Gainesville Regional Utilities Authority
Regular MeetingGainesville, FL · October 7, 2024
Minutes
Gainesville Regional Utilities Authority
MINUTES
October 7, 2024, 5:30 p.m.
GRU Administration Building
301 SE 4th Avenue
Gainesville, Fl 32601
Directors Present: Chair Lawson, Vice-Chair Haslam,
Craig Carter, Robert Skinner
Directors Absent: Jack Jacobs
_____________________________________________________________________
A. CALL TO ORDER
B. ROLL CALL
C. INVOCATION
Director Carter led the invocation.
D. PLEDGE OF ALLEGIANCE
E. ADOPTION OF THE AGENDA
Public Comment: Jim Konish
Moved by Craig Carter
Seconded by Robert Skinner
Motion: Adoption of the Agenda
Approved
F. APPROVAL OF MINUTES
Moved by Craig Carter
Seconded by Robert Skinner
Motion: Approval of Minutes
Aye (4): Craig Carter, Vice-Chair Haslam, Chair Lawson, and Robert Skinner
Absent (1): Jack Jacobs
Approved (4 to 0)
1. Approval of Minutes from the September 4 2024 Meeting
1
G. CHAIR COMMENTS
Chair Lawson provided a few comments and thanked GRU employees for their
hard work during Hurricane Helene restoration efforts.
H. GENERAL PUBLIC COMMENT
Jim Konish, Dean Mims, Chuck Ross, Nancy Deren, Mary Von Devinski, Kali
Blount, Tom Cunilio, David Hastings, Angela Casteel
I. CONSENT AGENDA
1. 2024-748 Fort Clarke Blvd. Sanitary Sewer Gravity Main Improvements
Project (B)
Moved by Craig Carter
Seconded by Robert Skinner
Recommendation: GRUA authorize the CEO, or his designee, to
negotiate and execute a contract with Commercial Industrial Corporation of
Ocala, FL for the Fort Clarke Blvd. Sanitary Sewer Gravity Main
Improvements Project for the price of $6,101,879.00, subject to legal review
and approval.
Approved On Consent
J. CEO COMMENTS
Chief Executive Officer, Ed Bielarski, addressed GRU budget cuts,
comments/inquiries made during general public comment as well as Hurricane
Helene restoration efforts as well as mutual aid efforts.
K. ATTORNEY COMMENTS
GRUA Attorney, Scott Walker, shared updates with the board. Additionally,
Kiersten Ballou, shared updates regarding the litigation with the City of Gainesville,
and that the trial will be held on October 23rd.
L. RESOLUTIONS (Roll Call Required)
2
M. BUSINESS DISCUSSION ITEMS
1. 2024-750 Informational presentation on the 2019 and 2023 Integrated
Resource Plans (IRP) and their significance to GRU operations and
planning (B)
GRU's Chief Executive Officer, Ed Bielarski, discussed the IRP Plans and
their significance to GRU operations and planning.
The GRU Authority Board discussed the IRP plans.
Recommendation: The GRU Authority consider the agenda item as
information only and participate and ask questions as needed.
Heard
2. 2024-751 Launch of Customer Advocate Program (B)
Government Affairs and Community Relations Director, Yvette Carter,
discussed the launch of the Customer Advocate Program (CAP).
The GRU Authority Board discussed CAP.
Recommendation: The agenda item is for informational purposes to
inform the GRU Authority of the steps being taken to further GRU’s positive
presence in the community.
Heard
N. DIRECTOR COMMENTS
Director Carter thanked GRU employees for storm restoration efforts. He also
stated that his term with the board has been extended for the time being until the
Governor's Office appoints a new director.
Director Skinner made a proposal for hosting meetings in an alternative location.
Director Carter added some additional context from previous work done on the
topic.
O. ADJOURNMENT
The Chair adjourned the meeting at 7:33PM.
_________________________
Christine Kunkel, GRUA Staff Liaison
3
Agenda
Gainesville Regional Utilities Authority
AGENDA
Monday, October 7, 2024, 5:30 p.m.
GRU Administration Building
301 SE 4th Avenue
Gainesville, Fl 32601
Authority Directors
Eric Lawson - Chair
David Haslam - Vice Chair
Craig Carter
Jack Jacobs
Robert Skinner
If you have a disability and need accommodation in order to participate in this meeting, please call
(352) 334-5051 at least two business days in advance. TTY (Text Telephone Telecommunication
Device) users please call 711 (Florida Relay Service). For Speech to Speech (STS) relay, please call
1-877-955-5334. For STS Spanish relay, please call 1-877-955-8773. For STS French Creole relay,
please call 1-877-955-8707.
Gainesville Regional Utilities Authority
A. CALL TO ORDER
Agenda Statement: The Gainesville Regional Utilities Authority encourages civil public
speech. The Gainesville Regional Utilities Authority expects each person entering this
chamber to treat others with respect and courtesy. Speakers are expected to focus on
agenda items under discussion. Signs, props, posters, food, and drinks should be left
outside the auditorium.
