Joint Purchasing Board

Regular Meeting

Lafayette, IN · March 9, 2012

AgendaMinutes

Minutes

JOINT PURCHASING BOARD March 9, 2012 The Joint Purchasing Board met on Friday March 9, 2012 at 10:00 a.m. in the Board of Public Works and Safety room, 20 North 6th Street, Lafayette City Hall. Present were: Jennifer Weston, Mayor Roswarski and Cindy Murray. Absent: Tom Murtaugh Also present were: Rick Morrissey, City of Lafayette Purchasing Manager Mr. Roswarski called the meeting to order. APPROVAL OF THE MINUTES Mrs. Weston moved for approval of the minutes from the December 7, 2011 meeting. Mrs. Murray seconded. Motion carried. BID OPENING Asphalt and Bituminous-Coated Aggregate MARATHON PETROLEUM COMPANY, LLC Indianapolis, IN 1. PLANT MIXED - HOT MIX ASPHALT MATERIAL*: 50,000 TONS A. FOB PLANT 1. HMA BASE 25 mm NO BID per ton 2. HMA INTERMEDIATE 19 mm NO BID per ton 3. HMA INTERMEDIATE 12.5 mm NO BID per ton 4. HMA INTERMEDIATE 9.5 mm NO BID per ton 5. HMA SURFACE 12.5 mm NO BID per ton 6. HMA SURFACE 9.5 mm NO BID per ton * ALL MATERIAL TO BE HMA TYPE B WITH PG BINDER 64-22 B. In place as specified with bidder furnishing all labor, traffic control and equipment. CITY / COUNTY to furnish trucking. Unit prices listed below are to be added to the material prices listed in item (A). 1. TONS PER DAY (0-200) NO BID per ton 2. TONS PER DAY (201-500) NO BID per ton 3. TONS PER DAY (501-1100) NO BID per ton 4. TONS PER DAY (1101 or MORE) NO BID per ton C. In place as specified with bidder furnishing all labor, trucking, traffic control and equipment. Unit prices listed below are to be added to the material prices listed in item (A). 1. TONS PER DAY (0-200) NO BID per ton 2. TONS PER DAY (201-500) NO BID per ton 3. TONS PER DAY (501-1100) NO BID per ton 4. TONS PER DAY (1101 or MORE) NO BID per ton BID PRICES ABOVE APPLY TO THE CITY OF LAFAYETTE ONLY. Prices for the Southwest and Southeast Quadrants (COUNTY ONLY). SOUTHWEST SOUTHEAST (per ton) (per ton) 5. TONS PER DAY (0-200) a) NO BID b) No Bid 6. TONS PER DAY (201-500) a) NO BID b) No Bid 7. TONS PER DAY (501-1100) a) NO BID b) No Bid 8. TONS PER DAY (1101 or MORE) a) NO BID b) No Bid Joint Purchasing Board March 9, 2012 Page 2 Prices for the Northwest and Northeast Quadrants (COUNTY ONLY). NORTHWEST NORTHEAST (per ton) (per ton) 9. TONS PER DAY (0-200) a) No Bid b) No Bid 10. TONS PER DAY (201-500) a) No Bid b) No Bid 11. TONS PER DAY (501-1100) a) No Bid b) No Bid 12. TONS PER DAY (1101 or MORE) a) No Bid b) No Bid D. Winter Mix Patching Material CM-300HP No Bid per ton E. Patching Material less than full truck load quantities, 2 Ton minimum load. 1. HMA BASE 25 mm No Bid per ton 2. HMA INTERMEDIATE 19 mm No Bid per ton 3. HMA INTERMEDIATE 12.5 mm No Bid per ton 4. HMA INTERMEDIATE 9.5 mm No Bid per ton 5. HMA SURFACE 12.5 mm No Bid per ton 6. HMA SURFACE 9.5 mm No Bid per ton 2. LIQUID ASPHALT – BITUMINOUS MATERIALS: 240,000 GALLONS* (A). FOB LAFAYETTE 1. AE-90, AE - T $ 489.60 per ton 2. HFRS – 2 (High Float) $ 501.60 per ton 3. AE – P (Prime) No Bid per ton (B). Contractor to furnish and apply liquid asphalt with approved distributors. County to furnish, haul, apply stone chips and roll. 1. AE – 90 No Bid per ton 2. HFRS – 2 (High Float) No Bid per ton 3. AE – SP No Bid per ton 4. AE – T No Bid per ton 5. AE – P (Prime) No Bid per ton (C). Contractor to furnish and apply liquid asphalt with approved distributors, apply stone chips with a mechanical self-propelled chip spreader and roll with an approved rubber tired roller. County to furnish and haul chips to spreader. 