MPO Technical Committee
Regular MeetingFarmington, NM · December 10, 2015
Agenda
JOINT MPO TECHNICAL COMMITTEE
& NMDOT AGENDA
December 10, 2015
10:00 a.m.
Council Chambers
Bloomfield City Hall
915 North First Street
Bloomfield, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
JOINT TECHNICAL COMMITTEE & NMDOT MEETING
December 10, 2015 10:00 AM
This meeting will be held in Council Chambers at Bloomfield City Hall, 915 North First Street,
Bloomfield, New Mexico.
ITEM PAGE
1. Call meeting to order
2. Approve the minutes from the November 5, 2015 Technical Committee 10
meeting.
3. Receive a report on the FFY2016 PL and FTA 5303 Work Authorizations 1
Presented by: Fran Fillerup
4. Receive a TIP Status Update Report 5
Presented by: Fran Fillerup
5. Receive a report on an amendment to the Public Participation Plan (PPP) 6
Presented by: Fran Fillerup
6. Information Items: 9
a. MPO Quarterly
b. Pedestrian Facility Design Course
c. Other
Presented by: Fran Fillerup
7. Joint Meeting Discussion Items and Additional Reports from NMDOT
a. US 64 – Phase 5 Discussion
b. Communication & Project Management Concerns
c. Status of NMDOT Representation on FMPO Policy Committee
d. Additional Update from District 5 (David Quintana)
e. Additional Update from the Planning Division (Brian Degani)
8. Business From Chairman, Members, and Staff
9. Business from the Floor
10. Adjournment
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in need of a
reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid or service to
attend or participate in the hearing or meeting, please contact the MPO Administrative Aide at the
Downtown Center, 100 W Broadway, Farmington, New Mexico or at 505-599-1466 at least one week
prior to the meeting or as soon as possible. Public documents, including the agenda and minutes, can
be provided in various accessible formats. Please contact the MPO Administrative Aide if a summary or
other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: FFY2015-2016 Work Authorization Update
Prepared by: Fran Fillerup, MPO Associate Planner
Date: December 3, 2015
BACKGROUND or PREVIOUS WORK
The MPO prepared its FFY2015-2016 Budget based on initial funding estimates
from NMDOT for FHWA PL and FTA 5303.
Work Authorizations now provide official amounts for PL and 5303 funding.
CURRENT WORK
The MPO is receiving a base amount in federal PL funding of $198,000 +
$32,742 in local match for a total of $231,742.
MPO staff has requested a carryover amount of $5,855.22
The MPO received federal FTA 5303 funding of $56,276 + local match of
$14,069 for a total of $70,345 that will cover transit activities from October 1,
2015 to September 30, 2016.
FTA updated the MPOs Award Letter from July 1, 2015 to the end of the 2015
FFY in the amount of $84,413.94
MPO staff has requested a 5303 carryover amount of $48,182.82 into FY2016.
ANTICIPATED WORK
MPO Staff prepared amendments to the UPWP to reflect these new funding
totals for recommended approval at the January 2016 Technical Committee
meeting.
ATTACHMENTS
The FFY2016 PL Work Authorization Letter
The FFY2016 FTA 5303 MPO Award Letter
INFORMATION ITEM
This is an informational report only.
1
Work Authorization/Notice to Proceed
Susana Martinez
Governor
October 1, 2015
Tom Church
Ms. Mary Holton Cabinet Secretary
City of Farmington and Farmington Metropolitan Planning Organization
800 Municipal Drive
Farmington, NM 87401
RE: Notice to proceed
Commissioners
Dear Ms. Holton: Ronald Schmeits
Chairman
District 4
This is your Work Authorization/Notice to Proceed with the tasks identified in your current
UPWP/RWP. Reference the attached Purchase Order and the following information in the Dr. Kenneth White
cover letter submitted with each reimbursement packet. Secretary
District 1
• Contract/Cooperative Agreement No: D14782
• Project/Control No: P515110 David Sepich
Commissioner
• Vendor No: 54331 District 2
• Purchase Order No:
• Authorized Amount/Project Total: $231,742
Keith Mortensen
• Federal Amount: $198,000 Commissioner
• Local Match Amount: $33,742 District 3
Butch Mathews
Sincerely, Commissioner
District 5
Jackson Gibson
Commissioner
District 6
Anne McLaughlin, Statewide Planning Bureau Chief
Attachment: Purchase Order
Copy: Richard Martinez
Vanessa Ytuarte
Geraldine Sanchez
G e n e r a l O f f i c e P. O. B o x 1 1 4 9 S a n t a F e, N M 8 7 5 0 4
2
3
4
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #4
Subject: Status of TIP Projects
Prepared by: Fran Fillerup, MPO Associate Planner
Date: December 1, 2015
BACKGROUND
The STIP Protocols indicate that each MPO shall develop a process to monitor
the progress and status of each project in the first two years of the TIP. These
monthly reviews help correct inconsistencies in the TIP, STIP, the MPO’s MTP,
Agreement Request Forms (ARFs), etc.
