Joint Purchasing Board
Regular MeetingLafayette, IN · March 5, 2018
Minutes
JOINT PURCHASING BOARD
March 5, 2018
The Joint Purchasing Board met on Monday, March 5, 2018 at 2:00 p.m. in the Board of Public Works and Safety
room, 20 North 6th Street, Lafayette City Hall. Present were: Mayor Roswarski, Cindy Murray, Robert Plantenga and
Tom Murtaugh.
Also present were: Dave Payne, City of Lafayette Purchasing Manager
Mayor Roswarski called the meeting to order.
APPROVAL OF THE MINUTES
Mr. Plantenga moved for approval of the minutes from the January 10, 2018 meeting. Mr. Murtaugh seconded.
Motion carried.
BID OPENING
2018 Asphalt and Bituminous-Coated Aggregate
CENTRAL PAVING, INC.
Logansport, IN
Joint Purchasing Board
March 5, 2018
Page 2
MARATHON PETROLEUM COMPANY, LLC
Indianapolis, IN
1. PLANT MIXED - HOT MIX ASPHALT MATERIAL*: 100,000 TONS
(A). FOB PLANT
TYPE B TYPE C
1. HMA BASE 25 mm per ton
2. HMA INTERMEDIATE 19 mm per ton
3. HMA INTERMEDIATE 12.5 mm per ton
4. HMA INTERMEDIATE 9.5 mm per ton
5. HMA SURFACE 12.5 mm per ton
6. HMA SURFACE 9.5 mm per ton
* ALL MATERIAL TO BE HMA TYPE B WITH PG BINDER 64-22 OR TYPE C WITH PG BINDER 70-
22, AS LABELED IN EACH TABLE
(B). In place as specified with bidder furnishing all labor, traffic control and equipment. CITY / COUNTY to
furnish trucking. Unit prices listed below are to be added to the material prices listed in item (A).
TYPE B TYPE C
1. TONS PER DAY (0-200) per ton
2. TONS PER DAY (201-500) per ton
3. TONS PER DAY (501-1100) per ton
4. TONS PER DAY (1101 or MORE) per ton
(C). In place as specified with bidder furnishing all labor, trucking, traffic control and equipment. Unit prices
listed below are to be added to the material prices listed in item (A).
TYPE B TYPE C
1. TONS PER DAY (0-200) per ton
2. TONS PER DAY (201-500) per ton
3. TONS PER DAY (501-1100) per ton
4. TONS PER DAY (1101 or MORE) per ton
Patching Material less than full truck load quantities
1. HMA BASE 25 mm per ton
2. HMA INTERMEDIATE 19 mm per ton
3. HMA INTERMEDIATE 12.5 mm per ton
4. HMA INTERMEDIATE 9.5 mm per ton
5. HMA SURFACE 12.5 mm per ton
6. HMA SURFACE 9.5 mm per ton
2. LIQUID ASPHALT – BITUMINOUS MATERIALS: 240,000 GALLONS or less*
FOB LAFAYETTE
1. AE-90, SS-1H $373.65 per ton
2. HFRS – 2 (High Float) per ton
3. AE – P (Prime) per ton
4. SS-1H (Contractor to Furnish and apply City per ton
only)
5. APME per ton
* Conversion from gallons to ton (All prices quoted in tons):
AE Grade – 240 Gallons / Ton
Joint Purchasing Board
March 5, 2018
Page 3
AE – P – 250 Gallons / Ton
3. DUST CONTROL – BITUMINOUS MATERIALS: 200,000 GALLONS*
(A). FOB – County Storage
1. DUSTLAY per ton
(B). Vendor to deliver to specified road site and County to pump off material
1. DUSTLAY per ton
*Conversion from gallons to ton (All prices quoted in tons):
AE Grade – 240 Gallons / Ton
4. COLD MIX – FOB PLANT
1. High Performance Type 1 or 2 (2 ton minimum) per ton
5. ASPHALT MILLING
Asphalt Milling (up to 2” depth, single mobilization) per square
yard
Mobilization for asphalt milling, after the first Lump sum,
mobilization each
6. 4.75 mm STEEL SLAG SAND SURFACE – FOB PLANT
4.75 mm Steel Slag Sand per ton
ASPHALT MATERIALS, INC.
