MPO Technical Committee
Regular MeetingFarmington, NM · November 10, 2021
Agenda
MPO POLICY COMMITTEE
AGENDA
November 10, 2021
10:00 a.m.
Council Chambers
City of Farmington
800 Municipal Drive
Farmington, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
November 10, 2021 10:00 AM
This regular meeting will be held in Council Chambers at Farmington City Hall, 800
Municipal Drive, Farmington, New Mexico. Virtual participation will also be provided
via GoToMeeting.
ITEM PAGE
1. Call to Order: Call meeting to order
2. Minutes: Approve the minutes from the October 13, 2021 Technical Committee 23-28
Meeting.
3. FFY2022-2027 TIP Amendment #1: Review and consider recommending 1-3
approval of proposed Amendment #1 to the FFY2022-2027 TIP and the Self-
Certification for Amendment #1:
a. Review the project(s) in proposed Amendment #1
b. Hold a public hearing on proposed Amendment #1
c. Consider recommending approval of proposed Amendment #1 and the
Self-Certification for Amendment #1 to the FFY2022-2027 TIP
Presented by: Peter Koeppel
4. Proposed Meeting Schedule for FY2022: The proposed meeting schedule for 4-9
FY2022 will be presented for discussion and review
Presented by: Peter Koeppel
5. Review PM 1 Safety Performance Measures for FY2022: The PM 1 Safety 10-16
Performance Measures for FY2022 will be presented for discussion and review
Presented by: Peter Koeppel
6. Project Updates from Technical Committee Members: Members will provide 17-19
updates on their current projects.
7. Reports from NMDOT
a. Update from the Planning Bureau (Joseph Moriarty)
b. Update from District 5 (Javier Martinez)
8. Committee Member Discussion Item(s) 20
No additional discussion items were presented for inclusion on the Agenda
9. Information Items 21
a. RTP/CMAQ/TAP Project Applications Submitted to NMDOT
Presented by: FMPO Staff
10. Business from Chairman, Members, and Staff
11. Public Comment on Any Issues Not on the Agenda
12. Adjournment
The public body may only take action on an item if it is
listed for action on the publicly noticed agenda.
The public is invited to participate in this GoTo Meeting:
By using a computer, tablet, or smartphone
https://global.gotomeeting.com/join/583329685
or by dialing: 1 (224) 501-3412 and entering access code: 583-329-685
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in need of a
reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid or service to
attend or participate in the hearing or meeting, please contact the MPO Administrative Assistant at the
Downtown Center, 100 W Broadway, Farmington, New Mexico or at 505-599-1466 at least one week prior
to the meeting or as soon as possible. Public documents, including the agenda and minutes, can be
provided in various accessible formats. Please contact the MPO Administrative Assistant if a summary or
other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: Amendment #1 to the FFY2022-2027 TIP
Prepared by: Peter Koeppel, MPO Officer
Date: November 10, 2021
BACKGROUND
The first Call for Projects for the FFY2022-2027 TIP Amendment #1 was sent
on October 19, 2021; a reminder sent out on October 31.
The Public Notice for Amendment #1 to the FFY2022-2027 TIP was published
on the MPO’s website and in the Daily Times on October 31, 2021
The amendment includes the addition of one project: US-550 pavement
rehabilitation from MP 161 to 168.3
The Technical Committee will consider recommending approval of proposed
Amendment #1 and the Self-Certification for Amendment #1 to the Policy
Committee on November 10
AMENDED TIP PROJECT(S)
US-550 pavement rehabilitation from MP 161-168.4 in federal fiscal year 2025
o Estimated cost $9.5 million
ANTICIPATED WORK
Hold a public hearing on TIP Amendment #1 on November 10, 2021.
Consider recommending approval to the Policy Committee of TIP Amendment
#1 and the Self-Certification.
Seek approval of the Amendment #1 and the Self-Certification at the
November 18, 2021 Policy Committee meeting.