The next scheduled TIP Amendment cycle will begin in January 2016.
CURRENT WORK
Staff will continue the monthly review of project status for projects in the TIP.
This includes updates on NMDOT and local lead projects. Staff will work from
the latest 2016-2021 TIP at the meeting.
INFORMATION ITEM
This is an information item only. Committee members will have an opportunity
to provide feedback regarding TIP project status and details.
5
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #5
Subject: Public Participation Plan Amendment
Prepared by: Fran Fillerup, MPO Associate Planner
Date: December 2, 2015
BACKGROUND
The current Public Participation Plan (PPP) was adopted on January 19, 2012.
The PPP needs to be reviewed and amended at least every five years.
Staff is proposing changes to the PPP.
Changing the public comment period to 15 days instead of the stated 30 days
(see Page 14 of the current document)
NMDOT has recommended, and the other MPOs throughout the state have
already adopted, a 15-day public comment period for most documents
including TIP amendments.
A new TIP adoption would continue to have a 30-day comment period.
The 45-day public noticing requirement for the Public Participation Plan was
begun on November 29, 2015.
At their November 19 meeting, the Policy Committee recommended the use of
social media in MPO outreach efforts as well as developing a Citizens (Civic)
Advisory Committee.
ANTICIPATED WORK
Staff reviewed the PPP for additional needed changes.
Seek approval of the 30 day reduction to 15 day TIP amendment change to the
PPP at the January 28, 2016 Policy Committee meeting.
Seek recommended approval of all the amendment to the PPP at a future
Technical Committee meeting.
ATTACHMENTS
The Public Participation Plan with proposed track changes will be sent as a
separate attachment.
DISCUSSION ITEM
This item is presented for review only.
6
MEMORANDUM
TO: Technical Committee, Farmington MPO
FROM: Fran Fillerup, MPO Associate Planner
DATE: December 3, 2015
SUBJECT: Excerpt from Policy Committee Minutes of November 19, 2015 regarding Public
Participation Plan Amendment
Below is an excerpt from the draft minutes of the FMPO Policy Committee meeting of November
19, 2015. This excerpt is from the discussion on the Public Participation Plan Amendment.
DISCUSSION: Mr. Wakan stated that the Public Participation Plan (PPP) was last approved in
2012 and approval of this amendment will be sought in January. Mr. Wakan reviewed the
proposed changes to the PPP:
• Integrate new technology to noticing requirements (sources and social media);
• Update the list of committee voting members;
• Change references from the previous federal transportation bill (SAFETEA-LU) to MAP-21
and identify the new goals and objectives;
• Create maps to identify concentrations of seniors, define transit and other needs, make
recommendations on how to meet those needs;
• Consider broader use of social media: MPO follows City of Farmington guidelines so use of
Facebook, Twitter, other is restricted.
Councilor Duckett and Commission Eckstein commented that the Policy Committee had
discussed this previously and recommended broader use of social media. Ms. Holton
commented that the City of Farmington does allow the use of Facebook, but a Twitter account
would have to be reviewed by the City Manager.
The Committee discussed the MPO possibly piggy-backing on each entity’s site to provide an
additional level of outreach. Councilor Duckett recommended that MPO set up their own
account and then each city could share pertinent and relevant information on their own
webpages. The Committee agreed that a stronger social media presence was important. Ms.
Holton said that Staff would put together a comprehensive plan for a social media presence and
then present it to the Committee for their approval.
• Proposal to develop a Citizens Advisory Committee (CAC). This group would be made up of
citizens from the region rather than from the engineers or planners from the cities. The MPO
wants to involve any interested persons and those with broader backgrounds (seniors,
7
schools, public health) to provide their own recommendations to the Policy Committee. Mr.
Wakan reported that some CACs use a hierarchy where they would first report to a technical
body and then to the policy body, while others report directly to a policy board. The Policy
Committee members agreed that a CAC sounded like a good idea and they recommended
having the CAC report directly to them. Councilor Duckett and Rodgers thought this
committee could also provide information to them as City Councilors.
It was noted that being able to find individuals willing to serve on this type of committee would
be a priority. Mr. Wakan said that many of the Complete Streets Advisory Group members want
to continue being involved with transportation issues even after the Complete Streets design
guidelines are completed. More information on a CAC will be forthcoming in January.
• MTP – the 2040 MTP was recently update;
• TIP call for projects – project ranking will be determined by the PPM;
• Public comment period on TIP amendments – reduce the required 30-day comment period
to 15 days. This change will allow more flexibility for NMDOT and the entities when
requested amendments to projects especially with last minute changes. The Farmington
MPO is the only MPO state-wide still using the 30-day period.
