Public Works & Utility Committee
Regular MeetingLisbon, WI · September 20, 2023
Minutes
VILLAGE OF LISBON
Public Works & Utility Committee Minutes
September 20, 2023
PUBLIC WORKS & UTILITY COMMITTEE MINUTES
The regular meeting of the Lisbon Public Works & Utility Committee was held on Wednesday, September
20, 2023, at the Lisbon Village Hall, W234 N8676 Woodside Road, Lisbon, WI.
Committee Chairman Marc Moonen called the meeting to order at 5:00 p.m.
Roll Call: Present: Trustee Marc Moonen (Chair); Trustee Linda Beal (Vice-Chair); Committee members
Jane Mueller, Joe Eberle, and Dan Plese; Utility District Accountant Mike Sargent; Village Engineer Don
Neitzel; DPW Director Joe DeStefano; Administrator Kathy Nickolaus; and Clerk Elisa Cappozzo Katch to
record the minutes.
The Committee and members of the public recited the Pledge of Allegiance.
Citizen Comment
None.
Minutes – 8/16/2023 Public Works & Utility Committee
Motion by Beal, second by Eberle, to approve the minutes of the August 16, 2023, Public Works & Utility
Committee meeting as presented. Motion carried 4:0, with Mueller abstaining.
Department Reports
A. Dept. of Public Works
DPW Director Joe DeStefano gave a brief update on current DPW projects and accomplishments (see
attached). No action was taken.
B. Utility District
Utility Administrator Mike Sargent reported on August flows for the Utility District.
Engineer Don Neitzel gave a brief update of current Utility District projects and accomplishments (see
attached). No action was taken.
Unfinished Business
A. Discussion and necessary action re: future water/ sewer service to Circlepark Crest subdivision
Administrator Nickolaus advised that LSP has indicated they will pay for all water service infrastructure.
Engineer Neitzel drafted a scope of services plan and will update cost estimates based on LSP feedback.
Staff was directed to create an Assessment policy, and Engineer Neitzel was directed to get preliminary
Geotech numbers, for review & consideration at the next meeting. No formal action taken.
B. Discussion and necessary action regarding creation of Sewer Permit & related connection process
Preliminary revisions to Sewer Permit and connection process were reviewed. No formal action taken.
New Business
A. Discussion and necessary action re: request for special needs road sign and village policy re: same
Discussion regarding creation of sign policy. It was determined no action would be taken until a sign
policy has been adopted by the Village Board.
Office: (262)246-6100 | Email: villagehall@lisbonwi.gov | Web: www.LisbonWI.gov
Public Works & Utility Committee Minutes
September 20, 2023
Page 2 of 2
B. Discussion only regarding preliminary draft updates to Sewer Code Ch. 18.01-18.05(3)
Preliminary updates to Chapter 18, sections .01 through .03 were reviewed. No formal action taken.
C. Discussion and necessary action regarding 2024 draft budget
Staff was directed to bring back a draft policy regarding Unrestricted Funds if not already adopted. No
formal action taken.
Adjournment
There being no further business, Eberle moved to adjourn. The motion was seconded by Beal, was voted
on, and carried unanimously. The meeting was adjourned at 8:20p.m.
Respectfully submitted,
Elisa Cappozzo Katch, WCMC
Lisbon Village Clerk
Office: (262)246-6100 | Email: villagehall@lisbonwi.gov | Web: www.LisbonWI.gov
August 2023
DPW Monthly
Report
Highway Division
• Staff started the second round of roadside mowing.
• Staff replaced the double culverts at the far north end of the Plainview Parkway.
• Staff performed the restoration work around the new basketball court that was installed at
Lisbon Oaks Park.
• Staff watered all storm water projects as needed.
• Staff performed misc. ditch cleaning in various areas.
• Staff continued to maintain and pushup the Compost Site twice a week.
• Staff performed repairs and preventive maintenance on HWY and FD trucks and equipment
as needed and able.
Parks Division
• Staff cleaned bathrooms and took care of garbage as needed at all Parks.
• Staff mulched at various parks.
• Staff have spent a considerable amount of time on weed maintenance.
• Staff have been cleaning shelters as needed after rentals were completed.
• Staff installed the freshly painted volleyball net posts at Lisbon Oaks Park. The court was
moved to accommodate the basketball court.
• Staff had the plants installed by Johnson’s Nursery for the Greiten Memorial and staff
watered as needed.
• Staff performed repairs and preventive maintenance on Parks trucks and equipment as
needed.
DPW Director
• I attended the Public Works and Utility Committee Meeting on August 16th.
• I have been spending a little more time with the Parks Division attending to concerns
that have been brought to our attention.
• I started to work in the shed at the new Compost Site. We installed the exterior lighting,
and have eliminated the need for the light tower at the site.
• I worked on and submitted a proposed Operating Budget for Hwy and Parks.
• I continued my Weed Commissioner duties by checking on complaints and sending
letters as needed.
• I continued to take care of invoices, r/w permits, capital projects, all clerical tasks
needed and helped around the shop or in the field as needed.
Regards,
Joe DeStefano Jr.
DPW Director
MEMORANDUM
September 20, 2023
To: Village of Lisbon Utility Committee
From: Don Neitzel
Re: Monthly Report
The monthly engineer’s report for the Village of Lisbon Utility Committee is as follows:
August 2023 Flows – Flows remain normal/consistent for the month of
August at each of the sites, with average flows for the month of 18 GPM for
Jeanine Lift Station, 17 GPM for Plainview, and 18 GPM for Willow Springs.
Richmond School Lift Station – Flows at Richmond School Lift Station
were also within range for the month, with an average of 0.9 hours of run time
per day per pump and 6 starts per day per pump. Per last months meeting, a
letter was drafted and sent to Richmond School on August 30th (see attached).
I did receive an email from Ed Blake with the school, on Tuesday (9/12)
regarding the letter and what needs to be done. We can discuss this more
during the meeting.
Business Park East – All work associated with this project has been
completed, including the pavement marking on Town Line Road, and the
mailbox replacement on Town Line Road. Need to confirm all punchlist
items have been completed and have final pay request submitted for
remaining retainage.
Manhole and Sewer Repairs – I spoke with Visu-Sewer and right now they
are thinking that this work will be done in the fall. Right now they are
looking at early November, but said there is a good chance that they could
complete this earlier by fitting it in between a couple of projects. They will
keep me posted.
Sewer System Maps (GIS) – Sewer maps have been updated to include the
boundary of the approved sewer service area, the drainage basins, parcels that
are active accounts, parcels that should be connected but are not, parcels that
are connected but haven’t paid, parcels that can’t hook up due to lack of sewer
availability, and those parcels with grinder pumps. Updated paper copy of
maps will be available at meeting.
Circlecrest Park Site Subdivision –Cost estimate and draft
preliminary assessments for extending sewer and water to those parcels
within Circlecrest Park Subdivision has been updated (see attached).
Agenda
VILLAGE OF LISBON
W234 N8676 Woodside Rd.
Lisbon, WI 53089
A.
Join Zoom Meeting Online: https://us06web.zoom.us/j/88319721129?pwd=Rm1tdkgzcW9PMG5HY051MlBpbzR4UT09
Join Zoom by Phone: Dial 1-312-626-6799 Meeting ID: 883 1972 1129 Passcode: 027704
PUBLIC WORKS & UTILITY COMMITTEE MEETING AGENDA
Lisbon Village Hall – Board Room
Wednesday, September 20, 2023
5:00 P.M.
