MPO Technical Committee
Regular MeetingFarmington, NM · July 24, 2014
Minutes
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
JULY 24, 2014
Technical Members Present: Bill Watson, City of Aztec
Cynthia Lopez, City of Farmington
David Sypher, Alternate, City of Farmington
Dave Keck, San Juan County
Technical Members Absent: Teresa Brevik, City of Bloomfield
Nica J. Westerling, City of Farmington
Staff Present: Mary Holton, MPO Officer
Duane Wakan, MPO Associate Planner
June Markle, MPO Administrative Aide
Staff Absent: Fran Fillerup, Acting MPO Planner
Also Present: Larry Hathaway, San Juan County
1. CALL TO ORDER
Ms. Lopez called the meeting to order at 10:07 a.m.
2. APPROVE THE MINUTES FROM THE JUNE 26, 2014 TECHNICAL COMMITTEE
MEETING
Mr. Keck moved to approve the minutes from the June 26, 2014 Technical Committee
Meeting. Mr. Watson seconded the motion. The motion was passed unanimously.
3. AMENDMENT #6 TO THE FFY2014-2019 TRANSPORTATION IMPROVEMENT
PROGRAM
Subject: FFY2014-2019 TIP Amendment #6
Prepared by: Duane Wakan, MPO Associate Planner
Date: July 17, 2014
BACKGROUND
On July 20, 2014 the Farmington MPO advertised Amendment #6 to the
FFY2014-2019 Transportation Improvement Program (TIP).
The amendment adds four project(s) to the TIP as described below and
removes one project as shown in the attached notice.
CURRENT WORK
Items added or amended include US 64 from MP 54 to 56 and from MP 58 to 60;
East Pinon Hills Boulevard; and the East Arterial project. The project removed
is Legion Road, as described below.
The previous TIP amendment added Legion Rd to the TIP to be the logical
terminus for the East Arterial Phase 1B.
NMDOT has now programmed $3.5 million toward construction of the East
Arterial Phase 1B.
Upon completion of this phase, the middle section will be the remaining phase
of this project.
A public hearing on Amendment #6 will be held on July 24, 2014 during the
Technical Committee meeting.
ACTION ITEM
It is recommended that the Technical Committee review the project(s) in
Amendment #6, hold a public hearing, and make a recommendation on
Amendment #6 to the FFY2014-2019 TIP.
DISCUSSION: Mr. Wakan reported on Amendment #6 to the FFY2014-2019
Transportation Improvement Program (TIP) and referred to Pages 2 and 3 of the
Agenda (see below). The 30-day comment period for Amendment #6 is from July 20 to
August 18, 2014.
Added/Amended Projects
Project Name: US 64 Phase IV
Control Number: F100110
Project Description: Widen to 6 Lanes
Project Termini: MP 58 to MP 60
Lead Agency: NMDOT
Functional Urban Principal Arterial- Other
Classification:
Funding Source STPS Small Urban - NHPP
Funding Amount: FY2014 $250,000 NHPP- no change
FY 2015$9,790,034- increase NHPP funds by
$6,195273 & move $350,000 from Construction to
Right of Way (ROW)
FY 2016 $5,559,966- decrease STPS funds by
$2,655,239 and NHPP funds by $4,440,034
Fiscal Year FFY2014, FFY2015,FFY 2016
Total Project Cost: $15,600,000
Project Name: East Piñon Hills Blvd
Control Number: F100100
Project Description: Full rebuild of the Intersection of Piñon Hills and
NM 516; Extension of Piñon Hills Blvd to include
earthwork, asphalt, street lighting, drainage
improvements and signalization upgrades
Project Termini: NM 516 (E. Main) to Hubbard
Lead Agency: City of Farmington
Functional Urban Principal Arterial- Other
Classification:
Funding Source TCSP – STP Small Urban – Local
Funding Amount: FY2015 $3,300,000- adds $300,000 in local
funding
FY 2016 $400,000- adds $400,000 in STP Small
urban funds
Fiscal Year FFY2015, FFY2016
Total Project Cost: $3,700,000
Project Name: US 64 Phase VI
Control Number: F100113
Project Description: Widen to 6 Lanes
Project Termini: From MP 54 to MP 56
Lead Agency: NMDOT
Functional Urban Principal Arterial- Other
Classification:
Funding Source NHPP – STP Small Urban
Funding Amount: FY2015 $1,000,000- adds $1,000,000 in final
design and ROW
FY2019 $9,000,000- no change
Fiscal Year FFY2015 & FFY2019
Total Project Cost: $10,000,000
Project Name: East Arterial Project (Phase II)
Control Number: F100191
Project Description: Construct new road
Project Termini: From Legion Rd to NM173
Lead Agency: City of Aztec
Functional Urban Principal Arterial- Other
Classification:
Funding Source State Severance Tax – STP Small Urban
Funding Amount: FY2016 $3,800,000 State Severance Tax
FY2017 $3,500,000 STP Small Urban
Fiscal Year FFY2016 & FFY 2017
Total Project Cost: $7,300,000
Project Removed
Project Name: Legion Road
Control Number: F100091
Project Description: Construct new road (logical termini) in preparation
for future East Arterial route
Project Termini: Current end of Legion Rd to East Arterial
Lead Agency: City of Aztec
Functional Urban Major Collector
Classification:
Funding Source Local Other
Funding Amount: Remove from FFY2014-2019 TIP
Fiscal Year FFY2014
Total Project Cost: $510,000
Mr. Wakan reviewed each of the projects that were a part of Amendment #6:
US 64 Phase IV
NMDOT is adding $6,000,000 in funding to this project and moving $350,000 from
Construction funds to Right-of-Way funds.
East Pinon Hills Boulevard
The City of Farmington is requesting to add $300,000 in local funding in FY2015 and
$400,000 in STP Small Urban funds in FY2016 to this project.
US 64 Phase VI
NMDOT is adding $1,000,000 in final design and ROW to FY2015 for this project.
East Arterial Project (Phase II)
NMODT has assigned a new control number of F100191 to this project. Additionally,
the City of Aztec was able to secure State Severance Tax funding in the amount of
$3,800,000 for FY2016 and will be receiving $3,500,000 in STP Small Urban funding for
FY2017. This project will be added to the TIP for a total project cost of $7,300,000.
With this funding, the entire project corridor can be constructed and Legion Road does
not now have to be built.
Legion Road
As noted above, with funding secured for the East Arterial Project, Legion Road is
being removed from the FFY2014-2019 TIP. Mr. Wakan noted that the City of Aztec
will save $510,000 in not having to construct this roadway.
Mr. Wakan added that Mr. David Quintana said that there was an additional $19,800
that will need to be added to the $3,800,000 in state severance tax funding that was
originally noted in the Amendment. This change will be done as part of the next TIP
amendment.
