City Council
Regular MeetingIdaho Falls, ID · May 11, 2015
Minutes
MAY 11, 2015
The City Council of the City of Idaho Falls met in Special Council Meeting (Council Work Session),
Monday, May 11, 2015, at the City Council Chambers in the City Annex Building located at 680 Park
Avenue in Idaho Falls, Idaho at 3:00 p.m.
There were present:
Mayor Rebecca L. Noah Casper
Councilmember Michael Lehto
Councilmember Thomas Hally
Councilmember Sharon Parry
Councilmember Barbara Ehardt
Councilmember David Smith
Also present:
Michael Kirkham, Assistant City Attorney
Brad Cramer, Community Development Services Director
Chris Fredericksen, Public Works Director
Craig Rockwood, Municipal Services Director
Melanie Marsh, Human Resources Director
Kerry McCullough, Public Information Officer
Jackie Flowers, Idaho Falls Power Director
Bryan Clark, The Post Register
David Richards, Superintendent, Water Department
Kathy Hampton, City Clerk
Mayor Casper called the meeting to order and proceeded with Mayor and City Council Reports:
Mayor Casper reminded the Council of the prayer gathering at the Courthouse on May 11, 2015, as
part of National Police Week. She gave an update on Priority Based Budgeting (PBB) and felt the
need to extend the date for the next PBB session due to current workload of the Division Directors.
She indicated the budget calendar has been distributed. Mayor Casper stated she will be traveling to
Boise on May 14 & 15, 2015, to attend board level strategy meetings for Association of Idaho Cities.
She also shared the following items – Cayenta implementation team will be in Idaho Falls May 19-21,
2015; the State Transportation Board will be holding meetings and a tour in Pocatello on May 20 & 21,
2015; the Idaho Water Resources Board will be holding meetings in Idaho Falls on May 21 & 22,
2015; a new Council picture will be taken on May 28, 2015; Clean and Green Volunteer Day will be
June 13, 2015, the Parks and Recreation Department will coordinate those groups willing to volunteer.
A handout was distributed from Skyline High School describing the Art Students/IFPD Mural Project
2015 as part of Clean and Green 2015. Mayor Casper requested the Council’s feedback with
participation of the Idaho Falls Parade as this year will include the IF150 celebration. Councilmembers
Hally and Ehardt indicated they would be willing to participate. Mayor Casper briefly shared that Kerry
McCullough had recently attended training in Reno, Nevada, related to social media and city branding.
Councilmember Lehto had no items to report.
Councilmember Parry stated she and Councilmember Ehardt visited Dora Erickson Elementary
School as a follow up to the school’s Literary Lot Program. Part of this program included the submittal
of letters from fourth-grade students to the Councilmembers and Mayor.
Councilmember Ehardt stated a $1000.00 donation will be made to the Senior Citizens Center on
behalf of Apple Athletic Club and some divisions of the INL.
1
MAY 11, 2015
Councilmember Smith had no items to report.
Councilmember Hally stated a group of Hillcrest High School students approached the Parks and
Recreation Department for a No Smoking Zones Resolution for portions of the City parks, including
the shelters and the all-access playground. There may be a future presentation after further research
from these students,.
Mayor Casper stated Sage Lakes Golf Shop had been burglarized and vandalized. Councilmember
Lehto would like have a budget discussion regarding placing cameras on City assets.
The Human Resources Department Director and Idaho Falls Power Director presented the following
item:
MEMORANDUM
Review and approve the Agreement between the City of Idaho Falls and International Brotherhood of
Electric Workers (IBEW) Local #57.
It is recommended that the Council approve the agreement with IBEW Local #57. The proposed
agreement includes a 2.5% in wages for all classifications with an additional 0.5% for Journey
Mechanic, Electrician, Meterman and Certified Distribution Dispatcher classifications. It also includes
adding a Serviceman job classification at the Temporary Foreman rate for a one year trial period.
Medical premium information updated to include the City paying an additional $53.94 per month to
LineCo for union employees’ health insurance.
Jackie Flowers briefly described the agreement and indicated there was a very positive conversation
regarding the Code of Excellence. She also confirmed the electric bond was paid in full in March.