B. ROLL CALL
C. INVOCATION
D. PLEDGE OF ALLEGIANCE
E. ADOPTION OF THE AGENDA
(Regular and Consent)
F. APPROVAL OF MINUTES
1. Approval of Minutes from the September 4 2024 Meeting
G. CHAIR COMMENTS
H. GENERAL PUBLIC COMMENT
(for items not on the agenda, not to exceed 30 minutes total)
I. CONSENT AGENDA
Page 2 of 52
Gainesville Regional Utilities Authority
1. 2024-748 Fort Clarke Blvd. Sanitary Sewer Gravity Main Improvements Project (B)
Department: Gainesville Regional Utilities/Water WasteWater
Description: This item is seeking approval to proceed with a construction contract for
Fort Clarke Blvd. Sanitary Sewer Gravity Main Improvements Project.
The new gravity sewer main will be 24-inch diameter PVC pipe that will replace a 16-
inch ductile iron pipe that has exceeded its service life. The overall project length is
roughly 2,500 feet of new gravity sewer main and will include three trenchless jack
and bore pipe crossings under existing Alachua County roadways. The existing 16-
inch ductile iron main will either be removed or abandoned/grouted in place. The
proposed gravity sewer main will be replaced all the way to the existing Lift Station
21, located at 1920 Fort Clarke Blvd.
GRU Procurement issued an Invitation To Bid (ITB) for the improvements to
prospective firms and posted on OpenGov on August 20, 2024. Two (2) responses
were received on September 24, 2024. The contract award will be made to the
lowest, responsive, responsible Respondent as GRU’s CEO determines to be in
GRU’s best interest. The Intent to Award is attached.
Fiscal Note: The funds for this project are included in the FY25-FY26
Water/Wastewater budget and partially funded by the Resilient Florida Grant
Program.
Recommendation: GRUA authorize the CEO, or his designee, to negotiate and
execute a contract with Commercial Industrial Corporation of Ocala, FL for the Fort
Clarke Blvd. Sanitary Sewer Gravity Main Improvements Project for the price of
$6,101,879.00, subject to legal review and approval.
J. CEO COMMENTS
K. ATTORNEY COMMENTS
L. RESOLUTIONS (Roll Call Required)
M. BUSINESS DISCUSSION ITEMS
Page 3 of 52
Gainesville Regional Utilities Authority
1. 2024-750 Informational presentation on the 2019 and 2023 Integrated Resource
Plans (IRP) and their significance to GRU operations and planning (B)
Department: Gainesville Regional Utilities/ Office of the CEO
Description: Once every three to five years, GRU’s Energy Supply group conducts a
complex study called an Integrated Resource Plan (IRP) through which the utility
analyzes alternatives to meet the electrical energy and demand requirements of its
retail electric customers over a long-term planning horizon (typically 20 to 30 years).
Over the past five (5) years, GRU is fortunate to have completed two (2) IRPs – one
in 2019 and the other in 2023 – to consider. The span of time and information are
invaluable in evaluating GRU’s energy future.
Taking the form of a complex long-term generation expansion production model, the
IRP simulates production cost and market interactions in arriving at Net Present
Value of Revenue Requirements (NPVRR) based on a select set of operating
scenarios with a magnitude of assumptions. Each scenario and each assumption are
impacted by future risk – regulatory, financial, market, operating, and prospects of
emerging technology.
GRU’s 2019 and 2023 IRPs identified the best path forward given the evolution of
energy resource technologies along with the risk surrounding each scenario.
Completed just 4 years apart both IRPs identify different, yet somewhat similar paths
forward.
This presentation highlights the differences, similarities, and trends in the two IRPs as
the basis for developing the best action plan for GRU’s future power generation
needs
Fiscal Note: None at this point in time.
Recommendation: The GRU Authority consider the agenda as information only and
participate and ask questions as needed.
Page 4 of 52
Gainesville Regional Utilities Authority
2. 2024-751 Launch of Customer Advocate Program (B)
Department: Gainesville Regional Utilities/Community Relations
Description: As part of GRU’s overall Customer First initiative, the first program being
implemented is our Customer Advocate Program under the supervision of our
Community Relations Department.
The Vision of the program is to foster and maintain:
A thriving atmosphere and culture of trust where our customers are empowered to
pursue their issues and complaints with confidence knowing that they have a reliable
partner who will ensure their matters will be heard and addressed.
The programs goals and objectives are to:
• Expand Community Relation’s Ombudsman role to develop a strong partnership
with and on behalf of GRU customers, and
• Ensure that our customers are aware of resources and services that are available
and assist them in accessing payment assistance through GRU’s ProjectShare and
other agencies, and
• Be responsive and timely in addressing customer issues, and
• Explore programs and opportunities to assist customers for utility payments, and.
• Improve customer dissatisfaction through positive customer interactions, and
• Ensure that customers are aware that their voices are heard and their issues are
resolved fairly, and
• Make recommendations for improvement of internal customer service processes
based on customer interactions, and
• Provide multiple points of contact for customers to be heard – surveys, drop boxes,
social media presence, etc., and
• Reduce communication/language barriers by establishing a pool of employees to
assist when needed.
GRU plans to launch the Customer Advocate Program on September 30, 2024.
Fiscal Note: No additional personnel changes or other expense budget modifications
are anticipated with the program.
Recommendation: The agenda item is for informational purposes to inform the GRU
Authority of the steps being taken to further GRU’s positive presence in the
community.