Mr. Wakan noted that, if required, another TIP amendment could fit into NMDOT’s
schedule prior to their STIP Amendment approval. Mr. Wakan said that Mr. Quintana
also now wants to include some additional projects that would require an Amendment
#7. Ms. Holton noted that if there were no objections or questions to Amendment #6
as presented, the additional $19,800 in state severance tax funding for the City of
Aztec’s East Arterial project would be referenced in a later administrative
modification or amendment.
Ms. Lopez opened the public hearing on Amendment #6 to the FFY2014-2019 TIP.
There were no public comments received. Ms. Lopez closed the public hearing.
ACTION: Mr. Keck moved to recommend approval of Amendment #6 to the FFY2014-
2019 TIP. Mr. Watson seconded the motion. The motion was passed unanimously.
Mr. Wakan noted that final approval would be sought by the Policy Committee at their
meeting on August 21. Mr. Sypher asked what NMDOT’s timeline for these projects
would be following final approval by the Policy Committee on August 21. Mr. Wakan
said that the State Transportation Commission meets on September 18, 2014 to
finalize the STIP. For any FY2015 project, the effective date would be October 1,
2014.
4. RECEIVE A REPORT FROM NMDOT
Neither Mr. Brian Degani nor Mr. David Quintana was able to participate in the
meeting. Their written reports were presented by Mr. Wakan.
District 5 Engineering Report
F100111 – US 64 from mile marker 60 to 62; paving is expected to be completed this
week. The overall project is expected to be substantially complete by the end of
August which is two months ahead of schedule.
The US 64 project at the intersection of US 550 is complete except for a few minor
punch list items which are still pending. Mr. Hathaway noted that Ms. Brevik with the
City of Bloomfield had said that part of the punch list included an issue with the
manhole covers.
5100110 – NM 516/NM 574 (Light Plant Road); project will be substantially complete by
the first of August. Mr. Keck asked Mr. Watson if this road section was to be milled and
overlaid. Mr. Watson said he had attempted to speak with the project manager on this
project, but they have not been able to meet. Mr. Watson stated that he thought the
concrete irrigation boxes on the south side of NM 516 at the intersection were to be
moved, but this has not been done yet either.
Mr. Keck commented that the joints on the patches were done poorly. Mr. Keck said
he had envisioned something different than what is being constructed and did not see
where any geometrics had been changed. Mr. Wakan said he would follow up with Mr.
Quintana on the mill and overlay question and what they plan to do with the irrigation
boxes.
F100110 – US 64 from mile marker 58 to 60; NMDOT is currently acquiring rights-of-way
and the project should be advertised in the spring of FY2015 with construction to
begin in the fall of FY2015;
F100170 – NM 173 safety project; project development is underway with construction
anticipated in FFY2016-2017; this project is from US 550 north to about one mile south
of Tiger Park toward Navajo Dam. Mr. Keck clarified that this project is to address
some sight distance issues on this section of the roadway, but that there would be a
gap between the improvements completed by the City of Aztec and those to be done
by NMDOT.
F100091 – East Arterial (Phase II) – This is the project in the current TIP Amendment
#6. This project will be programmed for construction in FFY2016-2017.
F100112- US 64 from mile marker 56 to 58; NMDOT will issue an RFP for project design
in September. The project is programmed for construction in FFY2017-2018.
F100113 – US 64 from mile marker 54 to 56; this project will also be on the RP for
design in September. It will be designed along with F100112 but will be packaged as a
separate two-mile project. This project is planned for construction in FFY2019-2020
and this will complete the US 64 corridor project.
Another T/LPA “cradle to grave” training is scheduled to be held in Farmington in
October and Ms. Westerling is working on the date and venue details. Mr. Wakan
reported that the first training he attended in Albuquerque was very well attended
and recommended that all Technical Committee members attend the two-day session.
He planned to also attend the meeting in Farmington in October. Ms. Holton
commented that the training highlights managing projects in collaboration with
NMDOT and understanding the different deadlines and milestones.
NMDOT Planning Report
TAP Projects; some of the FFY2014 TAP projects were recently moved to FFY2015 per
the Regional Design Center. This was a one-time solution that was negotiated due to
the short FFY2014 timeline. Mr. Degani provided a spreadsheet that detailed the
phasing information on the three FMPO TAP projects.
Mr. Wakan said that this remedy allowed the Bloomfield river trail project to be
salvaged as well as the 20th Street sidewalk and Southside river trail projects. He
added that the City of Farmington now wants to boost local funding for the 20th Street
sidewalk project. This will not involve moving any money from one fiscal year to
another so this change can be done with a simple modification. Mr. Wakan will review
this change request with Mr. Degani.
The next round of review and decision-making concerning proposed Highway Safety
Improvement Program (HSIP) safety projects or program applications by the Project
Selection Committee will take place on Friday, August 1, 2014. Mr. Wakan reminded
the members that applications can be submitted at any time, but would need to be
submitted at least two weeks prior to the quarterly review process in order to be
considered for funding by the Committee at that meeting.
The U.S. DOT Announced a Comprehensive Proposed Rulemaking for the Safe
Transportation of Crude Oil, Flammable Materials in the form of a Notice of Proposed
Rulemaking (NPRM) and a companion Advanced Notice of Proposed Rulemaking
(ANPRM). The NPRM proposes enhanced tank car standards, a classification and
testing program for mined gases and liquids and new operational requirements for
high-hazard flammable trains that include braking controls and speed restrictions.
Both the NPRM and ANPRM are available for review here and will be open for 60 days
of public comment. Given the urgency of the safety issues addressed in these
proposals, PHMSA does not intend to extend the comment period.
The Programs Infrastructure Finance Division amended the FFY14 T/LPA deadlines set
forth a few weeks back. Extensions were made to accommodate local governments in
the T/LPA for approved design and construction cooperative agreements to be
submitted by 8/1/2014.
FHWA and FTA jointly issued the NPRM to propose revisions to regulations governing
development of metropolitan transportation plans and programs for urbanized areas,
State transportation plans and programs, and the congestion management
process. The changes reflect the passage of MAP–21 and the requirement to take a
performance-based approach to planning and programming.
Mr. Wakan said he would forward these two informational e-mails from Mr. Quintana
and Mr. Degani to the Technical Committee members.
5. INFORMATION ITEMS
Subject: Information Items
Prepared by: Duane Wakan, MPO Associate Planner
Date: July 16, 2014
INFORMATION ITEMS
a. 2040 Metropolitan Transportation Plan (MTP) Update. – The draft survey
and online comment mapping tool are in development. Planning for the
public meetings and outreach has begun.
b. Complete Streets Advisory Group Update. The Complete Streets Advisory
Group met on July 16 and progress was made on the design guidelines.
c. Red Apple Transit. Ridership counts and surveys by the interns are
ongoing.
d. Statewide Long-Range Plan (SLRP) Working Group. Staff attended a SLRP
working group meeting in Albuquerque on July 17, 2014.
e. August Technical Committee Meeting. The August Technical Committee
meeting will be joint meeting with NMDOT on Tuesday, August 26 at 10:00
at the City of Aztec. Please provide agenda items to the MPO by Thursday,
August 14, 2014.
f. Other.
