Architectural & Historic Board of Review
Regular MeetingHudson, OH · February 8, 2023
Minutes
City of Hudson, Ohio
Meeting Minutes - Final
Architectural & Historic Board of Review
John Caputo, Chair
Allyn Marzulla, Vice Chair
John Workley, Secretary
Francoise Massardier-Kenney
John Funyak
William Ray
Karl Wetzel
Nicholas Sugar, City Planner
Alicia Schrenk, Associate Planner
Wednesday, February 8, 2023 7:30 PM Town Hall
27 East Main Street
I. Call To Order
Chair Caputo called to order the regularly scheduled meeting of the Architectural & Historic
Board of Review of the City of Hudson at 7:30 p.m., in accordance with the Sunshine Laws of
the State of Ohio, O.R.C. Section 121.22.
II. Roll Call
Present: 5 - Mr. Caputo, Mr. Ray, Mr. Workley, Ms. Marzulla and Ms. Kenney
Absent: 2 - Mr. Funyak and Mr. Wetzel
III. Public Comment
Chair Caputo opened the meeting to public comments for anyone wanting to address the
Board.
Mr. Sid Nelson, 52 Aurora Street, commented regarding the application for 64 Aurora Street .
Mr. Nelson commended the applicants regarding the proposed second floor window and
noted the proposed window on the first floor, by his interpretation, does not meet Hudson's
LDC nor was it recommended by a licensed architect and AHBR is not bound to follow the
recommendation. Mr. Nelson then stated his agreement with the applicants original January
25, 2023 proposal which did not have half-height windows and noted they were not typical of
the time period.
Chair Caputo noted three submitted communications received by the AHBR that are included
on the Agenda.
Seeing no one else coming desiring to speak, Chair Caputo closed public comment .
A. AHBR-6479 Public comment received for agenda item 22-1100, 2425 Hudson Aurora Road.
Attachments: 2425 Hudson Aurora Public Comments
City of Hudson, Ohio Page 1
Architectural & Historic Board of Review Meeting Minutes - Final February 8, 2023
B. AHBR-6485 Public comment received from the Hudson Heritage Association.
Attachments: Hudson Heritage Association Letter
C. AHBR-6486 Public comment received for agenda item 23-67, 64 Aurora Street.
Attachments: 64 Aurora Street Public Comment
IV. Consent Applications
A motion was made by Ms. Kenney, seconded by Mr. Ray, to approve the Consent
Agenda. The motion carried by the following vote:
Aye: 5 - Mr. Caputo, Mr. Ray, Mr. Workley, Ms. Marzulla and Ms. Kenney
A. AHBR 23-63 119 Hudson Street (Historic District)
Alterations (2nd Floor Balcony Railing)
Attachments: 119 Hudson St AHBR Packet
This AHBR application was approved on the Consent Agenda.
V. Old Business
A. AHBR 23-67 64 Aurora Street (Historic District)
Alterations (Flat Roof Replacement, Window, Doors)
Attachments: 64 Aurora Roof Alteration AHBR Packet
64 Aurora Facade Alteration AHBR Packet
Ms. Davey introduced the application by noting two separate projects are taking place on the
structure: 1) The redesign and installation of a flat roof. 2) A request to revise the garage
door, the man doors and a window change. Mr. Sugar then reviewed the proposed changes.
The Board, staff, Mr. Gale Wood, Campo Roofing, and Mr. Ackerman, general contractor,
discussed the timing of this revised request and that public comments were received and
forwarded to the applicant who submitted the redesigned elevation.The Board discussed the
changes recommended at the last AHBR meeting by the Historic Preservation Consultant . The
Board also discussed how an existing home in the Historic District may be treated differently
from a new home or addition, if the proposed small window does or does not meet the LDC
and that the small window is existing - only moved to a new position.