Page 5 of 52
Gainesville Regional Utilities Authority
N. DIRECTOR COMMENTS
O. ADJOURNMENT
Page 6 of 52
Gainesville Regional Utilities Authority
MINUTES
September 4, 2024, 5:30 p.m.
GRU Administration Building
301 SE 4th Avenue
Gainesville, FL 32601
Directors Present: Chair Lawson, Vice Chair Haslam
Craig Carter, Jack Jacobs, Robert Skinner
____________________________________________________________________
A. CALL TO ORDER
B. ROLL CALL
C. INVOCATION
Director Carter led the invocation.
D. PLEDGE OF ALLEGIANCE
E. ADMINISTRATIVE ITEMS
1. 2024-666 Oath of Office for New Authority Director (NB)
City Clerk Kristen Bryant swore in new GRU Authority Director Jack Jacobs.
Recommendation: The City Clerk Kristen Bryant administer an oath of office for
the new director of the Authority.
Heard
F. ADOPTION OF THE AGENDA
Public Comment: Jim Konish
Moved by Craig Carter
Seconded by Vice-Chair Haslam
Aye (5): Chair Lawson, Vice Chair Haslam, Craig Carter, Jack Jacobs, Robert Skinner
Approved (5 to 0)
Page 7 of 52
1
G. APPROVAL OF MINUTES
Public Comment: None
1. Approval of Minutes from the August 7 2024 Meeting
Moved by Craig Carter
Seconded by Robert Skinner
Aye (5): Chair Lawson, Vice Chair Haslam, Craig Carter, Jack Jacobs, Robert Skinner
Approved (5 to 0)
H. CHAIR COMMENTS
Chair Lawson shared a few updates with the board and public.
I. GENERAL PUBLIC COMMENT
Debbie Martinez, Chuck Ross, Angela Casteel, Jim Konish, Donald Shepherd, Richard
Schwab, Eddie Hodge
J. CONSENT AGENDA
1. 2024-631 SW 24th Avenue Sanitary Sewer Force Main Improvements Project
(B)
Moved by Craig Carter
Seconded by Vice-Chair Haslam
Recommendation: GRUA authorize the CEO, or his designee, to negotiate and
execute a contract with Commercial Industrial Corp. for SW 24th Avenue Sanitary
Sewer Force Main Improvements Project for the price of $4,965,360.00, subject to
legal review and approval.
Approved On Consent
2. 2024-637 Jacob Rodgers v. William Stormant and City of Gainesville, d/b/a
Gainesville Regional Utilities; Case No. 2016-CA-659; Eighth Judicial Circuit,
in and for Alachua County, Florida. (B)
Moved by Craig Carter
Seconded by Vice-Chair Haslam
Recommendation: The Gainesville Regional Utilities Authority 1) approve the
terms of the proposed settlement; and 2) authorize the City Attorney settle the
claim of Jacob Rodgers v. William Stormant and City of Gainesville, d/b/a
Gainesville Regional Utilities; Case No. 2016-CA-659; Eighth Judicial Circuit, in
and for Alachua County, Florida.
Approved On Consent
Page 8 of 52
2
3. 2024-665 William and Eulajean Malphurs v. City of Gainesville; Case No.
2023-CA-4832; Eighth Judicial Circuit, in and for Alachua County, Florida.
(NB)
Moved by Craig Carter
Seconded by Vice-Chair Haslam
Recommendation: The Gainesville Regional Utilities Authority 1) approve the
terms of the settlement; and 2) authorize the City Attorney settle the claim of
William and Eulajean Malphurs v. City of Gainesville; Case No. 2023-CA-4832;
Eighth Judicial Circuit, in and for Alachua County, Florida.
Approved On Consent
K. CEO COMMENTS
The CEO, Ed Bielarski, spoke to some of the items brought up during general public
comment.
L. ATTORNEY COMMENTS
Public Comment: Jim Konish, Jeffrey Shapiro, Chuck Ross, Donald Shepherd, Angela
Casteel, Debbie Martinez, Bobby Mermer, Elizabeth Hill
Moved by Craig Carter
Seconded by Robert Skinner
Motion: For the GRU Authority Board to authorize Folds Walker to work with GRU CEO
to draft language to prepare for a lawsuit to file against the City of Gainesville, if
necessary, without waiting for another GRUA board meeting.
Aye (5): Chair Lawson, Vice Chair Haslam, Craig Carter, Jack Jacobs, Robert Skinner
Approved (5 to 0)
M. RESOLUTIONS (Roll Call Required)
1. 2024-557 Resolution Authorizing the Amendment of Resolution No. 2024-557
Adopted by the GRU Authority on August 7, 2024 (B)
Public Comment: Jim Konish, Ernesto Martinez
Moved by Craig Carter
Seconded by Robert Skinner
Recommendation: The GRU Authority adopt the proposed resolution.
Aye (5): Chair Lawson, Vice Chair Haslam, Craig Carter, Jack Jacobs,
Robert Skinner
Approved as Recommended (5 to 0)
Page 9 of 52
3
2. 2024-632 A resolution eliminating the twenty-five percent surcharge imposed
on Gainesville Regional Utilities water and wastewater connection charges to
entities and consumers located outside of the corporate limits of the City of
Gainesville. (B)
Public Comment: Jim Konish, Bobby Mermer, Chuck Ross, Angela Casteel,
Debbie Martinez, Jeffrey Shapiro, Donald Shepherd
The board discussed the item.