1. Call to Order and Roll Call
2. Pledge of Allegiance
3. Citizen Comment (Please limit your comments to three minutes)
4. Approval of Meeting Minutes:
• August 16, 2023 Public Works Committee
5. Department Reports
A. Department of Public Works – Joe DeStefano Jr.
B. Utility District – Don Neitzel & Mike Sargent
6. Unfinished Business
A. Discussion and necessary action regarding future water/ sewer service to Circlecrest Park subdivision,
and recommendation to the Village Board of the same. (Don)
B. Discussion and necessary action regarding creation of Sewer Permit and related connection process,
and recommendation to the Village Board of the same. (Don)
7. New Business
A. Discussion and necessary action regarding request by April Gardner for special needs road sign and
village policy related to same.
B. Discussion only regarding preliminary draft updates to Sewer Code Chapter 18.01-18.05(3).
C. Discussion and necessary action regarding 2024 draft budget, and recommendation to the Village
Board of the same.
8. Adjournment
NOTE: It is possible that members of and possibly a quorum of members of other governmental bodies of the municipality may attend the above
meeting(s) to gather information. No action will be taken by any governmental body other than that specifically noticed above. Requests from persons
with disabilities who need assistance to participate in this meeting or hearing should be made to the Village Clerk’s office at 262-246-6100 at least 72
hours in advance of the meeting.
Village of Lisbon | W234N8676 Woodside Road, Lisbon WI 53089-1545 | (262)246-6100 | www.LisbonWI.gov
VILLAGE OF LISBON
Public Works & Utility Committee Minutes
August 16, 2023
DRAFT
PUBLIC WORKS & UTILITY COMMITTEE MINUTES
The regular meeting of the Lisbon Public Works & Utility Committee was held on Wednesday, August 16,
2023, at the Lisbon Village Hall, W234 N8676 Woodside Road, Lisbon, WI.
Committee Chairman Marc Moonen called the meeting to order at 5:02 p.m.
Roll Call: Present: Trustee Marc Moonen (Chair); Trustee Linda Beal (Vice-Chair); Committee members
Joe Eberle, and Dan Plese; Utility District Accountant Mike Sargent; Village Engineer Don Neitzel (via
Zoom); DPW Director Joe DeStefano; Administrator Kathy Nickolaus; and Clerk Elisa Cappozzo Katch to
record the minutes. Committee member Jane Mueller was absent and excused.
The Committee and members of the public recited the Pledge of Allegiance.
Citizen Comment
None.
Minutes – 7/19/2023 Public Works & Utility Committee
Motion by Eberle, second by Beal, to approve the minutes of the July 19, 2023 Public Works & Utility
Committee meeting as presented. Motion carried.
Department Reports
A. Dept. of Public Works
DPW Director Joe DeStefano gave a brief update on current DPW projects and accomplishments (see
attached). No action was taken.
B. Utility District
Utility Administrator Mike Sargent reported on July flows for the Utility District (see attached).
Engineer Don Neitzel gave a brief update of current Utility District projects and accomplishments (see
attached). No action was taken.
Unfinished Business
A. Engineer’s recommendation for work at Richmond School
Motion by Moonen, second by Eberle, directing staff to send correspondence to Richmond School
regarding scope of work, as well as rationale for requirements. The motion was voted on and carried
unanimously.
B. Preliminary cost breakdowns for future water and sewer service within Circle Crest Park subdivision
Committee directed Administrator Nickolaus to review preliminary numbers with Lannon Stone and
send historical documents to committee members for review. No formal action taken.
C. Engineer’s recommendation for creation of Sewer Permit and related connection process
Engineer Neitzel was directed to incorporate draft process into code form for review by the committee
and to take a deeper look at Pewaukee and Sussex procedures. No formal action taken.
Office: (262)246-6100 | Email: villagehall@lisbonwi.gov | Web: www.LisbonWI.gov
Public Works & Utility Committee Minutes
August 16, 2023
Page 2 of 2
D. Request for approval of Grinder Pump lock purchase
Motion by Eberle to approve the purchase of 85 locks from BonaFide for a cost not to exceed $899.65,
and recommendation to Village Board of the same. The motion was seconded by Beal, was voted on,
and carried unanimously.
Adjournment
There being no further business, Beal moved to adjourn. The motion was seconded by Eberle, was voted
on, and carried unanimously. The meeting was adjourned at 6:20p.m.
Respectfully submitted,
Elisa Cappozzo Katch, WCMC
Lisbon Village Clerk
Office: (262)246-6100 | Email: villagehall@lisbonwi.gov | Web: www.LisbonWI.gov
July 2023
DPW Monthly
Report
Highway Division
• Staff continued to shoulder misc. areas as needed.
• Staff removed and blocked up the door that use to be access for Lisbon Police to their office.
We did this prior to the building being painted.
• Staff ditched along Indiangrass Drive to clear out a heavily silted area and regain proper flow.
• Staff poured a sidewalk at Fire Station #1. The sidewalk needed to be removed for the
holding tank installation.
• A mastic wagon was rented for a week and staff went around the Village to correct dips and
heavily cracked areas, from a list we created over the last few months.
• Staff continued to maintain and pushup the Compost Site twice a week.
• Staff performed repairs and preventive maintenance on HWY and FD trucks and equipment
as needed.
Parks Division
• Staff cleaned bathrooms and took care of garbage as needed at all Parks.
• Staff maintained and prepared all the baseball fields and soccer field for games.
• Staff have been able to skip weekly mowing to bi-weekly due to the dry weather.
• Staff have spent a considerable amount of time on weed maintenance.
• Staff have been cleaning shelters as needed after rentals were completed.
• Staff spread playground chips at LCP, Lisbon Oaks and Jane Stadler Parks.
• Staff cleaned down trees from the late July storms.
• Staff performed repairs and preventive maintenance on Parks trucks and equipment as
needed.
DPW Director
• I attended the Public Works and Utility Committee Meeting on July 19th.
• I have been spending a little more time with the Parks Division attending to concerns
that have been brought to our attention.
• I continued to work with the contractors for the salt shed, building maintenance and the
2023 road paving.
• I have been working to get all the Parks and Hwy 2024 Capital Budget items submitted.
• I continued my Weed Commissioner duties by checking on complaints and sending
letters as needed.
• I continued to take care of invoices, r/w permits, capital projects, all clerical tasks
needed and helped around the shop or in the field as needed.
Regards,
Joe DeStefano Jr.
DPW Director
August 2023
DPW Monthly
Report
Highway Division
• Staff started the second round of roadside mowing.
• Staff replaced the double culverts at the far north end of the Plainview Parkway.
• Staff performed the restoration work around the new basketball court that was installed at
Lisbon Oaks Park.
• Staff watered all storm water projects as needed.
• Staff performed misc. ditch cleaning in various areas.
• Staff continued to maintain and pushup the Compost Site twice a week.
• Staff performed repairs and preventive maintenance on HWY and FD trucks and equipment
as needed and able.
Parks Division
• Staff cleaned bathrooms and took care of garbage as needed at all Parks.
• Staff mulched at various parks.
• Staff have spent a considerable amount of time on weed maintenance.
• Staff have been cleaning shelters as needed after rentals were completed.
• Staff installed the freshly painted volleyball net posts at Lisbon Oaks Park. The court was
moved to accommodate the basketball court.
• Staff had the plants installed by Johnson’s Nursery for the Greiten Memorial and staff
watered as needed.
• Staff performed repairs and preventive maintenance on Parks trucks and equipment as
needed.
DPW Director
• I attended the Public Works and Utility Committee Meeting on August 16th.
• I have been spending a little more time with the Parks Division attending to concerns
that have been brought to our attention.
• I started to work in the shed at the new Compost Site. We installed the exterior lighting,
and have eliminated the need for the light tower at the site.