A motion was made by Mr. Workley, seconded by Ms. Marzulla, that this AHBR
application be approved with the condition that the window in question match the
existing windows in style, size and appearance. The motion carried by the following
vote:
Aye: 5 - Mr. Caputo, Mr. Ray, Mr. Workley, Ms. Marzulla and Ms. Kenney
City of Hudson, Ohio Page 2
Architectural & Historic Board of Review Meeting Minutes - Final February 8, 2023
B. AHBR 22-119311 South Main Street (Historic District)
Alterations (Windows, Doors & Roof, Repair/Partial Log Replacements)
Attachments: 11 S. Main AHBR Packet 2.8.23 Meeting
11 S. Main AHBR Packet 1.11.23 Meeting
Historic Preservation Consultant Advisory Report
Mr. Matt Schwarz, Peninsula Architects, described the log cabin's history and use through the
years and that a structural engineer made recommendations for needed structural
improvements and Peninsula Architect's plans for improving the cabin. Mr. Schwarz also
discussed the site meeting with AHBR, changes to the previous plans and items for
discussion.
Mr. Sugar noted the City Arborist stated the logs used to build the cabin are common species
to this area and that the proposed logs, after staining should match the existing logs .
The Board, staff and applicant discussed the revised plan, the need for the proposed structural
improvements, the desire to straighten the bowed logs if possible or replace if needed, that
exterior logs will be repaired if possible or cut and replaced in part or in whole if needed, that
a variety of log species were used on the cabin, some with bark left on which caused
deterioration, the qualifications of the contractors, the source of the matching logs, the
intention to retain existing materials when possible, the muttons being applied between the
glass layers and on the exteriors - will use one piece of glass that will appear as multiple
individual panes of glass. Mr. Schwartz stated the logs he anticipates being replaced, guided
by the structural engineer's report, will result in approximately fifteen percent of the logs
being replaced.
A motion was made by Mr. Workley, seconded by Ms. Marzulla, that this AHBR
Application be approved with the following conditions: Matching windows, replacement
of gutters and downspouts, verification of the accessibility pad outside the exterior door,
and that the elevations be revised to depict the approximate log replacement areas for
staff to verify the extent, as discussed at the AHBR meeting and previous site visit . The
motion carried by the following vote:
Aye: 5 - Mr. Caputo, Mr. Ray, Mr. Workley, Ms. Marzulla and Ms. Kenney
VI. New Business
City of Hudson, Ohio Page 3
Architectural & Historic Board of Review Meeting Minutes - Final February 8, 2023
A. AHBR 23-69 190 N. Main Street (Historic District)
Alteration (Roof Replacement)
Submitted by Bill Buehl, A&B Roofing
a) Staff notes the proposal would replace an existing red tile roof with black
dimensional shingles.
b) The Secretary of Interior Standards states, the historic character of a
property shall be retained and preserved. The removal of historic
materials or alteration of features and spaces that characterize a property
shall be avoided. Distinctive features, finishes, and construction
techniques or examples of craftsmanship that characterize a property
shall be preserved. Deteriorated historic features shall be repaired rather
than replaced. Where the severity of deterioration requires replacement of
a distinctive feature, the new feature shall match the old in design, color,
texture, and other visual qualities and, where possible, materials.
Replacement of missing features shall be substantiated by documentary,
physical, or pictorial evidence.
c) The existing tile roof is a distinct historic feature that is reflective of the
James Ellsworth era of Hudson. Per the Secretary of Interior Standards
the applicant shall - 1. Document deterioration/need for replacement and
2. If replacement is necessary, propose a material that matches the
original design, texture etc. Asphalt shingles would not be an appropriate
replacement.
d) Staff notes in 1997 a shingle replacement was brought before the AHBR
and was denied.
Attachments: 190 N Main St AHBR Packet
No one was present for this application.