CEO Ed Bielarski commented on the item.
Moved by Craig Carter
Seconded by Vice-Chair Haslam
Recommendation: The GRUA adopt the proposed resolution.
Aye (5): Chair Lawson, Vice Chair Haslam, Craig Carter, Jack Jacobs,
Robert Skinner
Approved as Recommended (5 to 0)
3. 2024-633 A resolution authorizing Gainesville Regional Utilities (GRU) to
obtain a Utility Attorney who shall be a legal advisor to and attorney for
(GRU) free from the direction and control of another legal entity, such as the
City Commission. (B)
Public Comment: Jim Konish, Debbie Martinez, Jeffrey Shapiro, Donald
Shepherd
CEO Ed Bielarski shared that the utility attorney is no longer with the City of
Gainesville, and added that there is representation at the meeting from the City
Attorney's Office.
Director Carter spoke to the item.
Moved by Craig Carter
Seconded by Robert Skinner
Recommendation: The GRUA adopt the proposed resolution.
Aye (5): Chair Lawson, Vice Chair Haslam, Craig Carter, Jack Jacobs,
Robert Skinner
Approved as Recommended (5 to 0)
Page 10 of 52
4
4. 2024-634 A resolution requesting reinstatement to the previous provision in
the City Code of Ordinances exempting Gainesville Regional Utilities (GRU)
from applicable right-of-way regulations and permit fees other than to the
extent GRU is acting as a com
*Abbreviated Title of Item exceeded character limit. Should say "as a
communications services provider".
Public Comment: Jim Konish, Chuck Ross, Brian Singleton, Angela Casteel,
Bobby Mermer, Donald Shepherd
CEO Ed Bielarski spoke to the item, and addressed some public comments that
were made.
Director Skinner and Carter inquired about the item.
Water/Wastewater Officer Debbie Daugherty spoke to a question from Director
Skinner.
Moved by Craig Carter
Seconded by Vice-Chair Haslam
Recommendation: The GRUA adopt the proposed resolution.
Aye (5): Chair Lawson, Vice Chair Haslam, Craig Carter, Jack Jacobs,
Robert Skinner
Approved as Recommended (5 to 0)
Page 11 of 52
5
5. 2024-636 A resolution requesting City of Gainesville’s Ordinance No. 2024-
352 and Ordinance No. 2024-448 placing a referendum on the November
ballot be rescinded and taking all necessary actions to ensure the ballot
measure shall not appear therewith. (B)
Public Comment: Jim Konish, Bobby Mermer, Chuck Ross, Angela Casteel,
Elizabeth Hill, Jeffrey Shapiro, Kristen Bryant
Folds Walker Attorney Kiersten Ballou addressed a question from City Clerk
Kristen Bryant.
Director Skinner made an inquiry of GRUA Attorney Folds Walker.
Folds Walker Attorney Scott Walker addressed the question from Director Skinner.
Director Carter spoke to the item at hand.
Moved by Craig Carter
Seconded by Robert Skinner
Recommendation: The GRUA adopt the proposed resolution.
Aye (5): Chair Lawson, Vice Chair Haslam, Craig Carter, Jack Jacobs,
Robert Skinner
Approved as Recommended (5 to 0)
N. BUSINESS DISCUSSION ITEMS
O. DIRECTOR COMMENTS
Director Skinner discussed some of the challenges with customer service and the
improvements that are taking to place to improve the service.
Director Carter discussed the assistance from several staff members with different
concerns brought forward from the community.
Director Jacobs shared the intent of the board to make things better for everyone.
Director Haslam shared that the utility has a lot of wonderful people working for it.
Chair Lawson shared that he will bring forward an item in the future regarding customer
service as well what the next steps are for the IRP.
P. ADJOURNMENT
Chair Lawson adjourned the meeting at 7:39pm.
_________________________
Christine Kunkel, GRUA Staff Liaison
Page 12 of 52
6
Gainesville Regional Utilities Authority
Agenda Item Report
File Number: 2024-748
Agenda Date: October 7, 2024
Department: Gainesville Regional Utilities
Title: 2024-748 Fort Clarke Blvd. Sanitary Sewer Gravity Main Improvements
Project (B)
Department: Gainesville Regional Utilities/Water WasteWater
Description: This item is seeking approval to proceed with a construction contract for
Fort Clarke Blvd. Sanitary Sewer Gravity Main Improvements Project.
The new gravity sewer main will be 24-inch diameter PVC pipe that will replace a 16-
inch ductile iron pipe that has exceeded its service life. The overall project length is
roughly 2,500 feet of new gravity sewer main and will include three trenchless jack and
bore pipe crossings under existing Alachua County roadways. The existing 16-inch
ductile iron main will either be removed or abandoned/grouted in place. The proposed
gravity sewer main will be replaced all the way to the existing Lift Station 21, located at
1920 Fort Clarke Blvd.
GRU Procurement issued an Invitation To Bid (ITB) for the improvements to prospective
firms and posted on OpenGov on August 20, 2024. Two (2) responses were received
on September 24, 2024. The contract award will be made to the lowest, responsive,
responsible Respondent as GRU’s CEO determines to be in GRU’s best interest. The
Intent to Award is attached.
