Citizens Advisory Committee on Transportation
Regular MeetingFalls Church, VA · September 20, 2017
Minutes
Citizens Advisory Committee on Transportation
September 20, 2017 - 7:00 pm- 9:30 pm
Draft Meeting Minutes
Attendance
CACT Members
Member Present
City Staff
Andrea Caumont (Chair) Yes 1. Jeff Sikes
Paul Baldino (Vice-Chair) Yes
Bill Ackerman No
Doug Devereaux Yes
Addison Heard Yes
Steve Knight Yes
Dave Gustafson Yes
Liaisons
Liaison Present
Karen Oliver Yes
(City Council)
Brent Krasner No
(Planning Commission)
N/A
(Youth Representative)
Agenda
1. Public Comment
2. Action Item: Approval of the Minutes for March 2017 and September 2017 CACT meetings
3. Committee Reports
4. Staff Reports
5. Discussion Item: Priority Tracking Sheet
6. Information Item: Bike Share Station Location comments
7. Information Item: N West St/Lincoln Ave Striping Plan Update
8. Information Item: I-66 Commuter Choice Program
9. Discussion Item: Georgetown Sidewalk Expansion
10. Discussion Item: Envision Route 7 Phase III Conceptual Engineering Study
11. Attachments and Correspondence
a. CACT Member Comments on Bike share Location Stations
b. 2017 Priority Tracking sheet
c. National Transportation Safety Board (NTSB) Safety Study on Reducing Speeding and
Crashes
d. NVTC Report on the Value of Metrorail and VRE to the Northern Virginia Economy
e. Envision Route 7 Phase III-Conceptual Engineering Study Scope of Work (Bus Rapid
Transit from Tysons to Alexandria)
1. Public Comment:
A resident (Michael Hjerstedt) of the West Broad Apartments had written a report and letter
addressed to the CACT about traffic and pedestrian safety at the pedestrian crossing of W
Annandale Road behind the Harris-Teeter site in the vicinity of Big Chimney Park. He had
identified three safety issues and had developed recommendations as to how to address these
problems. The safety problems were identified as visibility at the crosswalk, poor driving
behavior on W. Annandale Road and pedestrian safety at the intersection of W Annandale Road
and Gundry Drive.
Jeff indicated that staff had not had time to respond to Mr. Hjerstedt’s report but would provide
a full staff response in the next few weeks. He also mentioned that the design is underway for
Big Chimney Park and it may be able to incorporate Annandale Road improvements in the
design. He also stated that the intersection of W Annandale Road and Gundry was in the queue
for NTC, but was lacking data collection, which should occur in October. In a recent email to the
Winter Hill HOA president, Jeff indicated that the CACT may be able to select the
Annandale/Gundry as a NTC project early next year.
Staff will invite the Big Chimney Park Project Planner to the next CACT meeting to discuss
roadway improvements to Annandale Road. (Staff note: Since plans will not be available until
after the next CACT meeting, a November presentation is planned)
2. Action Item: Approval of Minutes for the March 2017 and June
CACT Meetings:
The minutes for the March 2017 CACT Meeting were not approved as a quorum of those
members was not present. The Minutes of the July 2017 CACT Meeting were approved.
3. Committee Member Reports:
• AndreaI reported that Car Free Day will be celebrated on September 22nd, and that
WABA was conducting a class on Bike and Pedestrian safety in the City. She also shared
a Washington Post article on dockless bike racks that were coming to DC.
• Paul reported that part of City ‘s section of the W&OD trail had been selected for pilot
dual trails. He indicated that the dual trail would be installed in the section from Broad
Street to Little Falls Street and would consists of an 11 foot wide bike trail and 8 foot
wide pedestrian path, separated by a 2 foot median. The project is not fully funded but
funding should be in place in FY2018. The CFC contribution to NOVA Parks for the
project is $62,000. Paul also indicated that as part of the Speakers Series, NOVA parks
would make a presentation to the Planning Commission on October 2nd.
• Doug reported that he has just returned for Paris and commented on the way the
French use multimodal transit.
• Steve reported that he had not been able to work on the Pace Car Design or brochure
but will have these for the October meeting.
4. Staff Reports:
• Jeff reported on the public information meeting held in July on the N West St/Lincoln
Ave striping plans that were attended by about 35 residents. Some changes were
requested especially on West Street and the plans have been revised. We plan to install
the striping and crosswalks in October.
• N Maple AVE will go to construction on October 10th. Jeff reported that staff will be
updating the Planning Commission on October 16th on the status of the NTC program.
• Jeff indicated that Stephanie Rogers’ position is being recruited, but no one has been
selected as yet.
5. Discussion Item: CACT 2017 Priority Tracking Sheet:
Paul will update the CACT Project Priority Tracking Sheet and it will be distributed to Members
prior to the next meeting.
6. Information Item: Bike Share Station Location Comments:
Three Committee members provided comments on the City Council recommendation for the
locations of Bike Share Stations in the City. The comments will be forwarded as submitted to
appropriate staff.
7. Information item: N West St/Lincoln Ave Striping Plans Update:
Jeff reported that a public meeting was held on July 13th with resident of N West St and Lincoln
Ave to show the proposed striping plans for these roadways. Approximately 30-35 residents
attended. The plans will provide a visual narrowing of the roadway and new crosswalks at
several locations. New curb ramps and refuge islands will be provided where the roadway is
extra wide. Curb extensions will also bepainted at key intersections. Due to plan changes and
the contractor’s schedule, the projects will not be implemented until early October.
8. Information Item: I-66 Commuter Choice Program:
Earlier today was the kickoff event for I-66 Commuter Choice held in Falls Church with the
Governor and State Secretary of Transportation in attendance. This is the new program for
FY2018 for applying for Multimodal projects associated with I-66 Inside the Beltway. This is the
program that last year provided operating funds for Bike share. The city will be applying for
funds for projects under this program later this fall.
9. Discussion Item: Georgetown Sidewalk Expansion:
Council Member Hardi observed that DDOT had begun a procedure where sidewalks on M
Street in Georgetown had been expanded by the use of barricades positioned in the parking
lane and wanted to know if the CACT thought this would be appropriate in the City. After some
discussion, the concensus of the committee was that there were few places in the city where
this would be appropriate and it could be accomplished by street closures. Dave Gustafson will
write a memo for the CACT on this issue,
10. Discussion item: Envision Route 7 Phase III Conceptual
Engineering Study:
Jeff reported on the next Phase of the Envision Route 7 Project. The first two phases of
the project evaluated the demand and estimated ridership in the corridor. The
alignment of the transit project was determined (Spring Hill metro rail to the Mark
center in Alexandria with a connection to EFC Metro rail) Several transit modes were
evaluated but Bus Rapid Transit (BRT) was selected over Light Rail as being the more
cost effective alternative. The Phase III engineering study will evaluate right of way in
the corridor for BRT and look a t critical locations to determine impacts on existing
structures. The City of Falls Church contribution for Phase III will be $23,000 and the
study will take about a year to complete.