• I worked on and submitted a proposed Operating Budget for Hwy and Parks.
• I continued my Weed Commissioner duties by checking on complaints and sending
letters as needed.
• I continued to take care of invoices, r/w permits, capital projects, all clerical tasks
needed and helped around the shop or in the field as needed.
Regards,
Joe DeStefano Jr.
DPW Director
MEMORANDUM
September 20, 2023
To: Village of Lisbon Utility Committee
From: Don Neitzel
Re: Monthly Report
The monthly engineer’s report for the Village of Lisbon Utility Committee is as follows:
August 2023 Flows – Flows remain normal/consistent for the month of
August at each of the sites, with average flows for the month of 18 GPM for
Jeanine Lift Station, 17 GPM for Plainview, and 18 GPM for Willow Springs.
Richmond School Lift Station – Flows at Richmond School Lift Station
were also within range for the month, with an average of 0.9 hours of run time
per day per pump and 6 starts per day per pump. Per last months meeting, a
letter was drafted and sent to Richmond School on August 30th (see attached).
I did receive an email from Ed Blake with the school, on Tuesday (9/12)
regarding the letter and what needs to be done. We can discuss this more
during the meeting.
Business Park East – All work associated with this project has been
completed, including the pavement marking on Town Line Road, and the
mailbox replacement on Town Line Road. Need to confirm all punchlist
items have been completed and have final pay request submitted for
remaining retainage.
Manhole and Sewer Repairs – I spoke with Visu-Sewer and right now they
are thinking that this work will be done in the fall. Right now they are
looking at early November, but said there is a good chance that they could
complete this earlier by fitting it in between a couple of projects. They will
keep me posted.
Sewer System Maps (GIS) – Sewer maps have been updated to include the
boundary of the approved sewer service area, the drainage basins, parcels that
are active accounts, parcels that should be connected but are not, parcels that
are connected but haven’t paid, parcels that can’t hook up due to lack of sewer
availability, and those parcels with grinder pumps. Updated paper copy of
maps will be available at meeting.
Circlecrest Park Site Subdivision –Cost estimate and draft
preliminary assessments for extending sewer and water to those parcels
within Circlecrest Park Subdivision has been updated (see attached).
Village of Lisbon, Waukesha Co
Preliminary Cost Estimate
Circlecrest Park Site Subdivision
San Sewer & Watermain Extensions
4/11/2023 by Basil Orechwa PE
8/3/2023 Revised
Situation and Project Scope
Proposed san sewer & watermain extension to serve 39 Lots
Water feeds from Village of Sussex 12" Watermain on Silver Spring Dr / CTH W
Gravity Sewer runs south to Lannon Interceptor Sewer to Village of Sussex WWTP
Estimate includes water & sewer services extended to property line (public) &
and then from property line up to the house (private).
Sewer metering flume manholes are included for subdivision.
Valved & capped branch stubs for water master meter are included
Master meter and vault are not included in cost estimate below
Project Summary of Lengths for Street Restoration
Length Street Pavt Width, ft
1200 LF Lynwood Dr (N of Avalon) 26
550 LF Lynwood Dr (S of Avalon) 24
600 LF Avalon Dr (SW of Lynwood) 24
600 LF Avalon CT (NE of Lynwood) 24
2950 LF Total Project Length 39 Residential Svc
SECTION 1 SANITARY SEWER - Summary of Work & Project Costs
Quantity Unit Item Unit Cost Item Cost
2,838 LF 8" San Sewer $135.00 $383,130
1,326 LF 6" Sewer Service Lateral - Public $100.00 $132,600
2,050 LF 6" Sewer Service Lateral - Private $150.00 $307,500
4,550 LF Rock Excavation, San Sewer $30.00 $136,500
4,550 LF Granular Backfill, San Sewer $25.00 $113,750
12 EA Standard San Sewer Manhole $5,800.00 $69,600
1 EA San Sewer Manhole, 72" Dia. $10,000.00 $10,000
2 EA San Sewer MH w/ Flume $12,000.00 $24,000
1 EA Manhole Drop Connection $4,000.00 $4,000
1 LS Construction Erosion Control $6,500
Engineering & Contingencies $178,137
SECTION 1 - Sub-Total Estimated Costs $1,365,717
SE Water Service Area Town of Lisbon, Waukesha Co. Page1 of 2
SECTION 2 WATERMAIN - Summary of Work & Project Costs
Quantity Unit Item Unit Cost Item Cost
2,950 LF 8" Watermain $115.00 $339,250
120 LF 6" Watermain (Hyd Leads) $95.00 $11,400
9 EA 8" Gate Valve & Box $2,800.00 $25,200
6 EA 6" Gate Valve & Box $2,300.00 $13,800
1 EA 4" Gate Valve & Box $2,100.00 $2,100
6 EA Hydrant $6,000.00 $36,000
1 EA Connect to Watermain TS&V $7,500.00 $7,500
1,326 LF 1-1/4" Water Service Lateral - Public $75.00 $99,450
2,340 LF 1-1/4" Water Service Lateral - Private $125.00 $292,500
39 EA 1-1/4" Water Service Fittings $900.00 $35,100
3,830 LF Granular Backfill, Watermain $18.00 $68,940
3,830 LF Rock Excavation, Watermain $25.00 $95,750
8,200 SY Pulverize Existing Pavement $2.50 $20,500
2,000 TN 4" HMA Paving (full width) $110.00 $220,000
2,400 SY Topsoil, Seeding & Mulch $10.00 $24,000
1 LS Traffic Control and Access $3,000
Engineering & Contingencies $194,174
SECTION 2 - Sub-Total Estimated Costs $1,488,664
SECTION 1 & SECTION 2 - Total Estimated Costs $2,854,381
SE Water Service Area Town of Lisbon, Waukesha Co. Page2 of 2
Circlecrest Park Site Subdivision
Draft Preliminary Water & Sewer Assessments Date: August 4, 2023
Total Construction Cost Per Frontage Revised: August 25, 2023
Sanitary Sewer Cost Total Cost/LF Frontage Watermain Cost Total Cost/LF Frontage
$865,980.00 $179.96 $724,940.00 $150.65
Adj for Eng/Insp $ 117,036.20 $ 24.32 Adj for Eng/Insp $120,932.74 $25.13
Total $ 983,016.20 $204.28 $845,872.74 $175.78
Sanitary Sewer Lateral (Public) Total Cost/Parcel Water Service (Public) Total Cost/Parcel
$138,600.00 $3,553.85 $140,550.00 $3,603.85
Adj for Eng/Insp $18,731.63 $480.30 Adj for Eng/Insp $23,446.21 $601.18
$157,331.63 $4,034.14 $163,996.21 $4,205.03
Sanitary Sewer Lateral (Private) Total Cost/Parcel Water Service (Private) Total Cost/Parcel
$313,500.00 $8,038.46 $298,500.00 $7,653.85
Adj for Eng/Insp $42,369.17 $1,086.39 Adj for Eng/Insp $49,795.05 $1,276.80
$355,869.17 $9,124.85 $348,295.05 $8,930.64
Tax Owner Assessable Sanitary Lateral Sanitary Lateral Water Service Water Service Sewer Connection Sewer Permit Owner
Parcel Frontage Sanitary Sewer Watermain (Public) (Private) (Public) (Private) Fee Fee Assessment
$204.28 /LF $175.78 /LF $4,034.14 /EA $9,124.85 /EA $4,205.03 /EA $8,930.64 /EA $9,493.04 /EA (Private) TOTAL
LSBT-0243001 Justin & Samantha Raison 110 $22,470.86 $19,335.88 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $77,659.81
W227N6031 Lynwood Drive
Lisbon, WI 53089-3905
LSBT-0243002 Jeffrey & Laural Wolters 120 $24,513.66 $21,093.69 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $81,460.42
W227N6007 Lynwood Drive
Lisbon, WI 53089
LSBT-0243003 Bruce & Kathleen Marggraf 95 $19,406.65 $16,699.17 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $71,958.89
W227N5995 Lynwood Drive
Lisbon, WI 53089
LSBT-0243004 James & Mary Pruetz Trust 125 $25,535.06 $21,972.59 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $83,360.72
W227N5979 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243005 Jeremy Urbanek & Emily Groth 105 $21,449.45 $18,456.98 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $75,759.50
W227N5961 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243006 Robert Tiarks Jr. 105 $21,449.45 $18,456.98 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $75,759.50
W227N5945 Lynwood Drive
Lisbon, WI 53089-3903
LSBT- 0243007 Beth Meysembourg 119.8 $24,462.59 $21,049.74 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $81,365.40
W227N5929 Lynwood Drive
Lisbon, WI 53089-3903
LSBT- 0243008 Susan Blackford Revocable Trust 180 $36,770.49 $31,640.53 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $104,264.09
W227N5909 Lynwood Drive
Lisbon, WI 53089-3903 Corner Lot
LSBT- 0243009 Steve Kirchoff 133.4 $27,259.19 $23,456.18 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $86,568.44
W227N5909 Avon Drive
Lisbon, WI 53089
LSBT- 0243010 Dale Staus & Julie Johnson 145 $29,620.67 $25,488.21 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $90,961.95
W227N5999 Avon Drive
Lisbon, WI 53089
LSBT- 0243011 Flaeschel Living Trust 105 $21,449.45 $18,456.98 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $75,759.50
W227N5985 Avon Drive
Lisbon, WI 53089
LSBT- 0243012 John Lehman & Pamela Kidrick 150 $30,642.08 $26,367.11 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $92,862.26
N60W22745 Silver Spring Dr.
