If you have any questions regarding the agreement or need an extension to the submittal date, please call me at (608)
789-7879 or e-mail robert.winterton@dot.wi.gov.
Sincerely,
Robert Winterton
Robert Winterton, P.E.
Local Programs Engineer – SW Region
Date: December 22, 2022
STATE/MUNICIPAL AGREEMENT I.D.: 6217-01-02/72
FOR A STATE- LET STP-URBAN
PROJECT Road Name: Tower Drive
Limits: Faith Drive to CTH K
County: Columbia
Roadway Length: 0.28 miles
Program Name: STP-Urban
Functional Classification: Collector
Population Group: 5,000 - 20,000
Sub-program #: 206 Project Sponsor: City of Columbus
Cycle: FFY 2023-2026 BIL
The signatory, City of Columbus, hereinafter called the Municipality, through its undersigned duly authorized
officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the
State, to initiate and effect the highway or street improvement hereinafter described.
The authority for the Municipality to enter into this agreement with the State is provided by Sections 86.25(1), (2),
and (3) and Section 66.0301 of the Statutes.
NEEDS AND ESTIMATE SUMMARY:
All components of the project must be defined in the environmental document if any portion of the project is
federally funded. The Municipality agrees to complete all participating and any non-participating work included in
this improvement consistent with the environmental document. No work on final engineering and design may
occur prior to approval of the environmental document.
Existing Facility - Describe and give reason for request: The existing roadway is a 2-lane Urban Collector. It
is a 36-foot wide facility with an urban cross section constructed of asphalt pavement. The roadway
was last improved in 2002. The roadway has a pavement rating of 4 with significant transverse and
longitudinal cracking. There are existing sidewalks on one side of the roadway and no bicycle
accommodations.
Proposed Improvement - Nature of work: A pavement replacement project from Faith Drive to CTH K is
proposed. The project will be 0.28 miles in length constructed of asphalt pavement with an urban cross
section consisting of 12-foot wide travel lanes and 6-foot shoulders. Existing concrete curb & gutter to
remain with spot replacement. New sidewalk will be constructed on one side of the roadway and the
existing sidewalk with remain with spot replacement. Real estate acquisition is not anticipated.
Describe non-participating work included in the project and other work necessary to completely finish the project
that will be undertaken independently by the Municipality. Please note that non-participating components of a
project/contract are considered part of the overall project and will be subject to applicable federal requirements:
Municipal utility adjustments.
Page 1 of 8 ID 6217-01-02/72 – SW Region
The Municipality agrees to the following FFY 2023-2026 BIL STP-Urban project funding conditions:
Project ID 6217-01-02 design costs are funded with up to 80% federal funding up to a funding limit of $79,008.
The Municipality agrees to provide the remaining 20% and any funds in excess of the $79,008 federal funding
limit.
Project ID 6217-00-72 construction costs are funded with up to 80% federal funding up to a funding limit of
$632,880. The Municipality agrees to provide the remaining 20% and any funds in excess of the $632,880
federal funding limit. Non-participating costs are 100% the responsibility of the Municipality. Any work
performed by the Municipality prior to federal authorization is not eligible for federal funding. The Municipality
will be notified by the State that the project is authorized and available for charging.
This project is currently scheduled in State Fiscal Year 2025. Sunset date: June 30, 2030.
Sunset Date is determined based on the date a project is scheduled to be authorized. Sunset date is
calculated as six years from the beginning of the state fiscal year (SFY) in which a project is initially
scheduled. Extensions may be available upon approval of a written request by or on behalf of the Municipality
to State per WisDOT Change Management policy. The written request shall explain the reasons for project
implementation delay and revised timeline for project completion.
Extensions may be available upon approval of a written request by or on behalf of the Municipality to State.
The written request shall explain the reasons for project implementation delay and revised timeline for project
completion.
The dollar amounts shown in the Summary of Costs Table below are estimates. The final Municipal share is
dependent on the final federal participation, and actual costs will be used in the final division of cost for billing
and reimbursement. In no event shall federal funding exceed the estimate of $711,888 in the Summary of
Costs Table, unless such increase is approved in writing by the State through the State’s Change Management
Policy prior to the Municipality incurring the increased costs.