Fiscal Note: The funds for this project are included in the FY25-FY26
Water/Wastewater budget and partially funded by the Resilient Florida Grant Program.
Recommendation: GRUA authorize the CEO, or his designee, to negotiate and
execute a contract with Commercial Industrial Corporation of Ocala, FL for the Fort
Clarke Blvd. Sanitary Sewer Gravity Main Improvements Project for the price of
$6,101,879.00, subject to legal review and approval.
Page 13 of 52
Item#2024-748
Fort Clarke Blvd. Sanitary Sewer
Gravity Main Improvements Project
GRUA Meeting Project Overview
October 7, 2024
Page 14 of 52
Project Overview
Replacement of gravity sewer trunk main along Fort Clarke Blvd.
from NW 90th Terrace south to Lift Station 21.
Details:
• Installed parallel to active, existing 16-inch gravity sewer main
• ~2,500 feet of new 24-inch PVC gravity sewer main, including
three trenchless jack and bore pipe crossings under roadways
• Working hours: 8 a.m. to 5 p.m.
• Partially funded (40%) by the Resilient Florida grant program and
must be under contract by Dec. 31, 2024, to meet grant
requirements
Page 215 of 52 9/30/2024
Site Plan
New Gravity Sewer Main Route
Page 316 of 52 9/30/2024
Procurement Overview
Invitation to bid released via OpenGOV on August 20,
2024
Non-mandatory pre-bid meeting held September 10,
2024 at GRU Eastside Operations Center and Site Visit.
Awarded to lowest, responsive, responsible respondent
Proposals received September 24, 2024 via GRU
e-Procurement Portal.
Recommend award to Commercial Industrial
Corporation
Page 417 of 52 9/30/2024
Recommendation
GRUA authorize the CEO, or his designee, to negotiate
and execute a contract with Commercial Industrial
Corporation for Fort Clarke Blvd. Sanitary Sewer
Gravity Main Improvements Project for the price of
$6,101,879.00, subject to legal review and approval.
Page 518 of 52 9/30/2024
Item#2024-748 A
GAINESVILLE REGIONAL UTILITIES
PURCHASING DIVISION
NOTICE OF INTENT TO AWARD
ITB# 2024-084
~Via OpenGov~
October 1, 2024
To All Respondents of ITB No. 2024-084
Fort Clarke Blvd. Sanitary Sewer Gravity Main Improvements Project (Grant Funded)
Gainesville Regional Utilities has completed its review of the responses submitted to the above
referenced ITB and is recommending award, pending FDEP funding approval, to Commercial
Industrial Corp. as the lowest Responsive Responsible Respondent based on the line items listed
below.
VENDOR NAME ITEMS INCLUDED BID AMOUNT
Commercial Industrial Corp. Total Base Bid Price (Items 1-47) Not to Exceed $ 5,732,479.00
Owner Allowance Items:
Item# 48 $ 97,000.00
Item# 49 $ 60,000.00
Item# 50 $ 120,000.00
Item# 51 $ 92,400.00
Total Bid Amount $ 6,101,879.00
:
SanPik, Inc. Total Base Bid Price (Items 1-47) Not to Exceed $ 5,966,375.00
Owner Allowance Items:
Item# 48 $ 20,000.00
Item# 49 $ 60,000.00
Item# 50 $ 200,000.00
Item# 51 $ 66,500.00
Total Bid Amount $ 6,312,875.00
Thank you for your time participating on this ITB and for your interest in doing business with
Gainesville Regional Utilities (GRU). If you have any questions, please contact me via email at
veleza1@gru.com.
Prepared By: Annie Velez
Procurement Specialist III
Page 19 of 52
Gainesville Regional Utilities Authority
Agenda Item Report
File Number: 2024-750
Agenda Date: October 7, 2024
Department: Gainesville Regional Utilities
Title: 2024-750 Informational presentation on the 2019 and 2023 Integrated
Resource Plans (IRP) and their significance to GRU operations and planning (B)
Department: Gainesville Regional Utilities/ Office of the CEO
Description: Once every three to five years, GRU’s Energy Supply group conducts a
complex study called an Integrated Resource Plan (IRP) through which the utility
analyzes alternatives to meet the electrical energy and demand requirements of its retail
electric customers over a long-term planning horizon (typically 20 to 30 years).
Over the past five (5) years, GRU is fortunate to have completed two (2) IRPs – one in
2019 and the other in 2023 – to consider. The span of time and information are
invaluable in evaluating GRU’s energy future.
Taking the form of a complex long-term generation expansion production model, the
IRP simulates production cost and market interactions in arriving at Net Present Value
of Revenue Requirements (NPVRR) based on a select set of operating scenarios with a
magnitude of assumptions. Each scenario and each assumption are impacted by future
risk – regulatory, financial, market, operating, and prospects of emerging technology.
GRU’s 2019 and 2023 IRPs identified the best path forward given the evolution of
energy resource technologies along with the risk surrounding each scenario.
Completed just 4 years apart both IRPs identify different, yet somewhat similar paths
forward.
This presentation highlights the differences, similarities, and trends in the two IRPs as
the basis for developing the best action plan for GRU’s future power generation needs
Fiscal Note: None at this point in time.
