Architectural & Historic Board of Review
Regular MeetingHudson, OH · January 11, 2023
Minutes
City of Hudson, Ohio
Meeting Minutes - Final
Architectural & Historic Board of Review
Wednesday, January 11, 2023 7:30 PM Town Hall
27 East Main Street
I. Call To Order
Chair Caputo called to order the regularly scheduled meeting of the Architectural & Historic
Board of Review of the City of Hudson at 7:30 p.m., in accordance with the Sunshine Laws of
the State of Ohio, O.R.C. Section 121.22.
II. Roll Call
Present: 6 - Mr. Caputo, Mr. Funyak, Mr. Ray, Mr. Workley, Ms. Marzulla and Mr. Wetzel
Absent: 1 - Ms. Kenney
III. Election of Officers & Industrial Design Committee
The following were elected by the AHBR for 2023:
1. Chair - John Caputo
2. Vice Chair - Allyn Marzulla
3. Secretary - John Workley
4. Industrial Design Subcommittee - Allyn Marzulla and John Workley
IV. Public Comment
Mr. Sid Nelson, 52 Aurora Street, commented on the application for 64 Aurora Street noting
his home is directly affected by the proposed work. Mr. Nelson described what he believed
would be an expanse of 16-feet with no fenestration which violates the LDC and the removal
of the window on the first floor resulting in an unbalanced look. Mr. Nelson also noted using
trees to balance the look of the house is not binding on the resident nor permitted by the LDC .
V. Consent Applications
A motion was made by Mr. Workley, seconded by Ms. Marzulla, that the Consent
Agenda be approved. The motion carried by the following vote:
Aye: 6 - Mr. Caputo, Mr. Funyak, Mr. Ray, Mr. Workley, Ms. Marzulla and Mr. Wetzel
A. AHBR 22-116737 Laurel Lake Drive
Addition (Garage, 754 SF)
Attachments: 37 Laurel Lake AHBR Packet - Revised
This AHBR item was approved on the Consent Agenda.
City of Hudson, Ohio Page 1
Architectural & Historic Board of Review Meeting Minutes - Final January 11, 2023
VI. Old Business
A. AHBR 22-111680 N. Oviatt Street (Historic District)
Alterations (Dormer & Window Replacements to Accessory Structure)
Attachments: 80 N. Oviatt AHBR Packet - Revised
Ms. Davey introduced the application by noting an informal review took place at the
December 14, 2022 AHBR meeting and a site visit was conducted on January 4 , 2023. Ms.
Davey then displayed and explained the revised elevations.
Mr. & Ms. Donald Harvey, homeowners, stated a preference for the larger dormer which they
believe is symmetrical to the rear dormer.
The Board discussed the two dormer alternatives, noted there is no evidence the building is
historical and there have been many additions and changes through the years .
A motion was made by Mr. Ray, seconded by Mr. Workley, that this AHBR Application
be approved. The motion carried by the following vote:
Aye: 5 - Mr. Caputo, Mr. Funyak, Mr. Ray, Mr. Workley and Mr. Wetzel
Nay: 1 - Ms. Marzulla
B. AHBR 22-113864 Aurora Street (Historic District)
Alterations (Windows, Garage and Patio Doors)
Attachments: 64 Aurora AHBR Packet - Revised
64 Aurora AHBR Packet - December Meeting
Ms. Davey introduced the application by noting an informal review took place on December
14, 2022 by AHBR and a site visit on January 4, 2023. Ms. Davey also displayed photos and
elevations of the existing house and proposed work and noted staff's principle concern is the
west elevation.
The Board reviewed their observations and thoughts from the site visit(s).
Mr. John Morris, homeowner, was present for the meeting.
The Board, homeowner and staff discussed, the west side spacing of the fenestrations, the
proposed reduced number of windows on the west side as being a dramatic change, the
significance of this structure being in the historic district with the west elevation being on the
corner of College Street and alternative window placements and types which would be
approved by AHBR when revised elevations are submitted. Mr. Morris and the Board also
discussed windows which may be ordered for the other three sides of the structure .
A motion was made by Mr. Ray, seconded by Mr. Workley, that the North, East and
South sides of this AHBR Application be approved and the West side elevation be
resubmitted to AHBR for approval. The motion carried by the following vote:
Aye: 6 - Mr. Caputo, Mr. Funyak, Mr. Ray, Mr. Workley, Ms. Marzulla and Mr. Wetzel
VII. New Business
City of Hudson, Ohio Page 2
Architectural & Historic Board of Review Meeting Minutes - Final January 11, 2023
A. AHBR 22-114912 Owen Brown Street (Historic District)
Alterations (Detached Garage Siding, Roof, Windows)
Attachments: 12 Owen Brown AHBR Packet - Revised
Mr. Hannan introduced the application by displaying photos and describing the proposed
project.