Councilmember Lehto expressed his appreciation to those personnel involved regarding this
agreement. After further brief discussion by the Council it was moved by Councilmember Lehto,
seconded by Councilmember Parry to approve the Agreement between the City of Idaho Falls and
International Brotherhood of Electric Workers (IBEW) Local #57. Roll call as follows:
Aye: Councilmember Ehardt
Councilmember Parry
Councilmember Smith
Councilmember Lehto
Councilmember Hally
Nay: None
Motion carried.
The Community Development Services Department Director appeared to review the following:
Area of Impact Discussion: Sharing the numbers – comparison of fees and taxes.
The cost comparison study was performed at the request of the 2014 Citizens Review Committee for
fees and taxes of Idaho Falls, Bonneville County, and Ammon. Director Cramer stated all numbers
were based on actual permits issued from the City of Idaho Falls, Bonneville County or the City of
Ammon. He also explained how the calculations were determined with regard to power rates, tax rates
and utilities.
Part 1 – Commercial Projects-Permit Fees Comparisons:
2
MAY 11, 2015
Page 2, Case Study: Large Scale Office and Research Lab, 112,540 Sq. Ft.,
$9,476,000.00 valuation –
Idaho Falls (Lowest Cost) $62,020.57
Bonneville County $99,078.42
Ammon (Highest Cost) $104,570.95
Page 3, Case Study: Large Retail Building, 68,890 Sq. Ft., $3,383,079.00 valuation –
Idaho Falls (Lowest Cost) $21,678.91
Bonneville County $39,622.22
Ammon (Highest Cost) $47,213.28
Page 4, Case Study: Bank Branch, 4,794 Sq. Ft., $1,000,000.00 valuation –
Idaho Falls (Lowest Cost) $10,010.00
Bonneville County $13,388.94
Ammon (Highest Cost) $17,594.05
Page 5, Case Study: Fast Food Restaurant, 2,763 Sq. Ft., $505,000.00 valuation –
Idaho Falls (Lowest Cost) $10,099.04
Bonneville County $11,140.00
Ammon (Highest Cost) $15,890.86
Part 2 – Commercial Projects-Annual Cost Comparisons:
Page 7, Case Study: Commercial Construction Supply Business
Idaho Falls (Lowest Cost) $18,425.00
Bonneville County $21,798.00
Ammon (Highest Cost) $23,218.00
Page 7, Case Study: Large Retail Store
Idaho Falls $486,216.00
Bonneville County (Lowest Cost) $446,340.00
Ammon (Highest Cost) $493,287.00
Page 8, Case Study: Primary Medical Center
Idaho Falls (Highest Cost) $18,747.00
Bonneville County (Lowest Cost) $15,435.00
Ammon $18,024.00
Page 8, Case Study: Sit Down Restaurant
Idaho Falls (Lowest Cost) $45,604.00
Bonneville County $53,544.00
Ammon (Highest Cost) $57,850.00
Page 9, Case Study: Fast Food Restaurant
Idaho Falls $33,665.00
Bonneville County (Lowest Cost) $32,073.00
Ammon (Highest Cost) $36,309.00
Part 3 – Residential Projects-Permit Fee Comparisons:
Page 11, Case Study: Small Home, $69,482.00 valuation
Idaho Falls (Lowest Cost) $3,434.85
Bonneville County $4,103.00
Ammon (Highest Cost) $8,084.95
Page 12, Case Study: Medium Home, $80,028.00 valuation
Idaho Falls (Lowest Cost) $3,593.46
Bonneville County $4,193.00
Ammon (Highest Cost) $8,205.95
3
MAY 11, 2015
Page 13, Case Study: Large Home, $136,587.00 valuation
Idaho Falls (Lowest Cost) $4,096.68
Bonneville County $4,815.00
Ammon (Highest Cost) $8,779.20
Part 4 – Residential Property-Annual Cost Comparisons
Page 15, Case Study: Small Home, $150,000.00 Value
Idaho Falls (Lowest Cost) $3,044.15
Bonneville County $3,893.57
Ammon (Highest Cost) $4,166.76
Page 15, Case Study: Small Home, $250,000.00 Value
Idaho Falls (Lowest Cost) $4,710.13
Bonneville County $4,823.63
Ammon (Highest Cost) $5,378.99
Page 16, Case Study: Small Home, $350,000.00 Value
Idaho Falls $6,482.45
Bonneville County (Lowest Cost) $5,813.00
Ammon (Highest Cost) $6,668.61
Mayor Casper and Councilmembers concurred the study will be considered a ‘draft’ until review by the
Council and will be shared within the community once completed. Mayor Casper recognized IE
Productions as assisting with the graphics.