1. AE - 90 No Bid per ton 2. HFRS – 2 (High Float) No Bid per ton (D). Contractor to furnish and apply liquid asphalt with approved distributors and apply stone chips with a mechanical self-propelled chip spreader. County to furnish and haul chips to spreader and roll. 1. AE - 90 No Bid per ton 2. HFRS – 2 (High Float) No Bid per ton * Conversion from gallons to ton (All prices quoted in tons): AE Grade – 240 Gallons / Ton AE – P – 250 Gallons / Ton Joint Purchasing Board March 9, 2012 Page 3 3. DUST CONTROL – BITUMINOUS MATERIALS: 200,000 GALLONS* A. FOB – County Storage 1. DUSTLAY No Bid per ton B. Vendor to furnish one 10,000 gallon portable storage tank. 1. DUSTLAY No Bid per ton C. Vendor to deliver to specified road site and County to pump off material 1. DUSTLAY No Bid per ton *Conversion from gallons to ton (All prices quoted in tons): AE Grade – 240 Gallons / Ton ASPHALT MATERIALS, INC. Indianapolis, IN 1. PLANT MIXED - HOT MIX ASPHALT MATERIAL*: 50,000 TONS F. FOB PLANT 1. HMA BASE 25 mm NO BID per ton 2. HMA INTERMEDIATE 19 mm NO BID per ton 3. HMA INTERMEDIATE 12.5 mm NO BID per ton 4. HMA INTERMEDIATE 9.5 mm NO BID per ton 5. HMA SURFACE 12.5 mm NO BID per ton 6. HMA SURFACE 9.5 mm NO BID per ton * ALL MATERIAL TO BE HMA TYPE B WITH PG BINDER 64-22 G. In place as specified with bidder furnishing all labor, traffic control and equipment. CITY / COUNTY to furnish trucking. Unit prices listed below are to be added to the material prices listed in item (A). 1. TONS PER DAY (0-200) NO BID per ton 2. TONS PER DAY (201-500) NO BID per ton 3. TONS PER DAY (501-1100) NO BID per ton 4. TONS PER DAY (1101 or MORE) NO BID per ton H. In place as specified with bidder furnishing all labor, trucking, traffic control and equipment. Unit prices listed below are to be added to the material prices listed in item (A). 1. TONS PER DAY (0-200) NO BID per ton 2. TONS PER DAY (201-500) NO BID per ton 3. TONS PER DAY (501-1100) NO BID per ton 4. TONS PER DAY (1101 or MORE) NO BID per ton BID PRICES ABOVE APPLY TO THE CITY OF LAFAYETTE ONLY. Prices for the Southwest and Southeast Quadrants (COUNTY ONLY). SOUTHWEST SOUTHEAST (per ton) (per ton) 5. TONS PER DAY (0-200) a) NO BID b) No Bid 6. TONS PER DAY (201-500) a) NO BID b) No Bid 7. TONS PER DAY (501-1100) a) NO BID b) No Bid 8. TONS PER DAY (1101 or MORE) a) NO BID b) No Bid Prices for the Northwest and Northeast Quadrants (COUNTY ONLY). NORTHWEST NORTHEAST (per ton) (per ton) 9. TONS PER DAY (0-200) a) No Bid b) No Bid 10. TONS PER DAY (201-500) a) No Bid b) No Bid Joint Purchasing Board March 9, 2012 Page 4 11. TONS PER DAY (501-1100) a) No Bid b) No Bid 12. TONS PER DAY (1101 or MORE) a) No Bid b) No Bid I. Winter Mix Patching Material CM-300HP No Bid per ton J. Patching Material less than full truck load quantities, 2 Ton minimum load. 1. HMA BASE 25 mm No Bid per ton 2. HMA INTERMEDIATE 19 mm No Bid per ton 3. HMA INTERMEDIATE 12.5 mm No Bid per ton 4. HMA INTERMEDIATE 9.5 mm No Bid per ton 5. HMA SURFACE 12.5 mm No Bid per ton 6. HMA SURFACE 9.5 mm No Bid per ton 2. LIQUID ASPHALT – BITUMINOUS MATERIALS: 240,000 GALLONS* (E). FOB LAFAYETTE 1. AE-90, AE - T $ 460.62 per ton 2. HFRS – 2 (High Float) $ 472.62 per ton 3. AE – P (Prime) $ 766.62 per ton (F). Contractor to furnish and apply liquid asphalt with approved distributors. County to furnish, haul, apply stone chips and roll. 1. AE – 90 No Bid per ton 2. HFRS – 2 (High Float) No Bid per ton 3. AE – SP No Bid per ton 4. AE – T No Bid per ton 5. AE – P (Prime) No Bid per ton (G). Contractor to furnish and apply liquid asphalt with approved distributors, apply stone chips with a mechanical self-propelled chip spreader and roll with an approved rubber tired roller. County to furnish and haul chips to spreader. 