Recommendation: The GRU Authority consider the agenda as information only and
participate and ask questions as needed.
Page 20 of 52
Item#2024-750
Reconciling GRU’s Energy Future
10/7/24
Page 21 of 52
The Plan –
“Optionality”
• Run our existing assets as long as we can
• History of success in doing so:
• 2017 – Biomass PPA was bought out & plant modified to run more efficiently
• 2021 – Kelly plant was repowered
• 2021 – DH2 was converted to dual fuel capability
• 2022 – DH1 life extension undertaken
• Firm up natural gas supplies and transport to end reliance on coal
• Pursue additional generation when the opportunity arises
• Solar
• Battery
• RICE – Natural Gas plant
• Long-term PPAs
• Pursue transmission and generation alliances
Page 222 of 52
Existing
Capacity
GRU Generation and Load Forecast (as of 2023)
Page 323 of 52
IRP Process
• At least once every five years, GRU (and most electric utilities) conducts an integrated
resource plan (IRP) analysis to evaluate future energy demands and resource options
• GRU has had two IRPs performed over the past five years (2019 and 2023)
• IRP is a financial model through which future energy supply costs are calculated using a
selected set of inputs and variables
• Output of the model is only as valuable as the reliability of the inputs (future cost of gas,
solar, etc.)
• The IRP provides the broader strategic path for the utility, not the specific plan
• The specific plan is defined within the confines of GRU’s budget, capital plan, and long-
term plan
Page 424 of 52
Overview
There are several key differences between the 2019 and 2023 IRPs
Page 525 of 52
Baseline
Scenarios
R evenue R equirements Capacity Added Over Next 10 Years
Net Present Nominal Cost T otal Solar Natural B attery
Scenario / Sensitiv ity Capacity PPA
Value (Millions $) (Millions $) (MW) (Nameplate/Net) G as Storage
2019 IRP $1,961 $2,723 253 80/28 225 0 0
2023 IRP $1,652 $2,701 159 150/54 0 80 25
• 2019 IRP baseline selected solar in 2021; a large gas unit in 2032; and reciprocating gas engines in 2032
• 2023 IRP baseline selected solar in 2029; batteries in 2029; varying levels of capacity PPAs (beginning in 2027); and
deferred the retirements of CT1, CT2, and DH2 by five years
*For comparison purposes, the 2023 IRP baseline scenario was truncated to 20 years
Page 626 of 52
Other 2023 IRP
Final Scenarios
R es o u rce P lan C o s t C apacity A dded Ov er N ex t 10 Years
Net P resent Nominal Cost T otal S olar Natural B attery
S cenario / S ensitiv ity Capacity P P A
Value (M illions $) (M illions $) (M W) (Nameplate/Net) G as S torag e
B as elin e $1,652 $2,701 159 150/54 0 80 25
B as elin e w ith 2028 C T $1,655 $2,706 159 150/54 30 50 25
B as elin e (D H F S 2 R etires 2032) $1,664 $2,720 291 150/54 0 110 100
Market R elian ce u n til 2032 $1,686 $2,760 162 75/27 0 110 25
F u ll Market R elian ce beg in n in g 2032 $1,921 $3,241 412 75/27 0 385 0
B as elin e (N o S an d B lu ff) $1,658 $2,704 159 150/54 0 30 75
Market R elian ce u n til 2032 (N o S an d B lu ff) $1,687 $2,754 162 75/27 0 110 25
*For comparison purposes, the 2023 IRP baseline scenario was truncated to 20 years
Page 727 of 52
Existing
Capacity
GRU Generation and Load Forecast (as of 2023)
Page 828 of 52
The GAP
Looking at the N – 1 Criteria
Page 929 of 52
Deferring Unit
Retirements
• Generation units must ultimately retire, but their useful life may be longer than previously planned
• Deferring existing unit retirements can decrease future capacity needs (and future costs)
o Deferring GT1 & GT2’s retirements by five years delays near-term capacity needs by 35 MW (through
2031)
o Deferring DH2’s retirement by five years delays ~100 MW of capacity need from 2032 through 2036
Page10
30 of 52
Possible Resource
Mix to Meet N-1
Baseline (No Sand Bluff)
Page11
31 of 52
Solar Conundrum
Solar Price Escalation
• Original Sand Bluff price: $31.52/MWh (July 2020)
• Renegotiated Sand Bluff price: $40.56/MWh (February 2023)
• Current Price: likely greater than $50/MWh
Pricing Used in Evaluating Sensitivity of Solar PPAs Cost
Solar PPA Price Sensitivity Evaluated in 2023 IRP
Modeled PLEXOS Result
Scenario 2025 Price Tier 1 Tier 2
$/MWh MW MW current
Baseline $47.35 275 200 pricing
A $51.65 275 25 already
B $62.50 275 0 near here
C $75.63 0 0
- Result of sensitivity analysis was that solar price
would have to increase substantially before model
stops selecting Tier 1 solar
*Tier 1 solar is locally connected to GRU’s transmission system; Tier 2 solar is imported via GRU’s existing transmission system;
Tier 3 solar is imported via a new transmission line. Tier 2 & 3 solar is subject to other utilities’ transmission charges.