DISCUSSION: Mr. Wakan reported that the consultant for the 2040 MTP Update has
developed the online comment mapping tool. He said that the process for accessing
the survey was very easy: the user clicks on the map showing where they live,
questions then pop up about the demographics of their household, and they are then
taken to the MTP survey questions. The consultant plans to showcase some before and
after images of what projects might look like and determine the region’s willingness to
fund potential projects. Mr. Wakan reported that the MPO has provided the consultant
with layers of GIS data to allow them to format the map to fit the local needs. He said
Staff was pleased that the survey was very innovative.
Ms. Holton added that there was significant outreach planned for the MTP update
which is the preliminary work in terms of getting the survey tool on-line. She said that
eight locations for public meetings have been identified to date along with a presence
at the County Fair and a scheduled radio interview. Ms. Holton explained that
Technical Committee members might be asked to help staff the fair booth. Due to
issues with Wi-Fi access at the fairgrounds, paper MTP surveys may be used to gather
data.
The Complete Streets Advisory Group met on July 16 and decided to reconvene late in
August to allow time for the illustrations of all the preliminary design guidelines to be
readied for their review at that meeting. Some members of the Advisory Group
believed that this element of the design guidelines was being rushed and they wanted
to understand why. Ms. Holton commented that some members feel rush while others
are anxious for things to move forward. She stated that the MRA has funding for a
traffic study on Main Street and the impact to implementing Complete Streets project.
The funding for this study has been allocated by the City Council but they are seeking
criteria on which to base the study. Ms. Holton said the MRA has been waiting for at
least a draft version of the FMPO guidelines in order to begin the project. The
preliminary draft design guidelines for the downtown/urban area should be available
by September so movement on this MRA project can begin. The remaining design
guidelines can then be developed over time.
Mr. Wakan added that the next meeting for the Complete Streets Advisory Group was
scheduled for August 28. The preliminary design guidelines for the downtown/urban
area would be ready for the Advisory Group’s review and approval. These guidelines
can then be given to the City of Farmington’s MRA Commission to allow them to move
forward with their project.
The two MPO interns are out in the field counting Red Apple Transit passengers, riding
the various routes, and distributing surveys. Mr. Wakan noted that the input of the
date collected is ongoing.
Mr. Wakan attended another working group meeting of the Statewide Long-Range
Planning (SLRP) in Albuquerque last week. All the MPOs were in attendance and
provided input on how NMDOT can shed the image of a highway department to a multi-
modal transportation entity. Discussion focused on the planning, design, and
construction of facilities, and should we continue to build more of what there already
is or do we need to focus on other options. Also discussed were finding ways to fund
transportation projects.
The next Technical Committee meeting will be moved from August 28 to Tuesday,
August 26 and will be a joint meeting with NMDOT in Aztec.
With the requirement to meet performance measures and the need to collect and
show current and new data after changes are made to the road network, Mr. Wakan
said other MPOs are using some new and innovative products. He asked if a vendor
could make a presentation at a Technical Committee meeting to present their data
products that help MPOs track before and after measurements. Mr. Wakan has spoken
with the vendor, watched their presentation and sees value in the product, but would
like the Technical Committee members to weigh in also.
Ms. Holton said this would be permissible as long as there was a stipulation that the
presentation alone did not imply a purchase. Mr. Wakan said the presentation would
be in a “go-to” meeting format. He believed it was important for the Technical
Committee to see what products were available and determine what would be of value
to the MPO and to the entities.
Mr. Sypher said the City of Farmington had just purchased a software program called
Blue Toad that would be available to MPO Staff. It was asked if any other members
were using different software and the importance of striving to be compatible with
other products being used. The Technical Committee agreed that the educational
opportunity would be good and would provide some perspective of the products
available. Mr. Wakan said he would schedule this “go-to” presentation for after the
August 26 joint meeting and would also look at Blue Toad.
6. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
Mr. Keck asked if the MPO would request some information from NMDOT on the termini
for the NM 173 safety project on behalf of the City of Aztec and San Juan County.
Mr. Watson asked for the status of the planned traffic signal for the intersection of NM
173 and US 550. He said this project had been funded years ago, but was never built.
Now there is a development planned for that intersection that Mr. Watson said is
unsafe without the traffic signal.
Mr. Wakan suggested a presentation on case studies of book ends like those being
considered for the East Arterial Route design. He thought it might be beneficial to see
what others are doing when constructing relief routes.
Mr. Hathaway said that he had attended a meeting in Gallup yesterday and been
presented with information about the SLRP. Ms. Holton said that the long-range plan
for the MPO needed to collaborate with the SLRP and vice versa to ensure
transparency and communication with all parties.
There was no additional business from the Chairman, Members and Staff.
7. BUSINESS FROM THE FLOOR
There was no business from the Floor.
8. ADJOURNMENT
Mr. Watson moved to adjourn the meeting. Mr. Keck seconded the motion. Ms. Lopez
adjourned the meeting at 10:57 a.m.
__________________________ ________________________________
Cynthia Lopez, Chair June Markle, MPO Administrative Aide
Agenda
TECHNICAL COMMITTEE
AGENDA
Farmington Metropolitan Planning Organization
July 24, 2014
10:00 a.m.
Executive Conference Room
Farmington City Hall
800 Municipal Drive
Farmington, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
July 24, 2014 10:00 AM
This meeting will be held in the Executive Conference Room at Farmington City Hall, 800
Municipal Drive, Farmington, New Mexico.
ITEM PAGE
1. Call meeting to order
2. Approve the minutes from the June 26, 2014 Technical Committee meeting. 6
3. Amendment #6 to the FFY2014-2019 Transportation Improvement Program. 1
a. Review the project(s) in Amendment #6.
b. Hold a public hearing on Amendment #6.
c. Make recommendation on Amendment #6.