City of Hudson, Ohio Page 4
Architectural & Historic Board of Review Meeting Minutes - Final February 8, 2023
B. AHBR 22-11002425 Hudson Aurora Road
Alterations (Siding Replacement)
Attachments: 2425 Hudson Aurora AHBR Packet
Mr. Sugar introduced the application by displaying the site, displaying and explaining
comparison photos of the existing and proposed elevations and reviewing the staff comments
and concerns.
The Board and staff discussed the existing non-conforming areas.
The Board, staff , Mr. Jim Dombrowski, contractor, and Mr. Russ Gordyan, homeowner,
discussed the front stone foundation which replaced the original brick foundation, the second
story siding which replaced stone, the pitch of the garage roof, the lack of fenestration on the
garage second floor, the contractor's misunderstanding regarding permitting, that all vertical
siding and stone terminate at an inside corners and the height of the back wall .
Mr. Workley made a motion, seconded by Mr. Ray, to approve the application with the
following conditions: 1) The chimney and foundation stone remain as is. 2) That the
stone on the front porch remain on the front facade and terminate at the inside corners
with the stone on the wings removed and replaced with siding. 3) The siding on the
dormer sides be vertical to match the front. 4) The vertical siding on the right side
continue to the garage addition and terminate at an inside corner. 5) Steps be added in
front of the door which are at a minimum the width of the door. And a recommendation
that the dormer on the front gable elevation of the garage have additional fenestration
as approved by staff. The motion was approved by the following vote:
Aye: 5 - Mr. Caputo, Mr. Ray, Mr. Workley, Ms. Marzulla and Ms. Kenney
VII. Other Business
City of Hudson, Ohio Page 5
Architectural & Historic Board of Review Meeting Minutes - Final February 8, 2023
A. AHBR 23-6 35 South Oviatt Street
New Construction (Hudson Community Living)
Submitted by Nate Bailey, Peninsula Architects
a) Staff notes the AHBR reviewed the proposal at the February 8th, 2023
meeting. The following suggestions and comments were made by the
board members and staff:
· Suggest varying the garage doors by building.
· Revise buildings A/F and C/E to better meet the look-alike standards .
Suggestions for look-alike standards included; introducing a hip roof,
introducing variety in the gable ends, flipping the garage doors, introducing shed
pitches with a metal roof or trellis.
· Revise unit B to lower the ridge height, revise the clipped roof at the rear, and
reduce the forward projecting mass.
· Board acknowledged the applicant is requesting an exception from the garage
orientation requirements. If the Board grants the exception, it would have to do
so based on the criteria in Section II-1.
· Ensure that all material changes would end at an inside corner
· Suggest brick masonry at the clubhouse.
· Add additional fenestration to ensure each building has no more than 12 feet
without fenestration.
· Revise Elevations to depict any venting, mechanical units, etc.
b) Staff comments for the revised submittal:
· The Architectural Design Standards state projections may only extend 5’ from
the main mass. If more than 5’, they are treated as wings, which must be located
a minimum 18” behind the main mass. Revise unit B to comply with these
massing standards.
· The Architectural Design Standards state a building must have a typical window
used for most windows. Additional special windows are permitted on the front
façade. Suggest adding window divides to the front and side fixed windows of
unit F to meet this requirement. Windows on the rear elevation may be more
informal in design.
· If the Board were to make an exception to the garage orientation requirements,
the Architectural Design Standards state the design shall meet the five principles
enumerated in Section I-2 and shall meet one of the following conditions: ( 1)
The project is an exceptional design, meaning that it is either especially creative
or it is designed in response to unique situation, such as a very difficult site or an
unusual program requirement.; (2) Exceptional and unique conditions exist that
create a practical difficulty in complying with the requirements of these
Standards. The AHBR should consider the factors enumerated in as defined in
the Land Development Code in determining "practical difficulty".
· Staff notes the proposal is for an institutional residential use requiring unique
programming and building design (ADA requirements). The institutional
residential use is also deliberately designed with a centrally located communal
space to serve the needs of its residents. The overall site plan and orientation of
the buildings has been designed to minimize sightlines of multiple garage doors .
