MPO Technical Committee
Regular MeetingFarmington, NM · August 26, 2014
Agenda
TECHNICAL COMMITTEE
AGENDA
Farmington Metropolitan Planning Organization
August 26, 2014
10:00 a.m.
Commission Chambers
Aztec City Hall
201 West Chaco Street
Aztec, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
August 26, 2014 10:00 AM
This meeting will be held in Commission Chambers at Aztec City Hall, 201 West Chaco Street,
Aztec, New Mexico.
ITEM PAGE
1. Call meeting to order
2. Approve the minutes from the July 24, 2014 Technical Committee meeting. 6
3. Amendment #7 to the FFY2014-2019 Transportation Improvement Program. 1
a. Review the project(s) in Amendment #7.
b. Hold a public hearing on Amendment #7.
c. Make recommendation on Amendment #7.
4. Discussion Items:
a. Communication and Project Management
b. Regional Priorities
c. Traffic Operations
d. Maintenance and Inter-Governmental Agreements
e. Proposed Changes to the TAP Selection Process
5. Receive report from NMDOT on other items
a. District 5 (David Quintana)
b. Planning Division (Brian Degani)
6. Information Items: 5
a. Ongoing public participation on 2040 MTP
b. Other
7. Business from Chairman, Members, and Staff
8. Business from the Floor
9. Adjournment
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in need of a
reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid or service to
attend or participate in the hearing or meeting, please contact the MPO Administrative Aide at the
Downtown Center, 100 W Broadway, Farmington, New Mexico or at 505-599-1466 at least one week
prior to the meeting or as soon as possible. Public documents, including the agenda and minutes, can
be provided in various accessible formats. Please contact the MPO Administrative Aide if a summary or
other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: FFY2014-2019 TIP Amendment #7
Prepared by: Duane Wakan, MPO Associate Planner
Date: August 19, 2014
BACKGROUND
On August 17, 2014 the Farmington MPO advertised Amendment #7 to the
FFY2014-2019 Transportation Improvement Program (TIP).
The amendment adds/amends six project(s) to the TIP as described below in
the attached notice.
ADDED/DELETED TIP PROJECTS
Newly added TIP projects include a Bridge Preservation Project (F100114) north
of Aztec and a flashing beacon (F100221) at the intersection of NM 371 and N36
A public hearing on Amendment #7 will be held on August 26, 2014 during the
Technical Committee meeting.
ANTICIPATED WORK
Seek approval of the amendment at the September 18, 2014 Policy Committee
meeting.
Include the project revisions in the STIP.
ATTACHMENTS
Public Notice describing the projects in Amendment #7.
ACTION ITEM
It is recommended that the Technical Committee review the projects in
Amendment #7, hold a public hearing, and make a recommendation on
Amendment #7 to the FFY2014-2019 TIP.
1
PUBLIC NOTICE
The Farmington Metropolitan Planning Organization (FMPO) is the transportation
planning forum for the cities of Farmington, Aztec and Bloomfield and the surrounding
county area. The FMPO develops a Transportation Improvement Program (TIP), which is
a program of projects reasonably expected to be funded within the next six years. This
public comment period meets all of the applicable requirements of the federal
transportation bill MAP-21 and the federal transit requirements of Section 5307(c) (1-7).
The Farmington MPO is advertising Amendment #7 to the FFY2014-2019
Transportation Improvement Program which adds/amends six projects as follows:
Added/Amended Projects
Project Name: US 64 Phase V
Control Number: F100112
Project Description: Widen to 6 Lanes
Project Termini: MP 56 to MP 58
Lead Agency: NMDOT
Functional Urban Principal Arterial- Other
Classification:
Funding Source NHPP
Funding Amount: FY2015 increases funding level to $974,000 &
changes funding source from NHPP to STPF.