4. Receive a report from NMDOT
a. District 5 (David Quintana)
b. Planning Division (Brian Degani)
5. Information Items: 5
a. 2040 Metropolitan Transportation Plan (MTP) Update
b. Complete Streets Advisory Group Update
c. Red Apple Transit
d. Statewide Long-Range Plan (SLRP) Working Group
e. August Technical Committee Meeting
f. Other
6. Business from Chairman, Members, and Staff
7. Business from the Floor
8. Adjournment
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in need of a
reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid or service to
attend or participate in the hearing or meeting, please contact the MPO Administrative Aide at the
Downtown Center, 100 W Broadway, Farmington, New Mexico or at 505-599-1466 at least one week
prior to the meeting or as soon as possible. Public documents, including the agenda and minutes, can
be provided in various accessible formats. Please contact the MPO Administrative Aide if a summary or
other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: FFY2014-2019 TIP Amendment #6
Prepared by: Duane Wakan, MPO Associate Planner
Date: July 17, 2014
BACKGROUND
On July 20, 2014 the Farmington MPO advertised Amendment #6 to the
FFY2014-2019 Transportation Improvement Program (TIP).
The amendment adds four project(s) to the TIP as described below and
removes one project as shown in the attached notice.
CURRENT WORK
Items added or amended include US 64 from MP 54 to 56 and from MP 58 to 60;
East Pinon Hills Boulevard; and the East Arterial project. The project removed
is Legion Road, as described below.
The previous TIP amendment added Legion Rd to the TIP to be the logical
terminus for the East Arterial Phase 1B.
NMDOT has now programmed $3.5 million toward construction of the East
Arterial Phase 1B.
Upon completion of this phase, the middle section will be the remaining phase
of this project.
A public hearing on Amendment #6 will be held on July 24, 2014 during the
Technical Committee meeting.
ANTICIPATED WORK
Seek approval of the amendment at the August 21, 2014 Policy Committee
meeting.
Include the project revisions in the STIP.
ATTACHMENTS
Public Notice describing the projects in Amendment #6.
ACTION ITEM
It is recommended that the Technical Committee review the project(s) in
Amendment #6, hold a public hearing, and make a recommendation on
Amendment #6 to the FFY2014-2019 TIP.
1
PUBLIC NOTICE
The Farmington Metropolitan Planning Organization (FMPO) is the transportation planning
forum for the cities of Farmington, Aztec and Bloomfield and the surrounding county area. The
FMPO develops a Transportation Improvement Program (TIP), which is a program of projects
reasonably expected to be funded within the next six years. This public comment period meets
all of the applicable requirements of the federal transportation bill MAP-21 and the federal
transit requirements of Section 5307(c) (1-7).
The Farmington MPO is advertising Amendment #6 to the FFY2014-2019 Transportation
Improvement Program which adds/amends four projects and removes one project as follows:
Added/Amended Projects
Project Name: US 64 Phase IV
Control Number: F100110
Project Description: Widen to 6 Lanes
Project Termini: MP 58 to MP 60
Lead Agency: NMDOT
Functional Urban Principal Arterial- Other
Classification:
Funding Source STPS Small Urban - NHPP
Funding Amount: FY2014 $250,000 NHPP- no change
FY 2015$9,790,034- increase NHPP funds by
$6,195273 & move $350,000 from Construction to
Right of Way (ROW)
FY 2016 $5,559,966- decrease STPS funds by
$2,655,239 and NHPP funds by $4,440,034
Fiscal Year FFY2014, FFY2015,FFY 2016
Total Project Cost: $15,600,000
Project Name: East Piñon Hills Blvd
Control Number: F100100
Project Description: Full rebuild of the Intersection of Piñon Hills and
NM 516; Extension of Piñon Hills Blvd to include
earthwork, asphalt, street lighting, drainage
improvements and signalization upgrades
Project Termini: NM 516 (E. Main) to Hubbard
Lead Agency: City of Farmington
Functional Urban Principal Arterial- Other
Classification:
Funding Source TCSP – STP Small Urban – Local
Funding Amount: FY2015 $3,300,000- adds $300,000 in local
funding
FY 2016 $400,000- adds $400,000 in STP Small
urban funds
Fiscal Year FFY2015, FFY2016
Total Project Cost: $3,700,000
2
Project Name: US 64 Phase VI
Control Number: F100113
Project Description: Widen to 6 Lanes
Project Termini: From MP 54 to MP 56
Lead Agency: NMDOT
Functional Urban Principal Arterial- Other
Classification:
Funding Source NHPP – STP Small Urban
Funding Amount: FY2015 $1,000,000- adds $1,000,000 in final
design and ROW
FY2019 $9,000,000- no change
Fiscal Year FFY2015 & FFY2019
Total Project Cost: $10,000,000
Project Name: East Arterial Project (Phase II)
Control Number: F100191
Project Description: Construct new road
Project Termini: From Legion Rd to NM173
Lead Agency: City of Aztec
Functional Urban Principal Arterial- Other
Classification:
Funding Source State Severance Tax – STP Small Urban
Funding Amount: FY2016 $3,800,000 State Severance Tax
FY2017 $3,500,000 STP Small Urban
Fiscal Year FFY2016 & FFY 2017
Total Project Cost: $7,300,000
Project Removed
Project Name: Legion Road
Control Number: F100091
Project Description: Construct new road (logical termini) in preparation
for future East Arterial route
Project Termini: Current end of Legion Rd to East Arterial
Lead Agency: City of Aztec
Functional Urban Major Collector
Classification:
Funding Source Local Other
Funding Amount: Remove from FFY2014-2019 TIP
Fiscal Year FFY2014
Total Project Cost: $510,000
As required by federal law and the Farmington MPO Public Participation Plan, the FMPO
is holding a 30-day Public Comment period and Public Hearing on Amendment #6. The
30-day comment period is from July 20, 2014 to August 18, 2014. The public may also
make comments on the proposed amendment at the following meeting:
3
Public Hearing: During the Farmington MPO Technical Committee meeting at 10:00 a.m. on
Thursday, July 24, 2014 in the Executive Conference Room at Farmington City Hall, 800
Municipal Drive, Farmington, New Mexico.
Written comments may be sent to the Farmington MPO at:
Fax: (505) 599-1299
Mail: Farmington MPO, 800 Municipal Drive, Farmington, New Mexico, 87401
Email: dwakan@fmtn.org
The public may view this amendment at www.farmingtonmpo.org. For more information
contact Duane Wakan, MPO Associate Planner, at (505) 599-1449.
4
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #5
Subject: Information Items
Prepared by: Duane Wakan, MPO Associate Planner
Date: July 16, 2014
INFORMATION ITEMS
a. 2040 Metropolitan Transportation Plan (MTP) Update. – The draft survey and
online comment mapping tool are in development. Planning for the public
meetings and outreach has begun.
b. Complete Streets Advisory Group Update. The Complete Streets Advisory Group
met on July 16 and progress was made on the design guidelines.
c. Red Apple Transit. Ridership counts and surveys by the interns are ongoing.
d. Statewide Long-Range Plan (SLRP) Working Group. Staff attended a SLRP working
group meeting in Albuquerque on July 17, 2014.
e. August Technical Committee Meeting. The August Technical Committee meeting
will be joint meeting with NMDOT on Tuesday, August 26 at 10:00 at the City of
Aztec. Please provide agenda items to the MPO by Thursday, August 14, 2014.
f. Other.