Lisbon, WI 53089 Corner Lot
LSBT- 0243013 Jude & Diane Kelly 120 $24,513.66 $21,093.69 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $81,460.42
W227N6036 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243014 Brian Maahs 120 $24,513.66 $21,093.69 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $81,460.42
W227N6020 Lynwood Drive
Circlecrest Park Site Subdivision
Draft Preliminary Water & Sewer Assessments Date: August 4, 2023
Total Construction Cost Per Frontage Revised: August 25, 2023
Sanitary Sewer Cost Total Cost/LF Frontage Watermain Cost Total Cost/LF Frontage
$865,980.00 $179.96 $724,940.00 $150.65
Adj for Eng/Insp $ 117,036.20 $ 24.32 Adj for Eng/Insp $120,932.74 $25.13
Total $ 983,016.20 $204.28 $845,872.74 $175.78
Sanitary Sewer Lateral (Public) Total Cost/Parcel Water Service (Public) Total Cost/Parcel
$138,600.00 $3,553.85 $140,550.00 $3,603.85
Adj for Eng/Insp $18,731.63 $480.30 Adj for Eng/Insp $23,446.21 $601.18
$157,331.63 $4,034.14 $163,996.21 $4,205.03
Sanitary Sewer Lateral (Private) Total Cost/Parcel Water Service (Private) Total Cost/Parcel
$313,500.00 $8,038.46 $298,500.00 $7,653.85
Adj for Eng/Insp $42,369.17 $1,086.39 Adj for Eng/Insp $49,795.05 $1,276.80
$355,869.17 $9,124.85 $348,295.05 $8,930.64
Tax Owner Assessable Sanitary Lateral Sanitary Lateral Water Service Water Service Sewer Connection Sewer Permit Owner
Parcel Frontage Sanitary Sewer Watermain (Public) (Private) (Public) (Private) Fee Fee Assessment
$204.28 /LF $175.78 /LF $4,034.14 /EA $9,124.85 /EA $4,205.03 /EA $8,930.64 /EA $9,493.04 /EA (Private) TOTAL
Lisbon, WI 53089
LSBT- 0243015 Gary & Sandra Schwengel Trust 155 $31,663.48 $27,246.01 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $94,762.56
NW227N5998 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243016 Michael & Kristy Menke 150 $30,642.08 $26,367.11 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $92,862.26
W227N5972 Lynwood Drive
Lisbon, WI 53089-3904
LSBT- 0243017 David & Barbara Held 200.5 $40,958.24 $35,244.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $112,055.35
W227N5936 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243018 Cayla Yanny 150 $30,642.08 $26,367.11 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $92,862.26
W227N5906 Lynwood Drive
Lisbon, WI 53089-3904 Corner Lot
LSBT- 0243019 Linda Kanapka 131.6 $26,889.44 $23,138.02 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $85,880.53
W226N5985 Avon Court
Lisbon, WI 53089
LSBT- 0243020 Dana Leair 126.6 $25,868.04 $22,259.12 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $83,980.22
W226N6013 Avon Court
Lisbon, WI 53089
LSBT- 0243021 Scott & Margaret Wright 82.35 $16,822.50 $14,475.54 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $67,151.11
W226N6027 Avon Court
Lisbon, WI 53089
LSBT- 0243022 Michael Duncan & Kelsey Konkol 62.83 $12,834.94 $11,044.30 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $59,732.32
W226N6037 Avon Court
Lisbon, WI 53089-3901
LSBT- 0243023 Suzanne Rawling Irrevocable Trust 62.83 $12,834.94 $11,044.30 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $59,732.32
W226N6050 Avon Court
Lisbon, WI 53089-3902
LSBT- 0243024 Howard & Janet Lien 57.14 $11,672.59 $10,044.11 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $57,569.77
W226N6040 Avon Court
Lisbon, WI 53089
LSBT- 0243025 Beverly Pionke 157.6 $32,190.52 $27,699.53 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $95,743.12
W226N6034 Avon Court
Lisbon, WI 53089-3902
LSBT- 0243026 Sarah Kutchman 84.39 $17,239.23 $14,834.14 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $67,926.44
W226N6022 Avon Court
Lisbon, WI 53089-3902
LSBT- 0243027 Nicholas & Laura Frederick 84.39 $17,239.23 $14,834.14 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $67,926.44
W226N5994 Avon Court
Lisbon, WI 53089
LSBT- 0243028 Heather T Hess 215 $43,920.31 $37,792.86 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $117,566.24
Circlecrest Park Site Subdivision
Draft Preliminary Water & Sewer Assessments Date: August 4, 2023
Total Construction Cost Per Frontage Revised: August 25, 2023
Sanitary Sewer Cost Total Cost/LF Frontage Watermain Cost Total Cost/LF Frontage
$865,980.00 $179.96 $724,940.00 $150.65
Adj for Eng/Insp $ 117,036.20 $ 24.32 Adj for Eng/Insp $120,932.74 $25.13
Total $ 983,016.20 $204.28 $845,872.74 $175.78
Sanitary Sewer Lateral (Public) Total Cost/Parcel Water Service (Public) Total Cost/Parcel
$138,600.00 $3,553.85 $140,550.00 $3,603.85
Adj for Eng/Insp $18,731.63 $480.30 Adj for Eng/Insp $23,446.21 $601.18
$157,331.63 $4,034.14 $163,996.21 $4,205.03
Sanitary Sewer Lateral (Private) Total Cost/Parcel Water Service (Private) Total Cost/Parcel
$313,500.00 $8,038.46 $298,500.00 $7,653.85
Adj for Eng/Insp $42,369.17 $1,086.39 Adj for Eng/Insp $49,795.05 $1,276.80
$355,869.17 $9,124.85 $348,295.05 $8,930.64
Tax Owner Assessable Sanitary Lateral Sanitary Lateral Water Service Water Service Sewer Connection Sewer Permit Owner
Parcel Frontage Sanitary Sewer Watermain (Public) (Private) (Public) (Private) Fee Fee Assessment
$204.28 /LF $175.78 /LF $4,034.14 /EA $9,124.85 /EA $4,205.03 /EA $8,930.64 /EA $9,493.04 /EA (Private) TOTAL
W226N5968 Avon Court
Lisbon, WI 53089-3947 Corner Lot
LSBT- 0243029 Daniel & Dawn Scholl 97.85 $19,988.85 $17,200.15 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $73,042.06
W226N5964 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243030 Amie J Baldus 80 $16,342.44 $14,062.46 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $66,257.97
W226N5956 Lynwood Drive
Lisbon, WI 53089-3965
LSBT- 0243031 James & Elizabeth Pietrzak 127.2 $25,984.48 $22,359.31 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $84,196.86
W226N5946 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243032 William Knoten & Holli Sowinski 120 $24,513.66 $21,093.69 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $81,460.42
W226N5926 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243033 Douglas Fultz 120 $24,513.66 $21,093.69 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $81,460.42
W227N5978 Avon Drive
Lisbon, WI 53089
LSBT- 0243034 Sean Mcgee & Amber Sands 120 $24,513.66 $21,093.69 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $81,460.42
W227N5994 Avon Drive
Lisbon, WI 53089-3964
LSBT- 0243035 Brady & Janna Puetz 107.8 $22,013.27 $18,942.13 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $76,808.47