ATTACHMENTS
The e-STIP description for projects in Amendment #1 to the FFY2022-2027 TIP.
The Self-Certification for Amendment #1 to the FFY2022-2027 TIP.
ACTION ITEM
Staff recommends that the Technical Committee consider recommending
approval to the Policy Committee of proposed Amendment #1 and the Self-
Certification for Amendment #1 to the FFY2022-2027 TIP.
APPLICABLE CITATIONS
§ 450.328 TIP revisions and relationship to the STIP.
1
(a) An MPO(s) may revise the TIP at any time under procedures agreed to by
the cooperating parties consistent with the procedures established in this
part for its development and approval. In nonattainment or maintenance
areas for transportation-related pollutants, if a TIP amendment involves non-
exempt projects (per 40 CFR part 93), or is replaced with an updated TIP,
the MPO(s) and the FHWA and the FTA must make a new conformity
determination. In all areas, changes that affect fiscal constraint must take
place by amendment of the TIP. The MPO(s) shall use public participation
procedures consistent with § 450.316(a) in revising the TIP, except that these
procedures are not required for administrative modifications.) After approval
by the MPO(s) and the Governor, the State shall include the TIP without
change, directly or by reference, in the STIP required under 23 U.S.C. 135. In
nonattainment and maintenance areas, the FHWA and the FTA must make a
conformity finding on the TIP before it is included in the STIP. A copy of the
approved TIP shall be provided to the FHWA and the FTA.
(c) The State shall notify the MPO(s) and Federal land management agencies
when it has included a TIP including projects under the jurisdiction of these
agencies in the STIP.
2
3
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #4
Subject: 2022 Annual Meeting Schedule
Prepared by: Peter Koeppel, MPO Officer
Date: November 10, 2021
BACKGROUND
Each year the Technical Committee approves a resolution ensuring
compliance with the open meetings act and establishes its meeting schedule
for the coming year.
Technical Committee meetings will continue to be held on the 2nd Wednesday
of each month at 10:00 a.m. Meetings continue to be rotated among the
entities to facilitate member attendance.
Virtual participation for meetings will continue to be provided.
CURRENT WORK
Staff is presenting this proposed meeting schedule for review by the
Technical Committee.
Staff will seek considered adoption of the 2022 meeting schedule and
Technical Committee Resolution 2021-1 at the December 8 meeting.
ATTACHMENTS
The proposed FMPO Technical Committee 2022 Regular Meeting Schedule.
Proposed Technical Committee Resolution 2021-1 adopting the 2022 Regular
Meeting Schedule.
INFORMATION ITEM
Staff recommends that the Technical Committee review the proposed 2022
meeting schedule and Technical Committee Resolution 2020-1.
4
EXHIBIT “A”
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
2022 Regular Meeting Schedule
TECHNICAL COMMITTEE
All meetings will be held at 10:00 a.m. at the locations listed below.
MPO will seek final approval to TIP Amendments in the months highlighted below.
Date Location and City
January 12, 2022 Executive Conference Room Farmington
Farmington City Hall
800 Municipal Drive
February 9, 2022 Commission Chambers San Juan County,
San Juan County Administrative Bldg. Aztec
100 S. Oliver Street
March 9, 2022 Council Chambers Bloomfield
Bloomfield City Hall
915 N. First Street
April 13, 2022 Council Chambers Kirtland
Kirtland Town Hall
47 Road 6500
May 11, 2022 Commission Chambers Aztec
Aztec City Hall
201 W. Chaco Street
June 8, 2022 Executive Conference Room Farmington
Farmington City Hall
800 Municipal Drive
July 13, 2022 Commission Chambers San Juan County,
San Juan County Administrative Bldg. Aztec
100 S. Oliver Street
August 10, 2022 Council Chambers Bloomfield
Bloomfield City Hall
915 N. First Street
September 14, 2022 Council Chambers Kirtland
Kirtland Town Hall
47 Road 6500
October 12, 2022 Commission Chambers Aztec
Aztec City Hall
201 W. Chaco Street
November 9, 2022 Executive Conference Room Farmington
Farmington City Hall
800 Municipal Drive
December 14, 2022 Commission Chambers San Juan County,
San Juan County Administrative Bldg. Aztec
100 S. Oliver Street
5
6
7
8
9
FARMINGTON METROPOLITAN PLANNING ORGRANIZATION
Agenda Item #5
Subject: National Performance Management Measures
for Highway Safety Improvement Program (PM
1)
Prepared by: Peter Koeppel, MPO Officer
Date: November 10, 2021
BACKGROUND
23 CFR §490 Subpart B – National Performance Management Measures for
Highway Safety Improvement Program (see attached).