5
TC Draft Meeting Minutes
June 26, 2014
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
JUNE 26, 2014
Technical Members Present: Teresa Brevik, City of Bloomfield
Cynthia Lopez, City of Farmington
Nica J. Westerling, City of Farmington
Dave Keck, San Juan County
Technical Members Absent: Bill Watson, City of Aztec
Staff Present: Mary Holton, MPO Officer
Fran Fillerup, Acting MPO Planner
Duane Wakan, MPO Associate Planner
June Markle, MPO Administrative Aide
Staff Absent: None
Also Present: Brian Degani, NMDOT (by telephone)
Larry Hathaway, San Juan County
Mr. Brian Degani was contacted by telephone to participate in the meeting.
1. CALL TO ORDER
Ms. Lopez called the meeting to order at 10:04 a.m.
2. APPROVE THE MINUTES FROM THE MAY 22, 2014 TECHNICAL COMMITTEE
MEETING
Mr. Keck moved to approve the minutes from the May 22, 2014 Technical Committee
Meeting. Ms. Brevik seconded the motion. The motion was passed unanimously.
Agenda Item # 3 – Receive a Report on the Status of TIP Projects - was moved to later
in the meeting to allow time for Ms. Nica Westerling to arrive.
4. RECEIVE A REPORT FROM NMDOT
Planning Division Report
Mr. Brian Degani reported that Bicycle, Pedestrian & Equestrian (BPE) Technical
Committee will be meeting on July 2 where they will be developing a bicycle guideline
map incorporating GIS services. They will also be providing NMDOT staff with a
database of BPE facilities.
6
TC Draft Meeting Minutes
June 26, 2014
The next freight group meeting will be in Artesia, New Mexico on June 30 which Mr.
Degani planned to attend. During the week of July 21, there will be a breakout session
of the economic development group forum of the freight group. Agendas for these
meetings will be available on the SLRP website.
Mr. Degani said there were no new updates on statewide functional classification
review, but it was moving forward.
The recreational trails program will require a few more months before the NMDOT
planner will be ready to distribute new guidance information and issue a call for
projects. The MPOs will be notified once this process is ready to go.
Mr. Degani said that work on the SLRP was moving forward and that many meetings
had occurred during the month of June.
Mr. Degani reported that he and Mr. Claude Morelli were working with Staff on the
public participation elements of the MPO’s Metropolitan Transportation Plan (MTP) and
also to coordinate the MAP-21 requirements.
For those entities that received FFY21014 TAP design funds, Mr. Degani stated that
they need to ensure they have received an executed cooperative agreement. For any
questions or concerns, he or Ms. Rosa Kozub could be contacted. For the entities that
received TAP construction funds, the plan specification and evaluation (estimates?)
(PS&E) package must be submitted prior to the July 15 deadline. Mr. Degani reported
that the draft agreements should be making their way through the local government
processes concurrent with preparing the PS&E packages. The TAP process for FFY2015-
2016 will still be reviewed and updated throughout the month of July. Once
completed, MPO Staff will be updated.
The group discussed the package requirements for the TAP projects and the
timeframes for all. Ms. Brevik said the City of Bloomfield had all the needed
clearances and documents accept for the final design for Phase II of the Verada del Rio
San Juan River Trail project. Mr. Degani said he would get more information on the
FMPO projects from Mr. David Quintana and Ms. Kozub when she returned to the office
next week.
District 5 Project Update
No representatives from District 5 Engineering were present at the meeting.
5. RECEIVE A REPORT ON COMPLETE STREETS
Subject: Complete Streets
Prepared by: Duane Wakan, MPO Associate Planner
Date: June 18, 2014
7
TC Draft Meeting Minutes
June 26, 2014
BACKGROUND or PREVIOUS WORK
Complete Streets is a means of designing a roadway so that it accommodates
all modes of travel, including driving, walking, biking, and transit.
Staff has worked with the Advisory Group on development of land use context
areas (LUCAs) and road typology (RTs) overlays.
The Land Use Context Areas and Road Typologies drive the design guidelines.
The Advisory Group held its latest meeting on June 18.
CURRENT WORK
The design guidelines and Road Typologies were scaled back from a possible 72
combinations to 25 (5 RTs and 5 LUCAs).These 25 combinations set the stage
for the cross-section diagrams visualized as part of the design guidelines.
MPO Staff will create the descriptions and intended application of each RT and
LUCA
The Advisory Group advised staff to create the cross-section drawings based on
the LUCAs and RTs to gain a reaction from the group.
INFORMATION ITEM
This is an informational presentation only.
DISCUSSION: Mr. Wakan reported that the Complete Streets Advisory Group had met
on June 18 and they consolidated the road typologies and land use context areas from
a total combination of 72 down to 25 combinations (see final titles shown below). Mr.
Wakan said the nomenclature for the road typologies was revised to provide better
understanding for the lay citizen.
ROAD TYPOLOGIES (RTs) LAND USE CONTEXT AREAS (LUCAs)
Lane Rural
Street Neighborhood
Avenue Downtown/Urban Area
Boulevard Commercial
Parkway Industrial
From this new 5x5 matrix, the Advisory Group will begin development of the design
guidelines. The design guidelines will take each combination of road typology and land
use context area and provide multiple preferred options (A, B, and C) for that
combination (see next page).
8
TC Draft Meeting Minutes
June 26, 2014
Down Town
Preferred
Rural Neighborhood /Urban Commercial Industrial
Options A,
Area
B, or C
Lane
Street
Avenue
Boulevard
Parkway
Mr. Wakan explained that a single road typology and land use context area could have
Options A, B, and C (see above). He noted that the Advisory Group and Staff will now
look at the potential combinations to decide which they would not want to promote
and those that would not be encouraged (i.e.: a Parkway through a Neighborhood
would be discouraged). Staff is doing some preliminary work on this that they will then
present to the Advisory Group for discussion and review at their next meeting in July.
Mr. Wakan said the Advisory Group had asked Staff to create a draft of the design
guidelines and then present that to them for their review and further development.
Mr. Wakan showed some of the draft visual road typology and land use combinations
that Staff had worked on. These are just the beginning of the process.
The design guideline visuals Mr. Wakan presented used a similar design to those from
the City of Charlotte. They outline each of the roadway zones – pedestrian, buffer,
bicycle, and travel. Mr. Wakan said that the local example of Pinon Hills Boulevard
was used to demonstrate how a Boulevard in a Neighborhood setting might be defined.