FY 2017 no changes to NHPP funds of $4,962,682
FY 2018 no changes to NHPP funds of
$11,787,317
Fiscal Year FFY2015, FFY2017, FFY 2018
Total Project Cost: $17,724,000
Project Name: East Arterial Project (Phase II)
Control Number: F100091
Project Description: Construct new road
Project Termini: From Legion Rd to NM173
Lead Agency: City of Aztec
Functional Urban Principal Arterial- Other
Classification:
Funding Source State Severance Tax – STP Small Urban
Funding Amount: FY2016 $3,800,000 State Severance Tax adds an
additional $19,750 to State Severance Tax funds
FY2017 $3,500,000 STP Small Urban
Fiscal Year FFY2016 & FFY 2017
Total Project Cost: $7,319,750
2
Project Name: NM 371/N 36
Control Number: F100221
Project Description: Install Intersection Flashing Beacon and Advance
Warning System
Project Termini: From MP 54 to MP 56
Lead Agency: NMDOT
Functional Minor Arterial
Classification:
Funding Source Capital Outlay
Funding Amount: FY2015 $100,000 *new project in the TIP*
Fiscal Year FFY2015
Total Project Cost: $100,000
Project Name: 20th Street Sidewalks
Control Number: F100130
Project Description: Add pedestrian facilities/ sidewalks on North side
of street.
Project Termini: From Clayton to Fairview
Lead Agency: City of Farmington
Functional Minor Arterial
Classification:
Funding Source TAP- Local Non Match
Funding Amount: FY2014 $28,143 Local Non Match- no change
FY2015 $220,857 TAP- add an additional $28,143
(Local Non-Match) for construction
Fiscal Year FFY2014 & FFY2015
Total Project Cost: $277,143
Project Name: US 64 Phase IV
Control Number: F100110
Project Description: Widen to 6 Lanes
Project Termini: MP 58 to MP 60
Lead Agency: NMDOT
Functional Urban Principal Arterial-Other
Classification:
Funding Source NHPP, STP
Funding Amount: FY2016 decreases NHPP funds by $4,440,034 and
STP funds by $2,655,239 for a total FY 2016
funding of $5,559,966
Fiscal Year FFY 2014, FFY 2015 & FFY2016
Total Project Cost: $15,350,000
3
Project Name: Bridge Preservation Project US 550 Bridge 9178 &
9179 (Animas River)
Control Number: F100114
Project Description: Bridge preservation/maintenance
Project Termini: MP 169.5
Lead Agency: NMDOT
Functional Urban Principal Arterial-Other
Classification:
Funding Source NHPP
Funding Amount: FY2017 NHPP funds of $260,000 *new project in
the TIP*
Fiscal Year 2017
Total Project Cost: $260,000
As required by federal law and the Farmington MPO Public Participation Plan, the
FMPO is holding a 30-day Public Comment period and Public Hearing on
Amendment #7. The 30-day comment period is from August 17, 2014 to September
15, 2014. The public may also make comments on the proposed amendment at the
following meeting:
Public Hearing: During the Farmington MPO Technical Committee meeting at 10:00
a.m. on Tuesday, August 26, 2014 in the Commission Chambers at the Aztec City Hall,
201 W Chaco St, Aztec, New Mexico 87410.
Written comments may be sent to the Farmington MPO at:
Fax: (505) 599-1299
Mail: Farmington MPO, 800 Municipal Drive, Farmington, New Mexico, 87401
Email: dwakan@fmtn.org
The public may view this Amendment at www.farmingtonmpo.org. For more
information contact Duane Wakan, MPO Associate Planner, at (505) 599-1449.
4
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #6
Subject: Information Items
Prepared by: Fran Fillerup, MPO Associate Planner
Date: August 18, 2014
INFORMATION ITEMS
a. 2040 Metropolitan Transportation Plan (MTP) Update. – The survey and
online comment mapping tool are up and running. The MPO participated in
the San Juan County Fair as part of the outreach effort for the MTP. The
community meetings will be held the weeks of August 18 and 25, 2014
b. Other.