Mr. Wakan stated that any amendments to the PPP require a 45-day comment period. This
proposed amendment will be advertised beginning November 29 and will be brought back to
both the Technical and Policy Committees in January for final input. Ms. Holton encouraged the
members to provide any input to Staff now so that it can be incorporated into the amendment.
The members reiterated the need for a greater MPO social media presence primarily on
Facebook and to create a Citizens Advisory Committee.
8
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #6
Subject: Information Items
Prepared by: Fran Fillerup, MPO Planner
Date: December 2, 2015
INFORMATION ITEMS
a. MPO Quarterly. The MPO Quarterly will be held on December 14, 15, and
16 at the Mesilla Valley MPO in Las Cruces.
b. Pedestrian Facility Design Course - there are three sessions the week of
Dec. 14 in Las Cruces, Albuquerque, and Santa Fe. This class is highly
recommended for T/LPA engineering/planning staffs who have received
TAP funding.
c. Transportation Bill Update – It is anticipated that Congress will pass a new
Federal Transportation Bill shortly.
d. Other
9
TC Draft Meeting Minutes
November 5, 2015
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
November 5, 2015
Technical Members Present: Bill Watson, City of Aztec
Cindy Lopez, City of Farmington
David Sypher, City of Farmington
Andrew Montoya, Red Apple Transit
Dave Keck, San Juan County
Technical Members Absent: David Quintana, NMDOT District 5
Teresa Brevik, City of Bloomfield
Staff Present: Mary Holton, MPO Officer
Duane Wakan, MPO Planner
June Markle, MPO Administrative Aide
Staff Absent: Fran Fillerup, MPO Associate Planner
Others Present: Bil Homka, Alternate, City of Aztec
Brian Degani, Planning Liaison, NMDOT (via phone)
Larry Hathaway, Alternate, San Juan County
1. CALL TO ORDER
Mr. Sypher called the meeting to order at 10:05 a.m.
2. APPROVE THE MINUTES FROM THE OCTOBER 8, 2015 JOINT TECHNICAL
COMMITTEE & NMDOT MEETING
Mr. Keck moved to approve the minutes from the October 8, 2015 Joint Technical
Committee and NMDOT meeting. Ms. Lopez seconded the motion. The motion was
passed unanimously.
3. AMENDMENT #1 TO THE FFY2016-2021 TRANSPORTATION IMPROVEMENT
PROGRAM (TIP)
Subject: FFY2014-2019 TIP Amendment #1
Prepared by: Duane Wakan, MPO Planner
Date: October 29, 2015
BACKGROUND
On October 21, 2015 the Farmington MPO advertised Amendment #1 to the
10
TC Draft Meeting Minutes
November 5, 2015
FFY2016-2021 Transportation Improvement Program (TIP).
The amendment involves several projects in the TIP as described in the
attached notice.
The Technical Committee will consider the amendment and may make a
recommendation at their meeting on November 5.
AMENDED TIP PROJECTS
US 64 Phase IV - (CN F100110) – At the request of NMDOT, delete this project from
the TIP/STIP as it was able to be constructed using FY 2015 funds.
US 64 Phase V - (CN F100112) – At the request of NMDOT, amend FY 2017 funding
from $4,240,116 in NHPP while adding $5,800,000 in State Severance Tax funds. Also,
reduces FY 2018 NHPP funding from $7,059,081 to $6,343,676.
US 64 Phase VI – (CNF100113) – At the request of NMDOT, removed $1,123,797 in
STP Sm Urban funds in 2019 to be replaced with $5,980,800 in NHPP funds in FY 2020.
NM 173 – (CN F100170) – At the request of NMDOT, adds an additional $2,880,000 in
HSIP funds in FY 2016 and adjust the termini from MP 2.0 to MP 4.5.
Vereda del Rio San Juan River Trail Phase II – (CN F100230) – At the request of
the City of Bloomfield, add $189,465 in Local Non-Match funds in FY 2016.
Vereda del Rio San Juan River Trail Phase III – (CN F100231) – At the request of
the City of Bloomfield, add $115,135 in Local Non-Match funds in FY 2016.
Red Apple Transit Bus Route Accessibility – (CN TF00010) – At the request of
the City of Farmington, amend this project’s management from Federal Highway
Administration to Federal Transit Administration.
ACTION ITEM
Staff recommends the approval of Amendment #1.
DISCUSSION: Mr. Wakan reviewed the projects in Amendment #1 to the FFY2016-2021
TIP:
US 64 - Phase IV
NMDOT requested that this project be deleted from the TIP as it has already received
construction funds and this project is moving forward.