SUMMARY OF COSTS
Municipal
PHASE Total Est. Cost Federal Funds % Funds %
ID 6217-01-02*
Design $87,000 $69,600 80% $17,400 20% + BAL
State Review $22,752 $9,408 80% $13,344 20% + BAL
Project totals $109,752 $79,008 $30,744
ID 6217-01-72**
Participating Construction $688,500 $550,800 80% $137,700 20% + BAL
Non-Participating Construction $3,000 $0 0% $3,000 100%
Construction Engineering $87,000 $69,600 80% $17,400 20% + BAL
State Review $15,600 $12,480 80% $3,120 20% + BAL
Project totals $794,100 $632,880 $161,220
Total Est. Cost Distribution $903,852 $711,888 N/A $191,964 N/A
*Design ID# 6217-01-02 federal funding is limited to $79,008.
**Construction ID# 6217-01-72 federal funding is limited to $632,880.
Page 2 of 8 ID 6217-01-02/72 – SW Region
This request is subject to the terms and conditions that follow and is made by the undersigned under proper
authority to make such request for the designated Municipality and upon signature by the State and delivery to
the Municipality shall constitute agreement between the Municipality and the State. No term or provision of
neither the State/Municipal Agreement nor any of its attachments may be changed, waived or terminated orally
but only by an instrument in writing executed by both parties to the State/Municipal Agreement.
Signatures certify the content has not been altered by the municipality.
Signed for and in behalf of: City of Columbus (please sign in blue ink.)
Name Title Date
Signed for and in behalf of the State:
Name Title Date
GENERAL TERMS AND CONDITIONS:
1. All projects must be in an approved Transportation Improvement Program (TIP) or State Transportation
Improvement Program (STIP) prior to requesting authorization.
2. Work prior to federal authorization is ineligible for federal funding.
3. The Municipality, throughout the entire project, commits to comply with and promote all applicable federal
and state laws and regulations that include, but are not limited to, the following:
a. Environmental requirements, including but not limited to those set forth in the 23 U.S.C. 139 and
National Environmental Policy Act (42 U.S.C. 4321 et seq.)
b. Equal protection guaranteed under the U.S. Constitution, WI Constitution, Title VI of the Civil Rights
Act and Wis. Stat. 16.765. The municipality agrees to comply with and promote applicable Federal and
State laws, Executive Orders, regulations, and implementing requirements intended to provide for the
fair and equitable treatment of individuals and the fair and equitable delivery of services to the public.
In addition the Municipality agrees not to engage in any illegal discrimination in violation of applicable
Federal or State laws and regulations. This includes but is not limited to Title VI of the Civil Rights Act
of 1964 which provides that “no person in the United States shall, on the ground of race, color, or
national origin, be excluded from participation in, be denied the benefits of, or be subjected to
discrimination under any program or activity receiving Federal financial assistance.” The Municipality
agrees that public funds, which are collected in a nondiscriminatory manner, should not be used in
ways that subsidize, promote, or perpetuate illegal discrimination based on prohibited factors such as
race, color, national origin, sex, age, physical or mental disability, sexual orientation, or retaliation.
c. Prevailing wage requirements, including but not limited to 23 U.S.C 113.
d. Buy America Provision and its equivalent state statutes, set forth in 23 U.S.C. 313 and Wis. Stat.
16.754.
e. Competitive bidding and confidentiality requirements set forth in 23 U.S.C 112 and Wis. Stat. 84.06.
This includes the sharing of financial data prior to the conclusion of the competitive bid period.
f. All applicable Disadvantaged Business Enterprise (DBE) requirements that the State specifies.
g. Federal statutes that govern the Surface Transportation Program (STP), including but not limited to 23
U.S.C. 133.
h. General requirements for administrating federal and state aids set forth in Wis. Stat. 84.03.
Page 3 of 8 ID 6217-01-02/72 – SW Region
STATE RESPONSIBILITIES AND REQUIREMENTS:
4. Funding of each project phase is subject to inclusion in Wisconsin’s approved FFY 2023-2026 BIL STP-
Urban program. Federal funding will be limited to participation in the costs of the following items, as
applicable to the project:
a. The grading, base, pavement, and curb and gutter, sidewalk, and replacement of disturbed driveways
in kind.
b. The substructure, superstructure, grading, base, pavement, and other related bridge and approach
items.
c. Storm sewer mains necessary for the surface water drainage.
d. Catch basins and inlets for surface water drainage of the improvement, with connections to the storm
sewer main.
e. Construction engineering incident to inspection and supervision of actual construction work (except for
inspection, staking, and testing of sanitary sewer and water main).
f. Signing and pavement marking.
g. New installations or alteration of street lighting and traffic signals or devices.
h. Landscaping.
i. Preliminary engineering and design.
j. State review services.