Indianapolis, IN
1. PLANT MIXED - HOT MIX ASPHALT MATERIAL*: 100,000 TONS
(A). FOB PLANT
TYPE B TYPE C
1. HMA BASE 25 mm per ton
2. HMA INTERMEDIATE 19 mm per ton
3. HMA INTERMEDIATE 12.5 mm per ton
4. HMA INTERMEDIATE 9.5 mm per ton
5. HMA SURFACE 12.5 mm per ton
6. HMA SURFACE 9.5 mm per ton
* ALL MATERIAL TO BE HMA TYPE B WITH PG BINDER 64-22 OR TYPE C WITH PG BINDER 70-
22, AS LABELED IN EACH TABLE
(B). In place as specified with bidder furnishing all labor, traffic control and equipment. CITY / COUNTY to
furnish trucking. Unit prices listed below are to be added to the material prices listed in item (A).
TYPE B TYPE C
1. TONS PER DAY (0-200) per ton
2. TONS PER DAY (201-500) per ton
3. TONS PER DAY (501-1100) per ton
4. TONS PER DAY (1101 or MORE) per ton
Joint Purchasing Board
March 5, 2018
Page 4
(C). In place as specified with bidder furnishing all labor, trucking, traffic control and equipment. Unit prices
listed below are to be added to the material prices listed in item (A).
TYPE B TYPE C
1. TONS PER DAY (0-200) per ton
2. TONS PER DAY (201-500) per ton
3. TONS PER DAY (501-1100) per ton
4. TONS PER DAY (1101 or MORE) per ton
Patching Material less than full truck load quantities
1. HMA BASE 25 mm per ton
2. HMA INTERMEDIATE 19 mm per ton
3. HMA INTERMEDIATE 12.5 mm per ton
4. HMA INTERMEDIATE 9.5 mm per ton
5. HMA SURFACE 12.5 mm per ton
6. HMA SURFACE 9.5 mm per ton
2. LIQUID ASPHALT – BITUMINOUS MATERIALS: 240,000 GALLONS or less*
FOB LAFAYETTE
1. AE-90, SS-1H $384.76 per ton
2. HFRS – 2 (High Float) $396.76 per ton
3. AE – P (Prime) per ton
4. SS-1H (Contractor to Furnish and apply City per ton
only)
5. APME $384.76 per ton
* Conversion from gallons to ton (All prices quoted in tons):
AE Grade – 240 Gallons / Ton
AE – P – 250 Gallons / Ton
3. DUST CONTROL – BITUMINOUS MATERIALS: 200,000 GALLONS*
(A). FOB – County Storage
1. DUSTLAY $342.48 per ton
(B). Vendor to deliver to specified road site and County to pump off material
1. DUSTLAY $349.68 per ton
*Conversion from gallons to ton (All prices quoted in tons):
AE Grade – 240 Gallons / Ton
4. COLD MIX – FOB PLANT
1. High Performance Type 1 or 2 (2 ton minimum) per ton
5. ASPHALT MILLING
Asphalt Milling (up to 2” depth, single mobilization) per square
yard
Mobilization for asphalt milling, after the first Lump sum,
mobilization each
Joint Purchasing Board
March 5, 2018
Page 5
6. 4.75 mm STEEL SLAG SAND SURFACE – FOB PLANT
4.75 mm Steel Slag Sand per ton
MILESTONE CONTRACTORS, LP.