The Public Works Department Director, David Richards, and presenters David Stangel and Cody
Stanger appeared with the following item:
Water Department Facility Plan – Executive Summary
Director Fredericksen briefly explained the Water Facility Plan and stated he would like Council input,
followed by a draft plan to the public, a review with the Department of Environmental Quality, and a
final approval by the Council for this plan.
Presentation Contents:
Reasons to Develop a Water Facility Plan (WFP)
Last WFP completed in 1989
o Significant growth (demand and system expansion) has occurred
o Legal & regulatory environments have changed
Ensure future summer demands can be met
Develop prioritized plan for upgrading facilities
Identify locations for new sources of supply
Identify distribution system weaknesses and associated improvements
Identify short-term (1-5 year) and long-term (6-20 year) capital plan
Ensure rates and fees can pay for improvements
System Description
16 Water Division Employees
o 14 O&M operators
314 miles of City-owned pipeline
o 25 additional miles of private pipeline
19 groundwater wells
13 booster stations
4
MAY 11, 2015
o 22 booster pumps
16 water tanks
o 13 chlorine contact tanks (30-315 Kgal)
o 3 water storage tanks (0.5 to 3 Mgal)
The system provides water to:
Approximately 58,000 people
24,000 accounts
o 250 metered accounts
Population and Demand Projections
Limited customer water use data
Bonneville Metropolitan Planning Organization data used for population estimates and
location
Existing well production data indicates Average Day Demand of 455 gallons per capita
per day
Projections include specific large industrial demands
Demand projections indicate a 100% increase in 40 years
Water Rights
City must have adequate water rights to ensure future growth
3 Water Right Evaluation Options
o Acquire new water rights
o Use existing water rights more efficiently
o Pursue conservation measures
12 Total Alternatives Evaluated
Water Right Initial Recommendations
o Add points of diversion to existing water rights
o Construct large storage tanks at well sites
o Identify alternative irrigation sources for parks
o Implement water conservation plan
o Actively pursue aquifer recharge banking
Unknowns
o Curtailment orders
o Mother Nature
System Design Standards
Supply
o MDD with largest pump out of service (Well 5)
Storage
o Provide peak demands and fire flow excluding dead and operational storage
Pumping
o Redundant pumping adequate to serve PHD or MDD + fire flow (whichever is
larger)
Pressure
o 20 psi during MDD+fire flow
o 40 psi during PHD
o 40-80 psi under typical operations
Pipe velocity
o 5 feet/second under MDD
o 10 feet/second under PHD or MDD + fire flow
Fire Flow Requirements
o 1,500 (residential) or 4,500 gpm (heavy industrial)
5
MAY 11, 2015
System Analysis
Water Rights and Supply evaluated for existing, 5, 20 and 40 year projections
o Adequate yearly average water rights for 40 years
o Adequate instantaneous water rights for existing and 5-year conditions
o Instantaneous water right deficiency of 7.4 mgd in 20-year and 35.7 mgd in 40-
year horizon (43.1 mgd total)
o Adequate existing well supply
o 10.8 mgd supply deficiency in 5-year horizon, another 11.7 mgd within 20-year
horizon, and another 26 mgd within 40-year horizon
Storage, pumping and distribution piping evaluated for existing, 5 and 20 year
projections
o Storage Analysis
Adequate storage for existing and 5-year conditions
1.6 million gallon deficit within 20-year horizon
o Backup Power
11.1 mgd existing deficit (due to revised regulations) and an additional
13 mgd within the 20-year horizon (24.1 mdg total)
o Peak Pumping Analysis
Adequate pumping capacity for existing demand
PHD booster pumping deficit of 4.3 mgd within 5-year horizon, additional
17.4 mgd needed within 20-year horizon (21.7 mgd total)
o Distribution System Analysis
Existing ADD, MDD and PHD pressures generally adequate
Currently a significant number of fire-flow deficiencies due to undersized
pipes
Pressure problems at 20-year demand under PHD at north and south
ends of system
Operations and Maintenance
O&M Program Recommends Implementation of programs to address:
Water storage tank inspection and cleaning
Pipeline replacement
Unidirectional flushing
Valve exercising
Water meter testing and calibration
Current safety plans and equipment
Asphalt and concrete flatwork at each facility
Asset management software
Benchmarking results:
Staffing:
o The City currently operates the system with fewer staff than most cities. This
indicates a need to add staff to perform O&M tasks
o Staffing needs will grow as system expands, flows increase and regulations
become more strigent
o Current recommendations include:
Hire two FTE’s and appropriate equipment in the distribution section to
implement identified programs (valve exercising, unidirectional flushing,
meter O&M, etc.)