5. The work will be administered by the State and may include items not eligible for federal participation.
6. As the work progresses, the State will bill the Municipality for work completed that is not chargeable to
federal/state funds. Upon completion of the project, a final audit will be made to determine the final division
of costs subject to funding limits in the Summary of Costs Table. If reviews or audits show any of the work to
be ineligible for federal/state funding, the Municipality will be responsible for any withdrawn costs associated
with the ineligible work.
MUNICIPAL RESPONSIBILITIES AND REQUIREMENTS:
7. Work necessary to complete the FFY 2023-2026 BIL STP-Urban improvement project to be financed
entirely by the Municipality or other utility or facility owner includes the items listed below.
a. New installations of or alteration of sanitary sewers and connections, water, gas, electric, telephone,
telegraph, fire or police alarm facilities, parking meters, and similar utilities.
b. Damages to abutting property after project completion due to change in street or sidewalk widths,
grades or drainage.
c. Detour routes and haul roads. The municipality is responsible for determining the detour route.
d. Conditioning, if required and maintenance of detour routes.
e. Repair of damages to roads or streets caused by reason of their use in hauling materials incident to
the improvement.
f. All work related to underground storage tanks and contaminated soils.
Page 4 of 8 ID 6217-01-02/72 – SW Region
g. Street and bridge width in excess of standards, in accordance with the current WisDOT Facilities
Development Manual (FDM).
h. Real estate for the improvement.
i. Other 100% Municipality funded items: None
8. The construction of the subject improvement will be in accordance with the appropriate standards unless an
exception to standards is granted by State prior to construction. The entire cost of the construction project,
not constructed to standards, will be the responsibility of the Municipality unless such exception is granted.
9. Work to be performed by the Municipality without federal funding participation necessary to ensure a
complete improvement acceptable to the Federal Highway Administration and/or the State may be done in a
manner at the election of the Municipality but must be coordinated with all other work undertaken during
construction.
10. The Municipality is responsible for financing administrative expenses related to Municipal project
responsibilities.
11. The Municipality will include in all contracts executed by them a provision obligating the contractor not to
discriminate against any employee or applicant for employment because of age, race, religion, color,
handicap, sex, physical condition, developmental disability as defined in Wis. Stat. 51.01 (5), sexual
orientation as defined in Wis. Stat. 111.32 (13m), or national origin.
12. The Municipality will pay to the State all costs incurred by the State in connection with the improvement that
exceed federal/state financing commitments or are ineligible for federal/state financing. To guarantee the
Municipality’s foregoing agreements to pay the State, the Municipality, through its above duly authorized
officers or officials, agrees and authorizes the State to set off and withhold the required reimbursement
amount as determined by the State from any moneys otherwise due and payable by the State to the
Municipality.
13. In accordance with the State’s sunset policy for STP-Urban projects, the subject FFY 2023-2026 BIL STP-
Urban improvement must be constructed and in final acceptance within six years from the beginning of the
state fiscal year (SFY) in which a project is initially scheduled. Extensions may be available upon approval
of a written request by or on behalf of the Municipality to State. The written request shall explain the reasons
for project implementation delay and revised timeline for project completion.
14. If the Municipality should withdraw the project, it will reimburse the State for any costs incurred on behalf of
the project.
15. The Municipality will at its own cost and expense:
a. Maintain all portions of the project that lie within its jurisdiction (to include, but not limited to,
cleaning storm sewers, removing debris from sumps or inlets, and regular maintenance of the
catch basins, curb and gutter, sidewalks and parking lanes [including snow and ice removal]) for
such maintenance in a manner consistent with reasonable industry standards, and will make ample
provision for such maintenance each year.
b. Regulate [or prohibit] parking at all times in the vicinity of the proposed improvements during their
construction.
c. Regulate [or prohibit] all parking at locations where and when the pavement area usually occupied
by parked vehicles will be needed to carry active traffic in the street.
d. Assume general responsibility for all public information and public relations for the project and to
make fitting announcement to the press and such outlets as would generally alert the affected
property owners and the community of the nature, extent, and timing of the project and
arrangements for handling traffic within and around the project.