5
TC Draft Meeting Minutes
July 24, 2014
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
JULY 24, 2014
Technical Members Present: Bill Watson, City of Aztec
Cynthia Lopez, City of Farmington
David Sypher, Alternate, City of Farmington
Dave Keck, San Juan County
Technical Members Absent: Teresa Brevik, City of Bloomfield
Nica J. Westerling, City of Farmington
Staff Present: Mary Holton, MPO Officer
Duane Wakan, MPO Associate Planner
June Markle, MPO Administrative Aide
Staff Absent: Fran Fillerup, Acting MPO Planner
Also Present: Larry Hathaway, San Juan County
1. CALL TO ORDER
Ms. Lopez called the meeting to order at 10:07 a.m.
2. APPROVE THE MINUTES FROM THE JUNE 26, 2014 TECHNICAL COMMITTEE
MEETING
Mr. Keck moved to approve the minutes from the June 26, 2014 Technical Committee
Meeting. Mr. Watson seconded the motion. The motion was passed unanimously.
3. AMENDMENT #6 TO THE FFY2014-2019 TRANSPORTATION IMPROVEMENT
PROGRAM
Subject: FFY2014-2019 TIP Amendment #6
Prepared by: Duane Wakan, MPO Associate Planner
Date: July 17, 2014
BACKGROUND
On July 20, 2014 the Farmington MPO advertised Amendment #6 to the
FFY2014-2019 Transportation Improvement Program (TIP).
The amendment adds four project(s) to the TIP as described below and
removes one project as shown in the attached notice.
6
TC Draft Meeting Minutes
July 24, 2014
CURRENT WORK
Items added or amended include US 64 from MP 54 to 56 and from MP 58 to 60;
East Pinon Hills Boulevard; and the East Arterial project. The project removed
is Legion Road, as described below.
The previous TIP amendment added Legion Rd to the TIP to be the logical
terminus for the East Arterial Phase 1B.
NMDOT has now programmed $3.5 million toward construction of the East
Arterial Phase 1B.
Upon completion of this phase, the middle section will be the remaining phase
of this project.
A public hearing on Amendment #6 will be held on July 24, 2014 during the
Technical Committee meeting.
ACTION ITEM
It is recommended that the Technical Committee review the project(s) in
Amendment #6, hold a public hearing, and make a recommendation on
Amendment #6 to the FFY2014-2019 TIP.
DISCUSSION: Mr. Wakan reported on Amendment #6 to the FFY2014-2019
Transportation Improvement Program (TIP) and referred to Pages 2 and 3 of the
Agenda (see below). The 30-day comment period for Amendment #6 is from July 20 to
August 18, 2014.
Added/Amended Projects
Project Name: US 64 Phase IV
Control Number: F100110
Project Description: Widen to 6 Lanes
Project Termini: MP 58 to MP 60
Lead Agency: NMDOT
Functional Urban Principal Arterial- Other
Classification:
Funding Source STPS Small Urban - NHPP
Funding Amount: FY2014 $250,000 NHPP- no change
FY 2015$9,790,034- increase NHPP funds by
$6,195273 & move $350,000 from Construction to
Right of Way (ROW)
FY 2016 $5,559,966- decrease STPS funds by
$2,655,239 and NHPP funds by $4,440,034
Fiscal Year FFY2014, FFY2015,FFY 2016
Total Project Cost: $15,600,000
7
TC Draft Meeting Minutes
July 24, 2014
Project Name: East Piñon Hills Blvd
Control Number: F100100
Project Description: Full rebuild of the Intersection of Piñon Hills and
NM 516; Extension of Piñon Hills Blvd to include
earthwork, asphalt, street lighting, drainage
improvements and signalization upgrades
Project Termini: NM 516 (E. Main) to Hubbard
Lead Agency: City of Farmington
Functional Urban Principal Arterial- Other
Classification:
Funding Source TCSP – STP Small Urban – Local
Funding Amount: FY2015 $3,300,000- adds $300,000 in local
funding
FY 2016 $400,000- adds $400,000 in STP Small
urban funds
Fiscal Year FFY2015, FFY2016
Total Project Cost: $3,700,000
Project Name: US 64 Phase VI
Control Number: F100113
Project Description: Widen to 6 Lanes
Project Termini: From MP 54 to MP 56
Lead Agency: NMDOT
Functional Urban Principal Arterial- Other
Classification:
Funding Source NHPP – STP Small Urban
Funding Amount: FY2015 $1,000,000- adds $1,000,000 in final
design and ROW
FY2019 $9,000,000- no change
Fiscal Year FFY2015 & FFY2019
Total Project Cost: $10,000,000
Project Name: East Arterial Project (Phase II)
Control Number: F100191
Project Description: Construct new road
Project Termini: From Legion Rd to NM173
Lead Agency: City of Aztec
Functional Urban Principal Arterial- Other
Classification:
Funding Source State Severance Tax – STP Small Urban
Funding Amount: FY2016 $3,800,000 State Severance Tax
FY2017 $3,500,000 STP Small Urban
Fiscal Year FFY2016 & FFY 2017
Total Project Cost: $7,300,000
8
TC Draft Meeting Minutes
July 24, 2014
Project Removed
Project Name: Legion Road
Control Number: F100091
Project Description: Construct new road (logical termini) in preparation
for future East Arterial route
Project Termini: Current end of Legion Rd to East Arterial
Lead Agency: City of Aztec
Functional Urban Major Collector
Classification:
Funding Source Local Other
Funding Amount: Remove from FFY2014-2019 TIP
Fiscal Year FFY2014
Total Project Cost: $510,000
Mr. Wakan reviewed each of the projects that were a part of Amendment #6:
US 64 Phase IV
NMDOT is adding $6,000,000 in funding to this project and moving $350,000 from
Construction funds to Right-of-Way funds.
East Pinon Hills Boulevard
The City of Farmington is requesting to add $300,000 in local funding in FY2015 and
$400,000 in STP Small Urban funds in FY2016 to this project.
US 64 Phase VI
NMDOT is adding $1,000,000 in final design and ROW to FY2015 for this project.
East Arterial Project (Phase II)
NMODT has assigned a new control number of F100191 to this project. Additionally,
the City of Aztec was able to secure State Severance Tax funding in the amount of
$3,800,000 for FY2016 and will be receiving $3,500,000 in STP Small Urban funding for
FY2017. This project will be added to the TIP for a total project cost of $7,300,000.
With this funding, the entire project corridor can be constructed and Legion Road does
not now have to be built.
Legion Road
As noted above, with funding secured for the East Arterial Project, Legion Road is
being removed from the FFY2014-2019 TIP. Mr. Wakan noted that the City of Aztec
will save $510,000 in not having to construct this roadway.
Mr. Wakan added that Mr. David Quintana said that there was an additional $19,800
that will need to be added to the $3,800,000 in state severance tax funding that was
originally noted in the Amendment. This change will be done with as part of the next
TIP amendment.
Mr. Wakan noted that, if required, another TIP amendment could fit into NMDOT’s
schedule prior to their STIP Amendment approval. Mr. Wakan said that Mr. Quintana
also now wants to include some additional projects that would require an Amendment
#7. Ms. Holton noted that if there were no objections or questions to Amendment #6
9
TC Draft Meeting Minutes
July 24, 2014
as presented, the additional $19,800 in state severance tax funding for the City of
Aztec’s East Arterial project would be referenced in a later administrative
modification or amendment.
Ms. Lopez opened the public hearing on Amendment #6 to the FFY2014-2019 TIP.
There were no public comments received. Ms. Lopez closed the public hearing.
ACTION: Mr. Keck moved to recommend approval of Amendment #6 to the FFY2014-
2019 TIP. Mr. Watson seconded the motion. The motion was passed unanimously.
Mr. Wakan noted that final approval would be sought by the Policy Committee at their
meeting on August 21. Mr. Sypher asked what NMDOT’s timeline for these projects
would be following final approval by the Policy Committee on August 21. Mr. Wakan
said that the State Transportation Commission meets on September 18, 2014 to
finalize the STIP. For any FY2015 project, the effective date would be October 1,
2014.