The FHWA requires that MPOs establish targets for five (5) safety
performance measures for all public roads in the MPO planning area within
180 days after the State establishes each target.
The five Performance Measures to be considered are: 1) Number of
Fatalities, 2) Number of Serious Injuries, 3) Fatalities per 100 Million VMT
(Vehicle Miles Traveled) or Fatality Rate, 4) Serious Injuries per 100 Million
VMT (Vehicle Miles Traveled) or serious injury rate, and, 5) Number of Non-
Motorized Fatalities and Non-Motorized Fatalities and Serious Injuries.
The first three targets are common measures and must be identical to the
targets established for the Highway Safety Plan (HSP).
MPOs may either: Agree to support State targets OR Establish specific
numeric targets for a safety performance measure (number or rate).
Reporting is done on an annual basis, leaving the choice to adopt State
standards vs. establish MPO specific targets up to the MPO Policy Committee
each year.
CURRENT ISSUES & RECOMMENDATIONS
This item will be presented to both committees in November for their
information. It will be brought back to both the Technical and Policy
Committees in January for their recommendation/approval.
Staff recommends that the state targets be adopted for 2022.
FMPO Policy Committee action is due no later than February 27, 2022.
ATTACHMENTS
NMDOT’s Proposed Performance Measure (PM) Target Report – PM 1 for Year
2022
INFORMATION ITEM
This is being presented during the November meeting as an introduction.
APPLICABLE CITATIONS
Requirement for MPOs to establish performance targets for Federal-aid highway
measures and public transportation established by USDOT.
10
23 USC 134(h)(2)
49 USC 5303(h)(2)
49 USC 5304(d)(2)
Requirements to include discussion in the metropolitan and statewide transportation
improvement program as to how the planned program will achieve State/MPO
targets:
23 USC 134(j)(2)(D)
23 USC 135(g)(4)
49 USC 5303(j)(2)(D)
49 USC 5304(g)(4)
11
Memorandum NMDOT Proposed 2022 PM 1 Safety Targets
Memorandum
To: Farmington MPO
Santa Fe MPO
Mesilla Valley MPO
Mid‐Region MPO
El Paso MPO
Re: Proposed 2022 Safety Targets
From: Jason Coffey
HSIP Planner
Jason.coffey@state.nm.us
505‐469‐7491
Date: 06/15/2021
As presented at the MPO Quarterly 6/15/21, the target charts are included in this document for review. Generally, the
projected 5‐year moving average for each measure is the target. However, the 2020 preliminary data shows impact from
the COVID‐19 public health travel restrictions and NMDOT’s Planning Division is proposing adjusting two of the
measures to account for this. In each case where the projected 5‐year moving average is not the proposed 2022 target a
justification is provided.
The five performance measures are included as well as the VMT. VMT does not require a target but is included for
reference. Please contact me if you have questions or comments regarding the proposed targets.
New Mexico Department of Transportation proposed 2022 PM 1 Safety Targets.
1. Number of total fatalities
Target for 2022: 421.9 Fatalities
Page 1|5
12
Memorandum NMDOT Proposed 2022 PM 1 Safety Targets
2. Number of total serious injuries
Target for 2022: Limit the increase to the targets set in the 2021 PM Targets
Report to 1,030.5 A‐Injuries
Justification: Preliminary suspected serious injury numbers show a decrease of roughly
23% from 2019 to 2020. This can partially be attributed to lower VMT in 2020, due to the
COVID‐19 pandemic. In order to adjust to these fluctuations, we will use the targets that
were set in the summer of 2020, prior to any COVID‐19 considerations and impacts.