Page12
32 of 52
Surge in Utility-
Scale Solar Costs
• There has been a
surge in utility-
scale solar pricing
in the last three
years
• Inflation, the data
center industry,
and demand have
been drivers
Source: Level 10 Energy
Page13
33 of 52
The Optionality
• Run our existing assets as long as we can
Plan
• Firm up natural gas supplies and transport to end reliance on coal
• Pursue additional generation when the opportunity arises
• Solar
• Battery
• RICE – Natural Gas plant
• Long-term PPAs
• Pursue transmission and generation alliances
Page14
34 of 52
Thank You!
Page15
35 of 52
Gainesville Regional Utilities Authority
Agenda Item Report
File Number: 2024-751
Agenda Date: October 7, 2024
Department: Gainesville Regional Utilities
Title: 2024-751 Launch of Customer Advocate Program (B)
Department: Gainesville Regional Utilities/Community Relations
Description: As part of GRU’s overall Customer First initiative, the first program being
implemented is our Customer Advocate Program under the supervision of our
Community Relations Department.
The Vision of the program is to foster and maintain:
A thriving atmosphere and culture of trust where our customers are empowered to
pursue their issues and complaints with confidence knowing that they have a reliable
partner who will ensure their matters will be heard and addressed.
The programs goals and objectives are to:
• Expand Community Relation’s Ombudsman role to develop a strong partnership with
and on behalf of GRU customers, and
• Ensure that our customers are aware of resources and services that are available
and assist them in accessing payment assistance through GRU’s ProjectShare and
other agencies, and
• Be responsive and timely in addressing customer issues, and
• Explore programs and opportunities to assist customers for utility payments, and.
• Improve customer dissatisfaction through positive customer interactions, and
• Ensure that customers are aware that their voices are heard and their issues are
resolved fairly, and
• Make recommendations for improvement of internal customer service processes
based on customer interactions, and
• Provide multiple points of contact for customers to be heard – surveys, drop boxes,
social media presence, etc., and
• Reduce communication/language barriers by establishing a pool of employees to
assist when needed.
GRU plans to launch the Customer Advocate Program on September 30, 2024.
Fiscal Note: No additional personnel changes or other expense budget modifications
are anticipated with the program.
Page 36 of 52
Recommendation: The agenda item is for informational purposes to inform the GRU
Authority of the steps being taken to further GRU’s positive presence in the community.
Page 37 of 52
Item#2024-751
Gainesville Regional Utilities
Customer Advocate Program
Page 38 of 52
Some of What We Do Now Enhanced Services
o Community Relations serves as the Ombudsman to o Ensure that our customers are aware of resources
the community on behalf of the utility. and services that are available to them.
o Expand Community Relations’ Ombudsman role to
o Community Relations investigates and collaborates
facilitate a strong partnership of advocacy on behalf
with Customer Service staff to resolve customer
of our customers regarding their utility bills and
issues.
services.
o Community Relations keeps customers abreast of the o Assist customers in accessing help for payment
progress of their reported issue and its ultimate assistance.
resolution. o Stay abreast of programs and opportunities available
o Community Relations serves as GRU’s liaison with to our customers for utility payment assistance.
GRU’s ProjectShare Partners. o Be responsive and timely to address customer issues.
o Community Relations partners with other local o Improve customer dissatisfaction through positive
agencies including the Community Action Network to customer interactions and the adoption of and
provide community outreach events to facilitate adherence to GRU’s WE Motto.
customers obtaining assistance with their utility bills. o Make recommendations for review and analysis of
internal processes based on issues, complaints, and
insights obtained through this process.
Page 239 of 52 10/1/2024
GRU’s Customer Advocate Program
Awareness and Accessibility
1. Dedicated phone line and email address
2. Flyers and retractable sign in the lobby
3. Availability of a Customer Advocate in the lobby.
4. CAP intake form: https://forms.office.com/g/skiywW9z1v
5. GRU website – jot form: https://www.gru.com/Our-
Community/Customer-Advocates
Page 340 of 52 10/1/2024
Advocate Services:
Assistance with setting up reasonable, affordable payment arrangements
Assistance with appealing decisions on behalf of the customer
Help the customer to understand billing process and the specific details regarding
their “case”
Keep customers abreast of the status of their “case”
Help the customer with applying to programs for utility payment assistance
Follow up with customers to ensure they are able to honor their payment
arrangements
Be more accessible (dedicated phone line, daily presence in the lobby, GRU
website)
Page 441 of 52 10/1/2024
GRU Customer Advocate Contact Information
Phone Number:
352–393-1020
Email:
CommunityRelations@gru.com
A customer advocate will have a daily preference in GRU’s lobby as follows:
Page 542 of 52 10/1/2024
Thank You
Page 43 of 52
Item#2024-751
Gainesville Regional Utilities
Community Relations:
Customer Advocate Program
An Abbreviated Business Plan & Strategy
Page 44 of 52
Vision Statement
A thriving atmosphere and culture of trust
where our customers are empowered to pursue
their issues and complaints with confidence
knowing that they have a reliable partner who will
ensure that their matters will be heard and
addressed.
Page 45 of 52
Today’s Situation
1. Community Relations serves as the Ombudsman to the community on
behalf of the utility.
2. Community Relations receives and processes customer complaints and
issues that escalate to GRU’s CEO.
3. Community Relations investigates and collaborates with Customer
Service staff to resolve customer issues.