Other options for this corridor might include creating buffered sidewalks, bike lanes,
and a median, while another option might show on-street parking with tall trees along
the sides of the corridor. Mr. Wakan said that different options needed to be
considered for a more rural setting. In the visual he presented, the roadway showed
widened shoulders and a detached trail. Mr. Brevik said the City of Durango, Colorado
was doing this type of work now at the intersection of US 550 and CO 160.
The group discussed the need to consider tree sight distances along a roadway, bike
lanes now being colored green as a standard, and the use of sharrows (shared bike and
travel lane). Mr. Wakan said the use of green paint defines the lane as a bike lane and
prioritizes bicycles as a legitimate mode of transportation.
Mr. Wakan reported that during the Walkable & Livable Communities Institute meeting
with the Advisory Group, they suggested using an open source document developed by
LA County as the beginning for the MPO design guidelines. The Advisory Group asked
that Staff take on this project and use the LA County document to begin developing
the FMPO Complete Streets design guidelines. By using an open source document, the
Advisory Group can take all their ideas, verbiage, cross-section drawings, road
typologies and land use titles and insert them into the open source document. The
only requirement to using an open source document is to acknowledge who developed
the original document. If the open source document works for the Advisory Group’s
document, developing the design guidelines would be expedited significantly. If the
9
TC Draft Meeting Minutes
June 26, 2014
open source document did not work for the Advisory Group, they could then begin to
develop their own unique document.
ACTION: The report was received.
6. 2040 MTP PUBLIC PARTICIPATION
Subject: 2040 Metropolitan Transportation Plan (MTP)
Prepared by: Fran Fillerup, Acting MPO Planner
Date: June 19, 2014
BACKGROUND OR PREVIOUS WORK
The Metropolitan Transportation Plan (MTP) is the long range planning
document that addresses transportation needs for the next twenty-five years.
The MPO’s MTP is updated every five years and the 2035 MTP was adopted in
2010.
Development of the 2040 MTP began in November 2013 and is expected to be
adopted in April 2015.
Overview presentations have been given to the Technical and Policy
Committees, entity Councils and Commissions, and other organizations.
The Stakeholder Workshop was held on February 5.
The Technical Committee reviewed the goals and objectives on March 27 and
the Policy Committee did so on April 17.
CURRENT WORK
Sites Southwest has been selected through RFQ process to assist MPO Staff with
the public participation portion of the MTP. This will include public meetings,
an online tool to map comments and complete a survey, as well as paper
survey administration.
INFORMATION ITEM
This item is for information only; no action is requested.
DISCUSSION: Mr. Fillerup reported that Sites Southwest had been award the public
participation portion of the Metropolitan Transportation Plan (MTP).
Mr. Fillerup explained that Sites Southwest would be establishing an online survey to
provide public outreach and to gather public comments and suggestions. Mr. Fillerup
demonstrated how the online survey was expected to be designed.
10
TC Draft Meeting Minutes
June 26, 2014
The software was developed by a Finnish group, but will be customized for the MPO
and its MTP. The survey taker will be able to identify a particular spot in the MPO
where they would recommend changes be implemented. They will be able to provide
suggested ideas for improvement or offer completely new ideas. They will be
prompted with some recommendations related to safety, roads, or multimodal
transportation. There would also be a section to respond to survey questions and the
survey taker will not be limited to the number of responses they can provide. Also, the
survey taker can also respond to other comments already provided by others. In
addition, Sites Southwest will prepare and distribute paper surveys.
Mr. Wakan asked about overlaying the TAZ structure onto the survey map. Ms. Holton
thought this might be too confusing as part of the survey. She suggested this as more
of an internal tool and that perhaps this could be done once the public survey process
had been completed.
Ms. Holton said gathering public input was critical before the MTP document was
updated. Mr. Fillerup said that Sites Southwest will be assisting in getting the public
outreach completed and to hold six public meetings throughout the entire MPO
planning area. Ms. Holton said that the lead consultant for Sites Southwest is a
transportation planner in Durango.
Ms. Brevik asked that Staff let her know when the public meetings are scheduled and
she would help in notifying the community of the meetings.
ACTION: The report was received.
The Technical Committee returned to Agenda Item #3. Ms. Westerling arrived after
the Technical Committee had begun discussion of the individual TIP projects. Those
City of Farmington projects that Ms. Westerling initially missed commenting on were
reviewed again once she had arrived.
3. RECEIVE A REPORT ON THE STATUS OF TIP PROJECTS
Subject: Status of TIP Projects
Prepared by: Duane Wakan, MPO Associate Planner
Date: June 19, 2014
BACKGROUND
The STIP Protocols, finalized in early 2014, indicate that each MPO shall develop
a process to monitor the progress and status of each project in the first two
years of the TIP.
Although NMDOT STIP procedures require a review of projects during the last
two quarters of the Federal Fiscal year, MPO Staff recommends a monthly
review of all FMPO TIP projects with the Technical Committee.
11
TC Draft Meeting Minutes
June 26, 2014
Reviewing the status of projects is an opportunity to review project details,
programmed amounts, and any potential situations that may cause funding not
to be obligated by September 30th.
CURRENT WORK
Staff has prepared the list of current TIP/STIP projects that are receiving
federal funding for FY2014 through FY2019.
Staff has also prepared a list of the amendments and administrative
modifications that occurred during FY2014.
INFORMATION ITEM
Review the status of federally funded projects in the FY2014-2019 TIP.
DISCUSSION: Mr. Wakan stated that the STIP protocol required the MPOs to have a
process to monitor the TIP and to review the first two years of the TIP with the
committees and entities. The protocol also required that the entire TIP be reviewed
during the second to last quarter of the current federal fiscal year.
The review provides the opportunity for the local entity representatives with the
project knowledge to discuss any anticipated problems. Mr. Wakan stated that Staff
had been asked to take a more active role with NMDOT planning and in keeping them
informed and updated on local project status. Ms. Holton added that NMDOT wanted
to ensure that communication reached all agencies and for the MPOs to ensure that
everyone was on the same page and collaborating together.
Mr. Wakan reported that during the MPO Quarterly, he learned that some of the MPOs
review their TIP on a monthly basis with their technical committees. He asked if the
FMPO Technical Committee would like to do that, especially now with ensuring that
the TAP projects were on track.
Mr. Keck said that the MPO had met annually with the entities to discuss their TIP
projects. Ms. Holton stated that things were changing more rapidly now and it was
becoming necessary for Staff to be more in the loop and keep the TIP up-to-date. Ms.
Holton said that Staff will have a TIP project update on every meeting agenda so that
project changes can be discussed. Mr. Keck agreed that it was important to manage
the TIP and STIP because there will now be cooperative agreements for every phase of
a project from design, to right-of-way, and then to construction. Each phase will
require a separate cooperative agreement and each phase will need to be entered into
the STIP accordingly. Ms. Holton summarized that all agencies involved must now stay
better organized and on top of ongoing or pending projects.