Mr. Roberto Sorgi, described the project and the reason for eliminating the rear window.
The Board, applicant and staff discussed alternatives to the rear window, noted it is not a
historical structure, that lapped, wood looking Hardie Board will be used on the existing walls
which will match the house and that this is a replacement in-kind project which is approved
by the LDC.
A motion was made by Mr. Funyak, seconded by Mr. Ray, that this AHBR Application
be approved as amended with a faux window on the side. The motion carried by the
following vote:
Aye: 4 - Mr. Caputo, Mr. Funyak, Mr. Ray and Mr. Wetzel
Nay: 2 - Mr. Workley and Ms. Marzulla
City of Hudson, Ohio Page 3
Architectural & Historic Board of Review Meeting Minutes - Final January 11, 2023
B. AHBR 22-119311 South Main Street (Historic District)
Alterations (Windows, Doors & Roof)
Submitted by Quinn Miller, Peninsula Architects
a) Staff notes the project was reviewed at the January 11, 2023, Board
meeting. The Board requested a site visit, which was conducted on
January 18, 2023.
b) The Board requested Naylor Wellman, Historic Preservation Consultant,
to review and provide an advisory report.
c) The applicant submitted updated plans reflecting staff comments and the
Historic Preservation Consultant’s advisory report.
d) Naylor Wellman recommends approval of the plans as presented to be in
compliance with the Secretary of the Interior Standards for Rehabilitation
with the following two comments:
· The proposed replacement windows may be casement or double
hung but should match the existing window configuration and size of
pane. Windows should be aluminum clad wood and the color should
be consistent with the historic fabric.
· Gutters and downspouts should match neighboring materials in
color.
Attachments: 11 S. Main AHBR Packet 2.8.23 Meeting
11 S. Main AHBR Packet 1.11.23 Meeting
Historic Preservation Consultant Advisory Report
Mr. Hannan introduced the application by displaying photos and elevations of the project .
Mr. Matt Schwarz, Peninsula Architects, described the scope of the work including structural
issues requiring log, rafter, window and door replacement, tuck pointing of the exterior
fireplace and other minor changes. Mr. Schwarz also noted gutters will be added to the
exterior.
The Board, applicant and staff discussed making the shiplap siding vertical, the chinking
replacement, the window style and lead flashing replacement.
The Board determined to conduct a site visit.
This matter was discussed
City of Hudson, Ohio Page 4
Architectural & Historic Board of Review Meeting Minutes - Final January 11, 2023
C. AHBR 22-901 70 York Drive
Addition (Second Floor Bedrooms, Etc., 950 SF)
Attachments: 70 York Dr. Packet for AHBR - Revised
Ms. Davey introduced the application by displaying elevations and describing the project,
noting a variance was given for the setback on November 17 , 2022 and reviewed the staff
comments.
Ms. Rebecca Pantuso, Pantuso Architects, described the project, desired detailing and how
the roof pitch will be changed.
The Board, staff and applicant discussed the addition in relation to the main structure, the
standing seam roof, the details of the shingles and windows, the location of the standing seam
siding and the possibility of using shingles around the house or on portions of the house .
A motion was made by Mr. Workley, seconded by Mr. Wetzel, that this AHBR
Application be approved as amended with the standing seam changed to asphalt shingles
on all elevations aside from the rear and the diagional siding on the dormers to become
verticle to match the rest of the verticle siding. The motion carried by the following vote:
Aye: 6 - Mr. Caputo, Mr. Funyak, Mr. Ray, Mr. Workley, Ms. Marzulla and Mr. Wetzel
D. AHBR 22-927 77 Keswick Drive
Addition (Deck Awning)
Attachments: 77 Keswick AHBR Packet - Revised
Ms. Davey introduced the application by displaying photos, elevations and describing the
project.
Mr. Jeff Oslin, Bright Covers and Mr. Frank Tokash, homeowner, described the project and
noted a similar structure was approved in Hudson.
The Board, staff and applicant discussed the attachment to the house which will be stamped
by an Ohio licensed engineer, the size of the posts being six-by-six, if the structure will be
viewable from the street and the possibility and affect of reducing the size of the structure .