US 64 – Phase V
NMDOT requested that the NHPP funds be removed from FY2017 and replaced with
state severance tax funds. Also requested was to reduce the FY2018 NHPP funds from
$7,059,081 to $6,343,676. The project funding remains the same overall.
US 64 – Phase VI
NMDOT requested the removal of $1,123,797 in STP Small Urban funds (2019) which
will be replaced with $5,980,800 in NHPP funds in 2020.
NM 173
At the request of NMDOT, adds an additional $2,880,000 in HSIP funds in FY 2016 and
adjusts the termini from MP 2.0 to MP 4.5.
11
TC Draft Meeting Minutes
November 5, 2015
Vereda del Rio San Juan River Trail – Phase II
The City of Bloomfield requested to add $189,465 in Local Non-Match funds in FY 2016
to complete this phase of the project.
Vereda del Rio San Juan River Trail – Phase III
The City of Bloomfield also requested to add $114,135 in Local Non-Match funds in
FY2016 to complete this phase.
Red Apple Transit Bus Route Accessibility
This request came from the City of Farmington to move the TAP funding management
from Federal Highway Administration to Federal Transit Administration.
Mr. Sypher opened the public hearing.
There being no comments, Mr. Sypher closed the public hearing.
ACTION: Ms. Lopez moved to recommend approval of Amendment #1 to the FFY2016-
2021 TIP. Mr. Watson seconded the motion. The motion was approved unanimously.
4. RECEIVE A TIP PROJECT STATUS UPDATE
Subject: Status of TIP Projects
Prepared by: Duane Wakan, MPO Planner
Date: October 29, 2015
BACKGROUND
The STIP Protocols, finalized in early 2014, indicate that each MPO shall develop
a process to monitor the progress and status of each project in the first two
years of the TIP. These monthly reviews help correct inconsistencies in the TIP,
STIP, the MPO’s MTP, Agreement Request Forms (ARFs), etc.
The next scheduled TIP Amendment cycle will begin in January 2016.
CURRENT WORK
Staff will continue the monthly review of project status for projects in the TIP.
This includes updates on NMDOT and local lead projects. Staff will work from
the latest 2016-2021 TIP at the meeting.
INFORMATION ITEM
This is an information item only. Committee members will have an opportunity
to provide feedback regarding TIP project status and details.
12
TC Draft Meeting Minutes
November 5, 2015
DISCUSSION: Mr. Wakan asked the Technical Committee members if they would
provide updates to their projects in the FFY2016-2021 TIP.
East Arterial Route – Phase II – no update from Mr. Watson.
East Pinon Hills Extension – Phase I – Mr. Sypher reported that all the right-of-way
affidavits have been submitted. The City of Farmington was able to locate some
appraisals which may eliminate the need the any additional appraisals. They are
awaiting the review from NMDOT’s right-of-way division.
East Pinon Hills Extension – Phase II – Mr. Sypher reported that the next step will be
design which is planned for FY 2017 and is based on receiving a CMAQ grant. No word
has been received on the grant.
East Pinon Hills Extension – Phase III – Mr. Keck stated that the County is in the process
of getting the rights-of-way approved with NMDOT’s right-of-way division. They still
hope to begin construction next spring and finish the phase next fall.
CR 350/390 – Mr. Keck reported that the County is close to getting the project
certifications. Construction is planned for the spring of 2016 and is anticipated to be a
60-day project.
Kirtland Walk Path – Mr. Keck reported they are waiting for the agreements from
NMDOT and will then start the design.
Red Apple Transit – no update from Mr. Montoya.
ACTION: The projects were updated and the report received.
5. RECEIVE A REPORT ON AN AMENDMENT TO THE FFY2015-2015 UNIFIED
PLANNING WORK PROGRAM (UPWP)
Subject: FFY2015-2016 UPWP Amendment
Prepared by: Duane Wakan, MPO Planner
Date: October 29, 2015
BACKGROUND
The MPO maintains a Unified Planning Work Program which sets forth the tasks
the MPO will undertake in a fiscal year.
In 2014, the MPOs in the state converted to using UPWP covering two fiscal
years. The current UPWP covers FFY 2015 and 2016.
The recently adopted 2040 MTP identifies tasks which the MPO will undertake
and which need to be reflected in the UPWP.
FHWA has provided direction on other work to be added to the UPWP.
13
TC Draft Meeting Minutes
November 5, 2015
CURRENT WORK and ATTACHMENTS
MPO staff has prepared draft amendments to the UPWP for FFY 2016. The
proposed changes are in a “track changes” document which will be provided
separately. Attached is Chapter 14, Implementation Plan, from the 2040 MTP
and a FHWA letter on areas of emphasis.
Dollar amounts under each task have not been adjusted at this time. This item
will be presented again in January, and dollar amounts will be re-allocated as
needed.