Lafayette, IN
1. PLANT MIXED - HOT MIX ASPHALT MATERIAL*: 100,000 TONS
(A). FOB PLANT
TYPE B TYPE C
1. HMA BASE 25 mm $36.20 $39.20 per ton
2. HMA INTERMEDIATE 19 mm $36.25 $39.25 per ton
3. HMA INTERMEDIATE 12.5 mm $37.75 $40.75 per ton
4. HMA INTERMEDIATE 9.5 mm $38.65 $41.65 per ton
5. HMA SURFACE 12.5 mm $37.75 $40.75 per ton
6. HMA SURFACE 9.5 mm $38.65 $41.65 per ton
* ALL MATERIAL TO BE HMA TYPE B WITH PG BINDER 64-22 OR TYPE C WITH PG BINDER 70-
22, AS LABELED IN EACH TABLE
(B). In place as specified with bidder furnishing all labor, traffic control and equipment. CITY / COUNTY to
furnish trucking. Unit prices listed below are to be added to the material prices listed in item (A).
TYPE B TYPE C
1. TONS PER DAY (0-200) $39.00 $39.00 per ton
2. TONS PER DAY (201-500) $19.50 $19.50 per ton
3. TONS PER DAY (501-1100) $9.50 $9.50 per ton
4. TONS PER DAY (1101 or MORE) $7.50 $7.50 per ton
(C). In place as specified with bidder furnishing all labor, trucking, traffic control and equipment. Unit prices
listed below are to be added to the material prices listed in item (A).
LAFAYETTE TYPE B TYPE C
1. TONS PER DAY (0-200) $43.25 $43.25 per ton
2. TONS PER DAY (201-500) $26.25 $26.25 per ton
3. TONS PER DAY (501-1100) $15.25 $15.25 per ton
4. TONS PER DAY (1101 or MORE) $12.50 $12.50 per ton
TIPPECANOE COUNTY
1. TONS PER DAY (0-200) $51.60 $51.60 per ton
2. TONS PER DAY (201-500) $29.00 $29.00 per ton
3. TONS PER DAY (501-1100) $17.00 $17.00 per ton
4. TONS PER DAY (1101 or MORE) $13.60 $13.60 per ton
Patching Material less than full truck load quantities
1. HMA BASE 25 mm $41.20 per ton
2. HMA INTERMEDIATE 19 mm $41.25 per ton
3. HMA INTERMEDIATE 12.5 mm $42.25 per ton
4. HMA INTERMEDIATE 9.5 mm $43.65 per ton
5. HMA SURFACE 12.5 mm $42.75 per ton
Joint Purchasing Board
March 5, 2018
Page 6
6. HMA SURFACE 9.5 mm $43.65 per ton
2. LIQUID ASPHALT – BITUMINOUS MATERIALS: 240,000 GALLONS or less*
FOB LAFAYETTE
1. AE-90, SS-1H per ton
2. HFRS – 2 (High Float) per ton
3. AE – P (Prime) per ton
4. SS-1H (Contractor to Furnish and apply City only) $1,000.00 per ton
5. APME per ton
* Conversion from gallons to ton (All prices quoted in tons):
AE Grade – 240 Gallons / Ton
AE – P – 250 Gallons / Ton
3. DUST CONTROL – BITUMINOUS MATERIALS: 200,000 GALLONS*
(A). FOB – County Storage
1. DUSTLAY per ton
(B). Vendor to deliver to specified road site and County to pump off material
1. DUSTLAY per ton
*Conversion from gallons to ton (All prices quoted in tons):
AE Grade – 240 Gallons / Ton
4. COLD MIX – FOB PLANT
1. High Performance Type 1 or 2 (2 ton minimum) $130.00 per ton
5. ASPHALT MILLING
Asphalt Milling (up to 2” depth, single mobilization) $2.00 per square
yard
Mobilization for asphalt milling, after the first $3,500.00 Lump sum,
mobilization each
6. 4.75 mm STEEL SLAG SAND SURFACE – FOB PLANT
4.75 mm Steel Slag Sand $60.00 per ton
RIETH-RILEY CONSTRUCTION COMPANY
Lafayette, IN
1. PLANT MIXED - HOT MIX ASPHALT MATERIAL*: 100,000 TONS
(A). FOB PLANT
TYPE B TYPE C
1. HMA BASE 25 mm $33.57 $34.35 per ton
2. HMA INTERMEDIATE 19 mm $35.16 $36.00 per ton
3. HMA INTERMEDIATE 12.5 mm $36.48 $37.45 per ton
Joint Purchasing Board
March 5, 2018
Page 7
4. HMA INTERMEDIATE 9.5 mm $38.02 $39.85 per ton
5. HMA SURFACE 12.5 mm $37.41 $38.70 per ton
6. HMA SURFACE 9.5 mm $38.63 $39.85 per ton
* ALL MATERIAL TO BE HMA TYPE B WITH PG BINDER 64-22 OR TYPE C WITH PG BINDER 70-
22, AS LABELED IN EACH TABLE
(B). In place as specified with bidder furnishing all labor, traffic control and equipment. CITY / COUNTY to
furnish trucking. Unit prices listed below are to be added to the material prices listed in item (A).