The visual impact of the garage doors have been further minimized with the
proposed massing and overall quality of design and materials.
City of Hudson, Ohio Page 6
Architectural & Historic Board of Review Meeting Minutes - Final February 8, 2023
Attachments: 35 S. Oviatt AHBR Packet - Hudson Community Living
Material Packet
Hudson Community Living - Staff memo from 9.28.22 Informal
Mr. Sugar introduced the informal discussion by displaying renderings of the structures,
which have received Planning Commission approval and will go before BZBA regarding a
variance for wetlands.
Mr. Nate Bailey, Peninsula Architects, and Mr. Chris Gurreri, Hudson Community Living
representative, noted the revised plans now have 16 units as opposed to the original 19 .
Mr. Bailey displayed the original and proposed site plans, described the .2 acre wetlands,
noted the project is within the code regarding impervious surface requirements, described the
single direction loop road, noted the units will have rear access to a communal green space to
foster a sense of community, displayed and described the community house which will fit the
mixed use surrounding neighborhood, explained the materials to be used and the variety of
exterior colors. Mr. Bailey noted the foundations will be close to grade concrete for ADA
compliance and the structures will have high grade vinyl windows.
The Board, staff and applicant discussed the features of the community house which will be
designed as a residential building with Hardie siding for maintenance purposes, the pull off
areas for deliveries and garbage, the nature of the community being a Supportive Living
Environment which does not provide care services for individual residents, discussed other
similar communities in the area, how the community will develop with small groups of
residents moving in, the potential use of solar panels, the HVAC and commercial kitchen
venting being on the side of the building, the possibility of having a variety of garage door
styles, that tri-units A and F have similar characteristics in an effort to have commonality and
the applicants openness for ideas to differentiate the two units. The Board expressed concern
with the look alike characteristics of units A and F and encouraged the applicant to further
study differentiations. Mr. Sugar reviewed the look-alike standards and how they might be
met. The Board also discussed units C and E having look-alike issues and other units with a
lack of fenestration.
Mr. Gurreri described unit B which will house four residents and four resident assistants with
two front doors and a wing that projects forward, following discussion the applicant and staff
will work together to meet the LDC requirements regarding the projecting wing. Discussion
also took place regarding making the main mass more dominate.
The Board requested site line studies be included on the final application. Mr. Sugar reviewed
the LDC and Architectural Design Standards as applicable to the front facing garage doors
noting the requirement that one of two standards be met for approval and that this is a
Residential Institutional Use with a unique design. Mr. Bailey also noted that in a previous
AHBR meeting the Board stated allowing front facing garage doors would not be precedent
setting.
This matter was discussed.
B. AHBR 1-25-23 Minutes of Previous Architectural & Historic Board of Review Meeting:
January 25, 2023.
Attachments: AHBR Minutes January 25, 2023 - DRAFT
A motion was made by Mr. Workley, seconded by Mr. Ray, that the Minutes be
approved as amended. The motion carried by the following vote:
City of Hudson, Ohio Page 7
Architectural & Historic Board of Review Meeting Minutes - Final February 8, 2023
Aye: 4 - Mr. Caputo, Mr. Ray, Mr. Workley and Ms. Marzulla
Abstain: 1 - Ms. Kenney
VIII. Staff Update
Mr. Sugar noted a letter from Hudson Heritage regarding the use of roof materials and the
need for building out the requirements for work done in the Historic District.
The Board and staff discussed: 1) The LDC requirement that consultants be a licensed
architect and how it relates to the current Historic Preservation Consultants. 2) How
enforcement of the LDC and standards may be clarified and consistently applied which may
necessitate a special meeting. 3) The need for more information being in the written minutes
and that AHBR is not a Public Hearing that is required to receive Public Comments .
This matter was discussed
IX. Adjournment
A motion was made by Ms. Marzulla, seconded by Mr. Workley, that the meeting be
adjourned at 9:51 p.m.. The motion carried by an unanimous vote.