Adding an additional FTE and appropriate equipment to the supply
section to perform well site O&M work
6
MAY 11, 2015
System Condition & Code Evaluation
Task Description:
Evaluate the City’s pumping facilities and distribution system with regards to
operational and code compliance
Recommend specific facility improvements and provide facility rankings based on
condition
Determine pipeline condition priority and recommend replacement program
Facility evaluations and resulting improvements focused on the following areas;
HVAC
Electrical
Site/Facility Security
Site/Facility Safety
Piping Modifications
General Conditions
Wells
Reservoirs
Additional Items
Each facility was ranked on the areas listed above, then compared with water production rates, risk of
failure and relative cost for improvements.
Facility Results:
Recommended improvement ranking was based on:
o Risk of facility failure
o Facility water production
o Condition & Code ranking
Highest to Lowest Priority
Ranking Facility
1 Wells 9 & 10
2 Well 3
3 Well 1
4 Well 4
5 Well 8
6 Well 5
7 Well 12
8 Wells 11 & 14
9 Wells 13 & 13B
10 Well 6
11 Well 16
12 Well 17
13 Well 2
14 Wells 15 & 15B
Pipeline Analysis and Results:
The water system is comprised of approximately 314 miles of public pipeline and 25
miles of private
The oldest pipe installed in 1902 (cast iron), with the majority of pipes installed from
1960 to 1979 (cast iron & ductile iron)
7
MAY 11, 2015
Ductile iron pipeline installed today
City pipeline break records indicate that 1902 – 1959 cast iron pipe accounts for 70% of
the breaks and repairs
It is recommended that these pipelines be replaced first
Based on 100-year design life, it’s recommended the City replace approximately 3.2
miles of pipe a year.
Capital Improvement Program
Major Project Categories
o New and upgraded pipelines
Primary focus on hydraulic deficiencies
87 projects over 20 years
o New and upgraded facilities
Wells, storage tanks and booster stations
24 projects over 20 years
3 yearly maintenance projects
o Metering
$250,000 yearly – focused on metering large water users
Cost of Required 2020 Cost of Required 2035
(1 to 5 Year) (6 to 20 Year)
Improvements Improvements
New and Upgraded Pipelines $7,000,000 $28,014,000
New and Upgraded Facilities $14,715,000 $28,328,000
Metering $1,250,000 $3,750,000
Total $22,965,000 $60,092,000
Annual Average $4.6 million/year $4.0 million/year
$83 million over 20 years
Annual 100 year pipeline replacement not fully funded in 20 year CIP
CIP Funding Plan & Rate Impact Analysis
Financial Planning Assumptions
Annual expense escalation, 4.5 – 5.0%
o Consistent with historical trends
o Reflects recent policy changes & increased maintenance activities
Customer growth, 0.75%
Capital cost inflation, 2.5%
Conservative forecast of connection fees
o Average of last six fiscal years, includes recession
Available CIP Funding Sources
Current operating revenues (PAYGO)
o Expenses outpacing revenue growth
o $1.0 million annually, without future rate increases
Connection fee revenues
o Annual revenues of $200K
Existing operating reserves
o Historical savings related to fiscal constraint
o Water rate revenue reserves of $8.0 million
Long-term debt
8
MAY 11, 2015
Proposed Five-Year Funding Plan
Rate revenues primary funding source
o Roughly half of CIP funded through rate increases
Draw down reserves, connection fee funds
Annual CIP Expenditures and Funding by Source
FY FY FY FY FY TOTAL Percent
2016 2017 2018 2019 2020
Projected Capital Expenditures $4.72 $5.09 $5.34 $4.43 $4.51 $24.09 100.0%
Proposed Rate Increases 20.0% 5.0% 5.0% 5.0% 5.0%
Operating Revenues 3.02 3.16 3.40 3.65 3.92 17.14 71.0%
Connection Fee Revenues 0.45 0.45 0.45 0.45 0.45 2.25 9.3%
Existing Reserves 1.27 1.54 1.50 0.25 0.18 4.74 19.6%
Used (Unused) Balance (0.02) (0.06) (0.01) 0.08 (0.04) (0.05)
Total Funds $4.72 $5.09 $5.34 $4.43 $4.51 $24.09 100.0%
Reported in escalated dollars
Community Rate Comparison
Community Monthly Volumetric Rate Total Bill