W226N5906 Avon Drive
Lisbon, WI 53089
LSBT- 0243036 Mark & Jean Tackes 77.84 $15,901.19 $13,682.77 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $65,437.04
W226N5914 Avon Drive
Lisbon, WI 53089
LSBT- 0243037 Joshua & Nicole Lannert 187.4 $38,280.12 $32,939.55 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $107,072.75
?? Avon Drive 1022 Dresser Avenue
Waukesha, WI 53188-4978 Corner Lot
LSBT- 0243038 Raymond Galinsky 198.6 $40,568.07 $34,908.30 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $111,329.43
W226N5941 Lynwood Drive N17W22602 Watertown Road
Waukesha, WI 53186-1305
LSBT- 0243039 Randall Calmes 122 $24,922.22 $21,445.25 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65.00 $82,220.54
W226N5921 Lynwood Drive
Lisbon, WI 53089
Assessable Sanitary Lateral Sanitary Lateral Water Service Water Service Sewer Connection Sewer Permit Owner
Frontage Sanitary Sewer Watermain (Public) (Private) (Public) (Private) Fee Fee Assessment
TOTALS 4812 $983,016.20 $845,872.74 $157,331.63 $355,869.17 $163,996.21 $348,295.05 $370,242.60 $2,535.00 $3,227,158.60
Circlecrest Park Site Subdivision
Draft Preliminary Water & Sewer Assessments Date: August 4, 2023
Total Construction Cost Per Frontage Revised: August 25, 2023
Sanitary Sewer Cost Total Cost/LF Frontage Watermain Cost Total Cost/LF Frontage
$865,980.00 $179.96 $724,940.00 $150.65
Adj for Eng/Insp $ 117,036.20 $ 24.32 Adj for Eng/Insp $120,932.74 $25.13
Total $ 983,016.20 $204.28 $845,872.74 $175.78
Sanitary Sewer Lateral (Public) Total Cost/Parcel Water Service (Public) Total Cost/Parcel
$138,600.00 $3,553.85 $140,550.00 $3,603.85
Adj for Eng/Insp $18,731.63 $480.30 Adj for Eng/Insp $23,446.21 $601.18
$157,331.63 $4,034.14 $163,996.21 $4,205.03
Sanitary Sewer Lateral (Private) Total Cost/Parcel Water Service (Private) Total Cost/Parcel
$313,500.00 $8,038.46 $298,500.00 $7,653.85
Adj for Eng/Insp $42,369.17 $1,086.39 Adj for Eng/Insp $49,795.05 $1,276.80
$355,869.17 $9,124.85 $348,295.05 $8,930.64
Tax Owner Assessable Sanitary Lateral Sanitary Lateral Water Service Water Service Sewer Connection Sewer Permit Owner
Parcel Frontage Sanitary Sewer Watermain (Public) (Private) (Public) (Private) Fee Fee Assessment
$204.28 /LF $175.78 /LF $4,034.14 /EA $9,124.85 /EA $4,205.03 /EA $8,930.64 /EA $9,493.04 /EA (Private) TOTAL
Notes:
* Draft Preliminary Assessments as presented, are 100% of construction costs and engineering fees, as provided in the preliminary cost estimate for Circlecrest Park Site Subdivision, dated 8/4/2023, and
revised 8/25/2023. This also includes Sewer Connection Fee, as determined with Utility Accountant and Sewer Permit Fee, as determined with Village Building Inspector.
* Assessable frontage was obtained from Waukesha County GIS records. As part of final assessments, these distances will be double checked against that shown on the tax records.
* 5 of the lots in the subdivision are corner lots. The assessable frontage for these lots is the frontage along their address and not the total street frontage (along both streets)
* Sewer Connection Fee is made up of the following: Reserve Capacity Fee ‐ $6,010.00; Retained Capacity Fee ‐ $582.40; Interceptor Capacity Fee ‐ $2,043.00; and Lannon Interceptor Fee Lieds ‐ $858.00
* Sewer Permit Fee is $65 for the first 100' of lateral, from the right of way to the home and $40 for each additional 100'. Most homes checked within Circlecrest were between 40' to 65', so
a fee of $65 was used for everyone in Circlecrest as part of these draft preliminary assessments.
Circlecrest Park Site Subdivision
Draft Preliminary Water & Sewer Assessments Date: August 4, 2023
Total Construction Cost Per Each Parcel Revised: August 25, 2023
Sanitary Sewer Cost Total Cost/Per Each Parcel Watermain Cost Total Cost/Per Each Parcel
$865,980.00 $22,204.62 $724,940.00 $18,588.21
Adj for Eng/Insp $ 117,036.20 $ 3,000.93 Adj for Eng/Insp $120,932.74 $3,100.84
Total $ 983,016.20 $25,205.54 $845,872.74 $21,689.04
Sanitary Sewer Lateral (Public) Total Cost/Parcel Water Service (Public) Total Cost/Parcel
$138,600.00 $3,553.85 $140,550.00 $3,603.85
Adj for Eng/Insp $18,731.63 $480.30 Adj for Eng/Insp $23,446.21 $601.18
$157,331.63 $4,034.14 $163,996.21 $4,205.03
Sanitary Sewer Lateral (Private) Total Cost/Parcel Water Service (Private) Total Cost/Parcel
$313,500.00 $8,038.46 $298,500.00 $7,653.85
Adj for Eng/Insp $42,369.17 $1,086.39 Adj for Eng/Insp $49,795.05 $1,276.80
$355,869.17 $9,124.85 $348,295.05 $8,930.64
Tax Owner Assessable Sanitary Lateral Sanitary Lateral Water Service Water Service Sewer Connection Sewer Permit Owner
Parcel Frontage Sanitary Sewer Watermain (Public) (Private) (Public) (Private) Fee Fee Assessment
$25,205.54 /LF $21,689.04 /LF $4,034.14 /EA $9,124.85 /EA $4,205.03 /EA $8,930.64 /EA $9,493.04 /EA (Private)
LSBT-0243001 Justin & Samantha Raison 110 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N6031 Lynwood Drive
Lisbon, WI 53089-3905
LSBT-0243002 Jeffrey & Laural Wolters 120 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N6007 Lynwood Drive
Lisbon, WI 53089
LSBT-0243003 Bruce & Kathleen Marggraf 95 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5995 Lynwood Drive
Lisbon, WI 53089
LSBT-0243004 James & Mary Pruetz Trust 125 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5979 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243005 Jeremy Urbanek & Emily Groth 105 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5961 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243006 Robert Tiarks Jr. 105 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5945 Lynwood Drive
Lisbon, WI 53089-3903
LSBT- 0243007 Beth Meysembourg 119.75 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5929 Lynwood Drive
Lisbon, WI 53089-3903
LSBT- 0243008 Susan Blackford Revocable Trust 180 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5909 Lynwood Drive
Lisbon, WI 53089-3903 Corner Lot
LSBT- 0243009 Steve Kirchoff 133.44 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5909 Avon Drive
Lisbon, WI 53089
LSBT- 0243010 Dale Staus & Julie Johnson 145 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5999 Avon Drive
Lisbon, WI 53089
LSBT- 0243011 Flaeschel Living Trust 105 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5985 Avon Drive
Lisbon, WI 53089
LSBT- 0243012 John Lehman & Pamela Kidrick 150 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
N60W22745 Silver Spring Dr.