INFORMATION and DISCUSSION
The draft changes to the FFY 2016 UPWP are being presented for information
and discussion by the Technical Committee.
DISCUSSION: Mr. Wakan reported that the Unified Planning Work Program (UPWP)
outlines the work for the MPO for the fiscal year. Staff has reviewed the UPWP and has
made some updates and included some recommendations for changes from FHWA.
Mr. Wakan reviewed the proposed changes to the UPWP:
Membership – minor revisions to the list of Committee members and Staff
Title VI Plan – this is ongoing. Staff plans to develop some demographic and
environmental justice mapping to show the ability to accommodate all modes of
travel.
Update Public Participation Plan – more information on these changes in Agenda Item
#6. The MPO needs to increase its outreach and provide regional models of
cooperation (i.e.: Shiprock, Blanco).
Project Coordination – NMDOT has requested the MPO to increase their project
coordination with local governments, NMDOT, and other agencies. The UPWP needs to
include language to cover these responsibilities and the Staff time required. With
funding so tight and the additional Staff time necessary to perform this type of project
oversight, additional funding from NMDOT will need to be sought.
TIP Development – the TIP will be updated as needed.
Project Prioritization Process – this is new for the TIP and any new projects being
added to the TIP will need to follow this process.
New Activity – Staff would like to begin developing some scenario planning. This
entails the coordination of land use and transportation to illustrate to developers and
the public a development pattern and the potential impact on GRT. This will entail
gathering GIS data from across the region and putting that information into a model.
The software for this has already been purchased, but some GIS modeling training will
be needed. Staff recommends establishing a steering committee, and then beginning
to gather information and do some public outreach to see how development and
transportation can be informed and influenced going forward.
14
TC Draft Meeting Minutes
November 5, 2015
Performance Measures – this process will begin this year. Staff is looking at projects in
the region and what data can be gathered. NMDOT has not yet provided the detailed
guidelines on performance measures, but more guidance on these and the
methodology is expected to be made available at the MPO Quarterly in December.
Staff will look to the Technical Committee members for internal data that may be
useful for measuring performance.
Safe Routes to School (SRTS) – Staff will continue to facilitate SRTS. This work is
currently mainly within the City of Farmington, but with the new Kirtland walk path
project, other entities have requested SRTS assistance and information on how to fund
their own coordinator. Staff would like to see this program become more regional in
nature.
Bike/Ped Facilities – Staff will begin inventorying the bike and pedestrian facilities in
the region and highlight the gaps in sidewalks, bike lanes, etc. Staff wants to track
facilities over the past several years and these will become part of performance
measures as well.
Red Apple Transit – Staff will continue to assist with collecting ridership data and
ensuring the most accurate reports are received from Ride Right. In the future, this
information will be integrated into the travel demand model. The MPO may help fund
some RAT ridership studies in the future.
Corridor & Alignment Study – with tight funding in 2016, Staff does not foresee much
funding available for a consultant for this type of study.
The Technical Committee discussed the potential need for this type of study, the
costs, and possible timing of beginning this type of study. This discussion is
summarized below:
The need for this study is not pressing;
The push for this study came from the City of Aztec because they did not want
a six-lane east/west road running through Aztec; NMDOT has no immediate
plans to change NM 516;
MPO has only $70,000 in consultant fees identified for 2016; some of this has
already been allocated to the transit hub study and traffic counts. The MPO
would like to use additional funds for consultants to help with developing the
safety plan and GIS modeling. FTA 5303 funding will be allowed to be carried
over to 2016.
A corridor study would require at least $250,000 in funding;
Nothing urgent in terms of capacity, but need to determine when it would be
applicable and then determine when the study would have to begin (Pinon Hills
Boulevard extension was a 30-year process from concept to construction
completion);
A corridor study evaluates and studies different potential alignments with
construction costs being the main consideration in site selection;
This type of study will take time and will be a lengthy process – impact
statement will be required and if needed in 30 years, need to consider getting
started soon;
15
TC Draft Meeting Minutes
November 5, 2015
If the MPO were to take the lead on this study will need to budget sufficient
funding. With anticipated costs for a study of this type being at least $250,000,
participation by the local entities could likely be considered;
With the number of large local projects already ongoing, could consider waiting
until 2020 when these projects are completed before taking on a corridor
study.
Safety Plan – It has been demonstrated that having a safety plan provides for
advantageous funding opportunities through the HSIP program. Having a safety plan
would put the MPO in a stronger competitive situation for funding with the other
MPOs.
Mr. Sypher asked if Staff would resend a red lined version of the UPWP to the
Technical Committee members for their review. Ms. Holton clarified that this
document would come back to the Technical Committee in January for another review
and recommendation before being taken before the Policy Committee.
ACTION: The report was received.