___________________________________________
John Caputo, Chair
___________________________________________
John Workley, Secretary
___________________________________________
Joe Campbell, Executive Assistant
Upon approval by the Architectural & Historic Board of Review, this official written
summary of the meeting minutes shall become a permanent record, and the official minutes
shall also consist of a permanent audio and video recording, excluding executive sessions, in
accordance with Codified Ordinances, Section 252.04, Minutes of Architectural and Historic
Board of Review, Board of Zoning and Building Appeals, and Planning Commission .
* * *
City of Hudson, Ohio Page 8
Agenda
City of Hudson, Ohio
CD Meeting Agenda - Final
Architectural & Historic Board of Review
Wednesday, February 8, 2023 7:30 PM Town Hall
27 East Main Street
I. Call To Order
II. Roll Call
III. Public Comment
A. AHBR-6479 Public comment received for agenda item 22-1100, 2425 Hudson Aurora Road.
Attachments: 2425 Hudson Aurora Public Comments
B. AHBR-6485 Public comment received from the Hudson Heritage Association.
Attachments: Hudson Heritage Association Letter
C. AHBR-6486 Public comment received for agenda item 23-67, 64 Aurora Street.
Attachments: 64 Aurora Street Public Comment
IV. Consent Applications
A. AHBR 23-63 119 Hudson Street (Historic District)
Alterations (2nd Floor Balcony Railing)
Submitted by Rod Karsnak, Doors2U
a) Staff recommends approval as submitted.
Attachments: 119 Hudson St AHBR Packet
City of Hudson, Ohio Page 1 Printed on 2/8/2023
Architectural & Historic Board of Review CD Meeting Agenda - Final February 8, 2023
V. Old Business
A. AHBR 23-67 64 Aurora Street (Historic District)
Alterations (Flat Roof Replacement, Window, Doors)
Submitted by Kaitlyn Davis, Campopiano Roofing and Frederic Zonsius,
FZAD Architecture & Design
a) Staff notes the following roof alteration-
· The scope of work includes removing the existing EPDM flat roofing
material and installing new Carlisle EPDM roofing material limited
to the flat portion of the roof.
b) Staff notes the following for the façade alteration changes-
· The AHBR approved multiple alterations as per case number 22-
1138 to the front, east and rear elevations on January 11, 2023.
Additionally, the AHBR approved the west elevation window
alterations on January 25, 2023.
· The applicant is requesting changes to the approved plans that
includes a revised garage door design and revised rear patio and
garage man door design on the rear elevation. Additionally, the
applicant is requesting to add a window to the center of the second
story on the west elevation.
Attachments: 64 Aurora Roof Alteration AHBR Packet
64 Aurora Facade Alteration AHBR Packet
City of Hudson, Ohio Page 2 Printed on 2/8/2023
Architectural & Historic Board of Review CD Meeting Agenda - Final February 8, 2023
B. AHBR 11 South Main Street (Historic District)
22-1193 Alterations (Windows, Doors & Roof)
Submitted by Quinn Miller, Peninsula Architects
a) Staff notes the project was reviewed at the January 11, 2023, Board
meeting. The Board requested a site visit, which was conducted on January
18, 2023.
b) The Board requested Naylor Wellman, Historic Preservation Consultant,
to review and provide an advisory report.
c) The applicant submitted updated plans reflecting staff comments and the
Historic Preservation Consultant’s advisory report.
d) Naylor Wellman recommends approval of the plans as presented to be in
compliance with the Secretary of the Interior Standards for Rehabilitation
with the following two comments:
· The proposed replacement windows may be casement or double hung
but should match the existing window configuration and size of pane.
Windows should be aluminum clad wood and the color should be
consistent with the historic fabric.
· Gutters and downspouts should match neighboring materials in
color.