Lisbon, WI 53089 Corner Lot
LSBT- 0243013 Jude & Diane Kelly 120 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N6036 Lynwood Drive
Lisbon, WI 53089
Circlecrest Park Site Subdivision
Draft Preliminary Water & Sewer Assessments Date: August 4, 2023
Total Construction Cost Per Each Parcel Revised: August 25, 2023
Sanitary Sewer Cost Total Cost/Per Each Parcel Watermain Cost Total Cost/Per Each Parcel
$865,980.00 $22,204.62 $724,940.00 $18,588.21
Adj for Eng/Insp $ 117,036.20 $ 3,000.93 Adj for Eng/Insp $120,932.74 $3,100.84
Total $ 983,016.20 $25,205.54 $845,872.74 $21,689.04
Sanitary Sewer Lateral (Public) Total Cost/Parcel Water Service (Public) Total Cost/Parcel
$138,600.00 $3,553.85 $140,550.00 $3,603.85
Adj for Eng/Insp $18,731.63 $480.30 Adj for Eng/Insp $23,446.21 $601.18
$157,331.63 $4,034.14 $163,996.21 $4,205.03
Sanitary Sewer Lateral (Private) Total Cost/Parcel Water Service (Private) Total Cost/Parcel
$313,500.00 $8,038.46 $298,500.00 $7,653.85
Adj for Eng/Insp $42,369.17 $1,086.39 Adj for Eng/Insp $49,795.05 $1,276.80
$355,869.17 $9,124.85 $348,295.05 $8,930.64
Tax Owner Assessable Sanitary Lateral Sanitary Lateral Water Service Water Service Sewer Connection Sewer Permit Owner
Parcel Frontage Sanitary Sewer Watermain (Public) (Private) (Public) (Private) Fee Fee Assessment
$25,205.54 /LF $21,689.04 /LF $4,034.14 /EA $9,124.85 /EA $4,205.03 /EA $8,930.64 /EA $9,493.04 /EA (Private)
LSBT- 0243014 Brian Maahs 120 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N6020 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243015 Gary & Sandra Schwengel Trust 155 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
NW227N5998 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243016 Michael & Kristy Menke 150 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5972 Lynwood Drive
Lisbon, WI 53089-3904
LSBT- 0243017 David & Barbara Held 200.5 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5936 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243018 Cayla Yanny 150 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5906 Lynwood Drive
Lisbon, WI 53089-3904 Corner Lot
LSBT- 0243019 Linda Kanapka 131.63 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N5985 Avon Court
Lisbon, WI 53089
LSBT- 0243020 Dana Leair 126.63 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N6013 Avon Court
Lisbon, WI 53089
LSBT- 0243021 Scott & Margaret Wright 82.35 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N6027 Avon Court
Lisbon, WI 53089
LSBT- 0243022 Michael Duncan & Kelsey Konkol 62.83 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N6037 Avon Court
Lisbon, WI 53089-3901
LSBT- 0243023 Suzanne Rawling Irrevocable Trust62.83 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N6050 Avon Court
Lisbon, WI 53089-3902
LSBT- 0243024 Howard & Janet Lien 57.14 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N6040 Avon Court
Lisbon, WI 53089
LSBT- 0243025 Beverly Pionke 157.58 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N6034 Avon Court
Lisbon, WI 53089-3902
LSBT- 0243026 Sarah Kutchman 84.39 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N6022 Avon Court
Lisbon, WI 53089-3902
Circlecrest Park Site Subdivision
Draft Preliminary Water & Sewer Assessments Date: August 4, 2023
Total Construction Cost Per Each Parcel Revised: August 25, 2023
Sanitary Sewer Cost Total Cost/Per Each Parcel Watermain Cost Total Cost/Per Each Parcel
$865,980.00 $22,204.62 $724,940.00 $18,588.21
Adj for Eng/Insp $ 117,036.20 $ 3,000.93 Adj for Eng/Insp $120,932.74 $3,100.84
Total $ 983,016.20 $25,205.54 $845,872.74 $21,689.04
Sanitary Sewer Lateral (Public) Total Cost/Parcel Water Service (Public) Total Cost/Parcel
$138,600.00 $3,553.85 $140,550.00 $3,603.85
Adj for Eng/Insp $18,731.63 $480.30 Adj for Eng/Insp $23,446.21 $601.18
$157,331.63 $4,034.14 $163,996.21 $4,205.03
Sanitary Sewer Lateral (Private) Total Cost/Parcel Water Service (Private) Total Cost/Parcel
$313,500.00 $8,038.46 $298,500.00 $7,653.85
Adj for Eng/Insp $42,369.17 $1,086.39 Adj for Eng/Insp $49,795.05 $1,276.80
$355,869.17 $9,124.85 $348,295.05 $8,930.64
Tax Owner Assessable Sanitary Lateral Sanitary Lateral Water Service Water Service Sewer Connection Sewer Permit Owner
Parcel Frontage Sanitary Sewer Watermain (Public) (Private) (Public) (Private) Fee Fee Assessment
$25,205.54 /LF $21,689.04 /LF $4,034.14 /EA $9,124.85 /EA $4,205.03 /EA $8,930.64 /EA $9,493.04 /EA (Private)
LSBT- 0243027 Nicholas & Laura Frederick 84.39 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N5994 Avon Court
Lisbon, WI 53089
LSBT- 0243028 Heather T Hess 215 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N5968 Avon Court
Lisbon, WI 53089-3947 Corner Lot
LSBT- 0243029 Daniel & Dawn Scholl 97.85 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N5964 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243030 Amie J Baldus 80 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N5956 Lynwood Drive
Lisbon, WI 53089-3965
LSBT- 0243031 James & Elizabeth Pietrzak 127.2 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N5946 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243032 William Knoten & Holli Sowinski 120 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N5926 Lynwood Drive
Lisbon, WI 53089
LSBT- 0243033 Douglas Fultz 120 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5978 Avon Drive
Lisbon, WI 53089
LSBT- 0243034 Sean Mcgee & Amber Sands 120 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W227N5994 Avon Drive
Lisbon, WI 53089-3964
LSBT- 0243035 Brady & Janna Puetz 107.76 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N5906 Avon Drive
Lisbon, WI 53089
LSBT- 0243036 Mark & Jean Tackes 77.84 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N5914 Avon Drive
Lisbon, WI 53089
LSBT- 0243037 Joshua & Nicole Lannert 187.39 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
?? Avon Drive 1022 Dresser Avenue
Waukesha, WI 53188-4978 Corner Lot
LSBT- 0243038 Raymond Galinsky 198.59 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N5941 Lynwood Drive N17W22602 Watertown Road
Waukesha, WI 53186-1305
LSBT- 0243039 Randall Calmes 122 $25,205.54 $21,689.04 $4,034.14 $9,124.85 $4,205.03 $8,930.64 $9,493.40 $65 $82,747.66
W226N5921 Lynwood Drive
Lisbon, WI 53089
Circlecrest Park Site Subdivision
Draft Preliminary Water & Sewer Assessments Date: August 4, 2023
Total Construction Cost Per Each Parcel Revised: August 25, 2023
Sanitary Sewer Cost Total Cost/Per Each Parcel Watermain Cost Total Cost/Per Each Parcel
$865,980.00 $22,204.62 $724,940.00 $18,588.21
Adj for Eng/Insp $ 117,036.20 $ 3,000.93 Adj for Eng/Insp $120,932.74 $3,100.84
Total $ 983,016.20 $25,205.54 $845,872.74 $21,689.04