Page 2|5
13
Memorandum NMDOT Proposed 2022 PM 1 Safety Targets
3. Fatality rate
Target for 2022: 1.645 Fatalities per HMVMT
Page 3|5
14
Memorandum NMDOT Proposed 2022 PM 1 Safety Targets
4. Serious injury rate
Target for 2022: Limit the increase to the targets set in the 2021 PM Targets
Report to 3.824 A‐Injuries per HMVMT
Justification: Preliminary VMT numbers show a decrease of roughly 15% from 2019 to
2020. This can partially be attributed to the COVID‐19 pandemic. In order to adjust to
these fluctuations, we will use the targets that were set in the summer of 2020, prior to
any COVID‐19 considerations and impacts.
Page 4|5
15
Memorandum NMDOT Proposed 2022 PM 1 Safety Targets
5. Number of non‐motorized fatalities and serious injuries
Target for 2022: 190.6 non‐motorized fatalities and suspected serious
injuries
VMT‐no target required.
No target needed for the VMT.
Note: We are using the projected VMT values (not average values) for 2021
and 2022.
2021 VMT is a projection of 2015 through 2020.
2022 VMT is a projection of 2015 through 2021.
Page 5|5
16
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #6
Subject: Status of TIP Projects
Prepared by: MPO Staff & Technical Committee Members
Date: November 10, 2021
BACKGROUND
The STIP Protocols, finalized in early 2014, require that each MPO shall develop a
process to monitor the progress and status of each project in the first two years
of the TIP. These monthly reviews help correct inconsistencies in the TIP, STIP,
the MPO’s MTP, Agreement Request Forms (ARFs), etc. and provide for discussion
among the members and NMDOT representatives.
Listed below are current entity projects some of which are part of the FFY2022-
2027 TIP.
The Policy Committee approved the new FFY2022-2027 TIP on May 27, 2021,
which became effective on October 1, 2021.
TRACKING INFORMATION
Local Agreement Status (ARF) ITS/Sys ENG Certification
ROW Certification Public Involvement Certification
Design Completion 30 – 60 – 90%
Environmental Certification
Utilities Certification
Railroad Certification
Archeology Certification
ENTITY PROJECTS
Aztec
F100091 – East Aztec Arterial Phase II
F100410 – McWilliams Rd.
Bloomfield
F100300 – East Blanco Bridge
Farmington
F100099 – Foothills Drive Enhancement Phase II
F100100 – East Pinon Hills Blvd Extension Phase I
F100101 – East Pinon Hills Blvd Extension Phase II
F100132 – 20th Street Phase III
F100440 – Wildflower Parkway
F100390 – Foothills Drive Phase III
TF00001 – Red Apple Transit
Kirtland
F100420 – CR 6405
F100430 – CR 6411
San Juan County
F100021 – East Pinon Hills Blvd Extension Phase III
17
F100290 – CR 5500 Bridge Replacement
F100320 – Kirtland Schools Walk Path Extension
F100330 – Glade Run Recreation Area Trails Extension
F100360 – CR 3000 Bridge Replacement
F100370 – CR 3500 Bridge Replacement
F100380 – CR 6100 Pavement Rehab
NMDOT
F100170 - NM 173 Safety Improvements
F100341 – US 550 Pavement Rehab
F100350 – NM 371/N36 (PE)
F100351 – NM 371/N36 (Const)
ATTACHMENT
The Status Report Table of project updates received from Technical Committee
members. Subsequent project updates will be presented by members during the
committee meeting.
INFORMATION ITEM
This is an information item only. Committee members will have an opportunity to
provide any needed feedback/updates/details regarding the status of current
projects.