1. AE - 90 No Bid per ton 2. HFRS – 2 (High Float) No Bid per ton (H). Contractor to furnish and apply liquid asphalt with approved distributors and apply stone chips with a mechanical self-propelled chip spreader. County to furnish and haul chips to spreader and roll. 1. AE - 90 No Bid per ton 2. HFRS – 2 (High Float) No Bid per ton * Conversion from gallons to ton (All prices quoted in tons): AE Grade – 240 Gallons / Ton AE – P – 250 Gallons / Ton 3. DUST CONTROL – BITUMINOUS MATERIALS: 200,000 GALLONS* A. FOB – County Storage 1. DUSTLAY $ 436.62 per ton B. Vendor to furnish one 10,000 gallon portable storage tank. 1. DUSTLAY $ 439.02 per ton C. Vendor to deliver to specified road site and County to pump off material Joint Purchasing Board March 9, 2012 Page 5 1. DUSTLAY $ 443.82 per ton *Conversion from gallons to ton (All prices quoted in tons): AE Grade – 240 Gallons / Ton Joint Purchasing Board March 9, 2012 Page 6 MILESTONE CONTRACTORS, LP.. Lafayette, IN 1. PLANT MIXED - HOT MIX ASPHALT MATERIAL*: 50,000 TONS (A). FOB PLANT 1. HMA BASE 25 mm $ 40.10 per ton 2. HMA INTERMEDIATE 19 mm $ 41.10 per ton 3. HMA INTERMEDIATE 12.5 mm $ 41.10 per ton 4. HMA INTERMEDIATE 9.5 mm $ 43.10 per ton 5. HMA SURFACE 12.5 mm $ 43.10 per ton 6. HMA SURFACE 9.5 mm $ 43.10 per ton * ALL MATERIAL TO BE HMA TYPE B WITH PG BINDER 64-22 (B). In place as specified with bidder furnishing all labor, traffic control and equipment. CITY / COUNTY to furnish trucking. Unit prices listed below are to be added to the material prices listed in item (A). 1. TONS PER DAY (0-200) $ 25.00 per ton 2. TONS PER DAY (201-500) $ 14.00 per ton 3. TONS PER DAY (501-1100) $ 7.25 per ton 4. TONS PER DAY (1101 or MORE) $ 4.75 per ton (C). In place as specified with bidder furnishing all labor, trucking, traffic control and equipment. Unit prices listed below are to be added to the material prices listed in item (A). 1. TONS PER DAY (0-200) $ 30.00 per ton 2. TONS PER DAY (201-500) $ 18.00 per ton 3. TONS PER DAY (501-1100) $ 11.00 per ton 4. TONS PER DAY (1101 or MORE) $ 7.00 per ton BID PRICES ABOVE APPLY TO THE CITY OF LAFAYETTE ONLY. Prices for the Southwest and Southeast Quadrants (COUNTY ONLY). SOUTHWEST SOUTHEAST (per ton) (per ton) 5. TONS PER DAY (0-200) a) $ 37.00 b) $ 37.00 6. TONS PER DAY (201-500) a) $ 24.00 b) $ 23.00 7. TONS PER DAY (501-1100) a) $ 13.50 b) $ 13.00 8. TONS PER DAY (1101 or MORE) a) $ 10.25 b) $ 9.00 Prices for the Northwest and Northeast Quadrants (COUNTY ONLY). NORTHWEST NORTHEAST (per ton) (per ton) 9. TONS PER DAY (0-200) a) $ 37.00 b) $ 37.00 10. TONS PER DAY (201-500) a) $ 24.00 b) $ 23.00 11. TONS PER DAY (501-1100) a) $ 13.50 b) $ 12.00 12. TONS PER DAY (1101 or MORE) a) $ 10.25 b) $ 9.00 (D). Patching Material less than full truck load quantities, 2 Ton minimum load. 1. HMA BASE 25 mm $ 40.10 per ton 2. HMA INTERMEDIATE 19 mm $ 41.10 per ton 3. HMA INTERMEDIATE 12.5 mm $ 41.10 per ton 4. HMA INTERMEDIATE 9.5 mm $ 43.10 per ton Joint Purchasing Board March 9, 2012 Page 7 5. HMA SURFACE 12.5 mm $ 43.10 per ton 6. HMA SURFACE 9.5 