A motion was made by Mr. Ray, seconded by Mr. Wetzel, that this AHBR Application
be approved as amended by using six-inch by six-inch posts. The motion carried by the
following vote:
Aye: 5 - Mr. Caputo, Mr. Funyak, Mr. Ray, Ms. Marzulla and Mr. Wetzel
Nay: 1 - Mr. Workley
City of Hudson, Ohio Page 5
Architectural & Historic Board of Review Meeting Minutes - Final January 11, 2023
E. AHBR 23-1 7200 Valley View Road
Conversion to Single Family Residential, Garage and Mudroom Addition
Attachments: 7200 Valley View AHBR Packet - Revised
Ms. Davey introduced the application by displaying the revised site plan, describing the
project and reviewing the staff comments.
Ms. Tracy Corpus, displayed elevations, described how the front of the building and floorplan
integrate, noted the front doors are inset into the building, the distance of the building from
the street and the orientation of the siding on the top rear of the structure near the fireplace,
A motion was made by Mr. Workley, seconded by Mr. Wetzel, that this AHBR
Application be approved. The motion carried by the following vote:
Aye: 6 - Mr. Caputo, Mr. Funyak, Mr. Ray, Mr. Workley, Ms. Marzulla and Mr. Wetzel
VIII. Other Business
AHBR 12-14-22Minutes of Previous Architectural & Historic Board of Review Meeting:
December 14, 2022
Attachments: AHBR Minutes December 14, 2022 - Draft
A motion was made by Mr. Workley, seconded by Mr. Ray, that the December 14, 2022,
Minutes be approved as amended. The motion carried by the following vote:
Aye: 6 - Mr. Caputo, Mr. Funyak, Mr. Ray, Mr. Workley, Ms. Marzulla and Mr. Wetzel
IX. Staff Update
There were no staff updates.
City of Hudson, Ohio Page 6
Architectural & Historic Board of Review Meeting Minutes - Final January 11, 2023
X. Adjournment
A motion was made by Ms. Marzulla, seconded by Mr. Funyak, that this be adjourned
at 9:28 p.m.. The motion carried by an unanimous vote.
___________________________________________
John Caputo, Chair
___________________________________________
John Workley, Secretary
___________________________________________
Joe Campbell, Executive Assistant
Upon approval by the Architectural & Historic Board of Review, this official written
summary of the meeting minutes shall become a permanent record, and the official
minutes shall also consist of a permanent audio and video recording, excluding executive
sessions, in accordance with Codified Ordinances, Section 252 .04, Minutes of
Architectural and Historic Board of Review, Board of Zoning and Building Appeals,
and Planning Commission.
* * *
City of Hudson, Ohio Page 7
Agenda
City of Hudson, Ohio
CD Meeting Agenda - Final
Architectural & Historic Board of Review
Wednesday, January 11, 2023 7:30 PM Town Hall
27 East Main Street
I. Call To Order
II. Roll Call
III. Election of Officers & Industrial Design Committee
IV. Public Comment
V. Consent Applications
A. AHBR 37 Laurel Lake Drive
22-1167 Addition (Garage, 754 SF)
Submitted by Donna Anderson
a) Staff recommends approval as submitted.
Attachments: 37 Laurel Lake AHBR Packet - Revised
VI. Old Business
A. AHBR 80 North Oviatt Street (Historic District)
22-1116 Alterations (Dormer & Window Replacements to Accessory Structure)
Submitted by William Gotts
a) Staff notes the project was reviewed at the December 14, 2022 Board
meeting. The Board requested a site visit, which was held on January 4,
2023.
b) Proposed dormer would significantly alter the existing building if the
design mirrors the rear dormer. Staff notes the location of the existing
dormer on the rear is more appropriate. Staff suggests a reduced dormer
design to lessen overall impact on the front, or primary, elevation.
c) Applicant to submit elevations/floor plans of reduced dormer concept.
Attachments: 80 N. Oviatt AHBR Packet - Revised
Legislative History
12/14/22 Architectural & Historic Board discussed
of Review
City of Hudson, Ohio Page 1 Printed on 1/12/2023
Architectural & Historic Board of Review CD Meeting Agenda - Final January 11, 2023
B. AHBR 64 Aurora Street (Historic District)
22-1138 Alterations (Windows, Garage and Patio Doors)
Submitted by Frederic Zonsius
a) Staff notes the project was reviewed at the December 14, 2022 Board
meeting. The Board requested a site visit, which was conducted on January
4, 2022.
b) Staff notes a number of windows would be removed on the right elevation
of the historic main mass. The Secretary of Interior Standards state the
following relative to alterations; the historic character of a property shall
be retained and preserved. The removal of historic materials or alteration
of features and spaces that characterize a property shall be avoided; New
additions, exterior alterations, or related new construction shall not
destroy historic materials that characterize the property.