Sanitary Sewer Lateral (Public) Total Cost/Parcel Water Service (Public) Total Cost/Parcel
$138,600.00 $3,553.85 $140,550.00 $3,603.85
Adj for Eng/Insp $18,731.63 $480.30 Adj for Eng/Insp $23,446.21 $601.18
$157,331.63 $4,034.14 $163,996.21 $4,205.03
Sanitary Sewer Lateral (Private) Total Cost/Parcel Water Service (Private) Total Cost/Parcel
$313,500.00 $8,038.46 $298,500.00 $7,653.85
Adj for Eng/Insp $42,369.17 $1,086.39 Adj for Eng/Insp $49,795.05 $1,276.80
$355,869.17 $9,124.85 $348,295.05 $8,930.64
Tax Owner Assessable Sanitary Lateral Sanitary Lateral Water Service Water Service Sewer Connection Sewer Permit Owner
Parcel Frontage Sanitary Sewer Watermain (Public) (Private) (Public) (Private) Fee Fee Assessment
$25,205.54 /LF $21,689.04 /LF $4,034.14 /EA $9,124.85 /EA $4,205.03 /EA $8,930.64 /EA $9,493.04 /EA (Private)
Assessable Sanitary Lateral Sanitary Lateral Water Service Water Service Sewer Connection Sewer Permit
Frontage Sanitary Sewer Watermain (Public) (Private) (Public) (Private) Fee Fee
TOTALS 4812.09 $983,016.20 $845,872.74 $157,331.63 $355,869.17 $163,996.21 $348,295.05 $370,242.60 $2,535 $3,227,158.60
Notes:
* Draft Preliminary Assessments as presented, are 100% of construction costs and engineering fees, as provided in the preliminary cost estimate for Circlecrest Park Site Subdivision, dated 8/4/2023 and
revised 8/25/2023. This also includes Sewer Connection Fee, as determined with Utility Accountant and Sewer Permit Fee, as determined with Village Building Inspector.
* Assessable frontage was obtained from Waukesha County GIS records. As part of final assessments, these distances will be double checked against that shown on the tax records.
* 5 of the lots in the subdivision are corner lots. The assessable frontage for these lots is the frontage along their address and not the total street frontage (along both streets)
* Sewer Connection Fee is made up of the following: Reserve Capacity Fee ‐ $6,010.00; Retained Capacity Fee ‐ $582.40; Interceptor Capacity Fee ‐ $2,043.00; and Lannon Interceptor Fee Lieds ‐ $858.00
* Sewer Permit Fee is $65 for the first 100' of lateral, from the right of way to the home and $40 for each additional 100'. Most homes checked within Circlecrest were between 40' to 65', so
a fee of $65 was used for everyone in Circlecrest as part of these draft preliminary assessments.
SEWER SERVICE CONNECTION APPLICATION
To be filled out by property owner and returned to the building inspector. A plumbing permit is
to be applied for by the plumber as well as the connection application.
Property Owner Name: ___________________________ Phone # ______________
Property Address: ________________________________________________________
Property Tax Key: ________________________________________________________
Contractors Name: _______________________________________________________
Contractors Address, City & Zip: ____________________________________________
Contractors Email: _____________________________ Phone #_______________
Signature of applicant: _______________________________ Date: ___/___/____
-----------------------------------------------------------------------------------------------------------
Fees:
Reserve Capacity $6,010.00
Retained Capacity $ 582.40
Lisbon/Sussex interceptor $3,856.00
New Area Hookup $2,302.00
Lannon Interceptor $2,043.00
Lannon Interceptor East Extension $ 858.00
Excavation within the right of way
Excavation inspection
Total Fees: ______________
____Paid by check# ______ _____cash
Date paid ___/___/___
Sanitary permit__________ Plumbing permit ___________
Village of Lisbon | W234N8676 Woodside Road, Lisbon WI 53089-1545 | (262)246-6100 | www.LisbonWI.gov
---------- Forwarded message ---------
From: April Gardner <April.Gardner@directsupply.com>
Date: Mon, Aug 14, 2023 at 4:07 PM
Subject: Road Signage Request
To: jdestefano@lisbonwi.gov <jdestefano@lisbonwi.gov>
Cc: April Gardner <April.Gardner@directsupply.com>
Hi Joe,
Per our conversation today, I am putting in a request to add signage for a “Slow Down Autistic Child
Area” sign in our neighborhood subdivision. We live in the Partridge Hills Subdivision on the East Side of
Fox Hollow Drive. We have had more and more drivers going too fast with no cares in the last 6 months
down our road and cul-de-sac. Recently there was an Amazon driver that was going at least 50 down
our road and we needed to go to action quickly as Gavin was at the end of our driveway. We talked
with the driver, and he did not care at all and actually raced off after as well. Normally it is a lot of
turnarounds because they missed a turn to Wrendale, but we do truly think signage could at least stick
out to drivers to slow down earlier. Especially delivery drivers.
Our neighbor down the street also has a grandson that is autistic that does come over frequently and
plays in the yard around the road too. So, it could be helpful in more than one scenario. I would suggest
putting it on the corner of Wrendale and Fox Hollow since that would give some advance warning and
there is signage there already for the street sign.
Again, I would truly like you to consider this request. We have been here almost 11 years and we don’t
plan to move any time soon. We are working on boundaries and safety, but Gavin is non-verbal and a
slow processor, so things don’t come fast paced for learning. We do also have a fence request in with
the state because he elopes so we are doing what we can to help the situation as well.
Our address is N57 W25514 Fox Hollow Dr. Lisbon, WI 53089. If you need anything else from us, please
let me know. I appreciate your help on getting this started and getting the request in.
Thanks,
April
Sign Policies
Stop Signs
It is generally believed that the installation of stop signs at an intersection will
result in a decrease in the number of accidents. The installation of stop signs is a
very effective traffic control device when used under the right conditions. It is
intended to help drivers and pedestrians determine who has the right of way.
However, the installation of unwarranted stop signs can actually be a detriment
to the safe operation of an intersection. Stop signs are installed in compliance
with the Wisconsin Statutes and the Federal Highway Administration Manual on
Uniform Traffic Control Devices.
Warrants for Stop Signs
o An unsignalized intersection in a signalized area.
o Intersection of a less important road with a main road where application of
the normal right of way rule is unduly hazardous.
o Other intersections where a combination of high speed, restricted view and
a serious accident record indicates a need for stop control by a stop sign.
o Streets entering a through highway or street.