4. RECEIVE A REPORT FROM NMDOT
Neither Mr. Brian Degani nor Mr. David Quintana was able to participate in the
meeting. Their written reports were presented by Mr. Wakan.
District 5 Engineering Report
F100111 – US 64 from mile marker 60 to 62; paving is expected to be completed this
week. The overall project is expected to be substantially complete by the end of
August which is two months ahead of schedule.
The US 64 project at the intersection of US 550 is complete except for a few minor
punch list items which are still pending. Mr. Hathaway noted that Ms. Brevik with the
City of Bloomfield had said that part of the punch list included an issue with the
manhole covers.
5100110 – NM 516/NM 574 (Light Plant Road); project will be substantially complete by
the first of August. Mr. Keck asked Mr. Watson if this road section was to be milled and
overlaid. Mr. Watson said he had attempted to speak with the project manager on this
project, but they have not been able to meet. Mr. Watson stated that he thought the
concrete irrigation boxes on the south side of NM 516 at the intersection were to be
moved, but this has not been done yet either.
Mr. Keck commented that the joints on the patches were done poorly. Mr. Keck said
he had envisioned something different than what is being constructed and did not see
where any geometrics had been changed. Mr. Wakan said he would follow up with Mr.
Quintana on the mill and overlay question and what they plan to do with the irrigation
boxes.
10
TC Draft Meeting Minutes
July 24, 2014
F100110 – US 64 from mile marker 58 to 60; NMDOT is currently acquiring rights-of-way
and the project should be advertised in the spring of FY2015 with construction to
begin in the fall of FY2015;
F100170 – NM 173 safety project; project development is underway with construction
anticipated in FFY2016-2017; this project is from US 550 north to about one mile south
of Tiger Park toward Navajo Dam. Mr. Keck clarified that this project is to address
some sight distance issues on this section of the roadway, but that there would be a
gap between the improvements completed by the City of Aztec and those to be done
by NMDOT.
F100091 – East Arterial (Phase II) – This is the project in the current TIP Amendment
#6. This project will be programmed for construction in FFY2016-2017.
F100112- US 64 from mile marker 56 to 58; NMDOT will issue an RFP for project design
in September. The project is programmed for construction in FFY2017-2018.
F100113 – US 64 from mile marker 54 to 56; this project will also be on the RP for
design in September. It will be designed along with F100112 but will be packaged as a
separately two-mile project. This project is planned for construction in FFY2019-2020
and this will complete the US 64 corridor project.
Another T/LPA “cradle to grave” training is scheduled to be held in Farmington in
October and Ms. Westerling is working on the date and venue details. Mr. Wakan
reported that the first training he attended in Albuquerque was very well attended
and recommended that all Technical Committee members attend the two-day session.
He planned to also attend the meeting in Farmington in October. Ms. Holton
commented that the training highlights managing projects in collaboration with
NMDOT and understanding the different deadlines and milestones.
NMDOT Planning Report
TAP Projects; some of the FFY2014 TAP projects were recently moved to FFY2015 per
the Regional Design Center. This was a one-time solution that was negotiated due to
the short FFY2014 timeline. Mr. Degani provided a spreadsheet that detailed the
phasing information on the three FMPO TAP projects.
Mr. Wakan said that this remedy allowed the Bloomfield river trail project to be
salvaged as well as the 20th Street sidewalk and Southside river trail projects. He
added that the City of Farmington now wants to boost local funding for the 20th Street
sidewalk project. This will not involve moving any money from one fiscal year to
another so this change can be done with a simple modification. Mr. Wakan will review
this change request with Mr. Degani.