Attachments: 64 Aurora AHBR Packet - Revised
64 Aurora AHBR Packet - December Meeting
Legislative History
12/14/22 Architectural & Historic Board discussed
of Review
VII. New Business
A. AHBR 12 Owen Brown Street (Historic District)
22-1149 Alterations (Detached Garage Siding, Roof, Windows)
Submitted by Roberto Sorgi
a) The detached garage is located within the Historic District. The County
auditor notes 1923 for the construction.
b) Staff notes the existing siding materials are wood and vinyl. The applicant
wishes to replace with hardie board material. The AHBR shall determine if
repair is feasible prior to consideration of new materials. Staff does note
the rear elevation does not have wood siding present.
Attachments: 12 Owen Brown AHBR Packet - Revised
B. AHBR 11 South Main Street (Historic District)
22-1193 Alterations (Windows, Doors & Roof)
Submitted by Quinn Miller, Peninsula Architects
a) Staff notes the scope of work includes a full replacement of the roof
structure along with replacement of the windows, doors, and gable end
siding (revised from vertical to horizontal siding)
b) As the structure is located within the Historic District the board may
request a site visit and assistance from the consultant historic preservation
consultant architect.
Attachments: 11 S. Main AHBR Packet
City of Hudson, Ohio Page 2 Printed on 1/12/2023
Architectural & Historic Board of Review CD Meeting Agenda - Final January 11, 2023
C. AHBR 22-901 70 York Drive
Addition (Second Floor Bedrooms, Etc., 950 SF)
Submitted by Rebecca Pantuso, Pantuso Architecture
a) Staff notes the project received a front yard setback variance approval
(front addition) and a rear yard setback variance denial (rear covered
patio) through the Board of Zoning and Building Appeals on November 17,
2022.
b) The architectural design standards state large expanses of blank walls are
to be avoided - fenestration placement should be at a maximum of
approximately every twelve feet. The applicant should revise the right
elevation window spacing.
c) Staff notes the addition contains different materials than the main body, a
steeper roof pitch, and an offset ridge. Collectively, these design features
decrease compatibility with the main body.
Attachments: 70 York Dr. Packet for AHBR - Revised
D. AHBR 22-927 77 Keswick Drive
Addition (Deck Awning)
Submitted by Mike Sheets, Translucent LLC DBA BrightCovers
a) The Architectural Design Standards state materials used on an open porch
or screen room need not be the same as other materials in the structure, but
should be related to materials used in the details of the structure. Staff notes
the open porch would be constructed of a polycarbonate panel roof and
aluminum posts, neither of which would be related to the main house.
Attachments: 77 Keswick AHBR Packet - Revised
E. AHBR 23-1 7200 Valley View Road
Conversion to Single Family Residential, Garage and Mudroom Addition
Submitted by Tracy Corpus
a) Staff notes the request would convert a former place of worship (First
Church of Christ Scientist) to a single-family residential use.
b) The Architectural Design Standards state the front face of the main body
must sit forward 18” front face of the wings. This does not include
projections. Staff notes the proposed garage mass would be flush with the
main body; however, the building is setback approximately 350 feet from
Valley View Road.
c) Question if the roof overhang at the proposed mud room on the front
elevation could be redesigned to be in line with the cornice.
d) The Architectural Design Standards state the materials used in any mass
must be applied consistently on that mass on all sides of the structure.
Question the addition of lap siding to the rear pediment on the main mass,
when the existing and front pediments are comprised of trim board.
Attachments: 7200 Valley View AHBR Packet - Revised
VIII. Other Business
City of Hudson, Ohio Page 3 Printed on 1/12/2023
Architectural & Historic Board of Review CD Meeting Agenda - Final January 11, 2023
AHBR Minutes of Previous Architectural & Historic Board of Review Meeting:
12-14-22 December 14, 2022
Attachments: AHBR Minutes December 14, 2022 - Draft
IX. Staff Update
X. Adjournment
* * *
The mission of the Hudson City Government is to serve, promote and support, in a fiscally responsible manner,
an outstanding community that values quality of life, a well-balanced tax base, historic preservation, with a
vision to the future, and professionalism in volunteer and public service.
City of Hudson, Ohio Page 4 Printed on 1/12/2023
Get email alerts for Hudson
A daily email when new agendas and minutes are posted.