mm $ 43.10 per ton 2. LIQUID ASPHALT – BITUMINOUS MATERIALS: 240,000 GALLONS or less* (A). FOB LAFAYETTE 1. AE-90, AE - T $ 620.00 per ton 2. HFRS – 2 (High Float) $ 720.00 per ton 3. AE – P (Prime) No Bid per ton 4. AE-T (Contractor to Furnish and apply City only $ 845.00 per ton (B). Contractor to furnish and apply liquid asphalt with approved distributors. County to furnish, haul, apply stone chips and roll. 1. AE – 90 $ 705.00 per ton 2. HFRS – 2 (High Float) $ 725.00 per ton 3. AE – SP $ 705.00 per ton 4. AE – T NO BID per ton 5. AE – P (Prime) $1055.00 per ton (C). Contractor to furnish and apply liquid asphalt with approved distributors, apply stone chips with a mechanical self-propelled chip spreader and roll with an approved rubber tired roller. County to furnish and haul chips to spreader. 1. AE - 90 $ 745.00 per ton 2. HFRS – 2 (High Float) $ 770.00 per ton (D). Contractor to furnish and apply liquid asphalt with approved distributors and apply stone chips with a mechanical self-propelled chip spreader. County to furnish and haul chips to spreader and roll. 1. AE - 90 $ 735.00 per ton 2. HFRS – 2 (High Float) $ 760.00 per ton * Conversion from gallons to ton (All prices quoted in tons): AE Grade – 240 Gallons / Ton AE – P – 250 Gallons / Ton 3. DUST CONTROL – BITUMINOUS MATERIALS: 200,000 GALLONS* A. FOB – County Storage 1. DUSTLAY NO BID per ton B. Vendor to furnish one 10,000 gallon portable storage tank. 1. DUSTLAY NO BID per ton C. Vendor to deliver to specified road site and County to pump off material 1. DUSTLAY NO BID per ton *Conversion from gallons to ton (All prices quoted in tons): AE Grade – 240 Gallons / Ton 4. COLD MIX – FOB PLANT 1. CM-300 HP $110.00 per ton 2. SMP Patching Material NO BID per ton Joint Purchasing Board March 9, 2012 Page 8 5. 4.75 mm STEEL SLAG SAND SURFACE – FOB PLANT 4.75 MM Steel Slag Sand $68.10 per ton Unit price to be added to the in-place prices listed in 1-b and 1-c RIETH-RILEY CONSTRUCTION COMPANY Lafayette, IN 1. PLANT MIXED - HOT MIX ASPHALT MATERIAL*: 50,000 TONS (A). FOB PLANT 1. HMA BASE 25 mm $ 37.85 per ton 2. HMA INTERMEDIATE 19 mm $ 40.65 per ton 3. HMA INTERMEDIATE 12.5 mm $ 40.65 per ton 4. HMA INTERMEDIATE 9.5 mm $ 42.95 per ton 5. HMA SURFACE 12.5 mm $ 43.55 per ton 6. HMA SURFACE 9.5 mm $ 44.25 per ton * ALL MATERIAL TO BE HMA TYPE B WITH PG BINDER 64-22 (B). In place as specified with bidder furnishing all labor, traffic control and equipment. CITY / COUNTY to furnish trucking. Unit prices listed below are to be added to the material prices listed in item (A). 1. TONS PER DAY (0-200) $ 25.80 per ton 2. TONS PER DAY (201-500) $ 14.75 per ton 3. TONS PER DAY (501-1100) $ 7.30 per ton 4. TONS PER DAY (1101 or MORE) $ 4.80 per ton (C). In place as specified with bidder furnishing all labor, trucking, traffic control and equipment. Unit prices listed below are to be added to the material prices listed in item (A). 1. TONS PER DAY (0-200) $ 31.25 per ton 2. TONS PER DAY (201-500) $ 18.95 per ton 3. TONS PER DAY (501-1100) $ 11.70 per ton 4. TONS PER DAY (1101 or MORE) $ 7.40 per ton BID PRICES ABOVE APPLY TO THE CITY OF LAFAYETTE ONLY. Prices for the Southwest and Southeast Quadrants (COUNTY ONLY). SOUTHWEST SOUTHEAST (per ton) (per ton) 5. TONS PER DAY (0-200) a) $ 39.00 b) $ 39.00 6. TONS PER DAY (201-500) a) $ 24.25 b) $ 24.25 7. TONS PER DAY (501-1100) a) $ 14.45 b) $ 13.60 8. TONS PER DAY (1101 or MORE) a) $ 11.20 b) $10.30 Prices for the Northwest