4. Community Relations keeps customers abreast of the progress of their
reported issue and its ultimate resolution.
5. Community Relations maintains a log of referred matters and ultimate
resolutions.
6. Community Relations serves as GRU’s liaison with GRU’s ProjectShare
Partners.
7. Community Relations partners with other local agencies including the
Community Action Network to provide community outreach events to
facilitate customers obtaining assistance with their utility bills.
8. Community Relations serves as a clearinghouse for fielding customer
inquiries and referring them to the appropriate source for assistance.
Page 46 of 52
Goals and Objectives
1. Expand Community Relations’ Ombudsman role to facilitate a strong
partnership of advocacy on behalf of our customers regarding their
utility bills and services.
2. Ensure that our customers are aware of resources and services that are
available to them and assist them in accessing help for payment
assistance through GRU’s ProjectShare and other agencies or
programs.
3. Stay abreast of programs and opportunities available to our
customers for utility payment assistance.
4. Be responsive and timely to address customer issues.
5. Improve customer dissatisfaction through positive customer
interactions and the adoption of and adherence to GRU’s WE Motto.
6. Ensure that customers are keenly aware that their voices are heard
and their issues will be resolved fairly and timely.
7. Make recommendations for review and analysis of internal processes
based on issues, complaints, suggestions and insights obtained
through this process.
8. Provide multiple avenues for customers to relay information regarding
their concerns including surveys, drop boxes, etc.
9. Reduce communication/language barriers by establishing a pool of
employees to assist where needed.
Page 47 of 52
GRU’s ‘WE’ Motto
GRU Customer Advocate
WE are here for you.
We statements:
We bring together case management expertise to help our customers
We are here to help
We provide 1:1 support to our customers
We help customers understand their options
We provide a quality experience to every customer; it’s our top priority
We provide in-depth, hands-on support required to address and resolve issues
We help the customer navigate customer service with confidence
We utilize appropriate communication lines in relaying problems, concerns,
questions, and potential resolutions
We facilitate effective communication between the customer and utility
professionals
We always maintain a courteous demeanor
We demonstrate effective, empathetic and professional communication
We identify and address existing gaps and opportunities within existing
customer service processes to ensure customers receive support for
their issues
Page 48 of 52
Advocate Services
Assistance with setting up reasonable, affordable payment
arrangements
Assistance with appealing decisions on behalf of the customer
Helping the customer to understand billing process and the specific
details regarding their “case”
Keep customers abreast of the status of their “case”
Helping the customer with applying to programs for utility payment
assistance
Follow up with customers to ensure they are able to honor their
payment arrangements
Page 49 of 52
Proposed Implementation
1. Define the role of Community Relations/Customer Advocate to internal
stakeholders/partners:
a) Meet with the leaders of the internal stakeholders (i.e., Customer Service
Director, Customer Service Managers, Customer Experience Manager,
etc.) to provide information regarding the expanded role of Community
Relations as the Customer Advocate.
b) Express the importance of each stakeholder’s role and partnership in the
successful facilitation of this program for our customers.
c) Ensure that front line customer service staff are aware of how to escalate
issues to Community Relations by referring customers directly to an
Advocate or contacting the Advocate via e-mail or phone on behalf of
the customer.
d) Provision of literature that provides program guidelines and contact
information
e) Referring customers to the lobby phone to contact a Customer Advocate
for an immediate consultation or to schedule a consultation for a later
date (dependent upon the severity of customer’s issue).
2. Collaborate with Communications to develop and implement a plan for
notification of the availability of this resource internally and externally,
creation and provision of collateral, etc.
a) Flyers posted in the lobby and at the customer service stalls
b) Notification about the program on the utility bill
Page 50 of 52
Proposed Implementation
(cont.)
c) Message regarding the program on the television in GRU’s lobby
d) Literature/handouts that explains the program and provides contact
information to be used at events GRU attends or coordinates.
e) Exploration and consideration of other avenues as recommended by
Communications
3. Determination of the collaborative roles of the Customer Experience
Manager, Customer Service Manager, etc.
a) Customer Advocate may regularly schedule meetings with the CS
Manager or CE Manager for consultation with and on behalf of the
customer.
4. Designation of private office/meeting location for in-person meetings with
customers:
a) Assignment and utilization of the glass encased office for impromptu and
scheduled meetings.
b) Provide schedule in lobby that customers can use to schedule a meeting.
Also make business cards easily accessible in the lobby.
Page 51 of 52
Recommendations
Most of the Customer Advocate work is currently within the scope of
Community Relations’ responsibility as the utility’s Ombudsman for the
community. Expanding Community Relations’ role as described herein would
entail the following recommendations*:
• Meet with the Chief Customer Officer to discuss the incorporation of
Community Relations at an increased level.
• Discuss and determine level of interface and partnership with other
managers of customer services (e.g., Customer Experience Manager,
Customer Service Manager, etc.) if deemed appropriate.
• Work with Communications to devise and implement plan to bring
awareness about this service, create collateral, etc.
• Revise internal processes for expanded level of service.
• Develop an implementation schedule to include a rollout schedule for
each phase of this program.
*Note: With the exception of the rollout schedule, each of these items have been discussed
in detail under the Proposed Implementation section.
Page 52 of 52