Charge (20 kgals)
Butte, MT $26.84 Varies per hundred cubic feet, declining $83.53
block structure
Bozeman, MT 14.65 Varies, inclining block structure 68.82
Malad, ID $43.00 $0.60/kgal after first 5 kgals $52.00
Pocatello, ID 7.55 $2.00/kgal for first 25 kgals 47.55
Boise, ID 10.40 Varies, inclining block structure 46.20
Meridian, ID 5.49 $1.90/kgal, no minimum 43.49
Logan, UT 16.00 $0.99/kgal for first 10 kgal, $1.60 beyond 41.90
that
Twin Falls, ID 10.74 $1.70/kgal after first 2 kgals 41.34
St. Anthony, ID 27.13 $0.54/kgal, no minimum 37.93
Ammon, ID 37.25 Flat rate (some residential customers 37.25
charged $44.75/mo.)
Nampa, ID 34.90 Flat rate 34.90
American Falls, ID 24.15 $0.89/kgal after first 15 kgals 30.50
Blackfoot, ID 21.90 $1.54/kgal after first 15 kgals 29.60
Burley, ID 18.70 $0.573/kgal after first 3 kgals 28.44
Rexburg, ID 15.87 $0.82/kgal after first 6 kgals 27.35
Idaho Falls, ID (proposed)* 25.20 Flat rate (incorporates annualized irrigation 27.20
charge and DEQ fee)
Brigham City, UT 9.31 $1.31/kgal after first 7 kgals 26.34
Idaho Falls, ID (existing) 21.00 Flat rate (incorporates annualized irrigation 22.71
charge and DEQ fee)
Rigby, ID 19.00 Flat rate 19.00
Shelley, ID 17.50 Flat rate 17.50
*Monthly rate after proposed FY 2016 increase of 20%
Proposed 20-year Funding Plan
9
MAY 11, 2015
Annual rate increases of 3.9% to fund CIP
Reserves are replenished by year 20
o Residential water rate of $54.50 at end of forecast
Operating Revenues – 94.7%
Connection Fee Revenues – 5.3%
Plan Notes & Recommendations
Follows standards of practice, conservative
o Low revenues, CIP based on high growth
Continually update plan
o Actual vs. forecasted CIP, financial performance
o Adjust rate increases as necessary
Recommendation: establish new fund for CIP
o Separate CIP expenditures from O&M budget
o Provide mechanism for use of reserves, connection fees
Conservation Planning
Review of 63 separate conservation actions
Conservation plan recommendations
o 20 current actions to continue or augment
o 27 actions to begin within 1-5 years
o 10 actions not recommended
o 6 actions involving metering deferred
Benefits of conservation
o Water use reduction of 30%-40% (comparative analysis with Rexburg &
Pocatello)
o Extended water rights = continued City growth
o Deferred future capital projects
o Public perception
Drawbacks of conservation
o Most effective actions require labor & money
o Results marginal without installation of meters
Meter Implementation Analysis
Metering: Impact on Demand
Assumed 30% reduction in average demand and 40% reduction in peak demands due
to metering
Peak 20-year demands below current levels
Meter Installation Assumptions
Cost of city-wide meters: $77.7 million
o Ten-year implementation period
o Customers charged volumetric rate, demand reduced
Capital improvement project deferrals
o $20.8 million, mostly over last 15 years
Debt in two issuances
o $40 million in year 1, $25 million in year 6
o Assumes availability of low-interest state loans
Substantial rate increases during first 5 years
o 20% per annum first 5 years, but none thereafter
10
MAY 11, 2015
Meters: Suggested Funding
Five-Year Funding Plan
o Long-term Debt – 60.4%
o Operating Revenues – 25.2%
o Existing Reserves – 11.0%
o Connection Fee Revenues – 3.4%
20-Year Funding Plan
o Operating Revenues – 57.2%
o Long-term Debt – 39.4%
o Connection Fee Revenues – 3.4%
Feedback and Next Steps
Incorporate Council Feedback
Develop Draft WFP Document
o DEQ Review
o Conduct Public Open House
Incorporate final comments and deliver final WFP
City implements rate changes and capital improvement plan
A lengthy discussion was held regarding the Water Facility Plan which included the possibility of there
being no residential metering, grandfathering the current no-metering system, the installation of new
meters for any new subdivisions, and the use of water by City facilities. A policy discussion would
need to be held with the Council prior to deciding any future impacts.