Page 5 of 8 ID 6217-01-02/72 – SW Region
e. Provide complete plans, specifications, and estimates to State upon request.
f. Provide relocation orders and real estate plats to State upon request.
g. Use the WisDOT Utility Accommodation Policy unless it adopts a policy, which has equal or more
restrictive controls.
h. Provide maintenance and energy for lighting.
i. Provide proper care and maintenance of all landscaping elements of the project including
replacement of any plant materials damaged by disease, drought, vandalism or other cause.
16. It is further agreed by the Municipality that:
a. The Municipality assumes full responsibility for the design, installation, testing and operation of any
sanitary sewer and water main infrastructure within the improvement project and relieves the state
and all of its employees from liability for all suits, actions, or claims resulting from the sanitary
sewer and water main construction under this agreement.
b. The Municipality assumes full responsibility for the plans and special provisions provided by their
designer or anyone hired, contracted or otherwise engaged by the Municipality. The Municipality is
responsible for any expense or cost resulting from any error or omission in such plans or special
provisions. The Municipality will reimburse State if State incurs any cost or expense in order to
correct or otherwise remedy such error or omission or consequences of such error or omission.
c. The Municipality will be 100% responsible for all costs associated with utility issues involving the
Contractor, including costs related to utility delays.
d. All signs and traffic control devices and other protective structures erected on or in connection with
the project including such of these as are installed at the sole cost and expense of the Municipality
or by others, will be in conformity with such Manual of Uniform Traffic Control Devices as may be
adopted by the American Association of State Highway and Transportation Officials, approved by
the State, and concurred in by the Federal Highway Administration.
e. The right-of-way available or provided for the project will be held and maintained inviolate for public
highway or street purposes. Those signs prohibited under federal aid highway regulations, posters,
billboards, roadside stands, or other private installations prohibited by federal or state highway
regulations will not be permitted within the right-of-way limits of the project. The Municipality, within
its jurisdictional limits, will remove or cause to be removed from the right-of-way of the project all
private installations of whatever nature which may be or cause an obstruction or interfere with the
free flow of traffic, or which may be or cause a hazard to traffic, or which impair the usefulness of
the project and all other encroachments which may be required to be removed by the State at its
own election or at the request of the Federal Highway Administration, and that no such installations
will be permitted to be erected or maintained in the future.
f. The Municipality is responsible for any damage caused by legally hauled loads, including permitted
oversize and overweight loads. The contractor is responsible for any damage caused to haul roads
if the contractor does not obey size and weight laws, use properly equipped and maintained
vehicles, and does not prevent spilling of materials onto the haul road (WisDOT Standard
Specifications 618.1, 108.7, 107.8). The local maintaining authority can impose special or
seasonal weight limitations as defined in Wis. Stat. 349.16, but this should not be used for the sole
purpose of preventing hauling on the road.
The bid item 618.0100 Maintenance and Repair of Haul Roads (project) is ineligible for federal
funding on local program projects as per the State/Municipal Agreement. The repair of damages
as a result of hauling materials for the project is the responsibility of the Municipality as specified in
the State/Municipal Agreement Terms and Conditions under “Municipal Responsibilities and
Requirements.”
Page 6 of 8 ID 6217-01-02/72 – SW Region
LEGAL RELATIONSHIPS:
17. The State shall not be liable to the Municipality for damages or delays resulting from work by third parties.
The State also shall be exempt from liability to the Municipality for damages or delays resulting from
injunctions or other restraining orders obtained by third parties.
18. The State will not be liable to any third party for injuries or damages resulting from work under or for the
Project. The Municipality and the Municipality’s surety shall indemnify and save harmless the State, its
officers and employees, from all suits, actions or claims of any character brought because of any injuries or
damages received or sustained by any person, persons or property on account of the operations of the
Municipality and its sureties; or on account of or in consequence of any neglect in safeguarding the work; or
because of any act or omission, neglect or misconduct of the Municipality or its sureties; or because of any
claims or amounts recovered for any infringement by the Municipality and its sureties of patent, trademark or
copyright; or from any claims or amounts arising or recovered under the Worker's Compensation Act,
relating to the employees of the Municipality and its sureties; or any other law, ordinance, order or decree
relating to the Municipality's operations.
19. Contract modification: This State/Municipal Agreement can only be modified by written instruments duly
executed by both parties. No term or provision of either this State/Municipal Agreement or any of its
attachments may be changed, waived or terminated orally.