18
Status Reports – Entity Projects – November 10, 2021
Aztec F100091 East Aztec Arterial Phase III
F100410 McWilliams Rd.
Bloomfield F100300 East Blanco Bridge Environmental document drafted; design
revisions still in progress
Farmington F100099 Foothills Drive Enhancement Phase II Construction in progress
F100100 East Pinon Hills Blvd Extension Phase I
F100101 East Pinon Hills Blvd Extension Phase II
F100132 20th Street Phase III Project will be rebid in December
F100440 Wildflower Parkway
F100390 Foothills Drive Phase III
TF00001 Red Apple Transit
Kirtland F100420 CR 6405
F100430 CR 6411
19
San Juan County F100021 East Pinon Hills Blvd Extension Phase III
F100290 CR 5500 Bridge Replacement Phase I complete; west lane of traffic opened
on 10/28/21
F100320 Kirtland Schools Walk Path Extension Project out to bid; bids close 12/7/21
F100330 Glade Run Recreation Area Trails Ext. Construction nearly complete
F100360 CR 3000 Bridge Replacement
F100370 CR 3500 Bridge Replacement
F100380 CR 6100 Pavement Rehab
NMDOT F100170 NM 173
F100350 NM 371/Navajo 36
F100351 NM 371/Navajo 36
F100351 US 550 pavement rehab
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #8
Subject: Committee Member Discussion Items
Date: November 10, 2021
DISCUSSION ITEMS
There were no additional discussion items provided by Technical Committee members
for inclusion on the Agenda.
20
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #
Subject: Information Items
Prepared by: MPO Staff
Date: November 10, 2021
INFORMATION ITEMS
a. RTP/CMAQ/TAP Call for Projects. The MPO submitted 4 completed
applications to NMDOT.
T/LPA MPO/RTPO District Project Name Funding
Program
San Juan Glade Run Recreation Area
FMPO 5 RTP
County Trails
City of Main Street Sidewalk and ADA
FMPO 5 TAP
Farmington Improvements
City of Sunset Ave. Sidewalk and ADA
FMPO 5 TAP
Farmington Improvements
City of
FMPO 5 Westland Trail Connection TAP
Farmington
21
The minutes from the
October 13, 2021
Technical Committee meeting
are on the following pages.
22
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
October 13, 2021
Technical Members Present:
Steven Saavedra, City of Aztec
Jason Thomas, City of Bloomfield
Beth Escobar, City of Farmington
Isaac BlueEyes (Alt.), City of Farmington
Javier Martinez, NMDOT District 5
Andrew Montoya, Red Apple Transit
Nick Porell, San Juan County
Technical Members Absent: Virginia King, City of Farmington
Dan Flack, Town of Kirtland
Staff Present: Peter Koeppel, MPO Officer
Kathryn Leys, MPO Associate Planner
June Markle, Administrative Assistant
Staff Absent: None
Others Present: Paul Eckert, City Manager, City of Aztec
Katie Mason, Planning Tech, City of Aztec
Joe Moriarty, NMDOT Planning Liaison
1. CALL TO ORDER
Chair Porell called the meeting to order at 10:00 a.m.
2. APPROVE THE MINUTES FROM THE SEPTENBER 8, 2021 TECHNICAL COMMITTEE
MEETING
Ms. Escobar moved to approve the minutes from the September 8, 2021 Technical
Committee meeting. Mr. Saavedra seconded the motion. The motion to approve the
minutes passed with no opposition.
3. STATUS OF TIP PROJECTS
Subject: Status of TIP Projects
Prepared by: MPO Staff & Technical Committee Members
Date: October 13, 2021
23
BACKGROUND
The STIP Protocols, finalized in early 2014, require that each MPO shall develop a
process to monitor the progress and status of each project in the first two years
of the TIP. These monthly reviews help correct inconsistencies in the TIP, STIP,
the MPO’s MTP, Agreement Request Forms (ARFs), etc. and provide for discussion
among the members and NMDOT representatives.