The Public Works Department also discussed the following:
IF Ammon Subcommittee – Hitt Road/Target Access
Director Fredericksen stated the main issue regarding the Ammon Townsite Mall is the access in and
out of Target. The Woodbury Corporation previously paid for a study for installation of an additional
traffic signal onto Hitt Road but due to the proximity of the 17th Street and Hitt Road signalization, it
was not recommended. Former Councilmember, the late Dee Whittier, had proposed the frontage
road in front of Target as an alternate access point. It has also been proposed to allow two-way traffic
access from 25th Street to the east side of Target, which the current Target management team is now
willing to consider. Director Fredericksen stated if Ammon and the City of Idaho Falls could work
together for this project, the construction would need to happen in a timely manner. Councilmember
Lehto stated the City of Idaho Falls has a vested interest in the intersection for the signalization and
the intersection is soon slated for preventative upgrade. He would like the engineers, construction
personnel, and the administration from both cities to come together and discuss the project at which
the cost would be divided equally between the two cities. Director Fredericksen stated the overall total
cost of this project would be approximately $236,000.00. Councilmember Parry believes there is no
benefit to the City of Idaho Falls residents to change the stop light. Councilmember Ehardt believes
the City of Idaho Falls would have minimal cost to the project but would in turn make a huge impact to
both communities. Mayor Casper commended Councilmember Ehardt for her continued effort on the
Ammon Subcommittee. After further discussion, it was decided by the Council to proceed forward with
the project.
Mayor Casper briefed the Council regarding Annual Contributions and Gifts. She requested the
Council’s input regarding contributions and gifts for future budget discussion.
There being no further business it was moved by Councilmember Ehardt, seconded by
Councilmember Hally, that the meeting adjourn at 6:10 p.m. Roll call as follows:
11
MAY 11, 2015
Aye: Councilmember Parry
Councilmember Ehardt
Councilmember Hally
Councilmember Smith
Councilmember Lehto
Nay: None
Motion carried.
_____________________________________
_____________________________________
CITY CLERK MAYOR
12
Agenda
CITY OF IDAHO FALLS
City Clerk’s Office
NOTICE OF SPECIAL MEETING
NOTICE IS HEREBY GIVEN that the City Council of the City of Idaho Falls will hold a Special Meeting
(Council Work Session) on the 11 th day of May, 2015, at 3:00 p.m., in the City Council Chambers
located in the City Annex Building at 680 Park Avenue, Idaho Falls, Idaho. The purpose of this
meeting is to discuss the following items:
Mayor and Council: -Mayor and City Council Reports.
Idaho Falls Power/Human Resources: -Review and approve the Agreement between the City of
Idaho Falls and International Brotherhood of Electric
Workers (IBEW) Local #57.
Community Development Services: -Area of Impact Discussion: Sharing the numbers –
comparison of fees and taxes.
Public Works: -Water Department Facility Plan – Executive Summary
and;
-IF Ammon Subcommittee – Hitt Road/Target Access
discussion
Municipal Services: -Discussion regarding Annual Contributions and Gifts
Such meeting may be cancelled or recessed to a later time or place upon resolution by the City
Council at such meeting.
The public is invited to attend.
DATED this 8th day of May, 2015.
____________________________________________
Kathy Hampton
City Clerk
If you need communication aids or services or other physical accommodations to participate or access this meeting or program of the City of
Idaho Falls, you may contact City Clerk Kathy Hampton at Telephone Number 612-8414 or the ADA Coordinator Lisa Farris at Telephone
Number 612-8323 as soon as possible and they will make every effort to adequately meet your needs.