20. Binding effects: All terms of this State/Municipal Agreement shall be binding upon and inure to the benefits
of the legal representatives, successors and executors. No rights under this State/Municipal Agreement may
be transferred to a third party. This State/Municipal Agreement creates no third-party enforcement rights.
21. Choice of law and forum: This State/Municipal Agreement shall be interpreted and enforced in accordance
with the laws of the State of Wisconsin. The Parties hereby expressly agree that the terms contained herein
and in any deed executed pursuant to this State/Municipal Agreement are enforceable by an action in the
Circuit Court of Dane County, Wisconsin.
PROJECT FUNDING CONDITIONS
22. Non-appropriation of funds: With respect to any payment required to be made by the State under this
State/Municipal Agreement, the parties acknowledge the State’s authority to make such payment is
contingent upon appropriation of funds and required legislative approval sufficient for such purpose by the
Legislature. If such funds are not so appropriated, either the Municipality or the State may terminate this
State/Municipal Agreement after providing written notice not less than thirty (30) days before termination.
23. Maintenance of records: During the term of performance of this State/Municipal Agreement, and for a period
not less than three years from the date of final payment to the Municipality, records and accounts pertaining
to the performance of this State/Municipal Agreement are to be kept available for inspection and audit by
representatives of the State. The State reserves the right to audit and inspect such records and accounts at
any time. The Municipality shall provide appropriate accommodations for such audit and inspection.
In the event that any litigation, claim or audit is initiated prior to the expiration of said records maintenance
period, the records shall be retained until such litigation, claim or audit involving the records is complete.
Page 7 of 8 ID 6217-01-02/72 – SW Region
24. The Municipality agrees to the following FFY 2023-2026 BIL STP-Urban project funding conditions:
a. ID 6217-01-02: Design is funded with 80% federal funding up to a funding limit of $79,008, where
applicable when the Municipality agrees to provide the remaining 20% and any funds in excess of the
$79,008 federal funding limit. This phase includes plan development and state review. The work
includes project review, approval of required reports and documents and processing the final Plan,
Specification & Estimate (PS&E) document for award of the contract. Costs for this phase include an
estimated amount for state review activities, to be funded 80% with federal funding and 20% by the
Municipality.
b. ID 6217-01-72: Construction:
i. Costs for participating construction items are funded with 80% federal funding up to a funding limit of
$632,880, when the Municipality agrees to provide the remaining 20%, and any funds in excess of
the $632,880 federal funding limit.
ii. Non-participating costs for municipal utility adjustments are funded 100% by the Municipality. Costs
include construction delivery.
iii. Costs for this phase include an estimated amount for state review activities, to be funded 80% with
federal funding and 20% by the Municipality.
[End of Document]
Page 8 of 8 ID 6217-01-02/72 – SW Region
2023 AGENDA ITEM
Committee of the Whole Meeting date: _3/21/2023__________
Council Meeting date: ___4/3/2023____________
ITEM:_Review Roofing Quotes for City Hall Roof_
DETAILED DESCRIPTION OF SUBJECT MATTER:
Throughout 2022, the Public Works Director, Library Director and Utility Staff made an
extended effort to get roofing quotes for several buildings needing roof repairs or
replacements, including the roof covering the main portion of City Hall. It was difficult to get
interest from multiple firms that were contacted, and we only got quotes for City Hall from a
single firm that has also submitted quotes for the Library, Library Annex and Main Utility
Administration building. This experience is similar to the experience of the Utility
Department, as they were only able to get a quote from one company. The quote from
Great Lakes Roofing includes a 15 year labor warranty on the flat roof and a 20 year
product warranty. The shingles come with a 2 year labor warranty and a limited lifetime
warranty on the product.
Staff considered issuing a RFP, but only found a single firm to write specs for the multiple
buildings we would include in that type of process. The cost of that service would exceed
$40,000, and it seems unlikely we would suddenly find a large number of new bidders that
would be interested at a savings that would justify the cost.
The total project cost from the quotes given in late December is $116,350. We budgeted
$115,000 in the Capital Fund for the project, but will have enough to accommodate this
modest overage within the contingency expense line, or potentially from within the Capital
Fund itself if other equipment or projects come in under budget.
LIST ALL SUPPORTING DOCUMENTATION ATTACHED:
Quotes from Great Lakes Roofing
ACTION REQUESTED OF COUNCIL:
Approve Roofing project at a cost of $116,350