Listed below are the projects currently on the FFY2020-2025 TIP.
The Policy Committee approved the new FFY2022-2027 TIP on May 27, 2021,
which becomes effective on October 1, 2021.
TRACKING INFORMATION
Local Agreement Status (ARF) ITS/Sys ENG Certification
ROW Certification Public Involvement Certification
Design Completion 30 – 60 – 90%
Environmental Certification
Utilities Certification
Railroad Certification
Archeology Certification
PROJECTS ON FMPO FFY2020-2025 TIP
Aztec
F100091 – East Aztec Arterial Phase II
Bloomfield
F100300 – East Blanco Bridge
Farmington
F100099 – Foothills Drive Enhancement Phase II
F100100 – East Pinon Hills Blvd Extension Phase I
F100101 – East Pinon Hills Blvd Extension Phase II
F100132 – 20th Street Phase III
TF00001 – Red Apple Transit
San Juan County
F100021 – East Pinon Hills Blvd Extension Phase III
F100290 – CR 5500 Bridge Replacement
F100320 – Kirtland Schools Walk Path Extension
F100330 – Glade Run Recreation Area Trails Extension
F100360 – CR 3000 Bridge Replacement
F100370 – CR 3500 Bridge Replacement
F100380 – CR 6100 Pavement Rehab
NMDOT
F100170 - NM 173 Safety Improvements
F100340 – US 550 Pavement Rehab
F100350 – NM 371/N36 (PE)
F100351 – NM 371/N36 (Const)
24
INFORMATION ITEM
This is an information item only. Committee members will have an opportunity to
provide any needed feedback/updates/details regarding the status of current TIP
projects.
DISCUSSION: The Technical Committee members provided their project updates:
City of Aztec – Steven Saavedra
East Aztec Arterial
The City of Aztec is working with their contractor to recertify the environmental and
utility certificates to NMDOT. Costs for the project are increasing and the City
Commission has had to budget more funds to complete the project. Additionally, an
administrative change is needed to the TIP to re-appropriate $183,000 into design for
FFY2021. Mr. Koeppel said administrative changes can be processed monthly and he
would get this one completed. Mr. Saavedra added that the project should go to PS&E
in March 2022.
City of Bloomfield – Jason Thomas
East Blanco Bridge
The design revisions are underway and a right-of-way draft is ready for an additional
piece of property to the southeast that will be purchased. The City is working on the
environmental certification for the project. Mr. Thomas said the project is fully
funded and expects it to be out to bid in December or January.
City of Farmington – Isaac BlueEyes
20th Street
There were no bids received on this project last month. It will be re-bid in December.
Foothills Drive Phase II
Construction is in progress following a slow start as there were delays in receiving
materials.
Red Apple Transit – Andrew Montoya
The transit shelters were received. One shelter has been installed on Ojo Court near
the Sobering House and another one is currently underway at Orchard Plaza. Mr.
Montoya reported that installation is taking about two weeks per shelter, but he
anticipates that all 16 shelters will be completed by the end of the year.
San Juan County – Nick Porell
CR 5500 Bridge
Construction is moving smoothly and the first phase of the bridge should be open to
traffic on October 27.
Kirtland Schools Walk Path Extension
This project is under review by the County’s purchasing office. Mr. Porell said they
hope to work through contracts in December and issue a notice to proceed in mid-
January to avoid a winter shutdown.
25
Glade Run Recreation Trails Extension
This project is under construction. The bike park just outside the City of Farmington
city limits was completed and it has already seen lots of use and enjoyment.
CR 6100 Pavement Rehab
The signed TPF agreement was sent back to NMDOT.
NMDOT District 5 – Javier Martinez
Mr. Martinez joined the meeting late, but commented that District 5 is working on the
applications requesting LTP funding.
Prior to Mr. Martinez joining the meeting, Mr. Moriarty stated that the MPO members
had asked when they might receive the signed PFF forms from District 5 for the
TAP/RTP/CMAQ funding. Mr. Koeppel said he would re-send that information to Mr.