Attachments: 11 S. Main AHBR Packet 2.8.23 Meeting
11 S. Main AHBR Packet 1.11.23 Meeting
Historic Preservation Consultant Advisory Report
Legislative History
1/11/23 Architectural & Historic Board discussed
of Review
City of Hudson, Ohio Page 3 Printed on 2/8/2023
Architectural & Historic Board of Review CD Meeting Agenda - Final February 8, 2023
VI. New Business
A. AHBR 23-69 190 North Main Street (Historic District)
Alteration (Roof Replacement)
Submitted by Bill Buehl, A&B Roofing
a) Staff notes the proposal would replace an existing red tile roof with black
dimensional shingles.
b) The Secretary of Interior Standards states, the historic character of a
property shall be retained and preserved. The removal of historic
materials or alteration of features and spaces that characterize a property
shall be avoided. Distinctive features, finishes, and construction
techniques or examples of craftsmanship that characterize a property shall
be preserved. Deteriorated historic features shall be repaired rather than
replaced. Where the severity of deterioration requires replacement of a
distinctive feature, the new feature shall match the old in design, color,
texture, and other visual qualities and, where possible, materials.
Replacement of missing features shall be substantiated by documentary,
physical, or pictorial evidence.
c) The existing tile roof is a distinct historic feature that is reflective of the
James Ellsworth era of Hudson. Per the Secretary of Interior Standards
the applicant shall - 1. Document deterioration/need for replacement and
2. If replacement is necessary, propose a material that matches the
original design, texture etc. Asphalt shingles would not be an appropriate
replacement.
d) Staff notes in 1997 a shingle replacement was brought before the AHBR
and was denied.
Attachments: 190 N Main St AHBR Packet
City of Hudson, Ohio Page 4 Printed on 2/8/2023
Architectural & Historic Board of Review CD Meeting Agenda - Final February 8, 2023
B. AHBR 2425 Hudson Aurora Road
22-1100 Alterations (Siding Replacement)
Submitted by Jim Dombroski
a) Staff notes a zoning permit application for replacement siding and
windows was reviewed administratively and issued. Subsequently, staff
observed the following changes to the proposed scope of work in the field:
· Installation of vertical siding at front elevation
· Installation of metal roof at front elevation porch
· Stone replacement at existing brick chimney and existing brick
exposed foundation at main mass.
b) Staff notes previously the home was horizontal sided on all four sides, had
brick accent wall along the front left mass, and had a brick exposed
foundation along the front and left sides. The left and rear sides had an
exposed block foundation.
c) The architectural standards state the walls of the main body must be a
dominant material. Up to two additional materials may be used to call
attention to the composition. For example a different material may be used
on building projections gable ends, entrance recesses, or to emphasize the
horizontal or vertical divisions of the building. The wings may have a
different material for the wall than the main body. The materials used in
any mass must be applied consistently on that mass on all sides of the
structure. Details including foundation walls must be consistently applied
throughout all sides of the main body and consistently applied through all
sides of that wing. Based on these standards, staff notes the following:
· The vertical siding applied to the front garage mass is not
consistently applied around the mass, as it ends at an outside corner
and transitions to horizontal siding on the right side. After
discussions with staff, the applicant has agreed to continue the
vertical siding along the right side as noted on the photos; however,
to fully comply with the standards, the vertical siding would be
applied around the entire mass and include the rear of the mass.
· Exposed stone foundation was introduced along the front porch
inset at a height not consistent with the rest of the house. The
exposed foundation would be removed at front porch inset to fully
comply with the standards.
· The proposed vertical siding along the existing accent stone wall
would not be consistently applied around the mass; however, staff
notes the home was built with this nonconforming element in brick
and it has always been a defining feature of the home. The proposed
siding is a more compatible feature than the existing brick.