The next round of review and decision-making concerning proposed Highway Safety
Improvement Program (HSIP) safety projects or program applications by the Project
Selection Committee will take place on Friday, August 1, 2014. Mr. Wakan reminded
the members that applications can be submitted at any time, but would need to be
submitted at least two weeks prior to the quarterly review process in order to be
considered for funding by the Committee at that meeting.
11
TC Draft Meeting Minutes
July 24, 2014
The U.S. DOT Announced a Comprehensive Proposed Rulemaking for the Safe
Transportation of Crude Oil, Flammable Materials in the form of a Notice of Proposed
Rulemaking (NPRM) and a companion Advanced Notice of Proposed Rulemaking
(ANPRM). The NPRM proposes enhanced tank car standards, a classification and
testing program for mined gases and liquids and new operational requirements for
high-hazard flammable trains that include braking controls and speed restrictions.
Both the NPRM and ANPRM are available for review here and will be open for 60 days
of public comment. Given the urgency of the safety issues addressed in these
proposals, PHMSA does not intend to extend the comment period.
The Programs Infrastructure Finance Division amended the FFY14 T/LPA deadlines set
forth a few weeks back. Extensions were made to accommodate local governments in
the T/LPA for approved design and construction cooperative agreements to be
submitted by 8/1/2014.
FHWA and FTA jointly issued the NPRM to propose revisions to regulations governing
development of metropolitan transportation plans and programs for urbanized areas,
State transportation plans and programs, and the congestion management
process. The changes reflect the passage of MAP–21 and the requirement to take a
performance-based approach to planning and programming.
Mr. Wakan said he would forward these two informational e-mails from Mr. Quintana
and Mr. Degani to the Technical Committee members.
5. INFORMATION ITEMS
Subject: Information Items
Prepared by: Duane Wakan, MPO Associate Planner
Date: July 16, 2014
INFORMATION ITEMS
a. 2040 Metropolitan Transportation Plan (MTP) Update. – The draft survey
and online comment mapping tool are in development. Planning for the
public meetings and outreach has begun.
b. Complete Streets Advisory Group Update. The Complete Streets Advisory
Group met on July 16 and progress was made on the design guidelines.
c. Red Apple Transit. Ridership counts and surveys by the interns are
ongoing.
d. Statewide Long-Range Plan (SLRP) Working Group. Staff attended a SLRP
working group meeting in Albuquerque on July 17, 2014.
12
TC Draft Meeting Minutes
July 24, 2014
e. August Technical Committee Meeting. The August Technical Committee
meeting will be joint meeting with NMDOT on Tuesday, August 26 at 10:00
at the City of Aztec. Please provide agenda items to the MPO by Thursday,
August 14, 2014.
f. Other.
DISCUSSION: Mr. Wakan reported that the consultant for the 2040 MTP Update has
developed the online comment mapping tool. He said that the process for accessing
the survey was very easy: the user clicks on the map showing where they live,
questions then pop up about the demographics of their household, and they are then
taken to the MTP survey questions. The consultant plans to showcase some before and
after images of what projects might look like and determine the region’s willingness to
fund potential projects. Mr. Wakan reported that the MPO has provided the consultant
with layers of GIS data to allow them to format the map to fit the local needs. He said
Staff was pleased that the survey was very innovative.
Ms. Holton added that there was significant outreach planned for the MTP update
which is the preliminary work in terms of getting the survey tool on-line. She said that
eight locations for public meetings have been identified to date along with a presence
at the County Fair and a scheduled radio interview. Ms. Holton explained that
Technical Committee members might be asked to help staff the fair booth. Due to
issues with Wi-Fi access at the fairgrounds, paper MTP surveys may be used to gather
data.
The Complete Streets Advisory Group met on July 16 and decided to reconvene late in
August to allow time for the illustrations of all the preliminary design guidelines to be
readied for their review at that meeting. Some members of the Advisory Group
believed that this element of the design guidelines was being rushed and they wanted
to understand why. Ms. Holton commented that some members feel rush while others
are anxious for things to move forward. She stated that the MRA has funding for a
traffic study on Main Street and the impact to implementing Complete Streets project.