Martinez. Mr. Martinez said he would get the signed PFFs back to the entities as soon
as possible.
5. REPORTS FROM NMDOT
Planning Division – Joseph Moriarty
FFY2022 began on October 1, 2021. A notice to proceed was issued to all the MPOs on
September 30, 2021.
The Planning Bureau is monitoring the 2020 Census updates and timelines. NMDOT may
be required to adjust urban area boundaries throughout the state which may affect
some MPO and RTPO boundaries. FHWA has informed NMDOT that a Federal Register
notice regarding this issue will be published next spring. Mr. Moriarty anticipates
minimal impact in the northern part of the state with Roswell being the most likely to
be impacted.
The FTP site upload information for the TAP/RTP/CMAQ applications will be in today’s
Govt-to-Govt Update. Each application must be a single PDF and are due to NMDOT on
October 29.
NMDOT’s Strategic Highway Safety Plan Update meeting will be held on November 2.
Please share the invitation with MPO members and entity staffs.
Chair Porell asked if Mr. Moriarty would follow up with Mr. Martinez on receiving the
signed PFFs from District 5. Mr. Koeppel added that all the MPO applicants need the
signed PFFs returned.
District 5 – Javier Martinez
Mr. Martinez had no additional information to report.
5. COMMITTEE MEMBER DISCUSSION ITEMS
Subject: Committee Member Discussion Items
Date: October 13, 2021
26
DISCUSSION ITEMS
There were no additional discussion items provided by Technical Committee members
for inclusion on the Agenda.
6. INFORMATION ITEMS
Subject: Information Items
Prepared by: MPO Staff
Date: October 13, 2021
INFORMATION ITEMS
b. Local Road Safety Plan. FHWA and NMDOT have offered consulting services to
the FMPO to conduct a Local Road Safety Plan.
DISCUSSION:
Mr. Koeppel reported that MPOs had been offered the opportunity to participate
and/or work with a consultant and FHWA on a local road safety program for the MPO
region. Staff has expressed interest in the program as this effort will help to identify
projects in the area eligible for federal funding for all types of users. The consultant is
already working on a similar effort with Navajo DOT so this could work well on a
county-wide basis.
Mr. Koeppel thanked Chair Porell, Mr. Thomas and Mr. BlueEyes for participating in the
recent regional ITS architecture update discussion. They are working with the NMDOT
consultant on a regional update to work on signal timing optimization, monitoring traffic,
cameras, etc. The MPO appreciate all the time and assistance from the entities.
Chair Porell commented on the possibility of collaborating with NMDOT and using their
NM Roads platform for upload and post local road conditions such as construction work,
accidents, and/or snow conditions. Chair Porell said he would look into this further and
Mr. Koeppel offered MPO assistance as well.
7. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
Mr. Saavedra reported that the City of Aztec is moving forward with moving the water
line for NMDOT’s safety improvement project on NM 173. The City’s Public Works
Director is looking to advertise the project soon with an anticipated award in
December and construction beginning in January 2022.
Mr. Martinez was able to join the meeting and replied that the NM 173 project is
scheduled to go out to bid next month with the notice to proceed and construction
beginning sometime in the spring of 2022.
27
Chair Porell reported that the New Mexico State University Extension Office in Aztec
has an open house scheduled for October 14 at 4:00 p.m. at a new community farm
they recently opened. Anyone interested is encouraged to attend.
There was no additional business from the Chairman, Members and Staff.
8. PUBLIC COMMENT ON ANY ISSUES NOT ON THE AGENDA
There was no public comment on any issues not on the agenda.
9. ADJOURNMENT
Mr. Saavedra moved to adjourn the meeting. Ms. Escobar seconded the motion. The
motion passed with no opposition. The meeting adjourned at 10:21 a.m.
___________________________ _________________________
Nick Porell, Technical Committee Chair June Markle, Administrative Assistant
28