6. RECEIVE A REPORT ON AMENDING THE PUBLIC PARTICIPATION PLAN
Subject: Public Participation Plan Amendment
Prepared by: Duane Wakan, MPO Planner
Date: October 29, 2015
BACKGROUND
The current Public Participation Plan (PPP) was adopted on January 19, 2012.
The PPP needs to be reviewed and amended at least every five years.
Staff is proposing changes to the PPP.
Changing the public comment period to 15 days instead of the stated 30 days
(see Page 14 of the current document)
NMDOT has recommended, and the other MPOs throughout the state have
already adopted, a 15-day public comment period for most documents
including TIP amendments.
A new TIP adoption would continue to have a 30-day comment period.
On November 29, 2015 the Farmington MPO will advertised the amendments to
comply with the 45-day public noticing requirements in the Public Participation
Plan.
DISCUSSION ITEM
This item is presented for review only.
16
TC Draft Meeting Minutes
November 5, 2015
DISCUSSION: Mr. Wakan explained that the Public Participation Plan (PPP) was being
presented for a preliminary review today. Staff hopes to have the proposed changes
approved in January.
Mr. Wakan reviewed the PPP:
The PPP was last adopted in 2012 and this plan guides the MPO’s tasks in conducting
public outreach and in advertising requirements;
The Committee structure needs to be updated to include NMDOT representation on
both the Policy and Technical Committees;
Updates to the planning factors need to be changed from SAFETEA-LU to MAP-21;
TIP Advertising – will continue to open a 30-day public review period as it relates to
new TIP Developments which occur bi-annually;
Environmental Justice – this section needs updated mapping in the region to look at
low income areas and language barriers to help anticipate environmental justice issues
when transportation projects are developed;
Newsletter – published maybe three times per year rather than quarterly;
Social media – the MPO currently follows the City of Farmington’s social media
requirements and restrictions. Other MPOs are using expanded options in order to get
more public engagement;
Citizens Advisory Committee – this is a preliminary idea for establishing a committee
that would be led by citizens and would provide input to planning transportation
projects. This group would be similar to the Complete Streets Advisory Group.
Project Prioritization Process – this new process that will be used in the development
of the TIP needs to incorporated into the PPP;
Public Comment Periods - reduce public comment periods for TIP amendments from 30
days to 15 days. This will align better with other MPOs across the state who all use the
15 days for their comment periods. This change will also help with last minute changes
from NMDOT which with the current 30-day comment period, the MPO is unable to
accommodate.
Mr. Wakan reported that to meet the 45-day public comment period these changes will
need to be advertised no later than December 13 to seek approval in January.
ACTION: The report was received.
17
TC Draft Meeting Minutes
November 5, 2015
7. REVIEW THE PROPOSED MEETING CALENDAR FOR 2016
Subject: 2016 Annual Meeting Schedule
Prepared by: Duane Wakan, MPO Planner
Date: October 29, 2015
BACKGROUND
Each year the Technical Committee approves a resolution ensuring compliance
with the open meetings act and establishes its meeting schedule for the coming
year.
Based on recent amendments in the MPO Bylaws and Joint Powers Agreement,
NMDOT will be a voting member on the TC and PC boards.
NMDOT’s ability to attend TC meetings on the 2nd Thursday of the month is
hampered due to conflicting district meetings.
CURRENT WORK
Staff will present a proposed meeting schedule for discussion with the
Technical Committee.
It is suggested that the Technical Committee hold regular monthly meetings
during 2016.
NMDOT requested a change in meeting dates to better accommodate their
participation in person.
The proposed 2016 meeting schedule moves the meetings from the 2nd Thursday
to the 2nd Wednesday of each month at 10:00 a.m. and rotating among the
entities. Tuesdays were considered but are not ideal as entity commission and
council meetings usually happen on those days.
Formal action to adopt the meeting schedule and resolution will be done in
December.
INFORMATION ITEM
Review the proposed 2016 meeting schedule for the Technical Committee.
DISCUSSION: Mr. Wakan stated that Mr. David Quintana with NMDOT District 5 had
reported conflicts with his attendance at the Technical Committee meetings held on
the second Thursday of each month. In order to better meet his schedule and
facilitate more consistent attendance, the 2016 meeting schedule has changed the
meeting dates to the second Wednesday of each month (draft schedule shown on Page
18 of the Agenda).
18
* PROPOSED *
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
2016 Regular Meeting Schedule
TECHNICAL COMMITTEE
All meetings will be held at 10:00 am at the locations listed below
MPO will seek final approval to TIP Amendments in the months highlighted below.
Date Location
January 13, 2016 Executive Conference Room Farmington
Farmington Municipal Building
800 Municipal Drive
February 10, 2016 Commission Chambers Aztec
Aztec City Hall
201 W. Chaco Street
March 9, 2016 City Council Chambers Bloomfield
Bloomfield City Hall
915 N. First Street
April 13, 2016 Commission Chambers San Juan County
San Juan County Administrative Bldg.