The funding for this study has been allocated by the City Council but they are seeking
criteria on which to base the study on. Ms. Holton said the MRA has been waiting for at
least a draft version of the FMPO guidelines in order to begin the project. The
preliminary draft design guidelines for the downtown/urban area should be available
by September so movement on this MRA project can begin. The remaining design
guidelines can then be developed over time.
Mr. Wakan added that the next meeting for the Complete Streets Advisory Group was
scheduled for August 28. The preliminary design guidelines for the downtown/urban
area would be ready for the Advisory Group’s review and approval. These guidelines
can then be given to the City of Farmington’s MRA Commission to allow them to move
forward with their project.
The two MPO interns are out in the field counting Red Apple Transit passengers, riding
the various routes, and distributing surveys. Mr. Wakan noted that the input of the
date collected is ongoing.
13
TC Draft Meeting Minutes
July 24, 2014
Mr. Wakan attended another working group meeting of the Statewide Long-Range
Planning (SLRP) in Albuquerque last week. All the MPOs were in attendance and
provided input on how NMDOT can shed the image of a highway department to a multi-
modal transportation entity. Discussion focused on the planning, design, and
construction of facilities, and should we continue to build more of what there already
is or do we need to focus on other options. Also discussed were finding ways to fund
transportation projects.
The next Technical Committee meeting will be moved from August 28 to Tuesday,
August 26 and will be a joint meeting with NMDOT in Aztec.
With the requirement to meet performance measures and the need to collect and
show current and new data after changes are made to the road network, Mr. Wakan
said other MPOs are using some new and innovative products. He asked if a vendor
could make a presentation at a Technical Committee meeting to present their data
products that help MPOs track before and after measurements. Mr. Wakan has spoken
with the vendor, watched their presentation and sees value in the product, but would
like the Technical Committee members to weigh in also.
Ms. Holton said this would be permissible as long as there was a stipulation that the
presentation alone did not imply a purchase. Mr. Wakan said the presentation would
be in a “go-to” meeting format. He believed it was important for the Technical
Committee to see what products were available and determine what would be of value
to the MPO and to the entities.
Mr. Sypher said the City of Farmington had just purchased a software program called
Blue Toad that would be available to MPO Staff. It was asked if any other members
were using different software and the importance of striving to be compatible with
other products being used. The Technical Committee agreed that the educational
opportunity would be good and would provide some perspective of the products
available. Mr. Wakan said he would schedule this “go-to” presentation for after the
August 26 joint meeting and would also look at Blue Toad.
6. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
Mr. Keck asked if the MPO would request some information from NMDOT on the termini
for the NM 173 safety project on behalf of the City of Aztec and San Juan County.
Mr. Watson asked for the status of the planned traffic signal for the intersection of NM
173 and US 550. He said this project had been funded years ago, but was never built.
Now there is a development planned for that intersection that Mr. Watson said it is
unsafe without the traffic signal.
Mr. Wakan suggested a presentation on case studies of book ends like those being
considered for the East Arterial Route design. He thought it might be beneficial to see
what others are doing when constructing relief routes.
Mr. Hathaway said that he had attended a meeting in Gallup yesterday and been
presented with information about the SLRP. Ms. Holton said that the long-range plan
14
TC Draft Meeting Minutes
July 24, 2014
for the MPO needed to collaborate with the SLRP and vice versa to ensure
transparency and communication with all parties.
There was no additional business from the Chairman, Members and Staff.
7. BUSINESS FROM THE FLOOR
There was no business from the Floor.
8. ADJOURNMENT
Mr. Watson moved to adjourn the meeting. Mr. Keck seconded the motion. Ms. Lopez
adjourned the meeting at 10:57 a.m.
__________________________ ________________________________
Cynthia Lopez, Chair June Markle, MPO Administrative Aide
15
Get email alerts for Farmington
A daily email when new agendas and minutes are posted.