and Northeast Quadrants (COUNTY ONLY). NORTHWEST NORTHEAST (per ton) (per ton) 9. TONS PER DAY (0-200) a) $ 39.00 b) $ 39.00 10. TONS PER DAY (201-500) a) $ 24.25 b) $ 24.25 11. TONS PER DAY (501-1100) a) $ 14.45 b) $ 12.75 12. TONS PER DAY (1101 or MORE) a) $ 11.20 b) $ 9.75 Joint Purchasing Board March 9, 2012 Page 9 (D). Patching Material less than full truck load quantities, 2 Ton minimum load. 1. HMA BASE 25 mm $ 37.85 per ton 2. HMA INTERMEDIATE 19 mm $ 40.65 per ton 3. HMA INTERMEDIATE 12.5 mm $ 40.65 per ton 4. HMA INTERMEDIATE 9.5 mm $ 42.95 per ton 5. HMA SURFACE 12.5 mm $ 43.55 per ton 6. HMA SURFACE 9.5 mm $ 44.25 per ton 2. LIQUID ASPHALT – BITUMINOUS MATERIALS: 240,000 GALLONS* (A). FOB LAFAYETTE 1. AE-90, AE - T $ 600.00 per ton 2. HFRS – 2 (High Float) NO BID per ton 3. AE – P (Prime) NO BID per ton 4. AE-T (Contractor to Furnish and apply City only $ 955.00 Per ton (B). Contractor to furnish and apply liquid asphalt with approved distributors. County to furnish, haul, apply stone chips and roll. 1. AE – 90 NO BID per ton 2. HFRS – 2 (High Float) NO BID per ton 3. AE – SP NO BID per ton 4. AE – T $ 810.00 per ton 5. AE – P (Prime) NO BID per ton (C). Contractor to furnish and apply liquid asphalt with approved distributors, apply stone chips with a mechanical self-propelled chip spreader and roll with an approved rubber tired roller. County to furnish and haul chips to spreader. 1. AE - 90 NO BID per ton 2. HFRS – 2 (High Float) NO BID per ton (D). Contractor to furnish and apply liquid asphalt with approved distributors and apply stone chips with a mechanical self-propelled chip spreader. County to furnish and haul chips to spreader and roll. 1. AE - 90 NO BID per ton 2. HFRS – 2 (High Float) NO BID per ton * Conversion from gallons to ton (All prices quoted in tons): AE Grade – 240 Gallons / Ton AE – P – 250 Gallons / Ton 3. DUST CONTROL – BITUMINOUS MATERIALS: 200,000 GALLONS* A. FOB – County Storage 1. DUSTLAY NO BID per ton B. Vendor to furnish one 10,000 gallon portable storage tank. 1. DUSTLAY NO BID per ton C. Vendor to deliver to specified road site and County to pump off material 1. DUSTLAY NO BID per ton *Conversion from gallons to ton (All prices quoted in tons): AE Grade – 240 Gallons / Ton Joint Purchasing Board March 9, 2012 Page 10 4. COLD MIX – FOB PLANT 1. UPM High Performance (2 ton minimum) $125.00 per ton 5. 4.75 mm STEEL SLAG SAND SURFACE – FOB PLANT 4.75 MM Steel Slag Sand $ 64.00 per ton Mrs. Murray moved to take the bids under advisement for further review. Mrs. Weston seconded. Motion Carried. NEW BUSINESS Discussion on Road Salt Rick Morrissey stated that the State of Indiana will be sending an invitation out on road salt for the State Bid. Mr. Morrissey stated that even with the mild winter there is still the obligation to purchase salt through the existing contract. The Board weighted the pros and cons of participating with the State Bid or getting our own contract. Discussion ensued. PUBLIC COMMENT There was none. With no further business to come before the Board, Mrs. Weston moved to adjourn. Mrs. Murray seconded. Motion carried. Time: 10:13 a.m. JOINT PURCHASING BOARD Tony Roswarski s/s President Minutes written by: Mindy Miller 1st Deputy Clerk, City of Lafayette. An audio recording of this meeting is available in the Lafayette City Clerk’s Office.

Get email alerts for Lafayette

A daily email when new agendas and minutes are posted.

Report an issue with this meeting