100 S. Oliver Street
May 11, 2016 Executive Conference Room Farmington
Farmington Municipal Building
800 Municipal Drive
June 8, 2016 City Council Chambers Bloomfield
Bloomfield City Hall
915 N. First Street
July 13, 2016 Commission Chambers Aztec
Aztec City Hall
201 W. Chaco Street
August 10, 2016 Executive Conference Room Farmington
Farmington Municipal Building
800 Municipal Drive
September 14, 2016 City Council Chambers Bloomfield
Bloomfield City Hall
915 N. First Street
October 12, 2016 Commission Chambers San Juan County
San Juan County Administrative Bldg.
100 S. Oliver Street
November 9, 2016 Commission Chambers Aztec
Aztec City Hall
201 W. Chaco Street
December 14, 2016 Executive Conference Room Farmington
Farmington Municipal Building
800 Municipal Drive
19
Mr. Wakan stated that the highlighted months on the schedule were the months in
which TIP amendments are performed.
Mr. Sypher asked if the Technical Committee had any concerns with the proposed
schedule and if they wanted additional time to consider the dates. Those members
present thought the schedule was good and that it was important to make the change
to accommodate attendance by the NMDOT representatives.
ACTION: Ms. Lopez moved to approve the 2016 Regular Meeting Schedule. Mr. Keck
seconded the motion. The motion was passed unanimously.
8. REVIEW AND CONSIDER RECOMMENDING APPROVAL OF THE 2015 FALL WEEKDAY
TRAFFIC COUNT LIST
Subject: 2015 Fall Traffic Counts
Prepared by: Duane Wakan, MPO Planner
Date: October 29, 2015
BACKGROUND
The MPO conducts traffic counts at locations throughout the MPO area twice a
year, on a rotating basis such that each location is counted every three years.
Counts are posted to a web-based map with a link from the MPO website.
The MPO collects directional volume counts at most count locations, and speed
and vehicle classification at select locations.
CURRENT WORK
This fall, 44 locations will be counted, 16 of which will count speed and vehicle
classification. The table and map of the locations are attached.
RECOMMENDATION
The 2015 Fall Traffic Count list is presented for recommendation, and will be
forwarded to the Policy Committee.
DISCUSSION: Mr. Wakan reviewed the list of scheduled fall traffic counts. The list of
the locations and a map of the region showing the exact locations were found on Pages
20 & 21 of the Agenda. He asked the Technical Committee members to review the list
and to let Staff know of any maintenance or construction issues with any count
location.
Mr. Wakan said the tentative schedule for the traffic counts were for November 10,
11, and 12. Counts are typically not taken on a holiday (November 11 is Veterans’ Day)
or on Mondays or Fridays, but the consultant had some scheduling conflicts with
20
getting the counts done quickly on any other week. Mr. Sypher thought that if a count
taken on the holiday would give an erroneous count, it was important to ask the
consultant to schedule the MPO on a different week. Other Technical Committee
members agreed with this.
Mr. Wakan said he would follow up with the consultant and see about getting a
different week for the counts. Mr. Sypher asked if the list followed the normal three-
year rotation for counts. Mr. Wakan said the rotation of counts had not been changed.
ACTION: The report was received.
9. NMDOT REPORTS
Brian Degani – Planning Division Update
Mr. Degani participated in the meeting by telephone and also provided the following
written report on the Planning Division activities:
NMDOT Asset Management Planning Division will be rolling over MPO FFY15
balances for FFY16. The FMPO will have to request a rollover of any remaining
FFY15 funding into FFY16 and will have to amend their FFY15-FFY16 UPWP
accordingly.
Tribal/Local Planning Agencies (T/LPAs)
Per NMDOT Project Oversight Department (POD), important deadlines for
T/LPA projects:
1) March 15 for signed (by entities) agreements to be returned to
NMDOT. Design agreements will be executed and funds
obligated. Construction agreements will be held for execution pending PSE (9-
day letter requirements).
2) June 15th is the obligation deadline. In most cases this would be when
the 9-day letter.
Upcoming Meetings/Trainings/Timelines
The Pedestrian and Bicycle Information Center (PBIC) is offering a webinar
series on pedestrian safety countermeasures. Since NM and Albuquerque
are a focus state and city, respectively, due to our high numbers of per
capita pedestrian fatalities, these strategies are very relevant.
Registration is FREE. It’s a 12 part webinar series, running from Oct. 2015
to Jan. 2016. Info and registration:
http://www.pedbikeinfo.org/training/webinars_PSAP_countermeasurestra
tegies.cfm
The T/LPA Semi-Annual Training of the Federal and State Inception to
Completion for a Successful Project is taking place this week from
November 3-5, 2015 in Albuquerque. Contact Mary Eloise Martinez at
(505) 827-5273 for registration information.