Mr. Wakan reported that there was a new TIP database that had been produced by
MRCOG and that was now being used by NMDOT and all the other MPOs in the state.
The TIP project list provided to the Technical Committee came from this database.
Mr. Wakan added the entity’s logo so that the lead agency on a project was easily
identifiable.
12
TC Draft Meeting Minutes
June 26, 2014
Mr. Wakan began reviewing the current TIP project list:
Page 1 – San Juan County – there was a TIP Modification for this project to move the
funding to FFY 2014 to FFY2015;
Page 2 – City of Aztec - Tip Amendment in March of 2014; added the East Arterial back
into the TIP. This project had been removed due to the lack of a logical terminus. Mr.
Keck asked if the construction on this project was going to be completed in FFY2014.
Mr. Wakan said that NMDOT had given the go-ahead for construction on this project.
Mr. Wakan did not know how close they were to the construction phase.
Page 3 – City of Aztec - Legion Road – this is the logical terminus for the East Arterial
project to be added back into the TIP;
Page 4 – City of Farmington – East Pinon Hills Boulevard – City is working on some right-
of-way issues regarding construction; Ms. Holton said she thought the environmental
clearance was completed. Ms. Westerling reported that Ms. Jennifer Breakell, Deputy
City Attorney for the City of Farmington is working on the rights-of-way and hoped to
have them completed by October. There was a public meeting tonight to discuss
primarily Phase I of the project which is the extension of Pinon Hills Boulevard with
connections to Hubbard and Rancho de Animas. Ms. Westerling said that Councilor
Darnell has said that neither neighborhood wanted to be connected. Ms. Westerling
added that environment justice required that the connection be made to both
neighborhoods.
Mr. Keck said NMDOT was now concerned with STIP projects on an “inactive list”. He
said that San Juan County had a project and funding for a designated fiscal year on the
STIP, however due to some local constraints and because project reimbursement was
not requested in the designated timeframe, the project was being designated as
“inactive”. FHWA has threatened to take the money away from San Juan County. Mr.
Keck commented that it was critical to seek reimbursement for monies in the federal
fiscal year in which it was obligated otherwise that money could be withdrawn. Ms.
Holton commented on FHWA’s requirement for timeliness in the disbursement of funds
since they must answer to Congress and demonstrate their accomplishments. To
ensure the can meet their requirements FHWA is pressuring the state DOTs to make
sure the funding is spent. Ms. Holton added that the decision makers think that is
funding is not spent in a timely manner than it is not needed.
Pages 5-7 were NMDOT projects for phases of US 64.
Page 8 – City of Farmington - 20th Street sidewalk project. TAP funding for FFY2014
plus a smaller dollar amount for FFY2015 for Phase I of the project. Ms. Westerling
commented that no public meeting was held, but that mailings were sent to all the
adjoining property owners as well as site visits to all owners. Public Works is trying to
develop a Complete Streets concept in the timeframe available. The project will be
completed within the given right-of-way and trying to work around all the poles. Ms.
Westerling said the best thing would be to remove the poles especially since the Parks
& Rec Department has said that they cannot install trees with the poles there. Public
Works is planning to do some bumpouts and set the sidewalks back.
13
TC Draft Meeting Minutes
June 26, 2014
Mr. Wakan said the TAP Coordinator had asked that since there were construction
funds being used in FFY2014, were all the certifications completed. Ms. Westerling
said nothing had been completed because NMDOT first required that the plan design
be 100% complete. She hoped that NMDOT would provide the environmental document
in the next week so she could then obtain the rest of the needed certifications.
Because of the short timeframe, Ms. Westerling had asked NMDOT if the funding could
be moved to FFY2015 and had not been able to get a response. Mr. Degani said he
would ask the question of Rosa Kozub and Yolanda Roybal to see if moving this funding
would be allowed.
Page 9 – City of Farmington – 20th Street sidewalk project. This showed the remaining
TAP funding for Phase 2 of the project.
Page 10 – NMDOT - NM 173 safety project on lines of sight;
Page 11 – City of Farmington – HSIP funding for the intersection of San Juan Boulevard
and Scott Avenue. Ms. Westerling said a revised schedule for this project was sent to
NMDOT to get the contract for the engineering.
Page 12 – San Juan County – Safety project at intersection of CR 350 and CR 390. Mr.
Keck reported that NMDOT required that the project be laid out in three year. The
cooperative agreement has been received and San Juan County is in the process of
issuing an RFP, but NMDOT must first approve the RFP. Mr. Keck explained that
funding in FFY2014 was for design work; rights-of-way would be completed in FFY2015;
construction would be completed in FFY2016. Once the right-of-way phase was
completed, all of the environmental documents and certifications would be finished so
the project could proceed to PS&E.
Mr. Wakan noted the NMDOT coding listed by each of the funding amounts and said he
would get the legend to the codes and provide it to the Technical Committee.
Page 13 – City of Farmington – Southside River Road River Trail project. Mr. Wakan said
there was a public meeting held on June 25 for this TAP-funded project.
Mr. Wakan reminded the Technical Committee members stated that public meetings
are required for all TAP projects.
Page 14 – City of Bloomfield – Phase II of the Verada de Rio San Juan River Trail
project. Mr. Wakan reported that Phase I of the project was done in 2005-2006. Ms.
Brevik explained that the City of Bloomfield had received YCC funding for the pavers
to cover the City’s in-kind match. NMDOT did not approve this, but they took two
months to decide the design what they would approve and the City of Bloomfield had
to re-design everything they already had in place. The re-design was not economically
feasible for the City of Bloomfield to fund. The City of Bloomfield decided to let the
TAP money revert back to NMDOT. Ms. Brevik asked if these FFY2014 funds could be
moved to FFY2015 design funds.
Mr. Wakan restated Ms. Brevik’s question and asked Mr. Degani if the category 28
funding could be moved to FFY2015 design funds. The funds are currently FFY2014
construction funds, because the City of Bloomfield thought the project design was
14
TC Draft Meeting Minutes
June 26, 2014
sufficient based upon their preliminary application. However, NMDOT did not approve
the design and now the timeframe cannot be met.
Mr. Degani said this might be possible but that there would need to be a TIP
modification completed. Ms. Brevik asked if the July 15 deadline would affect this. Mr.
Wakan said that a TIP Modification could be done in-house at any time provided the
City of Bloomfield puts in a request for the modification to the MPO. Mr. Degani
agreed that a Ms. Brevik needed to submit a letter requesting the funding be changed
to preliminary engineering so that the MPO can then proceed with a TIP modification.
Ms. Brevik said that design was all that was left to do for this phase of the project and
that all other project requirements have been completed.