Warrants for Multi-way Stop Signs
o An accident problem, as indicated by five or more reported accidents of a
type susceptible of correction by a multi-way stop installation in a 12-month
period. Such accidents include right and left turn collisions as well as right-
angle collisions.
o Minimum traffic volumes must meet the following standards:
o The combined vehicular and pedestrian volume from the minor street
or highway must average at least 200 units per hour for the same
eight hours, with an average delay to minor street vehicular traffic of
at least 30 seconds per vehicle during the maximum hour.
o The total vehicular volume entering the intersection from all
approaches must average at least 500 vehicles per hour for any eight
hours of an average day.
o When the 85-percentile approach speed of the major street traffic
exceeds 40 miles per hour, the minimum vehicular volume warrant is
70% of the above requirements.
o Where traffic signals are warranted and urgently needed, the multi-way stop
is an interim measure that can be installed quickly to control traffic while
arrangements are being made for the signal installation.
All requests for stop sign installation must be made in writing to the Kenosha
County Director of Public Works and are subject to approval by the Kenosha
County Highway and Parks Committee, the Kenosha County Board and the
Kenosha County Executive.
Signs in Highway Right of Way
Wisconsin Statutes prohibit all signs except official traffic signs from being
placed within the right-of-way of any street or highway. Prohibited signs include
but are not limited to advertising, realty, political, rummage sale and directional.
Any prohibited sign found by the Kenosha County Division of Highways will be
removed and disposed of.
MUNICIPALITY OF ANCHORAGE
Traffic Engineering Department
SIGN INSTALLATION POLICY
“Special Needs Children” Signs
Although not as commonly requested as “Children at Play” signs – or variations on that same
message: “Slow Children at Play”, “[running child image] at Play, “Watch for Children”, etc.
signs have been asked for by parents concerned about the safety of their children with vision
or hearing impairments – or, children diagnosed with autism spectrum disorders.
The Federally-adopted Manual on Uniform Traffic Control Devices
(MUTCD) states the following about warning signs:
“The purpose of a warning sign is to provide advance warning to the
road user of unexpected conditions on or adjacent to the roadway that
might not be readily apparent.”
Section 5.01 “Introduction” Manual on Uniform Traffic Control Devices for Streets and
Highways, 2009, Federal Highway Administration
Signs that convey the message “Blind Child Area,” “Deaf Child” or “Autistic Child” are not recognized by the
State of Alaska or the Federal Highway Administration as official traffic control devices – and are no longer
installed on public streets in Anchorage. These signs have been installed in the past in a few locations in the
Municipality of Anchorage; however, the signs that are installed in neighborhoods are being left in place until
they are no longer serviceable (as is permitted by the MUTCD), or we become aware that the family in question
has moved from the neighborhood. At that time, the signs will be removed.
Public agencies across the United States have a variety of policies on these types of signs. Some agencies will do
so upon request since a compelling point can be made that a motorist – in a residential neighborhood – may
not be aware that a special needs child is living in the area – which meets the ‘purpose’ criteria for a warning
sign, as noted above.
Even those advocacy groups for individuals with these issues have mixed opinions on the use of these signs.
Some even object to the notion of defining a child by their disability: “Blind Child” or “Deaf Child” – which is
partly forced by the need to convey a readily-understood message that can fit on a standard-sized street sign.
Mailing Address: P.O. Box 196650 • Anchorage, Alaska 99519-6650 • http://www.muni.org
Policy on Special Needs Children Signs
The need to convey a readily-understood message also does not account for the possibility
that any particular child may have several issues: they may have impaired vision and
impaired hearing, for one example. In addition, not only there is no quantifiable ‘standard’ of
any of these impairments (a child may have very poor vision, but still be able to discern some
objects, another may be able to hear some sound frequencies, but not others), but, some
impairments are progressive – becoming worse, or better, with time and medical care.
Lastly, there is the real issue that the families of these children may move – without notice to the public agency
responsible for the installation, maintenance, and – ultimately – removal of the sign.
Many of the public agencies that will install these signs require the following from the family:
1) A physician’s statement identifying the extent of the disability
2) Concurrence from the parents of their understanding that the sign will be removed when the child
reaches a specified (often, 13 years) age. That may include a sworn statement of the child’s date of
birth.
3) Written acknowledgement from the parents of their understanding that the sign provides no guarantee
of their child’s safety – and that they remain responsible for monitoring their child’s activities.
4) A commitment to notify the public agency – in a timely manner – of any positive changes in their child’s
impairments (for example, cochlear implants, use of hearing aids, etc. for children with hearing
impairments).
5) A commitment to notify the public agency – in a timely manner – of any relocation to another place of
residence.
This requires a commitment of personal information that many parents are unwilling to provide. And, it
requires close tracking from the public agency.
Municipal Policy on “Special Needs Children” Signs:
“Blind Child,” “Deaf Child” or other variations on signage for special needs children are not recognized by the
State of Alaska or the Federal Highway Administration as official traffic control devices, and will not be installed
on those streets over which the Municipal Traffic Engineer has jurisdiction.
There is no evidence that the signs provide any benefit to the safety of children. There is no evidence that the
signs result in any behavioral changes by drivers. Reports from the National Cooperative Highway Research
Program have indicated the “Non-uniform signs….should not be permitted at any time… and the removal of any
non-standard signs should carry a high priority.” In addition, nearly 80 percent of the crashes involving children
resulted from an illegal or unsafe act by the child. In reality, no traffic control device could be expected to
protect a child.
Pediatric trauma physicians have cited the studies, and concur that children – particularly young children –
should actively be discouraged from playing near, or on, streets and that adults have the primary responsibility
for ensuring the safety of their children in/near their homes.
2 SIGN INSTALLATION POLICY – SPECIAL NEEDS CHILDREN | Municipality of Anchorage
Even into their teens, and even without accounting for impairments, children have difficulty judging the
approach speeds of oncoming vehicles. Association of Psychological Sciences, based in London,
http://pss.sagepub.com/content/22/4/429.full.pdf+html, make a finding that “Our study is the first to
demonstrate that the neural mechanisms for detection of looming [on-coming traffic] are not fully developed
until adulthood.”
Addressing the Safety of Young Children:
Unnecessary signs confuse and annoy drivers and foster a disrespect for all signs. Signs used
in accordance with the Federal MUTCD can and should be posted for school zones and
pedestrian crossings, as well as near established playgrounds and other recreational areas,
where a need exists.
The Muni has an active Neighborhood Traffic Calming Program, however, to determine if
motorists are driving at an inappropriate speed, or if there is a significant amount of non-local traffic using the
neighborhood streets. This program can be an effective means of addressing the concerns that parents and
families may have.
Parents have a vital role in providing for their childrens’ safety – and may, in fact, be the most effective means
of addressing safety concerns. They have the ability to teach children that it is not safe to play in/near the
street, and to discourage children from doing so without adult supervision.
Parents, however, should resist the temptation to purchase these signs from on-line sources, however, and
install the signs in or near the public road. Under Alaska State law, it is illegal for anyone other than the
Municipal Traffic Engineer to post signs – whether on public or private property – that attempt to regulate or
control traffic on an abutting public roadway.
Produced by the Traffic Safety Section
Traffic Engineering Department
4700 Elmore Road
Anchorage, Alaska
Municipality of Anchorage | SIGN INSTALLATION POLICY – SPECIAL NEEDS CHILDREN 3
Get email alerts for Lisbon
A daily email when new agendas and minutes are posted.