FTA published the Transit Asset Management Plan NPRM and the PDF has a
60 day comment period (comments are due to FTA by November 30, 2015).
Dave Harris is the lead for NMDOT comments, so please copy him on any
comments your agencies submit. Docket Number: FTA–2014–0020 Website:
21
http://www.regulations.gov/#!documentDetail;D=FTAFRDOC0001-0595 Due
Date: Nov. 30, 2015
Reminder: FHWA-HQ Office of Freight Management and Operations (HOFM)
MPO Freight Program Assessments are due to Paul by November 30, 2015.
He sent out an email regarding this on October 13, 2015. The intent of these
reviews is the following:
For State DOTs/MPOs to define what they are doing relative to freight
transportation.
To help FHWA, States and local entities identify potential gaps in freight
planning and programs
To enable FHWA to focus resources to advance freight transportation.
Mr. Degani reported that the Planning Division would be rolling over the remaining PL
funding balances to FFY2016. He has processed for payment this week the 4th Quarter
FFY2015 reimbursement package. The MPO will need to submit a request to roll over
any remaining FFY2015 funding balances and will also need to amend the FFY2015-
2016 UPWP. Mr. Degani noted that the PPP amendment and the UPWP amendments
can be simultaneously if desired.
Mr. Degani reviewed the important deadlines for Tribal/Local Planning Agencies
(T/LPA) projects noted above.
Mr. Degani reminded all that the MPO Freight Program Assessments are due to Paul
Sittig by November 30. The intent of these reviews is to define what NMDOT does for
freight transportation and identify gaps in freight planning programs and activities. It
also enables FHWA to focus resources for advance freight transportation needs. More
discussions and information on this will take place during the MPO Quarterly in
December.
Mr. Degani also noted the upcoming joint NMDOT and MPO Technical Committee
meeting in December in Bloomfield.
Mr. Sypher thanked Mr. Degani for his consistent attendance and participation in the
Technical Committee meetings.
David Quintana – District 5 Update
Mr. Quintana was on vacation and unable to attend the meeting.
10. INFORMATION ITEMS
Subject: Information Items
Prepared by: Duane Wakan, MPO Planner
Date: October 29, 2015
22
INFORMATION ITEMS
a. Upcoming Training: T/LPA Semi-Annual Training – State and Federal
Inception to Completion for a Successful Project. Mr. Fillerup is
attending this two and one-half day training in Albuquerque.
b. MPO Quarterly. The MPO Quarterly will be held on December 14 and 15 at
the Mesilla Valley MPO in Las Cruces.
c. Joint MPO & NMDOT Meeting. The next joint Technical Committee and
NMDOT meeting is scheduled for December 10 in Bloomfield.
d. Data Needs for NMDOT Collaboration. Staff is working with NMDOT on
asset management and other data collection efforts and more details on
local participation will be known prior to the MPO Quarterly.
e. Other.
DISCUSSION: Mr. Fillerup is attending the T/LPA training in Albuquerque.
The MPO Quarterly is scheduled for the Mesilla Valley MPO in Las Cruces on December
14 and 15.
The next joint MPO and NMDOT meeting will be on December 10 in Bloomfield.
Invitations will be sent out to District 5 and the Planning Division.
The data needs for NMDOT collaboration were previously discussed.
Mr. Wakan reported that Staff had requested to be notified when design reviews and
public meetings were held on US 64 project phases. A recent 30% review of Phase V of
the project (F100112) was held in Santa Fe and Staff was not notified of this meeting.
NMDOT is now moving forward with the 60% plan and there are no multi-modal
facilities in their current 60% plan. Mr. Wakan said that Staff was informed that once
the 60% plan is in place, it is very difficult to make recommendation for changes that
might be meaningful and potentially redirect the plan. Mr. Wakan asked if the
Technical Committee would like to see NMDOT come to San Juan County and hold a
public meeting here to receive local input rather than in Santa Fe. Ms. Holton added
that the MPO is considering making this request of NMDOT, but having the Technical
Committee’s support and consensus would add weight to the request.
The Technical Committee members thought this was a positive thing especially since
they had not notified us of the 30% review meeting. Mr. Sypher said that this could
possibly be part of the joint meeting with NMDOT on December 10. Mr. Wakan said he
would propose this, but it would ultimately be based on their public noticing
requirements for the plan review.
23
11. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
There was no business from the Chairman, Members and Staff.
12. BUSINESS FROM THE FLOOR
There was no business from the Floor.
13. ADJOURNMENT
Mr. Sypher adjourned the meeting at 11:08
___________________________ ___________________________
David Sypher, Chair June Markle, Administrative Aide
24