Attachments: 2425 Hudson Aurora AHBR Packet
VII. Other Business
City of Hudson, Ohio Page 5 Printed on 2/8/2023
Architectural & Historic Board of Review CD Meeting Agenda - Final February 8, 2023
A. AHBR 23-6 35 South Oviatt Street (Informal Discussion)
Commercial New Construction (Residential Development - Hudson
Community Living)
Submitted by Nate Bailey, Peninsula Architects
1) Project received conditional use and site plan approvals from the Planning
Commission on December 12, 2023 per case 2022-822.
2) Architectural design was reviewed as an informal discussion by the AHBR
on September 28, 2022. Discussion was focused on the proposed front
facing garage doors. Please see attached staff report.
3) Staff notes the project has received Planning Commission approval. The
applicant has applied for a variance through the Board of Zoning Appeals
for a wetland setback. Therefore, the AHBR may only review the proposal
on an informal basis until the Board of Zoning Appeals request is complete.
Staff recommends for this meeting, the applicant provide project orientation
and the Board provide initial comment.
4) General:
a. Submit specification sheets for the proposed siding, windows, doors
and roofing materials.
b. Indicate the exposed foundation material.
c. Add additional variety to meet the intent of the look-a-like standards.
Alterations can be incorporated into wall materials, major features,
bay/window configuration.
5) Clubhouse:
a. Submit a roof plan
b. Question if the two-story mass should be lower to match the adjacent
ridge line and be more compatible with Ell type massing.
c. Indicate the exposed foundation material and confirm it matches the
chimney.
d. Question if brick masonry would be more compatible with
surrounding development and the abutting Historic District.
6) Unit A: (Large mass type)
a. Question if variety can be incorporated to distinguish the three units
such as varied window organization, different door designs, and wall
materials.
b. Design Standards indicate fenestration placement should occur
approximately every 12 ft. Staff notes the side elevations contain two
facades of 16ft+ without an opening. Suggest adding an additional
window at each location.
7) Unit B: (Two story wing type)
a. The proposed massing does not comply with the two-story wing type
as the forward projection is greater than five feet.
b. Question the overlapping roof of the mass at the rear elevation
clipping the roof form of the reverse gable.
8) Unit C: (Large mass type)
a. Question if the side elevation accurately depicts the proposed roof
massing.
City of Hudson, Ohio Page 6 Printed on 2/8/2023
Architectural & Historic Board of Review CD Meeting Agenda - Final February 8, 2023
b. Question the mix of hip roof and gable forms.
9) Unit D: (Single story wing type)
a. Design Standards indicate fenestration placement should occur
approximately every 12 ft. Staff notes the side elevations contain two
facades of 16ft+ without an opening. Suggest adding an additional
window at each location.
10) Unit E: (Large mass type)
a. Design Standards indicate fenestration placement should occur
approximately every 12 ft. Staff notes the side elevations contain two
facades of 16ft+ without an opening.
b. Proposed wall materials do not appear compatible on all side of the
mass. Front face of the main mass
11) Unit F: (Large mass type)
a. Question is variety can be incorporated to distinguish the three units
such as varied window organization, different door designs, and wall
materials.
b. Design Standards indicate fenestration placement should occur
approximately every 12 ft. Staff notes the side elevations contain two
facades of 16ft+ without an opening.
Attachments: 35 S. Oviatt AHBR Packet - Hudson Community Living
Hudson Community Living - Staff memo from 9.28.22 Informal
B. AHBR Minutes of Previous Architectural & Historic Board of Review Meeting:
1-25-23 January 25, 2023.
Attachments: AHBR Minutes January 25, 2023 - DRAFT
VIII. Staff Update
IX. Adjournment
* * *
The mission of the Hudson City Government is to serve, promote and support, in a fiscally responsible manner,
an outstanding community that values quality of life, a well-balanced tax base, historic preservation, with a
vision to the future, and professionalism in volunteer and public service.
City of Hudson, Ohio Page 7 Printed on 2/8/2023
Get email alerts for Hudson
A daily email when new agendas and minutes are posted.