TYPE B TYPE C
1. TONS PER DAY (0-200) $32.00 $32.00 per ton
2. TONS PER DAY (201-500) $18.30 $18.30 per ton
3. TONS PER DAY (501-1100) $8.10 $8.10 per ton
4. TONS PER DAY (1101 or MORE) $5.40 $5.40 per ton
(C). In place as specified with bidder furnishing all labor, trucking, traffic control and equipment. Unit prices
listed below are to be added to the material prices listed in item (A).
TYPE B TYPE C
1. TONS PER DAY (0-200) $47.31 $47.31 per ton
2. TONS PER DAY (201-500) $28.00 $28.00 per ton
3. TONS PER DAY (501-1100) $17.04 $17.04 per ton
4. TONS PER DAY (1101 or MORE) $12.91 $12.91 per ton
Patching Material less than full truck load quantities
1. HMA BASE 25 mm $43.90 per ton
2. HMA INTERMEDIATE 19 mm $46.15 per ton
3. HMA INTERMEDIATE 12.5 mm $48.00 per ton
4. HMA INTERMEDIATE 9.5 mm $50.45 per ton
5. HMA SURFACE 12.5 mm $49.45 per ton
6. HMA SURFACE 9.5 mm $50.45 per ton
2. LIQUID ASPHALT – BITUMINOUS MATERIALS: 240,000 GALLONS or less*
FOB LAFAYETTE
1. AE-90, SS-1H $625.00 per ton
2. HFRS – 2 (High Float) per ton
3. AE – P (Prime) per ton
4. SS-1H (Contractor to Furnish and apply City $995.00 per ton
only)
5. APME per ton
* Conversion from gallons to ton (All prices quoted in tons):
AE Grade – 240 Gallons / Ton
AE – P – 250 Gallons / Ton
3. DUST CONTROL – BITUMINOUS MATERIALS: 200,000 GALLONS*
(A). FOB – County Storage
1. DUSTLAY per ton
(B). Vendor to deliver to specified road site and County to pump off material
Joint Purchasing Board
March 5, 2018
Page 8
1. DUSTLAY per ton
*Conversion from gallons to ton (All prices quoted in tons):
AE Grade – 240 Gallons / Ton
4. COLD MIX – FOB PLANT
1. High Performance Type 1 or 2 (2 ton minimum) $125.00 per ton
5. ASPHALT MILLING
Asphalt Milling (up to 2” depth, single mobilization) $2.00 per square
yard
Mobilization for asphalt milling, after the first $2,000.00 Lump sum,
mobilization each
6. 4.75 mm STEEL SLAG SAND SURFACE – FOB PLANT
4.75 mm Steel Slag Sand $58.75 per ton
Mrs. Murray moved to take the bids under advisement for further review. Mr. Plantenga seconded. Motion Carried.
PUBLIC COMMENT
There was none.
With no further business to come before the Board, Mr. Murtaugh moved to adjourn. Mrs. Murray seconded. Motion
carried.
Time: 2:08 p.m.
JOINT PURCHASING BOARD
Tony Roswarski s/s
President
Minutes written by: Mindy Miller 1st Deputy Clerk, City of Lafayette.
An audio recording of this meeting is available in the Lafayette City Clerk’s Office or online at
http://www.lafayette.in.gov/agendacenter.