Ms. Brevik asked if July 15 was the deadline for FFY2014 funds, can these funds be
moved to FFY2015. Mr. Degani said he thought they could be. Ms. Brevik asked how
the process of selecting the engineer was handled. Ms. Holton said that the process
required the use of the state procurement code. Mr. Keck recommended using the
2014 local government handbook to find answers to what is required. Ms. Brevik said
getting this done in FFY2014 could be tight, but the City of Bloomfield does have the
funding to finish construction of the project from another source. If the design funding
was moved to FFY2015, would that affect the Phase III TAP funding? Mr. Wakan said
the MPO would submit the TIP modification and wait for NMDOT’s response.
Page 15 – City of Bloomfield - Phase III of the Verada de Rio San Juan River Trail.
Page 16 – City of Aztec – Animas River Trail project; The City received FTA Transit in
the Parks funding for this project; the bridge crossing has been installed.
Page 17 – City of Aztec – Animas River Trail – construct bicycle/pedestrian trail from
Aztec Ruins to pedestrian bridge to Martinez Lane.
Page 18 – City of Farmington – Red Apple Transit – annual operating costs.
Mr. Wakan said that this had been a good review process and the Technical Committee
agreed that a project update every month would be beneficial. The review will
address any new project changes or revisions. Mr. Wakan reminded the Technical
Committee that the update today was required by STIP protocol. Mr. Fillerup added
that the August Technical Committee meeting was when NMDOT representatives would
be invited back to participate.
Mr. Wakan said that the last amendment cycle for TIP amendments begins on July 1.
Technical Committee recommended approval would be sought at the July meeting and
would then be taken to the Policy Committee in August. Mr. Wakan asked that the
entities let Staff know as soon as possible about any anticipated amendments to be
included. NMDOT will also be submitting their changes to Staff for this amendment
cycle.
The Technical Committee discussed the timeframes and the difficulty in meeting all
the TAP requirements in the time allotted. Ms. Westerling commented that the City of
Farmington is spending money to design projects with no guarantee of receiving the
15
TC Draft Meeting Minutes
June 26, 2014
money. Mr. Wakan asked Mr. Degani if exceptions to the July 15 deadline might be
made. Mr. Degani said he was not sure of this and recommended that the MPO submit
the request and see if the July 15 deadline could be extended. Mr. Wakan suggested
setting up a conference call next week to discuss some of these issues and to get
clarity on NMDOT’s expectations and requirements.
Mr. Keck asked if one entity had issued an on-call RFP for engineering services that
was approved by NMDOT, could another entity piggy-back off of that RFP. Ms. Brevik
added the City of Bloomfield had not been able to do this with the cities of Aztec and
Farmington on fiber. The consensus was that this was not allowed by NMDOT.
Ms. Brevik said the City of Bloomfield has three on-call engineers certified by NMDOT,
so would an RFP process be required for the river trail project. It was recommended
that the questions be posed to their city’s procurement officer for clarification. The
Technical Committee discussed phasing and consolidating the design funding from
three phases into just two phases. It was thought that the bidding for the two phases
could be done at one time as long as the phases were identified separately.
Mr. Keck said he had received a link from NMDOT to a FTP site that showed each
entities contracts, agreements, and related documents with a separate folder for each
project. He said he had to apply to gain access to the link and would forward the e-
mail with the link to the Technical Committee members.
ACTION: The report was received.
7. INFORMATION ITEMS
Subject: Information Items
Prepared by: Fran Fillerup, Acting MPO Planner
Date: June 17, 2014
INFORMATION ITEMS
a. Highway Safety Improvement Program (HSIP). Status update on HSIP
applications. New applications need to be submitted to the MPO by July 18.
b. MPO Quarterly Meeting. Duane Wakan attended the MPO Quarterly on June
10 in Albuquerque.
c. Cradle to Grave Training. Duane Wakan attended the Cradle to Grave
training held May 28 & 29 in Albuquerque.
d. TIP Amendments. Amendments to the TIP will be solicited beginning July
1.
e. Other.
16
TC Draft Meeting Minutes
June 26, 2014
DISCUSSION: Mr. Wakan reported on the HSIP review committee process. The next
review process is coming up so any HSIP applications for this review process need to be
submitted to the MPO by July 18. HSIP applications can be submitted at any time and
would be considered at the next quarterly review process. Mr. Wakan said that the
applications need to be data-driven and that any and all projects be submitted as
there was no cost limit on the projects. He said that if an entity had designed a
countermeasure for the project, even a roundabout, to apply for HSIP funding. Mr.
Wakan said that both Albuquerque and Santa Fe received $1,500,000 for roundabouts
during the last review process.
Ms. Brevik asked if a HSIP request could be submitted for a bridge design package. The
bridge inspections are done by NMDOT so any safety concerns would be documented by
that inspection. Mr. Keck said that a bridge is typically rated based on the safety
features of the pedestrian facilities and the guard railing.
Mr. Wakan attended the MPO Quarterly on June 10 held in Albuquerque. The MPOs led
the agenda with NMDOT spending a few hours speaking about the TAP projects and the
need for MPO staff to be “cradle to grave” planners. Staff asked the entities to keep
the MPO informed of their project benchmarks in order to satisfy NMDOT.
Mr. Wakan reported he attended the Cradle to Grave training held in Albuquerque
recently. Many of the entities sent their engineers to the training. Mr. Wakan said
much of the training was new for him, but it was good background information on
what is required by public works and the city engineers. There is another training
session planned for Farmington in October and Mr. Wakan recommended that everyone
consider attending.
Mr. Wakan again reminded the Technical Committee members of the July 1 date for
TIP Amendments.
Mr. Fillerup said Staff had been contacted by the ITS Bureau of NMDOT to undertake
an update the MPO’s ITS architecture that would be paid for by NMDOT. The ITS
Bureau is working with the Mesilla Valley MPO and planned to come to Farmington in
July.
8. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
Mr. Keck recommended that all Technical Committee members review the new 2014
Local Government Handbook (TLAP). He said it was laid out in the “cradle to grave”
format and provided good checklists and information that should be reviewed during
the different phases of projects.
Ms. Westerling reported that the City of Farmington had made an offer to Mr. Charlie
Trask to be the new traffic engineer replacing Steve Krest. Mr. Trask is a Professional
Traffic Operations Engineer (PTOE) and has worked with and mentored much of
NMDOT staff. Ms. Westerling hoped that Mr. Trask would begin work in the next 30
days.
There was no additional business from the Chairman, Members and Staff.
17
TC Draft Meeting Minutes
June 26, 2014
9. BUSINESS FROM THE FLOOR
There was no business from the Floor.
10. ADJOURNMENT
Ms. Lopez adjourned the meeting at 11:30 a.m.
__________________________ ________________________________
Cynthia Lopez, Chair June Markle, MPO Administrative Aide
18